NYC Administrative Code Title 28, Chapter 1 Administration, part 4 of 5
§ 28-113.3.8 to § 28-118.23: 100 sections.
§ 28-113.3.8. Maintenance of records of approved material
For any material that has been approved, a record of such approval, including the conditions and limitations of the approval, shall be posted on the department's website or shall be made available for public inspection at appropriate times.
§ 28-113.4. Labeling
Materials required to be labeled shall be labeled in accordance with the procedures set forth in this code or the recognized referenced standards.
§ 28-113.4.1. Testing
An approved agency shall test a representative sample of the material being labeled to the relevant standard or standards. The approved agency shall maintain a record of the tests performed. The record shall provide sufficient detail to verify compliance with the test standard.
§ 28-113.4.2. Inspection and identification
The approved agency shall at regular intervals perform surveillance inspections, which shall be in-plant if necessary, of the material that is to be labeled. The inspection shall verify that the labeled material is representative of the material tested.
§ 28-113.4.3. Label information
The label shall contain the manufacturer's or distributor's identification, model number, serial number or definitive information describing the material's performance characteristics and the approved agency's identification.
§ 28-113.4.4. Shipment and delivery certification of materials listed, labeled or approved
In the case of the shipment or delivery of material listed or labeled to a standard, such material shall be appropriately labeled or accompanied by the inspection certificate of an approved agency that the material is the same as that which was tested and evaluated by such agency. In the case of the shipment or delivery of material previously approved by the commissioner, the material shall be identified by a tag or certificate indicating that the material is the same that was approved for its intended use by the commissioner or, if applicable, previously approved by the board of standards and appeals, and containing the applicable approval number or calendar number under which the material received such approval.
§ 28-113.5. Volatile organic compounds emissions in carpet and carpet cushion
On and after July 1, 2013 carpet and carpet cushion as defined in section 17-1401 of the administrative code shall comply with the limits on volatile organic compound emissions set forth in chapter 14 of title 17 of such code.
§ 28-114.1. General
Approved agencies shall satisfy the provisions of this article and the rules of the department as to qualifications and operations. The commissioner may revoke or suspend the commissioner's approval of or otherwise sanction an approved agency for cause.
§ 28-114.1.1. Independent
An approved agency shall perform its authorized duties objectively and competently. The agency shall disclose possible conflicts of interest so that objectivity can be confirmed.
§ 28-114.1.2. Testing equipment
An approved agency shall have adequate testing equipment to perform required tests. The equipment shall be periodically calibrated.
§ 28-114.1.3. Personnel
An approved agency shall employ experienced personnel qualified to conduct, supervise and evaluate the tests or inspections that it undertakes. Special inspections may be performed only by employees of such agency who are special inspectors qualified pursuant to department rules to perform or witness the particular test or inspection. The commissioner may require proof of the qualifications of employees.
§ 28-114.1.4. Background
The commissioner may require an approved agency to submit to an investigation of its background and of the background of its principals as a condition of approval.
§ 28-114.1.5. Insurance
An approved agency shall maintain liability insurance as required by department rules.
§ 28-114.2. Written evaluation by approved agency
An agency's evaluation of material or report of an inspection shall be in writing after satisfactory completion of the required inspection or test.
§ 28-114.3. Records
The approved agency shall maintain records of inspection and test reports for at least six years or for such period as the commissioner shall determine and shall make such records available to the department upon request.
§ 28-114.4. Re-authorization of approved agencies
An approved agency shall have its approval re-authorized in accordance with rules of the department.
§ 28-114.5. Disqualification
The commissioner may disqualify an approved agency or inspector from performing inspections pursuant to this code for cause. The approved agency or inspector shall be given prior notice of the proposed disqualification and the opportunity to contest such action. A list of approved agencies and inspectors who have been disqualified from performing inspections shall be maintained and made available to the public on the department's website.
(L.L. 2021/126, 11/7/2021, eff. 11/7/2022)
Editor's note: For related unconsolidated provisions, see Appendix A at L.L. 2021/126.
§ 28-115.1. General
Special inspection agencies are approved agencies and shall be subject to the provisions of article 114 of this chapter. Special inspection agencies and special inspectors shall satisfy the provisions of this article and the rules of the department as to qualifications in order to perform special inspections required by chapter 17 of the New York city building code or elsewhere in this code or department rules.
§ 28-115.2. Disqualification
The commissioner may disqualify a special inspection agency or a special inspector from performing special inspections pursuant to this code for cause. The special inspection agency or special inspector shall be given prior notice of the proposed disqualification and the opportunity to contest such action. A list of special inspection agencies and special inspectors who have been disqualified from performing special inspection shall be maintained and made available to the public upon request.
§ 28-115.3. Records
A special inspector shall maintain records of special inspections on a building by building basis for at least six years or for such period as the commissioner shall determine and shall make such records available to the department upon request.
(Am. L.L. 2021/126, 11/7/2021, eff. 11/7/2022)
Editor's note: For related unconsolidated provisions, see Appendix A at L.L. 2021/126.
§ 28-116.1. General
Construction or work for which a permit is required shall be subject to inspection in accordance with this code and such construction or work shall remain accessible and exposed for inspection purposes until the required inspection is completed. A satisfactory inspection by the department or the acceptance by the department of a satisfactory report of an inspection by an approved agency shall not be construed to be an approval by the department of a violation of the provisions of this code or of any other provision of law. It shall be the duty of the permit holder to cause the work to remain accessible and exposed for inspection purposes. The permit holder shall be liable for any expense entailed in the removal or replacement of any material required to allow inspection. The inspector shall supply a report of the results of each inspection.
§ 28-116.1.1. Defective work and discrepancies with approved construction documents
An approved agency conducting inspections shall report defective work and discrepancies with the approved construction documents to the contractor and, when applicable, to the superintendent of construction, for correction. The approved agency shall report uncorrected discrepancies and defective work to the registered design professional of record and the owner in writing.
