§ 1-00. Purpose
The purpose of these rules is to protect public health and the environment by minimizing the emission of asbestos fibers into the air of the City when buildings or structures with asbestos-containing material are renovated, altered, repaired, or demolished by ensuring that asbestos-containing material is handled appropriately and by individuals qualified to do so.
(Added City Record 12/7/2018, eff. 1/6/2019)
§ 1-01. Scope and Application
(a) The following asbestos control program rules, 15 RCNY §§ 1-01 et seq., shall apply to all asbestos abatement activities occurring within the City of New York.
(b) Every owner of a building where asbestos abatement activity occurs shall be responsible for the performance of the asbestos abatement activities by his/her agent, contractor, employee, or other representative.
(c) Every contractor and worker engaged in asbestos abatement activities shall comply with the provisions of this chapter except as otherwise specified.
(d) Every investigator engaged to identify the presence and evaluate the condition of asbestos in a building or structure shall comply with the provisions of this chapter except as otherwise specified.
(e) No person shall knowingly make a false statement or submit or provide a false document to any city agency or any individual as to any matter related to an asbestos project, asbestos survey, or any document required to be filed under these rules.
(f) The department may inspect at a reasonable time and in a reasonable manner anything which affects or may affect the emission or release of asbestos fibers or the disturbance of asbestos-containing material, including but not limited to the premises where an asbestos project is being conducted, or the premises for which a notification has been filed under 15 RCNY § 1-21 - 15 RCNY § 1-26 of these Rules, or the premises where an application has been filed with the Department of Buildings for a plan or permit approval.
(g) No person shall interfere with or obstruct any employee of the Department in the performance of their official duties, including but not limited to the performance of inspections.
(h) No person who holds a certificate issued pursuant to these rules shall engage in unprofessional conduct. Unprofessional conduct shall include but is not limited to:
(1) Failure to comply with provisions of Federal, State or local laws, rules, or regulations.
(2) Conduct in asbestos inspections, assessment, abatement activities, air sampling, etc. which evidences moral unfitness.
(3) Making or filing a false report, or failing to file a report required by these rules or impeding or obstructing such filing, or inducing another person to do so.
(i) The size (amount of material to be disturbed or, in the case of cleanups, the dimensions of the area to be cleaned) and scope of the overall project shall control the notification to be filed and work procedures to be followed. The requirements set forth in these rules may not be avoided or lessened through the performance of work in increments or piecemeal fashion.
(j) (1) Any person, including but not limited to contractors, building owners, and air monitoring companies, who is in violation of or fails to comply with any provision of these rules or the terms and conditions of any variance issued pursuant to these rules shall be subject to the issuance of notice(s) of violation and other civil and criminal enforcement actions pursuant to Title 24, Chapter 1, Subchapter 9 of the Administrative Code of the City of New York.
(2) The maximum civil penalty for any violation of a lettered subsection of these rules, pursuant to a notice of violation returnable before the Environmental Control Board of the Office of Administrative Trials and Hearings, shall be $10,000, except that a violation of 15 RCNY § 1-26 shall carry a maximum penalty of $15,000.
(3) DEP may block an asbestos investigator from filing an Asbestos Assessment Report (Form ACP5) or deny any application for an asbestos abatement permit pursuant to 15 RCNY § 1-26, or a variance application pursuant to 15 RCNY § 1-03, where any party to the asbestos project, including but not limited to the abatement contractor, building owner, or air monitoring company, has docketed, unpaid civil penalties imposed by the Environmental Control Board of the Office of Administrative Trials and Hearings for violations of these rules, §§ 24-136 and 24-138 of the Administrative Code, or NYSDOLICR 56.
(Amended City Record 12/7/2018, eff. 1/6/2019; amended City Record 4/28/2022, eff. 5/28/2022)
§ 1-02. Definitions
Abatement. "Abatement" shall mean any and all procedures physically taken to control fiber release from asbestos-containing materials. This includes removal, encapsulation, enclosure, cleanup and repair.
Abatement activities. "Abatement activities" shall mean all activities from the initiation of work area preparation through successful clearance air monitoring performed at the conclusion of an asbestos project or minor project.
Adequately wet. "Adequately wet" shall mean the complete penetration of a material with amended water to prevent the release of particulates. If visible emissions are observed coming from asbestos-containing material, then the material has not been adequately wetted. However, the absence of visible emissions is not evidence of being adequately wet. ACM must be fully penetrated with the wetting agent in order to be considered adequately wet. If the ACM being abated is resistant to amended water penetration, wetting agent shall be applied to the material prior to and during removal as necessary to minimize fiber release.
Aggressive sampling. "Aggressive sampling" shall mean a method of sampling in which the individual collecting the air sample creates activity by the use of mechanical equipment during the sampling period to stir up settled dust and simulate activity in that area of the building.
AHERA. "AHERA" shall mean the Asbestos Hazard Emergency Response Act of 1986.
AIHA. "AIHA" shall mean the American Industrial Hygiene Association.
Airlock. "Airlock" shall mean a system for permitting entrance and exit while restricting air movement between a contaminated area and an uncontaminated area. It consists of two curtained doorways separated by a distance of at least three feet such that one passes through one doorway into the airlock, allowing the doorway sheeting to overlap and close off the opening before proceeding through the second doorway, thereby preventing flow-through contamination.
Air sampling. "Air sampling" shall mean the process of measuring the fiber content of a known volume of air collected during a specific period of time. The procedure utilized for asbestos follows the NIOSH Standard Analytical Method 7400 or the provisional transmission electron microscopy methods developed by the USEPA and/or National Institute of Science and Technology which are utilized for lower detectability and specific fiber identification.
Airtight. "Airtight" shall mean secured and sealed utilizing 6 mil plastic sheeting and tape to make a barrier through which no air, dust or debris can be transferred.
Ambient air monitoring. "Ambient air monitoring" shall mean measurement or determination of airborne asbestos fiber concentrations outside but in the general vicinity of the worksite.
Amended water. "Amended water" shall mean water to which a surfactant has been added.
Amendment. "Amendment" shall mean the Form ACP-8 submitted to modify the asbestos project notification (Form ACP7) by changing information that was provided when the ACP7 was originally filed.
ANSI. "ANSI" shall mean the American National Standards Institute.
Area air sampling. "Area air sampling" shall mean any form of air sampling or monitoring where the sampling device is placed at some stationary location.
ARTS E-File. "ARTS E-File" shall mean the web-based filing system applicants utilize to submit, process, amend and close out asbestos project notifications; asbestos project variances; asbestos work permits; project monitor reports; and related documents to the DEP.
Asbestos. "Asbestos" shall mean any hydrated mineral silicate separable into commercially usable fibers, including but not limited to chrysotile (serpentine), amosite (cumingtonite-grunerite), crocidolite (riebeckite), tremolite, anthrophyllite and actinolite.
Asbestos-containing material. "Asbestos-containing material" (ACM) shall mean asbestos or any material containing more than one percent asbestos.
Asbestos-containing waste material. "Asbestos-containing waste material" shall mean asbestos-containing material or asbestos-contaminated objects requiring disposal.
Asbestos-contaminated objects. "Asbestos-contaminated objects" shall mean any objects which have been contaminated by asbestos or asbestos-containing material.
