BetaNYCLaw Reader
Contents
  1. Home
  2. NYC Administrative Code
  3. Title 28
  4. Chapter 8
  5. Part 4 of 5
  6. Section MC 1208

NYC Administrative Code Section MC 1208 Tests

1208.1 General.

Hydronic piping systems other than ground-source heat pump loop systems shall be tested hydrostatically at one and one half times the system design operating pressure, but not less than 100 psi (689 kPa). The duration of each test shall be not less than 2 hours. Ground-source heat pump loop systems shall be tested in accordance with Section 1210.10.