§ 28-116.1.2. Hazardous conditions
The approved agency shall report all conditions noted as hazardous to life, safety or health that are not immediately corrected to the immediate attention of the commissioner.
§ 28-116.2. Types of inspections
The inspections set forth in sections 28-116.2.1 through 28-116.2.4 are required or authorized by this code.
§ 28-116.2.1. Preliminary inspection
Before approving construction documents, the commissioner is authorized to examine or cause to be examined structures or premises for which an application has been filed. The department shall conduct preliminary inspections of no less than 20 percent of buildings containing six or more units where (i) an application for construction documents is submitted to the department and (ii) the applicant has indicated that the building that is the subject of such application is unoccupied, in order to verify the occupancy status of such sites.
(Am. L.L. 2019/115, 6/8/2019, eff. 1/1/2020)
§ 28-116.2.1.1. Preliminary inspection reporting
By January 1, 2021 and no later than January 1 annually thereafter, the department of buildings shall submit to the mayor and the speaker of the council a report describing the findings of preliminary inspections performed pursuant to section 28-116.2.1 in the preceding year. Such report shall include, but not be limited to: (i) the total number of applications found to have falsely indicated that a building was unoccupied; and (ii) for each application found to have falsely indicated that a building was unoccupied, the location of the associated building and date of filing for such application.
(L.L. 2019/115, 6/8/2019, eff. 1/1/2020)
§ 28-116.2.2. Compliance inspections
In addition to the inspections specified in this code, the commissioner is authorized to make or require other inspections of any construction work to ascertain compliance with the provisions of this code and other laws that are enforced by the department.
§ 28-116.2.3. Special inspections, progress inspections and other inspections required during the progress of work
After the issuance of a work permit, special inspections, progress inspections and other inspections required by this code to be made during the progress of the work shall be made at such times or at such stages of the work and in such manner as shall be provided by this code or as otherwise required by the commissioner. The permit application shall set forth an inspection program for the work. Such inspections may be made by approved agencies or by the department as provided in this code or in the rules of the department. Special inspections shall be performed only by individuals who are special inspectors. The commissioner may accept inspection and test reports from approved agencies and the work may, unless otherwise specifically provided by code provisions or directed by the commissioner, proceed without any verifying inspection or test by the department. The names and business addresses of special inspectors and approved agencies shall be set forth in the work permit application. All inspection reports shall be in writing and signed by the person or entity performing the inspection. A record of all inspections shall be kept by the person performing the inspection. The commissioner may require inspection reports to be filed with the department. Records of inspections made by approved agencies and special inspectors shall be maintained by such persons for a period of six years after sign-off of the work or for such other period of time as the commissioner may require and shall be made available to the department upon request.
Editor's note: For related unconsolidated provisions, see Appendix A at L.L. 2008/008.
§ 28-116.2.3.1. Special and progress inspection of fabricated items
Where fabrication of regulated products is performed on the premises of a fabricator's shop, special and progress inspections of the fabricated items are required as provided in this code. The approved agency shall verify that the fabricator maintains detailed fabrication and quality control procedures that provide a basis for inspection control of the workmanship and the fabricator's ability to conform to approved construction documents and referenced standards. The approved agency shall review the procedures for completeness and adequacy relative to the code requirements for the fabricator's scope of work.
Exceptions:
1. Work that is subject to progress inspections and performed on the fabricator's premises shall not be subject to progress inspections where the fabricator is approved by the commissioner in accordance with section 28-116.6 of this code.
2. Work that is subject to special inspections and performed on the fabricator's premises shall be inspected by the special inspection agency in accordance with Section 1704.2.2.3 of the New York City Building Code where the fabricator is approved by the commissioner in accordance with section 28-116.6 of this code.
(Am. L.L. 2021/126, 11/7/2021, eff. 11/7/2022)
Editor's note: For related unconsolidated provisions, see Appendix A at L.L. 2021/126.
§ 28-116.2.3.2. Special inspection of raising and moving of a building
Where the lowest above-grade floor or the lowest subgrade floor of a building is to be raised, lifted, elevated or moved, special inspection of such work is required. The permit holder shall notify the department in writing at least 48 hours before the commencement of such work.
§ 28-116.2.4. Final inspection
There shall be a final inspection of all permitted work. Final inspections shall comply with sections 28-116.2.4.1 through 28-116.2.4.3.
Exception: A final inspection shall not be required for minor electrical work as defined in section 28-101.5.
(Am. L.L. 2016/151, 12/6/2016, eff. 1/1/2018; Am. L.L. 2024/128, 12/21/2024, eff. 12/21/2025)
Editor's note: For related unconsolidated provisions, see Appendix A at L.L. 2024/128.
§ 28-116.2.4.1. Final inspection prior to certificate of occupancy
In all cases where the permitted work requires the issuance of a new or amended certificate of occupancy, the final inspection shall be performed by the department in the presence of the permit holder, the registered design professional of record or the superintendent of construction. Such inspection shall be performed after all work authorized by the building permit is completed and before the issuance of the certificate of occupancy. All failures to comply with the provisions of this code or approved construction documents shall be noted and the owner promptly notified thereof in writing. All defects noted in such inspection shall be corrected. Reports of such final inspections shall be maintained by the department. The final inspection report shall confirm that defects noted have been corrected, that the work is in substantial compliance with the approved construction documents and with this code and with other applicable laws and rules and that all required inspections were performed.
Exception: For amended certificates of occupancy subject to section 28-118.16.2, the term construction documents, as used in section 28-116.2.4.1, shall consist of an accurate and complete final lot survey made by a land surveyor, and floor and roof plans showing at a minimum compliance with exit requirements in accordance with this code.
§ 28-116.2.6.4. Electrical final inspection
Final inspections for electrical work for which a permit is required shall be performed in accordance with the New York city electrical code.
