BetaNYCLaw Reader
Contents
  1. Home
  2. NYC Rules
  3. Title 43
  4. Chapter 14
  5. Part 2 of 2
  6. Schedule B

43 RCNY Schedule B Eligible Services and Activities/Reimbursable Allowance a, b

Activity Unit Reimbursable Allowance for Non-Preferred Community Development Project c Reimbursable Allowance for Preferred Community Development Project d Pre-development Title Insurance/ Title Search full coverage each $765 $1,020 limited coverage each $382.50 $510 non-insured reports each $255 $340 Project Feasibility Study market analysis each $765 $1,020 concept plans each $765 $1,020 pro-forma financial analysis each $765 $1,020 zoning analysis each $765 $1,020 legal due diligence review report $300 $400 State BCP eligibility consultation each $1,000 $1,333 Other Services community outreach each $956.25 $1,275 site survey day $956.25 $1,275 Phase 1 ESA each $1,593.75 $2,125 Environmental Investigation Workplans Phase II/site characterization workplan each $1,275 $1,700 remedial investigation workplan each $1,593.75 $2,125 Phase II (soil) geophysical survey report (GPR contractor) 1/2 day $765 $1,020 geophysical survey report (GPR contractor) day $1,116 $1,488 geophysical anomalies investigation (excavator/operator) day $606 $808 soil boring Installation 1/2 day $637.50 $850 soil boring Installation day $956.25 $1,275 soil sample collection/field screening day $510 $680 Phase II (groundwater) monitoring well installation (unconsolidated) Well $1,593.75 $2,125 monitoring well installation (bedrock) Well $2,550 $3,400 disposal of drill cuttings and transportation drum $79.50 $106 monitoring well survey day $956.25 $1,275 temporary well-point installation each $382.50 $510 groundwater sample collection day $510 $680 disposal of purge water and transportation drum $51 $68 aquifer test each $382.50 $510 Phase II (vapor) vapor probe installation day $956.25 $1,275 vapor sample collection day $510 $680 ambient air sample and collection day $510 $680 Reports Phase II/site characterization report each $1,275 $1,700 remedial investigation report each $1,593.75 $2,125 grant project reporting each $318.75 $425 Lab Analysis Metals (soil/water) Priority Pollutant metals (13 metals) sample $62.25 $83 total RCRA metals (8 metals) sample $39.75 $53 Target Analyte List metals (23 metals) sample $96.75 $129 Organics (soil/water) base neutrals sample $86.25 $115 base neutrals + 10 or 15 sample $96 $128 base neutrals/acid extractables (semivolatile organics) sample $153 $204 BTEX sample $30.75 $41 BTEX + MTBE + TBA sample $30.75 $41 herbicides sample $57.75 $77 PAHs sample $86.25 $115 PCBs sample $38.25 $51 PCBs in oil sample $30.75 $41 pesticides sample $38.25 $51 volatiles sample $51 $68 volatiles + 10 or 15 sample $57.75 $77 volatiles (drinking water) sample $78.75 $105 volatiles (drinking water) + 10 or 15 sample $86.25 $115 target compound list (VO+10, BNAE+20, Pest/PCB) sample $306 $408 Organics (air) TO-15 sample $204 $272 Group Tests ID-27 (TCLP metals, TPH, PCBs, reactive CN & S, Ignitability, pH) sample $156 $208 Priority Pollutants + 40 (VO+15, BNAE+25, pest/PCB, 13 metals, CN, phenol) sample $401.25 $535 RCRA characteristics (reactive CN & S, ignitability, corrosivitv) sample $38.25 $51 TCLP-full (8 metals, VO, BNAE, pesticides, herbicides) sample $381.75 $509