Asbestos assessment report. "Asbestos assessment report" shall mean the "Form ACP-5" form, as approved by DEP, by which a DEP-certified asbestos investigator certifies that a building or structure (or portion thereof) is free of ACM or the amount of ACM to be abated constitutes a minor project, or that ACM is present and will not be disturbed during construction activity.
Asbestos handler. "Asbestos handler" shall mean an individual certified by the Department who disturbs, removes, encapsulates, repairs, or encloses asbestos material.
Asbestos handler supervisor. "Asbestos handler supervisor" shall mean an individual certified by the Department who supervises the handlers during an asbestos project and ensures that proper asbestos abatement procedures as well as individual safety procedures are being adhered to.
Asbestos project notification. "Asbestos project notification" shall mean the "Form ACP-7" asbestos project notification form as approved by DEP.
Asbestos Project Air Sampling Technician. "Asbestos Project Air Sampling Technician" shall mean an individual who is certified by the NYS Department of Labor in accordance with 12 NYCRR 56.
Asbestos investigator. "Asbestos investigator" shall mean an individual certified by the Commissioner as having satisfactorily demonstrated his or her ability to identify the presence and evaluate the condition of asbestos in a building or structure.
Asbestos project. "Asbestos project" shall mean any form of work performed in a building or structure or in connection with the replacement or repair of equipment, pipes, or electrical equipment not located in a building or structure which will disturb (e.g., remove, enclose, encapsulate) more than 25 linear feet or more than 10 square feet of asbestos-containing material.
ASTM. "ASTM" shall mean the American Society For Testing and Materials.
Authorized visitor. "Authorized visitor" shall mean the building owner and his/her representative, and any representative of a regulatory or other agency having jurisdiction over the project.
Building owner. "Building owner" shall mean the person in whom legal title to the premises is vested unless the premises are held in land trust, in which instance building owner means the person in whom beneficial title is vested.
Building materials. "Building materials" shall mean any and all materials listed as Presumed Asbestos Containing Materials (PACM) and Suspect Miscellaneous ACM in NYSDOL ICR 56, including but not limited to interior and exterior finishes, equipment, plaster, roofing, flooring, caulking, sealants, tiles, insulation, and mortar and refractory bricks used in the construction of boilers.
Certified industrial hygienist. "Certified industrial hygienist" (CIH) shall mean an individual who is currently certified by the American Board of Industrial Hygiene.
Certified safety professional (CSP). "Certified safety professional" (CSP) shall mean an individual having a bachelor's degree from an accredited college or university and a minimum of four years experience as a safety professional and who has successfully completed both levels of the examination administered by the Board of Certified Safety Professionals and who is currently certified by that Board.
Chain of custody. "Chain of custody" shall mean the form or set of forms that document the collection and transfer of a sample, which must reflect the time and date of all transfers of that sample and identify each person that handles that sample by such person's printed full name and signature.
Clean room. "Clean room" shall mean an uncontaminated area or room which is part of the worker decontamination enclosure system with provisions for storage of workers' street clothes and protective equipment.
Clearance air monitoring. "Clearance air monitoring" shall mean the employment of aggressive sampling techniques with a volume of air collected to determine the airborne concentration of residual fibers, and shall be performed as the final abatement activity.
Commissioner. "Commissioner" shall mean the Commissioner of the New York City Department of Environmental Protection.
Containerize. "Containerize" shall mean the placing of asbestos-containing material in an acceptable container for disposal, as specified by these rules.
Contractor. "Contractor" shall mean a public authority or any other governmental agency or instrumentality thereof, self-employed person, company, unincorporated association, firm, partnership or corporation and any owner or operator thereof, which engages in an asbestos project or employs persons engaged in an asbestos project.
Curtained doorway. "Curtained doorway" shall mean a device which consists of at least three overlapping sheets of fire retardant plastic over an existing or temporarily framed doorway. One sheet shall be secured at the top and left side, the second sheet at the top and right side, and the third sheet at the top and left side. All sheets shall have weights attached to the bottom to ensure that the sheets hang straight and maintain a seal over the doorway when not in use.
Decontamination enclosure system. "Decontamination enclosure system" shall mean a series of connected rooms, separated from the work area and from each other by air locks, for the decontamination of workers, materials, waste containers, and equipment.
Demolition. "Demolition" shall mean the dismantling or razing of a building, including all operations incidental thereto (except for asbestos abatement activities), for which a demolition permit from the New York City Department of Buildings is required.
Department or DEP. "Department" or "DEP" shall mean the New York City Department of Environmental Protection.
Disturb. "Disturb" shall mean any activity that disrupts, impregnates, or strips the matrix of ACM or PACM, or that generates debris, visible emissions, or airborne asbestos fibers from ACM or PACM. This includes but is not limited to the removal, encapsulation, enclosure, renovation, repair, or cleanup of ACM or PACM.
DOB. "DOB" shall mean the New York City Department of Buildings.
ELAP. "ELAP" shall mean the Environmental Laboratory Approval Program administered by the New York State Department of Health.
Electronic Recordkeeping System. "Electronic recordkeeping system" shall mean an electronic system in which records are collected, organized, and categorized to facilitate their preservation and use, by utilizing a format and a reliable media that enables future retrieval of these records.
Encapsulant (sealant) or encapsulating agent. "Encapsulant (sealant) or encapsulating agent" shall mean liquid material which can be applied to asbestos-containing material which temporarily controls the possible release of asbestos fibers from the material or surface either by creating a membrane over the surface (bridging encapsulant) or by penetrating into the material and binding its components together (penetrating encapsulant). A thin coat of lockdown encapsulant shall be applied to all surfaces in the work area which were not the subject of removal or abatement, including the cleaned layer of the surface barriers and excluding sprinklers, standpipes, and other active elements of the fire suppression system.
Encapsulation. "Encapsulation" shall mean the coating or spraying of asbestos-containing material with an encapsulant. A thin coat of lockdown encapsulant shall be applied to all surfaces in the work area which were not the subject of removal or abatement, including the cleaned layer of the surface barriers and excluding sprinklers, standpipes, and other active elements of the fire suppression system.
Enclosure. "Enclosure" shall mean the construction of airtight walls and ceilings between the ACM and the facility environment, or around surfaces coated with ACM, or any other appropriate procedure as determined by the Department which prevents the release of asbestos fibers.
EPA. "EPA" or "USEPA" shall mean the United States Environmental Protection Agency.
Equipment room. "Equipment room" shall mean a contaminated area or room which is part of the worker decontamination enclosure system with provisions for the storage of contaminated clothing and equipment.
Exit. "Exit" shall mean that portion of a means of egress system which is separated from other interior spaces of a building or structure by fire-resistance-rated construction to provide a protected path of egress travel between the exit access and the exit discharge.
Exit Passageway. "Exit passageway" shall mean a horizontal extension of a vertical exit, or a passage leading from a yard or court to an open exterior space.
FDNY. "FDNY" shall mean the Fire Department of the City of New York.
Fiber. "Fiber" shall mean an acicular single crystal or a similarity elongated polycrystalline aggregate which displays some resemblance to organic fibers by having such properties as flexibility, high aspect ratio, silky luster, axial lineation, and others, and which has attained its shape primarily through growth rather than cleavage.
Fixed object. "Fixed object" shall mean a unit of equipment, furniture, or other item in the work area which cannot be removed from the work area. Fixed objects shall include equipment, furniture, or other items that are attached, in whole or in part, to a floor, ceiling, wall, or other building structure or system or to another fixed object and cannot be reasonably removed from the work area. Fixed objects shall also include pipes and other equipment inside the work area which are not the subject of the asbestos project. Active fire suppression system components shall not be considered fixed objects.