(L.L. 2026/042, 1/17/2026, eff. 1/17/2026)
§ 28-116.2.4.2. Final inspection prior to letter of completion
In all cases where the permitted work does not require the issuance of a certificate of occupancy, the final inspection shall be performed by an approved agency on behalf of the owner or by the department as directed by the commissioner. The applicant shall take all reasonable and necessary steps to ensure that the final inspection is performed within one year after the expiration of the last permit. The inspection shall be performed after all work authorized by the building permit is completed. The approved agency performing the inspection shall report defective work and discrepancies with the approved construction documents to the contractor and, when applicable, to the superintendent of construction, for correction. The approved agency shall report uncorrected discrepancies and defective work to the registered design professional of record and the owner in writing. The approved agency shall report all conditions noted or observed as hazardous to life, safety or health that are not immediately corrected to the immediate attention of the commissioner. All defects noted in such inspection shall be corrected. The final inspection report shall confirm that defects noted have been corrected, that the work is in substantial compliance with the approved construction documents and with this code and other applicable laws and rules and that all required inspections were performed. Final inspection reports shall be filed with and maintained by the department. Records of final inspections made by approved agencies shall be maintained by such persons for a period of six years after sign-off or for such other period as the commissioner shall require and shall be made available to the department upon request.
Exceptions:
1. Final inspection shall be performed by the department for permitted work in R-2 occupancies if the building is listed on the department of housing preservation and development's website pursuant to paragraph 6 of subdivision m of section 27-2115 of the administrative code. The department shall charge a fee for such inspection.
2. Final inspection shall not be required for temporary construction equipment permits. Unless otherwise specified elsewhere in this code, the permit holder, owner, or owner's designee shall notify the department upon removal of the temporary construction equipment no more than two business days following the removal of such equipment in a form and manner acceptable to the Department.
(Am. L.L. 2017/149, 8/30/2017, eff. 12/28/2017; Am. L.L. 2021/126, 11/7/2021, eff. 11/7/2022; Am. L.L. 2021/146, 12/11/2021, eff. 6/9/2022; Am. L.L. 2023/077, 6/11/2023, eff. 6/11/2023)
Editor's note: For related unconsolidated provisions, see Appendix A at L.L. 2021/126 and L.L. 2023/077.
§ 28-116.2.4.3. Final inspection of gas piping systems
The final inspection of gas piping systems shall be performed by the department in the presence of the permit holder, the registered design professional of record or the superintendent of construction. Such inspection shall be performed after all work authorized by the building permit is completed. All failures to comply with the provisions of this code or approved construction documents shall be noted and the owner promptly notified thereof in writing. All defects noted in such inspection shall be corrected. Reports of such final inspections shall be maintained by the department. The final inspection report shall confirm that defects noted have been corrected, that the work is in substantial compliance with the approved construction documents and with this code and with other applicable laws and rules and that all required inspections were performed.
(L.L. 2016/151, 12/6/2016, eff. 1/1/2018)
§ 28-116.3. Inspection requests
It shall be the duty of the permit holder to notify the department or the person or entity designated to perform the inspection when work requiring inspection is ready to be inspected. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code.
§ 28-116.3.1. Additional notifications for special inspections
The permit holder shall also notify the relevant special inspection agency in writing at least 72 hours prior to the commencement of any work requiring special inspection.
§ 28-116.4. Sign-off of completed work
Upon submission of a satisfactory report of final inspection and all required submittal documents, the department shall document the sign-off of the project and issue a letter of completion, or, if applicable, a certificate of occupancy for the work. The owner shall take all necessary steps required by the department for the issuance of such letter of completion or certificate of occupancy within one year following the expiration of the last permit.
(Am. L.L. 2021/126, 11/7/2021, eff. 11/7/2022)
Editor's note: For related unconsolidated provisions, see Appendix A at L.L. 2021/126.
§ 28-116.4.1. Issuance of certificate of compliance
The following types of service equipment shall not be operated until the department issues a certificate of compliance after submission of a satisfactory report of inspection and testing of such equipment in accordance with this code and all required submittal documents:
1. Air-conditioning, ventilation and exhaust systems
2. Elevators, escalators, moving walkways and dumbwaiters
3. Fuel burning and fuel-oil storage equipment
4. Refrigeration systems
5. Heating systems
6. Boilers.
Exception: A certificate of compliance shall not be required in connection with work specifically exempted from permit requirements in accordance with this code or department rules.
§ 28-116.5. Payment of outstanding penalties
The department may refuse to issue a letter of completion or certificate of occupancy pending payment of all outstanding fines or civil penalties imposed for violations of this code, the 1968 building code or other laws enforced by the department at the same building.
§ 28-116.6. Fabricator approval
Approval of fabricators by the department shall be based upon review of the fabricator's written procedural and quality control manuals and periodic auditing of fabrication practices by an approved agency.
§ 28-116.6.1. Certificate of intent to fabricate
For all work where approval is sought based upon section 28-116.6, the approved fabricator shall submit a certificate of intent to fabricate such work to the department identifying the work to be performed as an approved fabricator, and that such work shall be performed in accordance with the approved construction documents, referenced standards and applicable provisions of law and for which site the work is being fabricated prior to fabricating any items for such project.
(Am. L.L. 2021/126, 11/7/2021, eff. 11/7/2022)
Editor's note: For related unconsolidated provisions, see Appendix A at L.L. 2021/126.
§ 28-116.6.2. Fabricator's certificate of compliance
For all fabricated items, the approved fabricator shall submit a certificate of compliance to the department stating that the work was performed in accordance with the approved construction documents, referenced standards and applicable provisions of law.
(Am. L.L. 2021/126, 11/7/2021, eff. 11/7/2022)
Editor's note: For related unconsolidated provisions, see Appendix A at L.L. 2021/126.
§ 28-116.7. Post-construction stormwater management facilities
The department shall not issue a certificate of occupancy or letter of completion with respect to a building or premises that is part of a covered development project unless the applicant submits proof that the department of environmental protection has issued a stormwater maintenance permit for any post-construction stormwater management facilities serving such building or premises.
