9 RCNY Chapter 3 Methods of Source Selection, part 2 of 2

§ 3-15 to § 3-17: 3 sections.

§ 3-15. Investment Manager Search

Open this section

(a) Policy. Notwithstanding any other provision of this title, the preferred method of procuring investment management services for the assets of the City's Retirement Systems shall be the Investment Manager Search as described in this section. Upon the demonstration of compelling circumstances and in accordance with this section, an alternative procurement method to procure investment manager services may be utilized with the approval of the CCPO.

(b) Content of Notice of Search. Notices of Search shall include the following:

(1) the Retirement Systems participating in the search;

(2) the asset class or classes for which Investment Managers are being sought;

(3) the minimum requirements for eligibility;

(4) the factors upon which Investment Consultant recommendations will be made after application of minimum requirements;

(5) the database(s) to be reviewed for purposes of identifying candidates for further consideration and the date on which review of the database(s) may commence;

(6) information regarding how to participate in the database(s);

(7) a statement that the contract award will be made to the responsible Investment Manager(s) whose product is determined to be the most advantageous to the Retirement System, taking into consideration the price and such other factors or criteria that are set forth in the Notice of Search;

(8) the specific criteria and relative weight of each criterion or category of criteria that will be used by the Evaluation Committee to evaluate Investment Managers; and

(9) a statement of how price will be evaluated.

(c) Evaluation Process.

(1) Consultant Review. The respective Investment Consultant(s) for each participating Retirement System shall independently review information posted in the databases identified in the Notice of Search, and provide a written report that identifies the Investment Managers that meet the minimum requirements set forth in the Notice of Search. The Investment Consultants shall provide to the Evaluation Committee a report confirming databases searched and a list of Investment Managers that meet the minimum requirements.

(i) Investment Managers meeting the minimum requirements shall be further analyzed by each participating Investment Consultant based on quantitative and qualitative factors used for institutional investment management services searches. Such factors shall include, but are not limited to, investment philosophy, strategy and process; organizational stability, expertise and expertise of staff; regulatory history as well as analysis of customary and appropriate historic and comparative investment portfolio performance metrics; and such other factors consistent with industry standards for institutional investment management services and the Retirement System's investment policies and guidelines.

(ii) Following the analysis in subparagraph (i) of this paragraph, each Investment Consultant shall provide a written report describing the basis for its recommendations of qualified Investment Managers for further consideration by the evaluation committee.

(2) Evaluation Committee. An evaluation committee consisting of no fewer than three persons with knowledge, expertise, and experience sufficient to make a fair and reasonable evaluation shall be established. The ACCO shall require each member of the evaluation committee to submit a signed statement, in a format approved by the CCPO, agreeing to prohibitions on any conflicts of interest. The evaluation committee may include outside evaluators pursuant to 9 RCNY § 3-03(g)(1)(b).

(3) Shortlist of Investment Managers.

(i) The evaluation committee shall establish a Shortlist of qualified Investment Managers for further review comprised of the Investment Managers that received multiple recommendations from the Investment Consultants.

(ii) The ACCO shall contact each Investment Manager on the Shortlist and request written conformation that he or she is interested in being considered for a contract award. Any Investment Manager who does not provide written confirmation within the time period established by the ACCO, such period not to be less than ten days, shall be removed from the Shortlist.

(4) Evaluation Committee Review. The evaluation committee shall then evaluate the Shortlist of Investment Managers in accordance with the evaluation criteria set forth in the Notice of Search. The evaluation committee may require Investment Managers on the Shortlist of Investment Managers to submit information and documentation consistent with the evaluation criteria in the Notice of Search. The Evaluation Committee will review the recommendations of the Investment Consultants and work with each Investment Consultant to obtain information and documentation necessary to optimize the portfolio recommendations for the respective Board of Trustees.

(i) Rating Sheets. Ratings sheets or other written evaluation forms shall be used to evaluate Investment Managers and each evaluator shall sign and date his or her rating sheet. Initial ratings may be amended and the amended ratings recorded on amended rating sheets. Copies of all initial and amended rating sheets or evaluation forms shall be maintained.

(ii) The Evaluation Committee shall, based on its ratings, refine the Shortlist to create a Finalist List from which to solicit written proposals. Such written proposals shall include, at a minimum, a proposed investment strategy, process, and guidelines; a proposed staffing structure including key personnel; and a price proposal.

(iii) Discussions with Investment Managers. The evaluation committee may elect to enter into discussions with those Investment Managers as part of the evaluation process either before or after proposals are solicited and/or for the purpose of arriving at a contract that will be most advantageous to the Retirement System(s), taking into consideration price and the other evaluation factors set forth in the Notice of Search.

(iv) Conduct of Discussions.

(A) Investment Managers shall be accorded fair treatment with respect to any opportunity for discussions and clarifications of information.

(B) Working with the Evaluation Committee and Investment Consultants, the ACCO shall provide the Investment Manager with customized agendas and schedule for conducting discussions.

(C) Auction techniques (revealing one Investment Manager's price to another) and disclosure of any information derived from competing proposals are prohibited.

(D) Any oral clarification of a proposal shall be confirmed in writing by the Investment Manager.

(v) Best and Final Offers. Best and final offers are the revised and corrected final offers submitted by Investment Managers after discussions, if any, have been held. The ACCO shall establish a common date and time for the submission of best and final offers. Best and final offers shall be submitted only once unless the ACCO makes a determination that it is in the Retirement System's best interest to conduct additional discussions and/or require another submission of best and final offers. All best and final offers shall be handled in accordance with the control procedures contained in 9 RCNY § 3-03(f)(9). Best and final offers shall be evaluated in accordance with this subdivision and the Notice of Search.

(vi) Report to Board of Trustees. The Evaluation Committee, in consultation with the Investment Consultants, shall provide the Board of Trustees of the participating Retirement System(s) or its delegee with a written report summarizing the evaluation of all firms on the Shortlist of Investment Managers and at least two optimized portfolio recommendations prior to the Board of Trustees making a determination on the award of contract(s).

(5) Investment Manager Selection. Contract award(s), if any, must be made to the responsible proposer whose proposal is determined to be the most advantageous to the Retirement System(s), taking into consideration the price and such other factors or criteria that are set forth in the Notice of Search. In evaluating Investment Managers, only price, portfolio optimization and the criteria set forth in the Notice of Search may be considered. In considering price, methods such as ranking the Investment Managers on the Shortlist of Investment Managers by price, evaluating price per technical point, or evaluating Investment Managers on the Shortlist of Investment Managers in accordance with another combination of price and technical merit may be used. Such methods may result in selection of the highest technically rated Investment Manager over another technically qualified Investment Manager who offered a lower fee as a result of factors including, but not limited to, the selected Investment Managers' philosophy, strategy and process; stability and expertise of staff; regulatory history; and analysis of customary and appropriate historic and comparative investment portfolio metrics.

(6) Documentation of Award. The ACCO shall make a determination showing the basis on which the contract award was made to the responsible Investment Manager whose product was determined to be the most advantageous to the Retirement System(s), taking into consideration the price and such other factors or criteria that are set forth in the Notice of Search. This determination shall be included in a Recommendation for Award. Each Recommendation for Award shall include at a minimum the following information:

(i) justification of the award;

(ii) if the award is for services for which there is price history, a price comparison of the proposed price versus previous price, if applicable, with the rationale for any increases supported by cost/price analysis data;

(iii) reasons for multiple awards;

(iv) any special terms and conditions included in the proposed contract via the use of cost/price analysis techniques;

(v) affirmative finding of responsibility for the selected Investment Manager(s); and

(vi) efforts to negotiate better value. Upon determination of the most favorable product(s) and after obtaining all required approvals, the Contracting Officer shall award the contract to that Investment Manager.