Glovebag technique. "Glovebag technique" shall mean a method for removing asbestos-containing material from heating, ventilation and air conditioning (HVAC) ducts, short piping runs, valves, joints, elbows, and other nonplanar surfaces. The glovebag assembly is a manufactured device consisting of a large bag (constructed of at least 6-mil transparent plastic), two inward-projecting long sleeve gloves, one inward-projecting waterwand sleeve, an internal tool pouch, and an attached, labeled receptacle for asbestos waste. The glovebag is constructed and installed in such a manner that it surrounds the object or area to be decontaminated and contains all asbestos fibers released during the removal process.
HEPA filter. "HEPA filter" shall mean a high efficiency particulate air filter capable of trapping and retaining 99.97 percent of particles (asbestos fibers) greater than 0.3 micrometers mass median aerodynamic equivalent diameter.
HEPA vacuum equipment. "HEPA vacuum equipment" shall mean vacuuming equipment with a HEPA filter.
Holding area. "Holding area" shall mean a chamber in the equipment decontamination enclosure located between the washroom and an uncontaminated area.
Homogeneous work area. "Homogeneous work area" shall mean a portion of the work area which contains one type of asbestos-containing material and/or where one type of abatement is used.
Industrial hygiene. "Industrial hygiene" shall mean that science and art devoted to the recognition, evaluation and control of those environmental factors or stresses, arising in or from the work place, which may cause sickness, impaired health and well being, or significant discomfort and inefficiency among workers or among the citizens of the community.
Industrial hygienist. "Industrial hygienist" shall mean an individual having a college or university degree or degrees in engineering, chemistry, physics, or medicine or related biological sciences who, by virtue of special studies and training, has acquired competence in industrial hygiene.
Isolation barrier. "Isolation barrier" shall mean the construction of partitions, the placement of solid materials, and the plasticizing of apertures to seal off the work place from surrounding areas and to contain asbestos fibers in the work area.
Large asbestos project. "Large asbestos project" shall mean an asbestos project involving the disturbance (e.g., removal, enclosure, encapsulation) of 260 linear feet or more of asbestos-containing material or 160 square feet or more of asbestos-containing material.
Log. "Log" shall mean a permanently bound official record of all activities that occurred during the project. One log must be maintained by the abatement contractor in accordance with 15 RCNY § 1-92, and one log must be maintained by the air monitoring company in accordance with 15 RCNY § 1-37.
Means of egress. "Means of egress" shall mean a continuous and unobstructed path of vertical and horizontal egress travel from any occupied portion of a building or structure to a public way. A means of egress consists of three separate and distinct parts: the exit access, the exit and the exit discharge.
Minor project. "Minor project" shall mean a project involving the disturbance (e.g. removal, enclosure, encapsulation, repair) of 25 linear feet or less of asbestos containing material or 10 square feet or less of asbestos containing material.
Movable object. "Movable object" shall mean a unit of equipment or furniture in the work area which can be removed from the work area.
Negative air pressure equipment. "Negative air pressure equipment" shall mean a portable local exhaust system equipped with HEPA filtration. The system shall be capable of creating a negative pressure differential between the outside and inside of the work area.
NFPA. "NFPA" shall mean the National Fire Protection Association.
NIOSH. "NIOSH" shall mean the National Institute for Occupational Safety and Health.
NYSDOL. "NYSDOL" shall mean the New York State Department of Labor.
NYSDOL ICR 56. "NYSDOL ICR 56" shall mean Part 56 of the Official Compilation of Codes, Rules and Regulations of the State of New York or 12 NYCRR Part 56.
NYSDOH. "NYSDOH" shall mean the New York State Department of Health.
Obstruction. "Obstruction" shall mean the blocking of a means of egress with any temporary structure or barrier. A corridor shall not be considered obstructed when there is a clear path measuring at least three (3) feet wide permitting access to all required vertical exits and/or exit doors. Abatement worker egress from the work area through Polyethylene sheeting covering an egress used only by abatement workers, shall not be considered an obstruction when it is prominently marked with exit signage or paint and cutting tools (knife, razor) are attached to the work area side of the sheeting for use in the event that the sheeting must be cut to permit egress.
Occupied Area. "Occupied area" shall mean an area of the worksite where abatement is not taking place and where personnel or occupants normally function or where workers are not required to use personal protective equipment.
OSHA. "OSHA" shall mean the United States Occupational Safety and Health Administration.
OSHA Construction Safety and Health card. "OSHA Construction Safety and Health card" shall mean a card issued by an authorized OSHA Outreach Training Institute (OTI) or OTI Education Center that certifies that the recipient has successfully completed an approved OSHA 10-hour or 30-hour Construction Safety and Health training class.
Outside air. "Outside air" shall mean the air outside the work place.
Permanently bound log. "Permanently bound log" shall mean a log consisting of sequentially numbered sheets of paper, pre-printed or handwritten, that are permanently secured to front and back covers by stitching, glue, and binding that creates a strong and lasting bond and makes readily discernible the removal or insertion of sheets after the log's first use.
Person. "Person" shall mean any individual, partnership, company, corporation, association, firm, organization, governmental agency, administration or department, or any other group of individuals, or any officer or employee thereof.
Personal air monitoring. "Personal air monitoring" shall mean a method used to determine employees' exposure to airborne fibers. The sample is collected outside the respirator in the worker's breathing zone.
Personal protective equipment. "Personal protective equipment" (PPE) shall mean appropriate protective clothing, gloves, eye protection, footwear, head gear.
Phase contrast microscopy. "Phase contrast microscopy" (PCM) shall mean the measurement protocol for the assessment of the fiber content of air. (NIOSH Method 7400).
Physically present. “Physically present” means that an individual is actually in a building or location, and does not include being virtually or remotely present.
Physician. "Physician" shall mean an individual licensed or otherwise authorized under Article 131 § 65.22 of the New York State Education Law.
Plasticize. "Plasticize" shall mean to cover floors and walls with fire retardant plastic sheeting as herein specified or by using spray plastics as acceptable to the Department.
Polarized light microscopy. "Polarized light microscopy" (PLM) shall mean the measurement protocol for the assessment of the asbestos content of bulk materials. (Interim Method for the Determination of Asbestiform Materials in Bulk Insulation Samples - 40 C.F.R. Part 763, Subpart F, Appendix A as amended on September 1, 1982)
Pre-demolition Abatement Activities. "Pre-demolition abatement activities" shall mean any and all asbestos abatement activities required to be performed and completed prior to the partial or total structural demolition of a building or structure, including successful clearance air monitoring.
Presumed Asbestos Containing Material (PACM). "Presumed Asbestos Containing Material" shall mean all Thermal System Insulation and Surfacing Material as described in 15 RCNY § 1-38. PACM is considered to be ACM unless proven otherwise by appropriate bulk sampling and laboratory analyses.
Project designer. "Project designer" shall mean a person who holds a valid Project Designer Certificate issued by the New York State Department of Labor.
Project monitor. "Project monitor" shall mean a person who holds a valid Project Monitor Certificate issued by the New York State Department of Labor.
Project monitor's report. "Project monitor's report" shall mean the "Form ACP-15" that the project monitor is required to submit for partial or complete asbestos project closeout as approved by DEP.