(L.L. 2017/097, 5/30/2017, eff. 6/1/2019)
§ 28-117.1. Place of assembly certificate of operation
It shall be unlawful to use or occupy any building or space, including an outdoor space, as a place of assembly without a certificate of operation issued by the commissioner. An application for a certificate of operation shall be made to the department in such form and containing such information as the commissioner shall provide. The department shall inspect every place of assembly space prior to the issuance of a certificate of operation. The commissioner shall not issue a certificate of operation unless the department determines that the space conforms substantially to the approved construction documents and to this code or the 1968 building code as applicable and that the certificate of occupancy authorizes such use. A certificate of operation shall not be issued to a place of assembly providing seating or other moveable furnishings unless the commissioner approves a plan conforming to this code or the 1968 building code as applicable and the rules of the department. Seating and other moveable furnishings shall be maintained at all times during occupancy in accordance with the approved plan. Any amendment of such plan shall be subject to the prior approval of the commissioner.
§ 28-117.1.1. Contents of the place of assembly certificate of operation
The certificate of operation shall contain the place of assembly certificate number, the number of persons who may legally occupy the space and any other information that the commissioner may determine. Such certificate of operation shall be framed and mounted in a location that is conspicuously visible to a person entering the space. For the purposes of this article a department issued place of assembly permit or place of assembly certificate of operation shall be valid until its expiration, at which time a new place of assembly certificate of operation shall be required in accordance with the provisions of this article and with the filing requirements of the department.
§ 28-117.1.2. New certificate required
The following changes to a place of assembly shall require a new place of assembly certificate of operation instead of an amendment filed in accordance with section 28-117.1.3:
1. For a department issued place of assembly permit or place of assembly certificate of operation that does not have a nine-digit job number, any change of zoning use group, assembly occupancy group A-1 through A-5, or any of the changes set forth in section 28-117.1.3.
2. For all other department issued place of assembly permits or place of assembly certificates of operation, any change of zoning use group or assembly occupancy group A-1 through A-5.
§ 28-117.1.3. Amendments
No change shall be made to a place of assembly that is inconsistent with the most recently issued place of assembly certificate of operation or renewal unless an amendment to such certificate is filed with and approved or accepted by the department. Changes that require an amendment include any of the following:
1. Any physical change requiring an alteration permit to be issued by the department.
2. Any amendment to the plan for seating and other moveable furnishings, in accordance with section 28-117.1.
3. Any change to the name of the establishment.
§ 28-117.2. Temporary place of assembly certificate of operation
At the commissioner's discretion, a temporary certificate of operation may be issued for a place of assembly space upon request by the applicant in accordance with this code provided that public safety is not jeopardized thereby. The applicant shall notify the fire department when a temporary place of assembly certificate of operation is issued.
Exception. Applications for temporary certificates of operation for place of assembly space in prior code buildings shall be permitted to comply with the 1968 Building Code provided that public safety is not jeopardized thereby.
§ 28-117.3. Duration and renewal of certificate
A place of assembly certificate of operation shall be issued for a term of 1 year and may be renewed annually upon payment of proper fees and proof of satisfactory inspection by the fire department.
§ 28-117.4. Security guards
In the case of a certificate holder that offers for sale food and/or beverages for on-premises consumption, but not including establishments operated by a not-for-profit corporation, and employs or uses the services of a security guard, as that term is defined in subdivision 6 of section 89 of the New York state general business law, such certificate holder shall comply with the provisions of article 7-A of the New York state general business law, shall obtain proof that such security guard is registered pursuant to article 7-A of the general business law, shall maintain such proof in a readily available location, in accordance with rules promulgated by the commissioner during all hours in which such place of assembly is open to the public, shall maintain a roster of all security guards working at any given time when such place of assembly is open to the public, and shall require each security guard to maintain on his or her person proof of registration at all times when on the premises.
(Am. L.L. 2021/126, 11/7/2021, eff. 11/7/2022)
Editor's note: For related unconsolidated provisions, see Appendix A at L.L. 2008/008 and L.L. 2021/126.
§ 28-117.4.1. Presumption
For purposes of this section, there shall be a rebuttable presumption that a person employed or whose services are retained at a place of assembly is a security guard if his or her job functions include:
1. The monitoring or guarding of the entrance or exit of such place of assembly to manage ingress and egress to such place of assembly for security purposes during the hours of operation of such establishment; and/or
2. Protection of such place of assembly from disorderly or other unlawful conduct by patrons of such place of assembly.
Editor's note: For related unconsolidated provisions, see Appendix A at L.L. 2008/008.
§ 28-117.4.1.1. Presumption not applicable to owner
The rebuttable presumption in section 28-117.4.1 shall not apply to an individual who is an owner of the establishment as described in section 28-117.4 that has received a place of assembly certificate of operation.
Editor's note: For related unconsolidated provisions, see Appendix A at L.L. 2008/008.
§ 28-117.4.2. Responsibility for violations
Notwithstanding any provision of this section, only the holder of a certificate of operation shall be liable for violations of this article that relate to such holder's obligations regarding security guards.
Editor's note: For related unconsolidated provisions, see Appendix A at L.L. 2008/008.
§ 28-117.4.3. Enforcement
In addition to employees of the department, employees of the police department and the department of consumer and worker protection shall have the authority to enforce the provisions of this article regarding security guards.
(Am. L.L. 2020/080, 8/28/2020, eff. 8/28/2020)
Editor's note: For related unconsolidated provisions, see Appendix A at L.L. 2008/008 and L.L. 2020/080.
§ 28-117.4.4. State liquor authority reporting
The enforcement agency shall report any violation of the provisions of this section relating to security guards to the state liquor authority if the holder of the certificate of operation holds a license pursuant to the alcoholic beverage control law.
Editor's note: For related unconsolidated provisions, see Appendix A at L.L. 2008/008 and L.L. 2021/126.
§ 28-117.5. Outdoor places of assembly
The commissioner shall not issue a certificate of operation to an outdoor temporary or permanent place of assembly, including, but not limited to, tents, platforms, stages and outdoor assembly seating, unless the department determines that the space complies with the provisions of this code.