Environmental Remediation Unit Reimbursable Allowance Remedial Action Remedial action: full service e each $85,000 Workplans and Reports remedial action workplan each $5,000 remedial action report each $5,000 remedial investigation report and remedial action work plan: full service f each $30,000 Remedial action report: full service g each $30,000 site management plan each $2,500 grant project reporting each $425 field oversight h half day $400 day $1,000 environmental insurance i premium $25,000/$30,000 Soil Removal disposal - soil, hazardous ton $102 disposal – soil, non-hazardous ton $43 waste characterization: ID-27 (TCLP metals, TPH, PCBs, reactive CN & S, ignitability, PH) sample $208 mobilization / demobilization - one time allowable per site per machine each $425 loader/backhoe w/ operator day $808 small-trackhoe w/ operator (J Deere 200LC or equivalent) day $1,190 large trackhoe w/ operator (Cat 325 or equivalent) day $1,445 skid steer loader w/ operator day $595 dump truck w/ operator (approx. 12 yd. 3) day $340 dump truck, tandem - triaxle w/ operator (25 yd. 3) day $765 rolloff container (20 yd. 3) each $510 vacuum truck w/ operator hr $77 post-excavation soil sample collection day $680 Backfill recycled concrete aggregate ton $13 certified clean fill material ton $17 top soil cy $21 Engineering Controls (cap emplacement) clean fill/gravel ton $17 top soil cy $21 asphalt (2 in. compacted asphalt on 2 in. gravel base) sf $3.80 cement paving (4 in.) sf $4.25 subslab depressurization system passive sf $7.00 subslab depressurization system active sf $8.50 vapor barrier/water proofing (up to 39 mil) sf $5.00 vapor barrier (40 mil and greater) sf $6.00 Institutional Controls deed restriction preparation Each $2,125 Lab Analysis Metals (soil/water) Target Analyte List metals (23 metals) Sample $129 Organics (soil/water) Target Compound List SVOC's Sample $204 PCBs sample $51 Pesticides/herbicides sample $51 Target Compound List VOC's sample $204 target compound list (VO+10, BNAE+20) sample $408 Organics (air) TO-15 sample $272 Group Tests ID-27 (TCLP metals, TPH, PCBs, reactive CN & S, ignitability, pH) sample $208 RCRA characteristics (reactive CN & S, ignitability, corrosivity) sample $51 TCLP-full (8 metals, VO, BNAE, pesticides, herbicides) sample $509 Technical Assistance Grants Professional Services attorney hr $213 architect hr $128 planner, including peer advisory services hr $128 professional engineers hr $128 environmental consultants hr $81 community based organizations hr $81 Brownfield Opportunity Area Local Match Grants For Brownfield Opportunity Area (BOA) Local Match Grants, eligible services and/or activities must be reasonable, relevant, and directly related to the BOA scope of work. In order for these eligible costs to be reimbursed, they must be related to a work plan approved by the New York State Department of State pursuant to an executed State Assistance Contract and be appropriately documented in accord with the BOA Record Keeping and Payment Guide. See the guidance for the BOA Program issued by the New York State Department of State for questions or clarification regarding eligible and ineligible costs. For a Step 1 BOA award and a step 2 BOA award, the total amount of reimbursable expenses may not surpass the grant limit of the lesser of $25,000 or 10% for each Brownfield Opportunity Area Grant award. For Brownfield Opportunity Area Local Match Grants made to a place-based brownfield community planning organization, eligible services and activities must be set forth in the organization's agreement with the Office.

a All listed prices are inclusive of all subcontractor, professional oversight, materials and equipment costs.

b The Grant Allowance amounts presented in Schedule B represent the maximum amounts up to which specified activities may be funded. An eligible service and activity will not necessarily be funded up to that maximum amount.

c Pursuant to 43 RCNY § 43-1423(b)(4), predevelopment and environmental investigation grants, other than for preferred community development projects where the developer is a not-for-profit corporation, are reimbursed subject to the grant payment percentage limit of 75% for eligible costs for approved services and activities.

d This column applies to preferred community development projects where the developer or community based organization is a not-for-profit corporation. Pursuant to 43 RCNY § 43-1423(b)(4), such projects are not subject to the grant payment percentage limit.

e Reimbursement up to $85,000 subject to the project award cap. This payment is intended to cover all remedial action activities. This activity can only be selected for projects that have enrolled in the City's Voluntary Cleanup Program.

f Reimbursement up to $30,000 subject to the project award cap. This payment is intended to cover all remedial investigation activities and all document preparation activities including: a remedial investigation work plan, a Phase I environmental site assessment, a remedial investigation report, sampling, field oversight, mobilization, monitoring, chemical analysis and a remedial action work plan. This activity can only be selected for projects that have enrolled in the City voluntary cleanup program and no other costs for remedial investigation or remedial work plan preparation may be claimed.

g Reimbursement up to $30,000 subject to the project award cap. This payment is intended to cover all remedial action oversight activities and all document preparation activities including: field oversight by staff, daily reports, CAMP monitoring and equipment, HASP monitoring, sample collection, and preparation of a remedial action report. It does not cover construction of remedial systems including engineering controls. This activity can only be selected for projects that have enrolled in the City voluntary cleanup program and no other costs for remedial action oversight or remedial action report preparation may be claimed.

h Reimbursement for field oversight consists of oversight of active remedial work by a qualified environmental professional, CAMP monitoring equipment, HASP monitoring, and the collection of samples. The deliverable is a daily report that identifies the qualified environmental professional.

i Eligible activities consist of the purchase of Pollution Legal Liability, Contractors Pollution Liability and Cleanup Cost Cap Insurance. The total amount of reimbursable expenses may not surpass the grant limits established in Schedule A. Purchase of environmental insurance for a project that subsequently enrolls in the City voluntary

(Amended City Record 5/4/2017, eff. 6/3/2017; amended City Record 3/21/2019, eff. 4/20/2019)