Qualitative fit test. "Qualitative fit test" shall mean the individual test subject's responding (either voluntarily or involuntarily) to a chemical challenge outside the respirator face piece. Acceptable methods include irritant smoke test, odorous vapor test, and taste test.
Quantitative fit test. "Quantitative fit test" shall mean exposing the respirator wearer to a test atmosphere containing an easily detectable, nontoxic aerosol, vapor or gas as the test agent. Instrumentation, which samples the test atmosphere and the air inside the face piece of the respirator, is used to measure quantitatively the leakage into the respirator. There are a number of test atmospheres, test agents, and exercises to perform during the tests.
Registered design professional. "Registered design professional" shall mean a person licensed and registered to practice the professions of architecture or engineering under the Education Law of the State of New York.
Removal. "Removal" shall mean the stripping of any asbestos-containing materials from surfaces or components of a facility or taking out structural components in accordance with 40 C.F.R. 61 Subparts A and M.
Renovation. "Renovation" shall mean an addition or alteration or change or modification of a building or the service equipment thereof, that is not classified as an ordinary repair as defined in § 27-125 of the Administrative Code of the City of New York.
Repair. "Repair" shall mean corrective action using specified work practices e.g. glovebag, plastic tent procedures, etc. to minimize the likelihood of fiber release from minimally damaged areas of ACM.
Replacement material. "Replacement material" shall mean any material used to replace ACM that contains less than .01 percent asbestos.
Shift. "Shift" shall mean a worker's, or simultaneous group of workers', complete daily term of work.
Shower room. "Shower room" shall mean a room between the clean room and the equipment room in the worker decontamination enclosure with hot and cold running water controllable at the tap and arranged for complete showering during decontamination.
Small asbestos project. "Small asbestos project" shall mean an asbestos project involving the disturbance (e.g., removal, enclosure, encapsulation) of more than 25 and less than 260 linear feet of asbestos-containing material or more than 10 and less than 160 square feet of asbestos-containing material.
Staging area. "Staging area" shall mean the work area near the waste transfer airlock where containerized asbestos waste has been placed prior to removal from the work area.
Start date. "Start date" shall mean the date when a worker decontamination enclosure system is installed and functional.
Strip. "Strip" shall mean to remove asbestos materials from any part of the facility.
Structural member. "Structural member" shall mean any load-supporting member of a facility, such as beams and load-supporting walls, or any nonload-supporting member, such as ceiling and nonload-supporting walls.
Substrate. "Substrate" shall mean non-asbestos containing material which is beneath and supports asbestos-containing material.
Surface barriers. "Surface barriers" shall mean the plasticizing of walls, floors, and fixed objects within the work area to prevent contamination from subsequent work.
Surfactant. "Surfactant" shall mean a chemical wetting agent added to water to improve penetration.
Suspect Miscellaneous ACM. "Suspect Miscellaneous ACM" shall mean any building material that is not PACM, such as floor tiles, ceiling tiles, mastics/adhesives, sealants, roofing materials, cementitous materials, etc. All Suspect Miscellaneous ACM must be assumed to be ACM, unless proven otherwise by appropriate bulk sampling and laboratory analyses.
Transmission electron microscopy (TEM). "Transmission electron microscopy (TEM)" shall mean the measurement protocol for the assessment of the asbestos fiber content of air. (Interim Transmission Electron Microscopy Analytical Methods - 40 C.F.R. Part 763, Subpart E, Appendix A)
Variance. "Variance" shall mean relief from specific sections of the rule for a specific project.
Visible emissions. "Visible emissions" shall mean any emissions containing particulate material that are visually detectable without the aid of instruments.
Warning line system. "Warning line system" shall mean a barrier erected on a roof where there are no perimeter parapet walls or where perimeter parapet walls are less than 39 inches in height, which is intended to warn employees that they are approaching an unprotected roof side or edge.
Washroom. "Washroom" shall mean a room between the work area and the holding area in the equipment decontamination enclosure system where equipment and waste containers are wet cleaned and/or HEPA vacuumed prior to disposal.
Waste decontamination enclosure system. "Waste decontamination enclosure system" shall mean the decontamination enclosure system designated for the controlled transfer of materials and equipment, consisting of a washroom and a holding area.
Wet cleaning. "Wet cleaning" shall mean the removal of asbestos fibers from building surfaces and objects by using cloths, mops, or other cleaning tools which have been dampened with water.
Wet methods. "Wet methods" shall mean the use of amended water or removal encapsulants to minimize the generation of fibers during ACM disturbance.
Work area. "Work area" shall mean designated rooms, spaces, or areas of the building or structure where asbestos abatement activities take place. For glovebag procedures, the work area shall also include the areas contiguous to where the glovebag procedure takes place. For the purpose of the survey of a building for asbestos, the work area is the premises, or those portions of the premises where the renovation or alteration work is to occur, as reflected in the Form ACP 5.
Work place. "Work place" shall mean the work area and the decontamination enclosure system(s).
Work place safety plan. "Work place safety plan" shall mean documents prepared by a registered design professional and submitted for review by DEP in order to obtain an asbestos abatement permit. Such plan shall include, but not be limited to, plans, sections, and details of the work area clearly showing the extent, sequence, and means and methods by which the work is to be performed.
Work site. "Work site" shall mean premises where asbestos abatement activity is taking place, and may be composed of one or more work areas.
Worker. "Worker" shall mean asbestos handler and/or asbestos handler supervisor.
Worker decontamination enclosure system. "Worker decontamination enclosure system" shall mean that portion of a decontamination enclosure system designed for controlled passage of workers, and other individuals and authorized visitors, consisting of a clean room, a shower room, and an equipment room separated from each other and from the work area by airlocks and curtained doorways.
(Amended City Record 12/7/2018, eff. 1/6/2019; amended City Record 4/28/2022, eff. 5/28/2022; amended City Record 1/15/2025, eff. 2/14/2025)
§ 1-03. Variances
(a) Application for any variance must be made directly to the Department through the ARTS E-File System at least two weeks prior to the commencement of work. Work involving a variance may not commence prior to the receipt of the Department's approval of the application. Upon the Department’s approval of an application other than an application for a variance from section 15 RCNY § 1-22(b), application the applicant must generate an approved variance (Form V2) by entering a start date in the ARTS E-File System, and must print out and post a copy of the approved variance at the work place. Upon the Department’s approval of an application for a variance from 5 RCNY § 1-22(b), the Department will issue the variance approval (Form V5) in the ARTS E-File System, and the applicant must then submit the Form V5 to DOB and post a copy of the Form V5 at the work place. Any variance must be approved and issued prior to the commencement of asbestos abatement activities, except that where a project includes both work areas for which a variance application has been filed and work areas for which no variance is being sought, work on the non-variance portion of the project must begin on the start date indicated in the ACP-7.
(b) The Department's "Asbestos Variance Application" (ACP-9) form shall be prepared and submitted by a project designer and authorized by the building owner or authorized agent, and shall include the following information:
(1) Identification of those portions of the rules for which a variance is requested, providing each numbered section and subsection with a description of the deviation;
(2) A description of the hardship preventing the required procedures from being employed;
(3) A written proposal setting forth the alternative procedures the applicant will employ to satisfy each requirement as modified; and
(4) A drawing illustrating the proposed modification.