§ 28-118.1. General provisions
No building or open lot shall be used or occupied without a certificate of occupancy issued by the commissioner. Issuance of a certificate of occupancy shall not be construed as an approval of a violation of the provisions of this code or of other applicable laws and rules.
§ 28-118.2. New buildings or open lots
No building hereafter constructed or open lot shall be occupied or used, in whole or in part, unless and until a certificate of occupancy shall have been issued certifying that such building or open lot conforms substantially to the approved construction documents and the provisions of this code and other applicable laws and rules.
§ 28-118.3. Completed buildings or open lots
The provisions of sections 28-118.3.1 through 28-118.3.4 shall apply to completed buildings or open lots.
Exception: The provisions of sections 28-118.3.1 and 28-118.3.2 shall not be interpreted to require an issuance of a new or amended certificate of occupancy for a change from a mercantile establishment to a business establishment, or from a business establishment to a mercantile establishment, provided all the following criteria are met:
1. Such alteration is limited to a change within the same zoning use group;
2. The maximum occupant load for the individual establishment, both as existing and proposed, does not exceed 74 persons based on occupant load calculations in accordance with Table 6-2 of the 1968 building code or Table 1004.1.3 of the New York city building code, as applicable;
3. The establishment is located on the ground floor, accessed by the public directly from the exterior of the building;
4. The establishment undergoing alteration complies or is made to comply with any other requirements that would be applicable to the alteration, including but not limited to accessibility, and fire protection requirements pursuant to sections 901.9.2 and 1101.3.1 of the New York city building code;
5. Such alteration does not require a change in the required exits. Relocation of exit doors of the same size or larger shall not constitute a change in the required exits; and
6. Such alteration does not require a change in the live load from that stated on the existing certificate of occupancy.
(Am. L.L. 2021/126, 11/7/2021, eff. 11/7/2022)
Editor's note: For related unconsolidated provisions, see Appendix A at L.L. 2021/126.
§ 28-118.3.1. Change of occupancy or use
No building, open lot or portion thereof hereafter altered so as to change from one occupancy group to another, or from one zoning use group to another, either in whole or in part, shall be occupied or used unless and until the commissioner has issued a certificate of occupancy certifying that the alteration work for which the permit was issued has been completed substantially in accordance with the approved construction documents and the provisions of this code and other applicable laws and rules for the new occupancy or use.
§ 28-118.3.2. Changes inconsistent with existing certificate of occupancy
No change shall be made to a building, open lot or portion thereof inconsistent with the last issued certificate of occupancy or, where applicable, inconsistent with the last issued certificate of completion for such building or open lot or which would bring it under some special provision of this code or other applicable laws or rules, unless and until the commissioner has issued a new or amended certificate of occupancy.
§ 28-118.3.2.1. Changes in the address, block, lot, or zoning lot
When changes are made in the address of a building or open use, the block and/or lot numbers, or the metes and bounds of the zoning lot that are inconsistent with that indicated on a certificate of occupancy, the owner shall obtain a new or amended certificate of occupancy within one year of such change. For purposes of this section:
1. The date of change in the metes and bounds of the zoning lot shall be the date of the approval of construction documents for any new building or enlargement on the zoning lot, as per article 104 following the reporting required in section 28-104.7.18;
2. The date of the change of the address or the block and/or lot numbers shall be the date such change is made effective by the borough president or the department of finance.
(Am. L.L. 2021/126, 11/7/2021, eff. 11/7/2022)
Editor's note: For related unconsolidated provisions, see Appendix A at L.L. 2021/126.
§ 28-118.3.3. Zoning lot change not inconsistent with existing certificate of occupancy
Where metes and bounds of the zoning lot have been changed after the effective date of the local law that added this section and construction documents are approved for a new building or enlargement within such metes and bounds, an owner of a tax lot within such metes and bounds with a certificate of occupancy that does not indicate zoning lot metes and bounds shall file an application with the department notifying it of the amended metes and bounds, including the city registration file number (CRFN) numbers of the related zoning lot exhibits, and obtain approval and sign off within one year from the date of such change in metes and bounds. For purposes of this section, the date of change in the metes and bounds of the zoning lot shall be the date of the approval of construction documents for any new building or enlargement on the zoning lot, in accordance with article 104 following the reporting required in section 28-104.7.18.
(L.L. 2021/126, 11/7/2021, eff. 11/7/2022)
Editor's note: For related unconsolidated provisions, see Appendix A at L.L. 2021/126.
§ 28-118.3.4. Changes to exits
No building hereafter altered so as to cause a major alteration to existing exits shall be occupied or used unless and until the commissioner has issued a certificate of occupancy certifying that the alteration work for which the permit was issued has been completed substantially in accordance with the approved construction documents and the provisions of this code and other applicable laws and rules.
(Am. L.L. 2021/126, 11/7/2021, eff. 11/7/2022)
Editor's note: For related unconsolidated provisions, see Appendix A at L.L. 2021/126.
§ 28-118.3.5. Existing buildings or open lots without certificates of occupancy
A building or open lot in existence prior to January 1, 1938 and heretofore legally used or occupied without a certificate of occupancy or, if applicable, a certificate of completion, and subject to the provisions of section 28-102.4 (continuation of lawful existing use), may continue to be used or occupied without a certificate of occupancy or, if applicable, a certificate of completion, provided such use or occupancy is not inconsistent with the records of the department relating to the lawful use of such building or open lot, and complies with applicable laws and rules, and provided there is no change in the existing use or occupancy classification of the building, open lot or portion thereof.
(Am. L.L. 2021/126, 11/7/2021, eff. 11/7/2022)
Editor's note: For related unconsolidated provisions, see Appendix A at L.L. 2021/126.
§ 28-118.3.5.1. Zoning lot change
Where metes and bounds of a zoning lot have been changed after the effective date of this code for a building or open lot in existence prior to January 1, 1938 and heretofore legally used or occupied without a certificate of occupancy, the owner shall file an application with the department notifying it of such change in metes and bounds, including the CRFN numbers of the related zoning lot exhibits, and obtain approval and sign off within one year from the date of the change in metes and bounds of the zoning lot. For purposes of this section, the date of change in the metes and bounds of the zoning lot, shall be the date of the approval of construction documents for any new building or enlargement on the zoning lot, as per article 104 following the reporting required in section 28-104.7.18.