(d) Public Notice.

(1) Notices of Search. Notice of Notices of Search above the small purchase limits shall be published once in the City Record not less than twenty days before Investment Manager information is required to be entered into a database. Such notice shall include:

(i) Retirement System(s) names;

(ii) PIN;

(iii) title and/or brief description of the investment services being sought;

(iv) how interested investment managers may provide data to be included in identified databases, including date and time by which such data shall be submitted; and

(v) required minimum qualifications or eligibility requirements, if any.

(2) Simultaneous to their publication as required by paragraph one of this subdivision, Notices of Search shall be posted on the City's website in a location that is accessible to the public. Notices of Search shall also be furnished to each participating Investment Consultant. Notices of Search shall be made available electronically.

(3) Notice of Manager Selection.

(i) Frequency. Notice of Investment Manager selection exceeding the small purchase limits shall be published once in the City Record within fifteen days after registration of the contract.

(ii) Content. Such notice shall include:

(A) Retirement System name;

(B) PIN;

(C) title and/or brief description of the services procured;

(D) name and address of the Investment Manager;

(E) dollar value of the contract; and

(F) procurement method by which the contract was let.

§ 3-16. HHS Accelerator

Open this section

(a) Policy.

(1) Client services contracts must be procured through HHS Accelerator unless the HHS Accelerator Director authorizes, with the approval of the CCPO, the use of a different procurement method. Notwithstanding the above, the authorization of the HHS Accelerator Director is not required for procurements pursuant to 9 RCNY § 1-02(d); 9 RCNY § 1-02(e); 9 RCNY § 3-04(b)(2)(iii); 9 RCNY § 3-05; 9 RCNY § 3-06; 9 RCNY § 3-08; 9 RCNY § 3-09; and 9 RCNY § 3-13.

(2) The HHS Accelerator Director prequalifies vendors by evaluating their qualifications to provide client services (including subcategories of specific client services). When procuring client services pursuant to this Section, an agency must issue a solicitation for a specific contract to HHS Accelerator prequalified vendors in accordance with the provisions of this Section. The ACCO may permit joint ventures of two or more prequalified vendors. A procurement using HHS Accelerator is considered a "special case" under these Rules without the requirement for a further determination.

(b) Criteria. In developing the HHS Accelerator PQL, the HHS Accelerator Director may use any of the criteria listed in this subsection. Criteria that may be used to prequalify vendors for HHS Accelerator include, but are not limited to:

(1) current and past experience with similar projects;

(2) references, past performance, and reliability;

(3) organization, number of staff, staff abilities and experience, and the organization's ability to undertake the type and complexity of work;

(4) financial capability, responsibility and reliability for such type and complexity of work, and availability of appropriate resources;

(5) compliance with all federal, state, and local laws, rules, licensing requirements, where applicable, and executive orders, including but not limited to compliance with existing labor standards;

(6) compliance with equal employment opportunity requirements and anti-discrimination laws;

(7) business integrity of vendor.

(c) Public Notice of HHS Accelerator PQL.

(1) Frequency. The HHS Accelerator Director must publish at least once annually in the City Record, a notice or notices specifically identifying client services categories covered by HHS Accelerator and inviting vendors to apply for inclusion on the HHS Accelerator PQL. The same documents published in the City Record must be posted continuously and prominently on the City’s website. The City’s website shall also include the criteria used to prequalify vendors. The application to be included on the HHS Accelerator PQL must always be available.

(2) Content. The notice must include contact information for the HHS Accelerator Office, the procurement category, and information on how the vendor may obtain an application.

(d) Prequalification Questionnaire. A vendor must complete and submit a prequalification questionnaire developed by the HHS Accelerator Director in consultation with the CCPO. After prequalification, a vendor may update information contained in HHS Accelerator as needed. At least once every three years, and when submitting any bid or proposal in response to a solicitation from the HHS Accelerator PQL, vendors must affirm that there has been no change in the information included in the prequalification questionnaire, or if there have been changes, provide the changed information.

(e) Making the Prequalification Decision. Prequalification questionnaires will be reviewed by the HHS Accelerator Director and other personnel with knowledge, expertise, and experience sufficient to make a fair and reasonable determination, as appropriate. The HHS Accelerator Director must approve or deny prequalification within ninety days from the date of submission of a properly completed prequalification questionnaire.

(f) Denial or Revocation of Prequalification.

(1) Any vendor whose qualifications fail to meet the criteria established by the HHS Accelerator Director will be denied prequalification. The prequalified status of a vendor may be revoked at any time based on changed circumstance, conditions, or status of the vendor or its staff, or additional information acquired by the HHS Accelerator Director, or further analysis of the information upon which the original prequalification determination was made where the new information or further analysis indicates that the vendor does not meet the established criteria for prequalification.

(2) The HHS Accelerator Director must notify the vendor in writing of a denial or revocation of prequalification, stating the reasons for the determination and informing the vendor of the right to appeal. The notification must also include the following statement:

The vendor must also send a copy of its appeal to the New York City Comptroller, for informational purposes, at the Office of the New York City Comptroller, Bureau of Contract Administration, 1 Centre Street, Room 727, New York, NY 10007, (212) 669-2323.

A copy of the HHS Accelerator Director's determination must also be sent to the CCPO for inclusion in the VENDEX database and to the Comptroller's Office.

(3) HHS Accelerator PQLs must be reviewed at least once every three years to ensure that firms that no longer meet prequalification criteria are not retained on the list.

(g) Appeal of Denial or Revocation of Prequalification.

(1) Time Limit. A vendor shall have fifteen days from receipt of the determination to file a written appeal of that determination with the HHS Accelerator Director. Receipt of notice by the vendor will be deemed to be no later than five days from the date of mailing, or upon delivery if delivered using a system that provides proof of the date of delivery. Filing of the appeal must be accomplished by actual delivery of the hard copy appeal document to the office of the HHS Accelerator Director using a system that provides proof of the date of delivery.

(2) Form and Content. The appeal must be in writing and must briefly state all of the facts or other basis upon which the vendor contests the HHS Accelerator Director's determination. Supporting documentation, if any, must be included.

(3) Determination. The HHS Accelerator Director must consider the appeal, and must make a prompt written decision with respect to its merits. The HHS Accelerator Director may in his/her sole discretion convene an informal conference with the vendor to resolve the issue by mutual consent prior to making a determination.

(4) Notification. A copy of the decision of the HHS Accelerator Director must be sent to the vendor, stating the reasons for the decision and informing the vendor of the right to appeal. A copy of the determination must be sent to the Comptroller's Office and to the CCPO to modify the VENDEX database.

(5) Appeal to OATH. The decision of the HHS Accelerator Director shall be final unless appealed to OATH. If a vendor wishes to contest the HHS Accelerator Director's decision, it may appeal to OATH, which shall hear and take final action in the matter in accordance with its rules. The petition to OATH shall be filed by the vendor within fifteen days of the date of the decision. Supporting documentation, if any, shall be included. The vendor shall, at the same time, send a copy of its appeal to the HHS Accelerator Director, CCPO, and Comptroller's Office. The HHS Accelerator Director shall forward a copy of all appeal-related documents within fourteen days of its receipt of the copy of the vendor's appeal to OATH. During the pendency of the appeal, an Agency may proceed with the solicitation. OATH shall review the decision and determine whether that decision is arbitrary or capricious and whether it is based on substantial evidence. Copies of OATH's determination shall be sent to the vendor, HHS Accelerator Director, Comptroller's Office, and, where the decision results in the revocation of prequalification, to the CCPO for any modifications to the VENDEX database.