(c) For each variance application where the combined amount (total of both square and linear feet on the ACP-7) of ACM is less than 5,000 feet, payment of the variance processing fee shall accompany the application and shall conform with the payment schedule as follows:
(1) Request to modify no more than one lettered subsection in any section category listed in subsection (e) below: $400 fee.
(2) For each additional subsection in any category listed in subsection (e): $200 fee.
(3) The maximum fee: $1,200.
(d) For each variance application where the combined amount (total of both square and linear feet on the ACP-7) of ACM is greater than or equal to 5,000 feet, payment of the variance processing fee shall accompany the application and shall conform with the payment schedule as follows:
(1) Request to modify no more than one lettered subsection in any section category listed in subsection (e): $600.
(2) For each additional subsection in any category listed in subsection (e): $300.
(3) The maximum fee: $1,800.
(e) Section categories shall be as follows:
CATEGORY NYC Asbestos Control Program Section #s 12 NYCRR Part 56 Section #s Notifications Permitting & Recordkeeping 21-29 Air Monitoring 31-45 56-4, 6 Materials and Equipment 61 56-7 Work Place Preparation 81-84 56-7 Work Place Procedures 91-94 56-7 Abatement Procedures 101-110 56-8 Clean-up Procedures 111-112 56-9 Pre-Demolition Abatement Activity Procedures 120-129 –
(f) Any variance from the prohibition on concurrent abatement and full demolition or story removal set forth in 15 RCNY § 1-126 shall only be approved after notification and consultation with FDNY and DOB.
(g) Any violation of the terms of any variance issued under this section shall be considered a violation of the lettered subdivision modified by the variance.
(h) An approved variance, except for a variance from subdivision b of 15 RCNY § 1-22, is valid for a period of six months from the start date. An application to renew an existing variance must be submitted to DEP two weeks prior to the expiration date of the variance.
(i) If the asbestos abatement contractor was the applicant for a variance, or if the building owner changes the asbestos abatement contractors during the project, the variance application, and any written approval of the variance, are automatically canceled.
(j) Variances from 15 RCNY § 1-22(b).
(1) A variance from 15 RCNY § 1-22(b) requires the submission of the following:
(i) The DOB plan application number submitted with the application must be in approved status; and
(ii) An ACP-5 form must be submitted for those work areas listed on the plan application that are not listed on the ACP-7 form.
(2) When the 15 RCNY § 1-22(b) variance is submitted after the ACP-7 has been submitted and abatement work has commenced, the ACP-7 must be placed in postponed status in ARTS until the variance application is approved.
(3) Upon approval of a variance from 15 RCNY § 1-22(b), concurrent abatement and demolition or other DOB-permitted work must start at the same time. Compliance with this requirement is the responsibility of the building owner.
(Amended City Record 12/7/2018, eff. 1/6/2019; amended City Record 4/28/2022, eff. 5/28/2022; amended City Record 1/15/2025, eff. 2/14/2025)
§ 1-11. Asbestos Handler Certificate
(a) No individual shall engage in an asbestos project or in asbestos abatement activities on a minor project, for compensation, unless that individual is certified as an asbestos handler by the department and has an "Asbestos Handler Certificate" issued by the department.
(b) The department shall issue an asbestos handler certificate in the form of a photo identification card or digital or electronic equivalent as approved by DEP which shall be valid for two years from the date of issuance to applicants who meet the following conditions:
(1) Applicant must be at least eighteen (18) years of age at the date of application; and
(2) Applicant must submit a completed application provided by the department accompanied by a fee of one hundred dollars ($100); and
(3) Applicant must submit documentation of successful completion within the prior 12 months of a NYSDOH-approved Asbestos Handler training course; and
(4) Applicant must achieve a passing grade on a departmental examination.
(c) An applicant denied a certificate on any grounds other than failure to complete a certificate application or failure to meet the minimum requirements set forth in these rules may request a hearing before the commissioner or his/her designee to contest said denial by submitting a written request for such hearing within ten days of receipt of denial.
(Amended City Record 12/7/2018, eff. 1/6/2019; amended City Record 1/15/2025, eff. 2/14/2025)
§ 1-12. Renewal of Asbestos Handler Certificate
(a) The handler shall apply for renewal of the certificate at least 60 days prior to the date of its expiration.
(b) Application for renewal shall be made on a form approved by the department and shall be accompanied by a fee of one hundred dollars ($100) and proof of successful completion within the prior 12 months of a NYSDOH-approved Asbestos Handler Refresher training course; and
(c) An applicant denied a certificate on any grounds other than failure to complete a certificate application or failure to meet the minimum requirements set forth in these rules may request a hearing before the commissioner or his/her designee to contest said denial by submitting a written request for such hearing within ten days of receipt of denial.
(d) If an asbestos handler certificate is lost or stolen, the certificate holder must immediately notify the department. An application for a replacement must be made in writing and must include a notarized statement that the certificate was lost or stolen, a statement that the applicant understands that submittal of a false statement will subject him or her to penalties and other remedies under the law, and a fee of $50. A replacement certificate may only be obtained twice in any two-year validity period.
(Amended City Record 12/7/2018, eff. 1/6/2019)
§ 1-13. Restricted Asbestos Handler Certificate
(a) This section shall apply to individuals involved in the construction of the containment barriers of a work area (e.g., carpenters), or who otherwise enter the contained work area for a limited period of time to perform certain specialized tasks in preparation for, or ancillary to, the actual abatement (e.g., electricians); and for whom asbestos handler certification would otherwise be required. This section shall not apply to individuals performing abatement handling of ACM.
(b) The department shall issue a restricted asbestos handler certificate, in the form of a photo identification card or digital or electronic equivalent as approved by DEP which shall be valid for two years from the date of issuance to applicants who comply with the requirements of 15 RCNY § 1-11(b)(1) - (4), except that the fee shall be $50.
(c) An individual certified as a restricted asbestos handler by the department shall perform only those particular job functions specified by the department in the application for certification.
(Amended City Record 1/15/2025, eff. 2/14/2025)
§ 1-14. Asbestos Handler Supervisor Certificate
(a) No individual shall supervise asbestos handlers engaged in an asbestos project, for compensation, unless that individual is certified as an asbestos handler supervisor by the department.
(b) The department shall issue an asbestos handler supervisor certificate in the form of a photo identification card or digital or electronic equivalent as approved by DEP, which shall be valid for two years from the date of issuance, to applicants who meet the following conditions:
(1) Applicant must be at least twenty-one (21) years of age at the time of application; and
(2) Applicant must submit a completed application provided by the department accompanied by a fee of one hundred dollars ($100); and
(3) Applicant must submit documentation of successful completion within the prior 12 months of a NYSDOH-approved Asbestos Supervisor training course.
(4) Applicant must submit additional credentials as follows:
(i) A registered design professional, certified industrial hygienist, or certified safety professional must submit a copy of the licensing credentials or certification, and documentation of one month post-graduate experience in asbestos abatement activities.
(ii) A graduate from an accredited college or university possessing a bachelor's or advanced degree in engineering, architecture, environmental health science, industrial hygiene, occupational health and safety or a related science must submit a copy of the degree, and documentation of three months post graduate experience in asbestos abatement activities.
(iii) A graduate from an accredited college of university possessing an associate's degree in applied science and technology, environmental health science, public health, industrial health or a related science must submit a copy of the degree, and documentation of six months post- graduate experience in asbestos abatement activities.