(L.L. 2021/126, 11/7/2021, eff. 11/7/2022)
Editor's note: For related unconsolidated provisions, see Appendix A at L.L. 2021/126.
§ 28-118.3.5.2. Application for certificate of occupancy
Upon application by the owner of such a building or open lot in existence prior to January 1, 1938, the commissioner shall issue a certificate of occupancy for such building, provided that at the time of issuing such certificate, such existing building is in compliance with all retroactive requirements of the 1968 building code applicable to such building and no notices of violation or other notices or orders affecting the building as they relate to the provisions of this code or the 1968 building code are pending before the department, and provided further that it is established to the satisfaction of the commissioner, after inspection and investigation, that the alleged use and occupancy of the building has heretofore legally existed.
(Am. L.L. 2021/126, 11/7/2021, eff. 11/7/2022)
Editor's note: For related unconsolidated provisions, see Appendix A at L.L. 2021/126.
§ 28-118.3.5.3. Partial certificates of occupancy
Partial certificates of occupancy may be issued pursuant to section 28-118.20.
(Am. L.L. 2021/126, 11/7/2021, eff. 11/7/2022)
Editor's note: For related unconsolidated provisions, see Appendix A at L.L. 2021/126.
§ 28-118.4. Applications for certificates of occupancy
All applications for certificates of occupancy shall be submitted on forms furnished by the department. Applications for new buildings or additions to buildings shall be accompanied by an accurate and complete final lot survey made by a land surveyor showing such information as prescribed by the commissioner. The commissioner may waive the requirement of such survey in the case of small sheds, stands, temporary structures, signs, and similar small structures.
§ 28-118.4.1. Applicant
The application for a certificate of occupancy shall be made by or on behalf of the owner of the building or open lot; and if made by a person other than the owner, the application shall be accompanied by a signed statement of the applicant stating that the applicant is authorized by the owner to make the application. The full names and addresses of the owner, and applicant, and of the principal officers thereof, if a corporation, shall be stated in the application.
§ 28-118.4.2. Statement of compliance
When a certificate of occupancy for a new or altered building is applied for, the application shall be accompanied by a signed statement of the registered design professional of record or permittee, stating that such person has examined the approved construction documents and specifications of the building for which the certificate of occupancy is sought, and that, to the best of his or her knowledge and belief, the building has been erected or altered in accordance with the approved construction documents and specifications and, as erected or altered, complies with the provisions of this code and all other applicable laws and rules, except insofar as variations or variances therefrom have been legally permitted or authorized, specifying such variations or variances in such required statement.
(Am. L.L. 2021/006, 1/10/2021, eff. 5/10/2021; Am. L.L. 2021/126, 11/7/2021, eff. 11/7/2022)
Editor's note: For related unconsolidated provisions, see Appendix A at L.L. 2021/126.
§ 28-118.4.3. Timeframe for application
The application for the certificate of occupancy must be submitted within six months of the final construction inspection. The department may refuse to issue a certificate of occupancy where the final inspection was completed more than six months prior to such application.
(L.L. 2021/126, 11/7/2021, eff. 11/7/2022)
Editor's note: For related unconsolidated provisions, see Appendix A at L.L. 2021/126.
§ 28-118.5. Review of applications for certificates of occupancy
All applications for certificates of occupancy and accompanying submittal documents shall be examined promptly after their submission. If the building is entitled to the certificate of occupancy applied for, the application shall be approved and the certificate of occupancy issued by the commissioner within 10 calendar days after submission of a complete application. Otherwise, the application shall be rejected and written notice of rejection, stating the grounds of rejection, shall be given to the applicant within 10 calendar days of the submission of the application. Wherever an application has been rejected and proof is thereafter submitted establishing that the grounds of rejection have been met and that the building is entitled to the certificate of occupancy applied for, the application shall be approved and the certificate of occupancy issued within 10 calendar days after submission of such proof.
§ 28-118.6. Issuance of certificate of occupancy
After the commissioner inspects the building or open lot and determines that the building or open lot conforms substantially to the approved construction documents and to the provisions of this code and other applicable laws and rules, the commissioner shall issue a certificate of occupancy that shall contain information including, but not limited to:
1. The building permit number.
2. The address of the structure.
3. Block and lot numbers pertaining to the zoning lot as of the date of issuance, as defined in section 12-10 of the New York city zoning resolution.
4. The description of the structure for which the certificate is issued.
5. A statement that the described portion of the structure has been inspected for compliance with the requirements of this code.
6. The name and signature of the commissioner.
7. The code under which the permit was issued.
8. The use and occupancy, in accordance with this code and the zoning resolution.
9. The type of construction as defined in this code.
10. The design occupant load of floors and spaces, including roofs.
11. Types of major fire suppression or alarm systems.
12. Any special stipulations and conditions of the building permit.
13. The maximum permissible live loads on the building floors and roofs.
14. The number of parking spaces.
(Am. L.L. 2021/126, 11/7/2021, eff. 11/7/2022)
Editor's note: For related unconsolidated provisions, see Appendix A at L.L. 2021/126.
§ 28-118.7. Pavement plan
No certificate of occupancy shall be issued for any building or open lot requiring a pavement plan pursuant to article 108 unless and until an inspection has been made to show that all work necessary for compliance with the pavement plan has been completed.
§ 28-118.7.1. Certification
No certificate of occupancy shall be issued for any building or open lot requiring a certification pursuant to article 108 unless and until the applicant, after completion of construction work, inspects the sidewalk and certifies that the sidewalk is free from defects.
Exception: The commissioner may issue a certificate of occupancy if in lieu of such certification the owner furnishes to the department prior to the issuance of the certificate of occupancy security satisfactory to the department that the sidewalk will be installed and paved or repaired within the time specified by the department.