(h) Prequalification Not a Finding of Responsibility. That a vendor has been prequalified does not imply a finding of responsibility for a particular procurement. Between the time of receipt of proposals or bid opening and contract award, the ACCO may determine that a prequalified vendor is not responsible for a particular procurement pursuant to 9 RCNY § 2-08. If the ACCO makes such determination, in addition to the requirements of 9 RCNY § 2-08, he or she must also notify the HHS Accelerator Director, who will then determine whether a vendor should be removed from the PQL.

(i) Solicitation from HHS Accelerator PQL. The solicitation of bids or proposals through HHS Accelerator is limited to vendors on the HHS Accelerator PQL who are prequalified in the specific category(ies) of client services being solicited. The solicitation of bids or proposals through HHS Accelerator must be publicly advertised to provide notice to vendors of the solicitation and an opportunity to apply for prequalification in order to submit a proposal.

(j) Requirement for a Concept Report for a New Client Services Program. At least 45 days prior to issuing a Client Services Requests for Proposals ("CS-RFP") for a new client services program, the agency must publicly release a concept report regarding such CS-RFP.

(1) For the purposes of this section, the term "new client services program" means any program that differs substantially in scope from an agency's current contractual client services programs, including, but not limited to, substantial differences in the number or types of clients, geographic areas, evaluation criteria, service design, or price maximums or ranges per participant, if applicable.

(2) For the purposes of this section, the term "concept report" means a document outlining the basic requirements of an RFP for client services contracts and includes, but is not limited to, the following information:

(i) purpose of the CS-RFP;

(ii) planned method of evaluating proposals;

(iii) proposed term of the contract(s);

(iv) procurement timeline, including, but not limited to, the expected start date for the new contract(s), expected CS-RFP issuance date, approximate proposal submission deadline and expected award announcement date;

(v) funding information, including but not limited to, total funding available for the CS-RFP and sources of funding, anticipated number of contracts to be awarded, average funding level of contracts, anticipated funding minimums, maximums or ranges per participant, if applicable, and funding match requirements, if any;

(vi) program information, including, but not limited to, as applicable, proposed model or program parameters, site, service hours, participant population(s) to be served and participant minimums and/or maximums; and

(vii) proposed vendor performance reporting requirements.

(3) Notwithstanding the issuance of a concept report, the agency may change the above-required information at any time after the issuance of such concept report.

(4) Prior to release of the concept report, the agency must publish a notification of its release in five consecutive editions of the City Record and electronically on the City's website in a location that is accessible to the public.

(5) Upon release, the concept report must be posted electronically on the City's website in a location that is accessible to the public.

(6) Non-compliance with this section shall not be grounds to invalidate a contract.

(k) CS-RFP Contents. CS-RFPs must include the following data:

(1) statement that the contract award will be made only to vendors that are prequalified through HHS Accelerator at the time that proposals are due;

(2) statement that the contract award will be made to the responsible proposer whose proposal is determined to be the most advantageous to the City, taking into consideration the price and such other criteria that are set forth in the RFP;

(3) statement of work or scope of services statement, performance requirements, and any special instructions;

(4) the specific criteria and the relative weight of each criterion or category of criteria that will be used to evaluate the proposals;

(5) statement of how price will be evaluated. In addition, the following statements regarding price must be included:

(i) a notice that prices shall be irrevocable until contract award, unless the proposal is withdrawn, and that offers may be withdrawn only after the expiration of ninety days (or such longer period as is specified in the solicitation) after opening of proposals, in writing received by the agency prior to award;

(ii) if applicable, request for cost breakdown of the proposed price;

(6) proposal submission requirements including requirements, if any, for the electronic submission of proposals, including through the use of documents contained in the HHS Accelerator document repository; if applicable, that technical and price proposals must be submitted in separate sealed envelopes (paper) or attachments (electronic); and the time and date after which proposals will not be accepted as well as the location of proposal submission;

(7) other information such as delivery dates or time frames within which the work must be completed. Where it is anticipated that a contract will extend beyond one year, the following information must be included in any solicitation, in addition to any other requirements of these Rules:

(i) a statement of intent to award a multi-term contract, and an estimate of the quantity of services required for the proposed contract period;

(ii) a request for a proposal of a total price which shall be binding in the first year and may be negotiable from year to year thereafter;

(iii) that the multi-term contract is subject to modification or cancellation if adequate funds are not appropriated to the agency to support continuation of performance in any fiscal year succeeding the first;

(iv) that the multi-term contract is subject to modification or cancellation if the vendor's performance is not satisfactory;

(v) that the Contracting Officer must notify the vendor as soon as is practicable that the funds are, or are not, available for the continuation of the multi-term contract for each succeeding fiscal year;

(vi) whether proposers must submit prices for the first year, for the entire period of performance, or for some portion of the period; and

(vii) a statement setting forth those costs, if any, for which the vendor will be reimbursed in the event of cancellation;

(8) general as well as special terms and conditions, if applicable;

(9) a notice of the proposer's rights to appeal certain decisions;

(10) a notice of the City's prompt payment policy, including an explanation of the requirements for invoicing;

(11) a requirement for acknowledgment of amendments;

(12) if applicable, a request for a description of experience in the line of work being considered (including references);

(13) if applicable and necessary in the judgment of the Contracting Officer, a request for description of staff capability along with the resumes of key individuals who will work on the contract;

(14) a notice that although discussions may be conducted with offerors submitting acceptable proposals, award may be made without any discussions;

(15) if applicable, a provision on the submission and consideration of multiple or alternate proposals;

(16) a provision that proposers should clearly identify those portions of their proposals that they deem to be confidential, proprietary information or trade secrets and provide any justification why such materials, upon request, should not be disclosed by the City. Such information must be easily separable from the non-confidential sections of the proposals;

(17) a notice that contract award is subject to the provisions of the MacBride Principles Law;

(18) a notice that contract award is subject to applicable provisions of federal, state, and other local laws and executive orders requiring affirmative action and equal employment opportunity;

(19) if applicable, a notice that contract award is subject to completion of a VENDEX questionnaire and review of that information by the Department of Investigation;

(20) where applicable, all information required pursuant to Section 312(a) of the Charter;

(21) the following statement: The New York City Comptroller is charged with the audit of contracts in New York City. Any vendor who believes that there has been unfairness, favoritism, or impropriety in the proposal process should inform the Comptroller, Bureau of Contract Administration, 1 Centre Street, Room 727, New York, NY 10007; telephone number (212) 669-2323; and

(22) name, address, and telephone number of contact person; and

(23) if applicable, information regarding multiple award task order contracts for services.

(l) "Open ended" CS -RFPs. For a client services program in which there is available funding for more than the available responsible vendor, and for which the requirements and qualifications are unusually complex and difficult to predict (such as Uniform Land Use Review Procedures approvals of appropriate sites, licenses, etc.) and for which interested potential vendors may become qualified during the course of a year, the ACCO may designate the applicable RFP as an "open -ended RFP." If an RFP is so designated, the agency must publish quarterly in the City Record a notice of solicitation, clearly stating that the RFP may be obtained at any time and that proposals may be submitted in response to the RFP on an on-going basis. When an agency decides to terminate the open-ended RFP, it must publish the termination in the City Record.

(m) Proposal Preparation Time and Form.

(1) Vendors must be given a reasonable time to prepare their proposals, and this time must never be less than ten days. How proposals are to be submitted, including any required forms, must be included in the RFP.