(iv) All other applicants must submit documentation of one year of experience in asbestos abatement activities. All such experience must be on small or large asbestos projects, and at least half the experience must be on large projects, except employees of electric utilities, whose full year of experience may be on minor or small projects. The applicant's experience in asbestos abatement activities must be listed chronologically and must include each contractor's name, address and phone number; the number of hours worked per week on asbestos abatement activities; the applicant's job title and a brief description of duties; and the size of each project; and
(5) Applicant must achieve a passing grade on a departmental examination, which shall be given in English.
(c) The department may consider applicants who submit additional credentials which are not identical to the categories specified in subdivision (b)(4) above, but who present an equivalent combination of familiarity with abatement activities and demonstrated competence.
(d) An applicant denied a certificate on any grounds other than failure to complete a certificate application or failure to meet the minimum requirements set forth in these rules may request a hearing before the commissioner or his/her designee to contest said denial by submitting a written request for such hearing within ten days of receipt of denial.
(Amended City Record 8/27/2015, eff. 8/27/2015; amended City Record 12/7/2018, eff. 1/6/2019; amended City Record 1/15/2025, eff. 2/14/2025)
§ 1-15. Renewal of Asbestos Handler Supervisor Certificate
(a) The supervisor shall apply for renewal of the certificate at least 60 days prior to the date of its expiration.
(b) The supervisor shall submit the following items for renewal:
(1) A completed application provided by the department accompanied by a fee of $100; and
(2) Documentation of successful completion within the prior 12 months of a NYSDOH-approved Asbestos Handler Supervisor Refresher training course.
(c) An applicant denied a certificate on any grounds other than failure to complete a certificate application or failure to meet the minimum requirements set forth in these rules may request a hearing before the commissioner or his/her designee to contest said denial by submitting a written request for such hearing within ten days of receipt of denial.
(d) If an asbestos handler supervisor certificate is lost or stolen, the certificate holder must immediately notify the department. An application for a replacement must be made in writing and must include a notarized statement that the certificate was lost or stolen, a statement that the applicant understands that submittal of a false statement will subject him or her to penalties and other remedies under the law, and a fee of $50. A replacement certificate may only be obtained twice in any two-year validity period.
(Amended City Record 12/7/2018, eff. 1/6/2019)
§ 1-16. Asbestos Investigator Certificate
(a) (1) No individual shall engage in a building survey for asbestos unless that individual is certified as an asbestos investigator by the department.
(2) An individual not certified by the department may assist in an asbestos survey being conducted by a NYC certified asbestos investigator only if both the uncertified individual and the certified asbestos investigator are physically present at the site and the uncertified individual works under the direct and continuing supervision of the certified asbestos investigator for the duration of the survey.
(b) The department shall qualify applicants to be asbestos investigators. The applicant must both submit documentation of successful completion of a 8 hour minimum introductory blueprint-reading course or any applicable building design and construction training or certification as established by the department and posted on the DEP website and satisfy one of the following five sets of conditions:
(1) A registered design professional, a certified industrial hygienist or a certified safety professional shall submit a copy of licensing or certification and documentation of six months post-graduate experience in building survey for asbestos.
(2) A graduate from an accredited college or university possessing a doctorate or master's degree in architecture, engineering, occupational health and safety, industrial hygiene or related science must submit a copy of the degree and documentation of six months post-graduate experience in building survey for asbestos indicating specific addresses at which the graduate performed such building surveys.
(3) A graduate from an accredited college or university possessing a bachelor's degree in architecture, engineering, occupational health and safety, industrial hygiene or a related science must submit a copy of the degree and documentation of one year post-graduate experience in building survey for asbestos indicating specific addresses at which the graduate performed such building surveys.
(4) A graduate from an accredited college or university possessing an associate's degree in architecture, engineering, environmental health, public health, industrial health, or a related science must submit a copy of the degree and documentation of two years post-graduate experience in conducting building surveys for asbestos, indicating specific addresses at which the graduate performed such building surveys and an additional two years of experience in any other type of building surveys of a technical nature including structural, mechanical, or electrical, is required.
(5) An individual with extensive experience in asbestos investigation on a professional level must submit documentation demonstrating three years of experience conducting building surveys for asbestos indicating specific addresses at which the individual performed such building surveys and an additional three years of other experience in any other type of building surveys of a technical nature including structural, mechanical, or electrical is required. Additionally, such an individual must possess a four-year high school diploma or its educational equivalent, approved by a State's Department of Education.
(c) The department shall issue an asbestos investigator certificate in the form of a photo identification card or digital or electronic equivalent as approved by DEP which shall be valid for two years from the date of issuance to qualified applicants who submit the following:
(1) A completed application provided by the Department accompanied by a fee of two hundred fifty dollars ($250); and
(2) Documentation of successful completion within the prior 12 months of a NYSDOH-approved Asbestos Inspector Training course, and a passing grade on the required investigator training course; and
(3) Documentation of a medical examination performed by a physician within the prior 12 months, which must include at a minimum a pulmonary function test, evaluation of a recent chest x-ray and a physician's recommendation as to whether the applicant is able to wear a respirator in the performance of his/her job; and
(4) Documentation of a qualitative or quantitative fit test performed within the prior three months, which must include brand name and type of respirator, date and location of test, and the signature of the industrial hygienist administering the test.
(i) Qualitative fit test may be used only for fit testing of half-mask negative pressure respirators.
(ii) Quantitative fit test must be performed on all full-face negative pressure respirators.
(d) Applicant shall be allowed three attempts to achieve a passing grade on a departmental examination. If an applicant receives a failing grade after the third attempt, the applicant shall retake a New York State Inspector Training course as set forth in paragraph 2 of subdivision (c) of this section before being allowed to retake the departmental examination.
(e) Under special circumstances the department may consider applicants who submit additional credentials which are not identical to the categories specified in subdivision (b)(1) through (5) above.
(f) An applicant denied a certificate on any grounds other than failure to complete a certificate application or failure to meet the minimum requirements set forth in these rules may request a hearing before the commissioner or his/her designee to contest said denial by submitting a written request for such hearing within ten days of receipt of denial.
(g) A person who possesses an asbestos investigator certificate shall be responsible for the proper execution of his or her duties. Unprofessional conduct is prohibited. Unprofessional conduct shall include but is not limited to:
(1) Failing to comply with the provisions of Federal, State, or local laws, rules or regulations.
(2) Making or filing a false report, or failing to file a report required by Federal, State, or local laws, rules, or regulations.
(3) Delegating professional responsibilities to a person who is not qualified to perform them.
(h) Investigator's seal requirement.
(1) No NYC-certified asbestos investigator shall submit any plan or report to any client or any city, state, or federal agency that does not have the investigator's seal and signature affixed to it. Photocopies of the seal and signature are not acceptable.
(2) Seals used by certified asbestos investigators shall be circular in shape, approximately one and three quarter inches in diameter, with three concentric circles. The inner circle shall contain an accurate representation of the great seal of the City of New York. The legend at the top of the outer band shall read "CITY OF NEW YORK" and at the bottom "CERTIFIED ASBESTOS INVESTIGATOR". In the inner circle above the great seal of the City of New York shall be shown the name of the certified asbestos investigator.
(3) Any plan or report submitted without the investigator's seal and signature shall be considered invalid.
(4) [Repealed.]
(i) Employees of the department's Asbestos Control Program (ACP) are prohibited from applying for an asbestos investigator certificate. Any ACP employee who holds an asbestos investigator certificate is prohibited from applying for renewal of the certificate.