§ 28-118.8. Sanitary/storm water drainage
No certificate of occupancy shall be issued until the department confirms by inspection that all work relating to the installation of the part of the sanitary/storm water drainage system which lies outside of such property, if and as required by section 24-526 of the administrative code, has been satisfactorily completed.
§ 28-118.9. Fire protection plan
No certificate of occupancy shall be issued until a fire protection plan, if required pursuant to article 109, has been filed and accepted.
§ 28-118.10. Electrical work
No certificate of occupancy shall be issued unless compliance with the New York city electrical code is certified by the commissioner.
§ 28-118.11. Certificates of compliance
No certificate of occupancy shall be issued until certificates of compliance are issued for the following types of service equipment:
1. Air conditioning and ventilation systems.
2. Elevators, escalators, moving walkways and dumbwaiters.
3. Fuel burning and fuel oil storage equipment.
4. Refrigeration systems.
5. Heating systems.
6. Boilers.
§ 28-118.12. Place of assembly certificate of operation
The issuance of a certificate of occupancy shall not authorize the use of any space as a place of assembly unless and until the commissioner thereafter issues a place of assembly certificate of operation.
§ 28-118.13. Certificates of occupancy for air-inflated structures, air-supported structures, and tents
Certificates of occupancy for air-inflated structures, air-supported structures, and tents shall be issued for a period not exceeding one year. Such certificates may be renewed for one-year periods upon demonstration that the structure complies with all laws and rules in effect at the time of the request for renewal.
§ 28-118.14. Payment of outstanding fees and penalties
The department may refuse to issue a certificate of occupancy for a building pending payment of all outstanding fees, fines or civil penalties imposed for violations of this code, the 1968 building code or other laws enforced by the department at the same building.
(Am. L.L. 2021/126, 11/7/2021, eff. 11/7/2022)
Editor's note: For related unconsolidated provisions, see Appendix A at L.L. 2021/126.
§ 28-118.15. Temporary certificates of occupancy
Upon application, the commissioner is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that the subject portion or portions of the building may be occupied and maintained in a manner that will not endanger public safety, health, or welfare. The commissioner may refuse to issue a temporary certificate of occupancy for a building pending payment of all outstanding fees, fines or civil penalties imposed for violations of this code, the 1968 building code or other laws enforced by the department at the same building. The commissioner shall set a time period during which the temporary certificate of occupancy is valid. The provisions of section 28-118.15.1 apply only to interim certificates of occupancy. Nothing in section 28-118.15.1 is intended to affect, alter or amend the commissioner's power to issue or to set time periods for the expiration of temporary certificates of occupancy that are not interim certificates of occupancy.
(Am. L.L. 2021/006, 1/10/2021, eff. 5/10/2021; Am. L.L. 2021/126, 11/7/2021, eff. 11/7/2022)
Editor's note: For related unconsolidated provisions, see Appendix A at L.L. 2021/126.
§ 28-118.15.1. Interim certificate of occupancy
An interim certificate of occupancy may be issued authorizing occupancy of a specific floor or floors of a building prior to the completion of the entire work covered by a permit in accordance with this section and rules of the department, subject to the following conditions:
1. The building is of noncombustible construction and protected with an automatic sprinkler system;
2. Adequate means of egress are provided;
3. There are no outstanding objections relating to or affecting the occupancy of such portion of the building; and
4. Upon inspection, the portion of the building is deemed safe for occupancy without reliance upon temporary measures.
Exceptions: Section 28-118.15.1 shall not apply to:
1. Residential buildings with fewer than eight stories or fewer than four dwelling units; or
2. Nonresidential buildings with fewer than five stories; or
3. Mixed-use buildings with fewer than four dwelling units; or
4. Parking structures.
(L.L. 2021/006, 1/10/2021, eff. 5/10/2021; Am. L.L. 2023/077, 6/11/2023, eff. 6/11/2023)
Editor's note: For related unconsolidated provisions, see Appendix A at L.L. 2023/077.
§ 28-118.15.1.1. Issuance, contents and posting of interim certificate of occupancy
An interim certificate of occupancy shall be issued after an inspection by the commissioner determines that the floor or floors of the building conform substantially to the approved construction documents and to the provisions of this code and other applicable laws and rules. Such interim certificate of occupancy shall contain the same information as a certificate of occupancy issued pursuant to section 28-118.6 and shall be posted while it is in effect in accordance with section 28-118.19 and replaced when necessary in accordance with section 28-118.19.1.
(L.L. 2021/006, 1/10/2021, eff. 5/10/2021)
§ 28-118.15.1.2. Effective period
An interim certificate of occupancy shall remain in effect until the issuance of a certificate of occupancy for the building in accordance with section 28-118.6.
(L.L. 2021/006, 1/10/2021, eff. 5/10/2021)
§ 28-118.15.2. Revocation and suspension
The commissioner may revoke or suspend a temporary certificate of occupancy, including an interim certificate of occupancy, that was issued in error, or on the basis of incorrect information provided to the department, or based on discontinuance of a nonconforming use pursuant to article V of the New York city zoning resolution, in accordance with the procedures set forth in sections 28-105.10.1 and 28-105.10.2 for the suspension or revocation of a permit.
(L.L. 2021/006, 1/10/2021, eff. 5/10/2021; Am. L.L. 2021/126, 11/7/2021, eff. 11/7/2022)
Editor's note: For related unconsolidated provisions, see Appendix A at L.L. 2021/126.
§ 28-118.16. Amended certificate of occupancy
The provisions of sections 28-118.16.1 through 28-118.16.2 shall apply to amended certificates of occupancy.
§ 28-118.16.1. Buildings exceeding three stories in height and change does not exceed 20 percent of total floor area
Where a building exceeds three stories in height and the change does not exceed 20 percent of the total floor area, an amendment to the existing certificate of occupancy for such new use shall be issued by the commissioner certifying that the proposed new occupancy and use conforms to the provisions of the laws governing building construction and that the proposed use will not be in conflict with any provisions of the New York state labor law, New York state multiple dwelling law or the zoning resolution.