(2) The ACCO is responsible for ensuring that an extract or copy of the scope of work is available for public inspection upon request at the agency issuing the solicitation and that the notice of the solicitation includes a description of the proposed service area and the name and telephone number of an agency individual who can be contacted to provide a copy of the extract or the scope of work.

(n) Public notice.

(1) Notice of solicitation. When RFPs, notices of their availability or notices of solicitation are published, they must also be simultaneously posted on the City's website in a location that is accessible to the public. An agency may, upon a vendor's request, provide RFPs or notices electronically. Notices of solicitation and copies of the CS-RFP must be delivered electronically at least twenty days prior to the due date to all vendors prequalified through HHS Accelerator for the applicable category(ies), unless a selective solicitation is being utilized pursuant 9 RCNY § 3-16(j). Vendors must respond to the solicitation electronically via the HHS Accelerator System.

(2) Notice of Vendor Selection.

(i) Frequency. Notice of vendor selection exceeding the small purchase limits must be published once in the City Record within fifteen days after registration of the contract.

(ii) Content. Such notice must include:

(A) agency name;

(B) PIN;

(C) title and/or brief description of the goods, services, or construction to be procured;

(D) name and address of the vendor;

(E) dollar value of the contract; and

(F) procurement method by which the contract was let.

(o) CS-RFP Handling Procedures.

(1) Pre-Proposal or Pre-Solicitation Conferences. Pre-proposal or pre- solicitation conferences may be conducted as set forth in 9 RCNY § 3-02.

(2) Amendments to CS-RFPs. Amendments to CS-RFPs may be made as set forth in 9 RCNY § 3-02 and will be issued by the Agency through HHS Accelerator.

(3) Modification or Withdrawal of Proposals. Proposals may be modified or withdrawn prior to the established due date as set forth in 9 RCNY § 3-02. The established due date is either the time and date announced for receipt of proposals or receipt of modifications to proposals, if any, or if discussions have begun, the time and date by which best and final offers must be submitted.

(4) Late Proposals and Modifications. Any proposal or modification received after the established due date and time at the place designated for receipt is late and may be accepted only as set forth in paragraphs (5) through (8) below.

(5) Handling and Acceptance of Late Proposals. A late proposal may only be accepted if the ACCO determines that it is in the best interest of the City to do so. In such event, the ACCO may hold open the receipt of proposals by no more than three hours, during which time no other competing proposal may be opened. The ACCO may, upon written approval by the CCPO, hold open the receipt of proposals by longer than three hours, but until no later than the original submission time on the next business day; such approval may be given by the CCPO only where the need for holding the receipt of proposals open for a longer time arises from generally applicable emergency circumstances, such as weather or transit emergencies. No late proposals can be accepted if any proposals have been opened. Where an ACCO has determined that it is in the best interest of the City to accept a late proposal, any other late proposal received during the period of extension must also be accepted.

(6) Documentation of Late Proposals. The ACCO must, within one business day of accepting late proposals, document the reasons that it is in the best interest of the City to approve the extension, indicate the length of time extended, list the name of any vendor(s) submitting a proposal received during the extension period established pursuant to paragraph (5) above, and include an affirmative statement that no proposals were opened before the late proposal was accepted and that any other late proposal received during the period of extension was also accepted.

(7) Late Modifications. A late modification of an accepted proposal that makes its terms more favorable to the City must be considered at any time it is received and, if accepted by the ACCO, must be so documented in the Recommendation for Award.

(8) Record. A record must be made of each request for acceptance of a late proposal or modification. A late proposal or modification that is not accepted by the ACCO must not be opened until after registration of the contract.

(9) Receipt and Registration of Proposals. The identity of an offeror shall not be disclosed prior to the established date and time for receipt of proposals. Proposals shall not be opened publicly. Proposals and modifications shall be time and date-stamped upon receipt and held in a secure place until the established due date and time. After the date and time established for the receipt of proposals, a Register of Proposals including shall be prepared and available for public inspection after award of a contract.

(p) Evaluation Process. Award, if any, must be made to the responsible proposer whose proposal is determined to be the most advantageous to the City, taking into consideration the price and such other factors or criteria that are set forth in the RFP. In evaluating the proposals, the agency may consider only price and the criteria set forth in the RFP. In considering price, the agency may use methods such as ranking technically viable proposals by price, evaluating price per technical point, or evaluating proposals in accordance with another combination of price and technical merit. Such methods may result in the agency selecting the highest technically rated proposer over another technically qualified proposer who offered a lower fee as a result of factors including, but not limited to, the selected vendor 's superior technical skill and expertise, increased likelihood of timely completion, and/or ability to manage several projects simultaneously with lower overall costs to the City, including costs in City personnel time and consultants.

(1) Evaluation Committee. Proposals must be reviewed by an evaluation committee of no fewer than three persons with knowledge, expertise, and experience sufficient to make a fair and reasonable evaluation. If an RFP incorporates multiple competitions, each competition may be evaluated by a separate committee. Each member of the evaluation committee(s) must submit a signed statement to the ACCO, in a format approved by the CCPO, agreeing to prohibitions on any conflicts of interest.

(a) Randomized evaluation process. If the HHS Accelerator Director determines that the expected number of proposals will be large enough to make it infeasible for each member of the evaluation committee to read each proposal, the ACCO may, subject to the approval of the HHS Accelerator Director, establish a pool of appropriate evaluators and then randomly assign each proposal to at least three such evaluators for review.

(b) Outside Evaluators. The evaluation committee may include persons not employed by the agency. In addition, the ACCO may determine, subject to the approval of the HHS Accelerator Director, that it is in the best interests of the City for the evaluation committee to include persons who are not employees of the City of New York, provided that such non-City employees may not constitute a majority of the evaluation committee. Such persons must serve without compensation, but may be entitled to travel and other related expenses as may be reasonably incurred in their role as an evaluator.

(2) Rating Sheets. Ratings sheets or other written evaluation forms must be used by the evaluators to evaluate proposals. Each evaluator must sign and date his or her rating sheet. Initial ratings may be amended and the amended ratings recorded on amended ratings sheets. Copies of all initial and amended rating sheets or evaluation forms must be maintained.

(3) Proposal Discussions with Individual Offerors. The evaluation committee must evaluate all proposals and may elect to enter into discussions with those offerors whose proposals are acceptable or are reasonably likely to be made acceptable. Discussions with offerors may be for any or all of the following purposes:

(i) to promote understanding of the City's requirements and the vendors' proposals and capabilities;

(ii) to obtain the best price for the City; or

(iii) to award a contract that will be most advantageous to the City taking into consideration price and the other evaluation criteria in the RFP.

(4) Conduct of Discussions.

(i) Proposers shall be accorded fair treatment with respect to any opportunity for discussions and revisions of proposals.

(ii) The ACCO must set an agenda and schedule for conducting discussions.

(iii) If there is a need for any substantial clarification of, or change in, the RFP, the RFP must be amended to incorporate such clarification or change and the amended RFP must be provided to all proposers.

(iv) Auction techniques (revealing one proposer's price to another) and disclosure of any information derived from competing proposals are prohibited.

(v) Any oral clarification of a proposal must be confirmed in writing by the proposer.

(5) Best and Final Offers. Best and final offers are the revised and corrected final proposals submitted by proposers after discussions, if any, have been held by the agency.

(i) The ACCO must establish a common date and time for the submission of best and final offers.

(ii) Best and final offers may be submitted only once unless the ACCO makes a determination that it is in the City's best interest to conduct additional discussions and/or require another submission of best and final offers.