(j) The department may deny any application submitted under this section where it is determined that the applicant has failed to meet the standards established by these rules, including:
(1) Failure to demonstrate the ability to comply fully with applicable requirements, standards, and procedures set forth in these rules;
(2) Submission of false information on an application;
(3) Failure to submit all required information and documentation with the application;
(4) Where the department has determined that the applicant's past history of violation of federal or state asbestos regulations, or of any laws, rules, or regulations relating to occupational or public safety or health, indicates a direct relationship between that history and the license or that issuance of the license would pose unreasonable risks to property or safety;
(5) Loss of a relevant professional accreditation or license; or
(6) Any other cause which the commissioner determines to be of such serious and compelling nature as to warrant denial of the application.
(k) A certified asbestos investigator who is issued a notice of violation under this section alleging that the investigator engaged in unprofessional conduct that demonstrates a willful disregard for public health, safety or welfare shall be subject to immediate suspension, provided that the Commissioner serves the investigator with a notice of charges and an opportunity to be heard within 15 calendar days, pursuant to Administrative Code § 24-136(e)(4).
(l) When the commissioner has reasonable cause to believe that an asbestos investigator's surveys have been performed improperly or fraudulently such that work performed, pursuant to such a survey poses or may pose a threat to human safety, he or she may invalidate any or all ACP-5s filed by that asbestos investigator, and may order the building owner to stop all work, have a new survey performed by a different asbestos investigator, and have a new ACP-5 submitted to the department. The commissioner in his or her discretion may waive the filing fee for such ACP 5.
(m) Applicants to become a certified asbestos investigator shall disclose prior convictions as part of their application to the extent permitted under Section 23-A of the correction law, Section 296(16) of the executive law and § 8-107 of the Administrative Code, and once certified, must notify DEP in writing of any criminal conviction, to the extent permitted by such laws, within ten days of occurrence.
(Amended City Record 8/27/2015, eff. 8/27/2015; amended City Record 12/7/2018, eff. 1/6/2019; amended City Record 1/15/2025, eff. 2/14/2025)
§ 1-17. Renewal of Asbestos Investigator Certificate
(a) The investigator shall apply for renewal of the certificate at least 60 days prior to the date of its expiration.
(b) The investigator shall submit the following items for renewal:
(1) A completed application provided by the Department accompanied by a fee of $250 payable to the Department; and
(2) Documentation of successful completion within the prior 12 months of a NYSDOH-approved Asbestos Inspector Refresher course; and
(3) Documentation of a medical examination performed by a physician within the prior 12 months, which shall include at a minimum a pulmonary function test, evaluation of a recent chest x-ray and a physician's recommendation as to whether the applicant is able to wear a respirator in the performance of his/her job; and
(4) Documentation of a qualitative or quantitative fit test performed within the prior three months, which shall include brand name and type of respirator, date and location of test, and the signature of the industrial hygienist administering the test.
(i) Qualitative fit test may be used only for fit testing of half-mask negative pressure respirators.
(ii) Quantitative fit test shall be performed on all full-face negative pressure respirators.
(c) An applicant denied a certificate on any grounds other than failure to complete a certificate application or failure to meet the minimum requirements set forth in these rules may request a hearing before the commissioner or his/her designee to contest said denial by submitting a written request for such hearing within ten days of receipt of denial.
(d) If an asbestos investigator certificate is lost or stolen, the certificate holder must immediately notify the department. An application for a replacement must be made in writing and must include a notarized statement that the certificate was lost or stolen, a statement that the applicant understands that submittal of a false statement will subject him or her to penalties and other remedies under the law, and a fee of $50. A replacement certificate may only be obtained twice in any two-year validity period.
(Amended City Record 12/7/2018, eff. 1/6/2019)
§ 1-18. Renewal of Restricted Asbestos Handler Certificate
(a) The restricted asbestos handler must apply for renewal of the certificate at least 60 days prior to the date of its expiration.
(b) Application for renewal must be made on a form approved by the department and must be accompanied by a fee of fifty dollars ($50).
(c) An applicant denied a certificate on any grounds other than failure to complete a certificate application or failure to meet the minimum requirements set forth in these rules may request a hearing before the commissioner or the commissioner's designee to contest that denial by submitting a written request for such hearing within ten days of receipt of the denial.
(d) If a restricted asbestos handler certificate is lost or stolen, the certificate holder must immediately notify the department. An application for a replacement must be made in writing and must include a notarized statement that the certificate was lost or stolen, a statement that the applicant understands that submittal of a false statement will subject him or her to penalties and other remedies under the law, and a fee of $50. A replacement certificate can only be obtained twice in any two-year validity period.
(Added City Record 12/7/2018, eff. 1/6/2019)
§ 1-21. Size and Scope of Asbestos Project
(a) For the purpose of determining whether there has been compliance with any reporting or filing requirement established in 15 RCNY §§ 1-22 through 1-27, the size and scope of the overall project shall control, with particular reference to the total amount of asbestos-containing material which will be disturbed. Such requirements may not lawfully be avoided or lessened through the performance of work in incremental or piecemeal fashion.
(b) When alternative calculations (i.e., linear feet and square feet) of the size and scope of an asbestos project result in that project coming within the definition of more than one subclassification of asbestos project, the calculation with the higher absolute number shall determine the subclassification of asbestos project procedures to be followed.
(c) For the purpose of 15 RCNY §§ 1-21 through 1-27, the term "work" shall be understood as in the common construction usage, i.e. not specifically related to asbestos abatement activities.
§ 1-22. Projects Requiring Certification to the Department of Buildings
(a) This section shall apply to applications for the following projects requiring permits to be issued by the Department of Buildings:
(1) Full demolitions.
(2) Alterations, renovations, or modifications.
(3) Plumbing work, except for the direct replacement of plumbing fixtures.
(b) In accordance with § 28-106.1 of the Administrative Code, the building owner or such owner's authorized agent must submit one of the following certifications to the Department of Buildings except as set forth below:
(1) Asbestos Assessment Report. If the building (or portions thereof) affected by the work are free of asbestos-containing material, ACM will not be disturbed by the work, or the amount of ACM to be abated constitutes a minor project, an asbestos assessment report (Form ACP-5) completed, signed, and sealed by a DEP-certified asbestos investigator, along with a fee of $47.00 must be submitted to DEP prior to construction document approval and to any amendment of the construction document approval which increases the scope of the project to include any surveyed area not previously covered.
(2) Asbestos Project Completion Form. If an asbestos project has been performed and satisfactorily completed in accordance with these rules, a copy of the asbestos project completion form (Form ACP21) issued to the building owner or its authorized representative by DEP must be submitted to DOB prior to the issuance of a DOB permit and to any amendment of the underlying construction document approval which increases the scope of the project to include any work area not previously covered.
(3) Asbestos Project Conditional Completion Form. If an asbestos project has been performed but would be subject to the procedures of 15 RCNY § 1-26(c)(2)(ii), a copy of the asbestos project conditional completion form (Form ACP20) issued to the building owner or its authorized representative by DEP must be submitted to DOB prior to the issuance of a DOB permit and to any amendment of the underlying construction document approval which increases the scope of the project to include any work area not previously covered.