(Am. L.L. 2021/126, 11/7/2021, eff. 11/7/2022)
Editor's note: For related unconsolidated provisions, see Appendix A at L.L. 2021/126.
§ 28-118.16.2. Change in address of the structure, block and lot numbers or metes and bounds of a zoning lot subsequent to the issuance of a certificate of occupancy
Where no change is made to a building, open lot or portion thereof inconsistent with the last issued certificate of occupancy, an amended certificate of occupancy may be issued to reflect a change in the address of the structure, block and lot numbers or the metes and bounds of the zoning lot. Notwithstanding any other provisions of law, removal of violations and payment of outstanding penalties are not required prior to issuance of an amended certificate of occupancy in accordance with this section 28-118.16.2.
§ 28-118.17. Revocation of certificates of occupancy
The commissioner is authorized to request, in writing, pursuant to section 645 of the New York city charter that the board of standards and appeals or a court of competent jurisdiction revoke, vacate, or modify a certificate of occupancy issued under the provisions of this code whenever the certificate is issued in error, or on the basis of incorrect information provided to the department, or the nonconforming use reflected on the certificate of occupancy is no longer permitted pursuant to article V of the New York city zoning resolution. This section shall not be construed to apply to interim certificates of occupancy and other temporary certificates of occupancy.)
(Am. L.L. 2021/006, 1/10/2021, eff. 5/10/2021; Am. L.L. 2021/126, 11/7/2021, eff. 11/7/2022)
Editor's note: For related unconsolidated provisions, see Appendix A at L.L. 2021/126.
§ 28-118.18. Record of certificates
A record of all certificates of occupancy shall be kept by the department; and copies thereof shall be furnished by the department upon request, and on the payment of the fee prescribed in article 112 of this chapter. The certificate of occupancy or a copy thereof shall be available for inspection at the building at all reasonable times.
§ 28-118.19. Posting of certificates of occupancy
The owner shall post a copy of the building's certificate of occupancy, partial certificates of occupancy or temporary, including interim, certificates of occupancy in accordance with this section, except buildings occupied entirely by group R-3. Owners of buildings that are not required to have a certificate of occupancy shall post a sign or placard in a form prescribed by the commissioner. The certificate of occupancy or sign, as applicable, shall be permanently affixed to the structure in a conspicuous location in a public hall, corridor, management office of the building or as otherwise prescribed by the commissioner.
(Am. L.L. 2021/006, 1/10/2021, eff. 5/10/2021; Am. L.L. 2021/126, 11/7/2021, eff. 11/7/2022)
Editor's note: For related unconsolidated provisions, see Appendix A at L.L. 2021/126.
§ 28-118.19.1. Replacement of posted certificates of occupancy and signs
All posted certificates of occupancy, partial certificates of occupancy, temporary, including interim, certificates of occupancy or signs, as applicable, shall not be removed or defaced and, if lost, removed or defaced, shall be immediately replaced. The commissioner may inspect or cause to be inspected periodically all buildings for compliance with the provisions of this code in regard to posting; and the inspection reports shall specify any violation thereof.
(Am. L.L. 2021/006, 1/10/2021, eff. 5/10/2021)
§ 28-118.20. Partial certificate of occupancy
A partial certificate of occupancy may be issued to a specific floor or floors of an existing building erected prior to January 1, 1938 subject to the following conditions:
1. The building does not have and is not otherwise required to have a certificate of occupancy or certificate of completion, if applicable.
2. The floor or floors for which a certificate of occupancy is issued shall not constitute more than 50 percent of the gross floor area of the building.
3. The building is of noncombustible construction and protected with an automatic sprinkler system.
4. Adequate means of egress are provided from all floors.
5. Upon inspection, the building is deemed safe for occupancy.
§ 28-118.21. Live loads posted
Where the live loads for which each floor or portion thereof of a commercial or industrial building is or has been designed to exceed 50 psf (2.40 kN/m 2 ), a certificate of occupancy required by this article shall not be issued until such design loads shall be conspicuously posted by the owner in that part of each story in which they apply, using durable signs. It shall be unlawful to remove or deface such signs.
Exception. This section shall not apply to prior code buildings.
(Am. L.L. 2021/126, 11/7/2021, eff. 11/7/2022)
Editor's note: For related unconsolidated provisions, see Appendix A at L.L. 2021/126.
§ 28-118.22. Post-construction stormwater management facilities
The department shall not issue a certificate of occupancy with respect to a building or premises that is part of a covered development project unless the applicant submits proof that the department of environmental protection has issued a stormwater maintenance permit for any post-construction stormwater management facilities serving such building or premises.
(L.L. 2017/097, 5/30/2017, eff. 6/1/2019)
§ 28-118.23. Extension, alteration or relocation of chimneys and vents
No certificate of occupancy shall be issued until all chimneys and vents required to be extended, altered or relocated by section 2113 of the New York city building code, section 801 of the New York city mechanical code or section 501 of the New York city fuel gas code have been so modified.
Exceptions:
1. A certificate of occupancy may be issued to the new or altered taller building where access is granted and conditions are observed that result in a determination that chimney or vent alteration is not required and a revised chimney or vent plan is submitted pursuant to section 107.18 of the New York city building code.
2. A certificate of occupancy may be issued to the new or altered taller building where one or more of the chimneys or vents requiring alteration has not been altered or proven to comply with the applicable requirements of the New York city fuel gas code or New York city mechanical code as required when the following conditions have been met:
2.1. The owners of the affected buildings have provided their refusal of consent in writing, or the owner of the affected buildings failed to grant consent after the owner of the new or altered taller building has made all the required notifications to the affected building owners; and
2.2. The owner of the new or taller building demonstrates to the department in the form of a written statement from a registered design professional that there is no hazard to the occupancy in whole or in part of the new or altered building from the continued operation of the chimneys or vents in question.
(L.L. 2021/126, 11/7/2021, eff. 11/7/2022)
Editor's note: For related unconsolidated provisions, see Appendix A at L.L. 2021/126.