(iii) Proposers must be informed that if they do not submit a notice of withdrawal or another best and final offer, their immediate previous offer will be construed as their best and final offer.

(iv) All best and final offers must be recorded on the Register of Proposals and handled in accordance with the control procedures contained in this Section.

(v) The ACCO may request best and final offers on the whole proposal or on any one or combination of its component parts (e.g., price, technical qualifications, approach, and/or capability). The request must be the same for all proposers.

(vi) Best and final offers must be evaluated in accordance with 9 RCNY § 3-16(q).

(q) Mistakes in Proposals.

(1) Confirmation of Proposal. When the ACCO knows or has reason to conclude before award that a mistake has been made by the proposer, he or she must request the proposer to confirm the proposal. If the proposer alleges there is a mistake in the proposal, the proposal may be corrected or withdrawn during any discussions that are held or if the conditions set forth in this subdivision are met.

(2) Mistakes Discovered After Receipt of Proposals but Before Vendor Selection.

(i) During Discussions Prior to Best and Final Offers. Once discussions are commenced with any proposer or after best and final offers are requested, any offeror may correct any mistake by modifying or withdrawing the proposal until the time and date set for receipt of best and final offers.

(ii) Minor Informalities. Minor informalities, unless otherwise corrected by an offeror, must be treated in accordance with 9 RCNY § 3-02(m)(3)(i).

(iii) Correction of Mistakes. If discussions are not held or if the best and final offers upon which award will be made have been received, mistakes may be corrected and the intended correct offer considered only in accordance with 9 RCNY § 3-02(m)(3)(ii).

(3) Mistakes Discovered After Vendor Selection. Mistakes may not be corrected after vendor selection except in accordance with 9 RCNY § 3-02(m)(4).

(4) Determinations Required. When a proposal is corrected or withdrawn, or correction or withdrawal is denied, a determination must be prepared in accordance with 9 RCNY § 3-02(m)(5).

(r) Vendor Selection and Documentation. The ACCO must make a determination showing the basis on which the contract award was made to the responsible proposer whose proposal was determined to be the most advantageous to the City, taking into consideration the price and other criteria in the RFP. This determination must be included in a Recommendation for Award. Each Recommendation for Award must include at a minimum the following information:

(1) justification of the award;

(2) if the award is for client services for which there is agency price history, a price comparison of the proposed price versus previous price, with reasons for any increases as supported by a cost/price analysis;

(3) reasons for multiple award contracts;

(4) any special terms and conditions included in the proposed contract that were derived from a cost/price analysis;

(5) affirmative finding of responsibility for the selected proposer(s); and

(6) efforts to negotiate better value. Upon determination of the most favorable proposal and after obtaining all required approvals, the Contracting Officer shall award the contract to that proposer.

(Amended City Record 1/29/2016, eff. 3/1/2016; amended City Record 12/15/2023, eff. 1/14/2024)

§ 3-17. Design-Build Services

Open this section

(a) Design-Build Services Procurement.

(1) Application. Proposals for design-build contracts shall only be solicited as authorized pursuant to Chapter 749 of the laws of 2019, as amended, or any other provision of law authorizing the use of Design-Build Services. Such procurements shall follow a two-step process: 1) RFQ; and 2) RFP.

(2) Step 1: RFQ.

(i) The RFQ is used to initiate a competitive selection for SOQs to establish a shortlist of the most highly qualified proposers.

(ii) The RFQ shall include:

(A) a general description of the public work project, including but not limited to program goals, utility relocations, professional licensing requirements, project description and Design-Builder responsibilities, funding sources, list of stakeholders, anticipated project duration, contract type, payment structure, costs, and any special instructions, and, if applicable, a notice that the agency may issue one or more RFPs as a result of the RFQ and a potential list and description of work for each RFP;

(B) the maximum number of proposers to be included on the shortlist;

(C) general instructions including, but not limited to, rules of communications between proposers, rules of contact between vendors, and the process for questions or clarifications regarding the RFQ;

(D) an overview of the procurement process including but not limited to the purpose of the RFQ and RFP and the procurement schedule;

(E) the selection criteria to be used to evaluate the vendors, including any mandatory selection criteria set forth in the applicable state law and the relative weight of each criterion used to evaluate the vendors and generate the shortlist including but not limited to:

((i)) the qualifications and experience of the Design-Builder, including entities comprising the Design-Builder’s team;

((ii)) Design-Builder organization;

((iii)) demonstrated responsibility;

((iv)) ability of the Design-Builder to comply with applicable requirements, including the provisions of articles 145, 147 and 148 of the New York State Education Law;

((v)) past record of compliance with the New York State Labor Law;

((vi)) experience with M/WBEs or State-certified M/WBEs and the M/WBE program, and the vendor’s anticipated approach to meet M/WBE goals or, if applicable, experience with DBEs and the DBE program and the Design-Builder’s anticipated approach to meet DBE goals; and

((vii)) any other qualifications the agency deems appropriate, which may include, but is not limited to, understanding, financial capability, and record of past performance and experience.

(F) SOQ evaluation process, including but not limited to, the evaluation objectives, evaluation factors, and requests for clarification process;

(G) SOQ submission requirements including requirements, if any, for the electronic submission of SOQs, if applicable, and including but not limited to submission address, content requirements including fundamental qualifications, past performance and experience on projects, Design-Builder organization, management approach, description of experience in the line of work being considered including references, and known and potential conflicts of interest;

(H) notice of vendor right to protest and file complaints on certain enumerated decisions;

(I) agency rights and disclaimers;

(J) notice of participation by M/WBEs and State-certified M/WBEs in City procurement, including but not limited to M/WBE policy, M/WBE goals, a notice that contract award shall comply with the objectives and goals of § 6-129 of the New York City Administrative Code (M/WBE and EBE Program) or article 15-A of the executive law, as well as to applicable provisions of federal, State, and other local laws, and executive orders;

(K) a requirement for acknowledgment of amendments;

(L) requirements of compliance with applicable laws;

(M) general, as well as special terms and conditions, if applicable;

(N) a provision that proposers should give specific attention to the identification of those portions of their SOQs that they deem to be confidential, proprietary information or trade secrets and provide any justification why such materials, upon request, should not be disclosed by the City. Such information must be easily separable from the non-confidential sections of the SOQs;

(O) if applicable, a notice that selection for the shortlist is subject to completion of a PASSPort questionnaire and review of that information by the Department of Investigation;

(P) if applicable, information regarding a stipend for unsuccessful qualified, responsive and responsible proposers who are selected for the shortlist and who comply with the relevant stipend criteria and requirements defined in the subsequent RFP and the anticipated stipend amount; and

(Q) any other information as determined by the ACCO.

(iii) The RFQ shall be publicly advertised on the City’s website at least twenty-seven days prior to the due date for SOQs.

(iv) Evaluation Process. The agency shall evaluate and rate all vendors’ SOQs based on the selection criteria and evaluation factors set forth in the RFQ. Based upon the results of the evaluation and the ranking of the vendors based on such ratings, the agency shall select the responsive, responsible vendors for the shortlist that shall receive an RFP pursuant to 9 RCNY § 3-17(a)(3).

(v) The ACCO may, upon written approval by the CCPO, issue one RFQ that may result in multiple RFPs upon determination by the ACCO that it is in the best interest of the City to award multiple contracts to multiple Design-Builders and to allocate work among such Design-Builders with separate RFPs. The criteria to be considered by the ACCO in making such determination shall include the following: the nature of the Design-Build Services to be procured; a description of the public work project; the location(s) of the public work project; anticipated cost of the separate RFPs or awards; the capacity of proposers to provide all of the required Design-Build Services within the required timeframes; the potential advantage of multiple contracts (e.g., more favorable terms; more competitive pricing); efficiency in procurement administration and common market practice for certain asset classes; and justification for multiple awards from one RFQ.

(vi) Multiple evaluation committees may be established to evaluate SOQs submitted for a single RFQ for a public work project.

(vii) Randomized evaluation process. If the ACCO determines that such a high volume of competing SOQs is likely to be received that it will be infeasible for each member of the evaluation committee to read each SOQ, the ACCO may, subject to the approval of the CCPO, establish a pool of appropriate evaluators and then randomly assign each SOQ to at least three such evaluators for review.

(viii) Shortlist Notice.

(A) Frequency. Notice of shortlist selection shall be posted publicly on the City’s website following the agency’s final determination of a shortlist.

(B) Content. Such notice shall include:

((i)) agency name;

((ii)) title or brief description of the project to be procured;

((iii)) name of the shortlisted responding entities; and

((iv)) contact info for the shortlisted responding entities, if provided.

(3) Step 2: RFP.

(i) Upon completion of the RFQ step, the agency shall issue the RFP to only the shortlisted proposers pursuant to 9 RCNY § 3-17(a)(2).

(ii) The RFP shall include:

(A) a statement that the contract award will be made to the responsible proposer whose proposal represents the best value to the City by optimizing quality, cost and efficiency and therefore is determined to be the most advantageous to the City, in accordance with the evaluation criteria, including price and other factors, that are set forth in the RFP;

(B) a statement of work or scope of services statement, performance requirements, and any special instructions;

(C) the specific criteria and the relative weight of each criterion or category of criteria that will be used to evaluate the proposals, including but not limited to:

((i)) the proposal’s price;

((ii)) the quality of the proposal’s solution;

((iii)) the qualifications and experience of the proposer;

((iv)) the approach to meeting the anticipated M/WBE goals; and

((v)) other factors deemed pertinent by the agency, which may include, but shall not be limited to, the proposal’s manner and schedule of project implementation, the proposer’s ability to complete the work in a timely and satisfactory manner, maintenance costs of the completed public work, maintenance of traffic approach, and community impact;

(D) a statement of how price will be evaluated, including, but not limited to, a notice that prices shall be irrevocable until the contract is executed by the selected proposer, unless the proposal is withdrawn, and that offers may be withdrawn only after the expiration of one hundred eighty days (or such period as is specified in the solicitation, but not shorter than ninety days) after opening of proposals, in writing received by the agency prior to award, and a request for cost breakdown of the proposed price, if applicable;

(E) proposal submission requirements including requirements, if any, for the electronic submission of proposals; if applicable, that technical and price proposals shall be submitted in separate sealed envelopes (electronic or paper); and the time and date after which proposals will not be accepted as well as location of proposal submission;

(F) other information such as delivery dates or time frames within which the work must be completed.

(G) general as well as special terms and conditions, if applicable;

(H) a notice of the proposer’s rights to appeal certain decisions;

(I) a notice of the City’s prompt payment policy pursuant to Section 4-06, including an explanation of the requirements for invoicing;

(J) a requirement for acknowledgment of amendments;

(K) a request for a description of experience in the line of work being considered (including references);

(L) a provision that the Design-Builder team evaluated and selected during the RFP shall remain unchanged throughout the project, unless otherwise approved in writing by the agency;

(M) a notice that although discussions may be conducted with proposers during the RFP process, award may be made without any discussions;

(N) if applicable, provision on the submission and consideration of interim design document submission and multiple or alternate proposals;

(O) a provision that proposers should give specific attention to the identification of those portions of their proposals that they deem to be confidential, proprietary information or trade secrets and provide any justification why such materials, upon request, should not be disclosed by the City. Such information must be easily separable from the non-confidential sections of the proposals;

(P) a notice that contract award is subject to the provisions of the MacBride Principles Law;

(Q) a notice that contract award is subject, if applicable, to the objectives and goals of § 6-129 of the New York City Administrative Code (M/WBE and EBE Program) or article 15-A of the executive law, as well as to applicable provisions of federal, State, and other local laws, regulations, and executive orders;

(R) if applicable, a notice that contract award is subject to completion of a PASSPort questionnaire and review of that information by the Department of Investigation;

(S) where applicable, all information required pursuant to Section 312(a) of the Charter;

(T) the following statement:

The New York City Comptroller is charged with the audit of contracts in New York City. Any vendor who believes that there has been unfairness, favoritism, or impropriety in the proposal process should inform the Comptroller, Bureau of Contract Administration, 1 Centre Street, Room 727, New York, NY 10007; telephone number (212) 669-2323;

(U) name, address, and telephone number of contact person;

(V) if applicable, information and process regarding a stipend for responsive and responsible proposers who comply with the relevant stipend criteria and requirements defined in the RFP, the anticipated stipend amount and a requirement to submit a signed stipend agreement as part of the proposal; and

(W) other requirements, as determined by the agency.

(iii) Proposal Preparation Time and Form. Proposal preparation time shall be set to provide vendors a reasonable time to prepare their proposals. A minimum of twenty-seven days shall be provided. The manner in which proposals are to be submitted, including any forms for that purpose, shall be designated as a part of the RFP.

(iv) Individual Proposal Discussions Before Proposal Submission. The agency may elect to enter into individual discussions with proposers to facilitate understanding of the requirements of the RFP and how the proposal and the proposer’s capabilities and methodology will meet these requirements. Based on these discussions, the agency may issue addendums to the RFP to allow for utilization of alternative means, methods, or concepts that can meet the requirements of the RFP.

(v) Conduct of Discussions During Individual Proposal Discussions Before Proposal Submission.

(A) Proposers shall be accorded fair treatment with respect to any opportunity for discussions and revisions of proposals. If an agency elects to enter into individual discussions with a proposer, the agency must allow individual discussions with all proposers and give all proposers an opportunity to enter into individual discussions with the agency.

(B) The ACCO shall establish an agenda and schedule for conducting discussions.

(C) If there is a need for any material clarification of, or change in, the RFP, the RFP must be amended to incorporate such clarification or change and shall be provided to all proposers.

(vi) Evaluation Committee. Proposals shall be reviewed by an evaluation committee consisting of no fewer than three persons with knowledge, expertise, and experience sufficient to make a fair and reasonable evaluation. If an RFP incorporates multiple competitions pursuant to 9 RCNY § 3-17(a)(2)(v), each competition may be evaluated by a separate committee. The ACCO shall require each member of the evaluation committee(s) to submit a signed statement, in a format approved by the CCPO, agreeing to prohibitions on any conflicts of interest.

(A) Outside Evaluators. The evaluation committee may include persons who are not employed by the agency. In addition, the ACCO may determine, subject to the approval of the CCPO, that it is in the best interests of the City for the evaluation committee to include persons who are not employees of the City of New York, provided however that such non-City employees may not constitute a majority of the evaluation committee. Such persons must serve without financial compensation but may be entitled to travel and other related expenses as may be reasonably incurred in the execution of their role as an evaluator.

(vii) Rating Sheets. Ratings sheets or other written evaluation forms shall be used to evaluate proposals by the evaluators and each evaluator shall sign and date their rating sheet. Initial ratings may be amended and the amended ratings recorded on amended ratings sheets. Copies of all initial and amended rating sheets or evaluation forms shall be maintained.

(viii) Individual Proposal Discussions After Proposal Submission. The evaluation committee shall evaluate all proposals and may elect to enter into individual discussions with those proposers that have submitted proposals that satisfy all RFP requirements, in each case for any or all of the following purposes:

(A) promoting understanding of the City’s requirements and the vendors’ proposals and capabilities;

(B) obtaining the best price for the City; or

(C) arriving at a contract that will deliver best value to the City in accordance with the evaluation criteria, including price and other factors, set forth in the RFP.

(ix) Conduct of Discussions During Individual Proposal Discussions After Proposal Submission.

(A) Proposers shall be accorded fair treatment with respect to any opportunity for discussions and revisions of proposals. If an agency elects to enter into individual discussions with a proposer, the agency must allow individual discussions with all proposers and give all proposers an equal opportunity to enter into individual discussions with the agency and modify their proposals.

(B) The ACCO shall establish an agenda and schedule for conducting discussions.

(C) If there is a need for any substantial clarification of, or change in, the RFP, the RFP must be amended to incorporate such clarification or change and shall be provided to all proposers.

(D) Any oral clarification of a proposal shall be confirmed in writing by the proposer.

(x) Best and Final Offers. Best and final offers are the revised and corrected final proposals submitted by proposers after discussions, if any, have been held by the procuring agency.

(A) The ACCO shall establish a common date and time for the submission of best and final offers.

(B) Best and final offers shall be submitted only once unless the ACCO makes a determination that it is in the City’s best interest to conduct additional discussions and/or require another submission of best and final offers.

(C) Proposers shall be informed that if they do not submit a notice of withdrawal or another best and final offer, their immediate previous offer will be construed as their best and final offer.

(D) All best and final offers shall be maintained and handled in accordance with the control procedures contained in these Rules.

(E) The ACCO may request best and final offers on the whole proposal or on any one or combination of its component parts (e.g., price, technical qualifications, approach, and/or capability). The request shall be the same for all proposers.

(F) Best and final offers shall be evaluated in accordance with this subdivision.

(xi) Mistakes in Proposals.

(A) Confirmation of Proposal. When the ACCO knows or has reason to conclude before award that a mistake has been made, he or she should request the proposer to confirm the proposal. If the proposer alleges mistake, the proposal may be corrected or withdrawn during any discussions that are held or if the conditions set forth in this subdivision are met.

(B) Mistakes Discovered After Receipt of Proposals but Before Vendor Selection.

((i)) During Discussions Prior to Best and Final Offers. Once discussions are commenced with any proposer or after best and final offers are requested, any offeror may correct any mistake by modifying or withdrawing the proposal until the time and date set for receipt of best and final offers.

((ii)) Minor Informalities. Minor informalities, unless otherwise corrected by an offeror, shall be treated in accordance with 9 RCNY § 3-02(m)(3)(i).

((iii)) Correction of Mistakes. If discussions are not held or if the best and final offers upon which award will be made have been received, mistakes may be corrected and the intended correct offer considered only in accordance with 9 RCNY § 3-02(m)(3)(ii).

(C) Mistakes Discovered After Vendor Selection. Mistakes shall not be corrected after vendor selection except in accordance with 9 RCNY § 3-02(m)(4).

(D) Determinations Required. When a proposal is corrected or withdrawn, or correction or withdrawal is denied, a determination shall be prepared in accordance with 9 RCNY § 3-02(m)(5).

(xii) Vendor Selection and Documentation. The ACCO shall make a determination showing the basis on which the contract award was made to the responsible proposer whose proposal was determined to represent the best value to the City, in accordance with the evaluation criteria, including cost, quality, experience, efficiency and other factors, that are set forth in the RFP. Such final scores shall be published on the agency’s website after registration of such contract or the date upon which such contract may be implemented, if registration requirements do not apply. This determination shall be included in a Recommendation of Award. Each Recommendation for Award shall include at a minimum the following information:

(A) justification of the award;

(B) affirmative finding of responsibility for the selected proposer(s);

(C) efforts to negotiate better value; and

(D) if applicable, the stipends and amounts being provided to responsive and responsible proposers who complied with the relevant criteria and requirements defined in the RFP.

(4) Protests Procedures Applicable to the RFQ and RFP steps. Vendor protests shall be made only pursuant to the procedures set forth in 9 RCNY § 2-10, except for 9 RCNY § 2-10(a)(2), and vendors shall follow the following procedures with respect to protest submittal procedures:

(i) Time for Protest - RFQ Step:

(A) Any protests based on the form or content of the RFQ which is or should have been apparent prior to the date established for submittal of the SOQ must be filed no later than fourteen days before the SOQ due date, or if the SOQ due date is revised, no later than seven days before the revised SOQ due date.

(B) Any protests other than those set forth in clause (4)(i)(A) above related to the RFQ must be filed no later than ten business days after the agency’s publication of the shortlist.

(ii) Time for Protest - RFP Step:

(A) Any protests based on the form or content of the RFP must be filed before the proposal due date. Any protests based on the form or content of modifications to the original RFP must be filed no later than the next established due date for receipt of proposals following the modification.

(B) Any protests other than those set forth in clause (4)(ii)(A) above related to the RFP must be filed within ten business days after the protesting vendor knows or should have known the facts that prompted the protest but no later than ten business days after the agency’s publication of the notice of public comment to the City Record. Before submitting a protest within the required time for protest, the vendor may request a meeting with the ACCO, in writing, to discuss the potential protest or the notice of award. The ACCO may, in their sole discretion, meet with the vendor within the required time for protest.

(b) Dispute Resolution. Resolution of Disputes arising out of design-build contract administration shall be governed by the following provisions rather than 9 RCNY § 4-09, and to the extent not inconsistent with this rule, the design-build contract:

(1) Applicability. This section shall apply to disputes between the City and a Design-Builder that arise under, or by virtue of, a contract for design-build services. All contracts shall include a clause providing that such disputes shall be finally resolved in accordance with the provisions of this section. This section includes disputes raised by the Design-Builder solely about the scope of work delineated by the contract, the interpretation of contract documents, the amount to be paid for extra work or disputed work performed in connection with the contract, the conformity of the Design-Builder’s work to the contract, or the acceptability and quality of the Design-Builder’s work. For disputes that are eligible for ADR pursuant to the design-build contract (“ADR-Eligible Disputes”), the Design-Builder may either:

(i) File a plenary action in accordance with applicable law and the terms of the contract; or

(ii) Dispute the Agency Head’s final decision by following the procedure set forth in 9 RCNY § 3-17(b)(3).

(A) An Agency’s decision to terminate of the contract for cause or other than for cause is not an ADR-Eligible Dispute. Such a decision may only be challenged pursuant to an Article 78 proceeding brought in New York Supreme Court, New York County, within four months of the issuance of the decision.

(B) For other disputes, the Design-Builder may file an action in New York Supreme Court, New York County, in accordance with applicable law after the Agency Head has made a final decision.

(C) Prior to filing a plenary action or presenting its dispute notice (“Notice of ADR Dispute”) to the Comptroller, the Design-Builder must comply with and exhaust the dispute resolution procedures contained in the contract, and the Agency Head must have issued their final decision, unless their time to do so has expired.

(D) Once the Design-Builder has filed a Notice of ADR-Dispute, it may only challenge the Agency Head’s decision through the procedure set forth in 9 RCNY § 3-17(b)(3), and may not subsequently file a plenary action as to that dispute, unless the dispute is not an ADR Eligible Dispute. Once the Design-Builder has filed a plenary action, it may not pursue its dispute pursuant to 9 RCNY § 3-17(b)(3).

(2) Work to Continue. During such time as any dispute is being presented, heard, and considered, the contract terms shall remain in force and, unless otherwise directed by the ACCO or Engineer, work shall continue as directed. Failure of the Design-Builder to continue the work as directed shall constitute a waiver by the Design-Builder of its claim.

(3) Presentation of ADR-Eligible Disputes. Before any dispute may be brought by the Design-Builder to the CDRB, the Design-Builder must first present a Notice of ADR Dispute to the Comptroller for their review, investigation, and possible adjustment.

(i) Time, Form, and Content of Notice. Within thirty days of the Design-Builder's receipt of the Agency Head’s final decision, the Design-Builder shall submit to the Comptroller and to the Agency Head a Notice of ADR Dispute regarding its dispute with the agency. The Notice of ADR Dispute shall consist of (i) a brief statement of the substance of the dispute; the amount of money, if any, claimed; and the reason(s) the Design-Builder contends the dispute was wrongly decided by the Agency Head; (ii) a copy of the decision of the Agency Head; and (iii) a copy of all materials submitted by the Design-Builder in the contractual dispute resolution process. The Design-Builder may not present to the Comptroller any material not presented in the contractual dispute resolution process, except at the request of the Comptroller.

(ii) Agency Response. Within twenty days of receipt of the Notice of Claim, the agency shall make available to the Comptroller a copy of all material submitted by the agency to the Agency Head in connection with the dispute. The agency may not present to the Comptroller any material not presented to the Agency Head except at the request of the Comptroller.

(iii) Comptroller Investigation. The Comptroller may investigate the claim in dispute and, in the course of such investigation, may exercise all powers provided in §§ 7-201 and 7-203 of the New York City Administrative Code. In addition, the Comptroller may demand of either party, and such party shall provide, whatever additional material the Comptroller deems pertinent to the claim, including original business records of the Design-Builder. Willful failure of the Design-Builder to produce within fifteen days any material requested by the Comptroller shall constitute a waiver by the Design-Builder of its claim. The Comptroller may also schedule an informal conference to be attended by the Design-Builder, agency representatives, and any other personnel desired by the Comptroller.

(iv) Opportunity of Comptroller to Compromise or Adjust Claim. The Comptroller shall have twenty days from his or her receipt of all materials referred to in (b)(3) to investigate the disputed claim. The period for investigation and compromise may be further extended by agreement between the Design-Builder and the Comptroller, to a maximum of ninety days from the Comptroller’s receipt of all materials. The Design-Builder may not present its petition to the CDRB until the period for investigation and compromise delineated in this section has expired or the Comptroller has issued a determination. In compromising or adjusting any claim hereunder, the Comptroller may not revise or disregard the terms of the contract between the parties.

(4) Petition to CDRB. In the event the claim has not been settled or adjusted by the Comptroller within the period provided in this section, the Design-Builder, within twenty days thereafter, may petition the CDRB to review the Agency Head determination.

(i) Form and Content of Petition by Design-Builder. The Design-Builder shall present its dispute to the CDRB in the form of a Petition, which shall include (i) a brief statement of the substance of the dispute; the amount of money, if any, claimed; and the reason(s) the Design-Builder contends that the dispute was wrongly decided by the Agency Head; (ii) a copy of the decision of the Agency Head; (iii) copies of all materials submitted by the Design-Builder in the contractual dispute resolution process and to the Comptroller; and (v) copies of all correspondence with, and material submitted by the Design-Builder to, the Comptroller’s Office. The Design-Builder shall concurrently submit four complete printed sets and one electronic set of the Petition and all exhibits: one to the Corporation Counsel (Attn: Commercial and Real Estate Litigation Division), and three to the CDRB at OATH’s offices, with proof of service on the Corporation Counsel. In addition, the Design-Builder shall submit a copy of the statement of the substance of the dispute, cited in (i) above, to both the Agency Head and the Comptroller.

(ii) Agency Response. Within twenty days of receipt of the Petition by the Corporation Counsel, the agency shall respond to the statement of the Design-Builder and make available to the CDRB all materials it submitted in the contractual dispute resolution process and to the Comptroller. Three complete printed copies and one electronic set of the agency response shall be submitted to the CDRB at OATH’s offices and one to the Design-Builder. Extensions of time for submittal of the agency response shall be given as necessary upon a showing of good cause or, upon the consent of the parties, for an initial period of up to thirty days. The Design-Builder shall have an opportunity to submit a reply to the agency response within ten days of receipt of the agency response.

(iii) Further Proceedings. The Board shall permit the Design-Builder to present its case by submission of the Petition, briefs, and oral argument. The Board shall also permit the agency to present its case in response to the Design-Builder by submission of its Response, briefs, and oral argument. If requested by the Corporation Counsel, the Comptroller shall provide reasonable assistance in the preparation of the agency’s case. Neither the Design-Builder nor the agency may support its case with any documentation or other material that was not considered in the contractual dispute resolution process or by the Comptroller, unless requested by the CDRB. The CDRB, in its discretion, may seek such technical or other expert advice as it shall deem appropriate and may seek, on its own or upon application of a party, any such additional material from any party as it deems fit. The CDRB, in its discretion, may combine more than one ADR-Eligible Dispute between the parties for concurrent resolution. If the Board permits an oral argument, the oral argument shall be scheduled within thirty days of receipt of the Design-Builder’s reply to Agency Response, or longer if the parties agree.

(iv) CDRB Determination. Within forty-five days of the conclusion of all submissions and oral arguments, the CDRB shall render a decision resolving the dispute. In an unusually complex case, the CDRB may render its decision in a longer period of time, not to exceed ninety days, and shall so advise the parties at the commencement of this period. The CDRB’s decision must be consistent with the terms of the contract. Decisions of the CDRB shall only resolve matters before the CDRB and shall not have precedential effect with respect to matters not before the CDRB.

(v) Notification of CDRB Decision. The CDRB shall send a copy of its decision to the Design-Builder, the ACCO, the Corporation Counsel, the Comptroller, the CCPO, and the Engineer. A decision in favor of the vendor shall be subject to the prompt payment provisions of these Rules. The required payment date shall be thirty days after the date the parties are formally notified of the CDRB’s decision.

(vi) Finality of CDRB Decision. The CDRB’s decision shall be final and binding on all parties. Any party may seek review of the CDRB’s decision solely in the form of a challenge, filed within four months of the date of the CDRB’s decision, in a court of competent jurisdiction of the Supreme Court of the State of New York, County of New York pursuant to Article 78 of the Civil Practice Law and Rules. Such review by the court shall be limited to the question of whether or not the CDRB’s decision was made in violation of lawful procedure, was affected by an error of law, or was arbitrary and capricious or an abuse of discretion. No evidence or information shall be introduced or relied upon in such proceeding that was not presented to the CDRB in accordance with this section.

(c) Contract Administration. Except as provided in subdivision (b)(1) and (b)(2) of this Section or as otherwise stated in these Rules, 9 RCNY Chapter 4 titled Contract Administration shall apply to all contracts for Design-Build Services, including design-build contracts.

(1) Contract changes pursuant to 9 RCNY § 4-02 shall not preclude the Design-Build contract from agreeing to Extra Work funded through allowances and approved under the contract or restrict the ability to agree to modifications as authorized by Chapter 749 of the laws of 2019;

(2) Renewals pursuant to 9 RCNY § 4-04 are not permitted in design-build contracts.

(3) Buy-against Procurements pursuant to 9 RCNY § 4-07 are not permitted in Design-Build Services contracts.

(Added City Record 12/12/2025, eff. 1/11/2026)