(Amended City Record 12/7/2018, eff. 1/6/2019)
§ 1-23. Alterations/Renovations/Modifications
(a) As early as possible before an alteration, renovation, modification, demolition, or plumbing work takes place, or changes in such work occur, the building owner shall be responsible for having an asbestos survey performed by a DEP-certified asbestos investigator to determine the absence or presence of asbestos-containing material which may be disturbed during the course of the work. The owner of the building or authorized agent shall comply with the notification requirements of 15 RCNY § 1-25 regarding asbestos-containing material.
(b) Asbestos Exemption. Where the work to be performed requires a permit to be issued by the DOB, an asbestos exemption may be claimed by checking the appropriate boxes on the DOB permit application forms PW1 or LAA1, where the applicant for construction document approval certifies that:
(1) the permit sought does not involve the performance of any physical work, such as permits for zoning lot subdivisions, zoning lot reapportionment, or changes in the certificate of occupancy; or
(2) no existing building materials, as the term "building materials" is defined in these rules, are to be disturbed by the proposed work; or
(3) the activities being performed include work on one of the following: Awnings Cranes not anchored to building or structure Emergency power not involving hard wiring, e.g. battery packs Exterior concrete work (e.g. sidewalks, curb cuts, traffic islands) except if waterproofing compound is present Exterior scaffolding not anchored to building or structure Exterior trenching and drainage Ground-mounted flagpoles New storefronts in existing masonry openings (no disturbance of existing building) Radio antennas (free-standing towers) Relocating free-standing parking lot sheds Replacing rooftop air conditioning (no modification of ductwork or disturbance of building) Roadway asphalt Sealing unsafe or abandoned buildings with cinderblock and mortar Sidewalk sheds, bridges, fences, elevators, hoists and cafe signs (no penetration of building materials) Street furniture, e.g. candy or newsstands, bus shelters, kiosks Installation of new outdoor swimming pool Free-standing tents Erection of temporary structures (e.g. trailers) with electric/water lines only
(c) Asbestos Assessment Report (ACP-5 Form). If, after a survey performed by a DEP-certified asbestos investigator, it is determined that the building (or portion thereof) affected by the work is free of asbestos-containing material, the ACM present will not be disturbed by the work, or the amount of ACM to be abated constitutes a minor project, said asbestos investigator must complete, sign, and affix his or her seal to the asbestos assessment report (ACP-5 Form) which shall be submitted with a fee of $47.00 to DEP in accordance with 15 RCNY § 1-22(b)(1).
(d) Asbestos Project Completion Form. Where the work to be performed constitutes an asbestos project, an asbestos project notification (ACP-7 Form) shall be submitted to DEP in accordance with the provisions of 15 RCNY § 1-25. Upon completion of the asbestos project and submission of all required documentation to DEP, DEP shall issue an asbestos project completion form to the building owner or its authorized representative.
(Amended City Record 12/7/2018, eff. 1/6/2019)
§ 1-24. [Reserved.]
BetaNYC's copy has no text for this section. Read 15 RCNY § 1-24 at American Legal Publishing.
§ 1-25. Asbestos Project Notifications
(a) This section shall apply to the following categories:
(1) Removal, encapsulation, enclosure or replacement of asbestos-containing materials (including insulation); and
(2) Work in or into plenum spaces of existing buildings (e.g. electrical, ventilation, cable, sheet metal work, etc.); and
(3) Removal of asbestos-covered structures and equipment such as boilers, pipes, etc.; and
(4) Other miscellaneous activities not previously exempted.
(b) [Reserved.]
(c) Asbestos Projects. If the cumulative total of all surfaces affected by the work is an asbestos project, the department's asbestos project notification (ACP-7 Form) completed by the building owner or authorized agent, and listing each work area within the building separately, shall be submitted directly to the department one week in advance of the start of the work along with a filing fee in the following amounts:
(1) For work which will disturb more than 25 linear feet but less than 100 linear feet, or more than 10 square feet but less than 50 square feet, of asbestos-containing material, the fee shall be $200.
(2) For work which will disturb at least 100 linear feet and less than 260 linear feet, or at least 50 square feet and less than 160 square feet, of asbestos-containing material, the fee shall be $400.
(3) For work which will disturb at least 260 linear feet and less than 1,000 linear feet, or at least 160 square feet and less than 1,000 square feet, of asbestos-containing material, the fee shall be $800.
(4) For work which will disturb 1,000 linear feet or more, or 1,000 square feet or more, of asbestos-containing materials, the fee shall be $1,200.
(d) Modification of or deviation from the information provided in any notification submitted to the DEP under this section must immediately be reported to DEP using the ARTS E-File system if the change refers to the identity of the building owner or ACM removal contractor or the air monitoring firm; or the amount of ACM to be removed; or the dates of the project; or the specific project location. A notification may be modified no more than twice, but a modification related to the extension or reinstatement of an asbestos abatement permit shall not count towards this total. A modification is valid only if it is received by the DEP prior to the previously filed date of completion, except for start date changes which must be received by the original start date. If the modification is received after that date, a new notification submitted directly to the department will be required. Additional work, identified after the completion of the work indicated on the asbestos project notification and successful clearance air monitoring, shall require a new notification. A notification to DEP shall be valid for one year from the date of original filing.
(Amended City Record 12/7/2018, eff. 1/6/2019)
§ 1-26. Asbestos Abatement Permits
(a) Permit required. An asbestos abatement permit authorizing the performance of construction work shall be required for asbestos projects involving one or more of the following activities:
(1) Obstruction of an exit door leading to an exit stair or the exterior of the building;
(2) Obstruction of an exterior fire escape or access to that fire escape;
(3) Obstruction of a fire-rated corridor leading to an exit door;
(4) Removal of handrails in an exit stair or ramp within the work area;
(5) Removal or dismantling of any fire alarm system component including any fire alarm-initiating device (e.g., smoke detectors, manual pull station) within the work area;
(6) Removal or dismantling of any exit sign, including directional signs, or any component of the exit lighting system, including photoluminescent exit path markings within the work area;
(7) Removal or dismantling of any part of a sprinkler system including piping or sprinkler heads within the work area;
(8) Removal or dismantling of any part of a standpipe system including fire pumps or valves within the work area;
(9) Any abatement activity to be performed within a building concurrently with the full demolition of such building or concurrently with the removal of one or more stories of such building.
(10) Removal of any non-load bearing/non-fire-resistance rated wall (greater than 45 square feet or 50 per cent of a given wall) within the work area;
(11) Any plumbing work other than the repair or replacement of plumbing fixtures within the work area;
(12) Removal of any fire-resistance rated portions of a wall, ceiling, floor, door, corridor, partition, or structural element enclosure including spray-on fire-resistance rated materials within the work area;
(13) Removal of any fire damper, smoke damper, fire stopping material, fire blocking, or draft stopping within fire-resistance rated assemblies or within concealed spaces;
(14) Obstruction of an interior stairway leading to an exit or exit passageway of a building;
(15) Any abatement activity to be performed within a work area located in a confined space.
(b) Work Place Safety Plan.
(1) Plan required. For projects requiring an asbestos abatement permit due to one or more of the activities listed in (a)(1) - (15), the building owner or its authorized representative must submit, together with the asbestos project notification, a work place safety plan (WPSP) and any other applicable construction documents, which must be prepared by a registered design professional, and a permit fee as specified in subsection (g). If the WPSP is being submitted, pursuant to subsection (a)(9), it must also set forth the sequencing of the proposed work. The WPSP may not be approved unless it provides for a buffer of four floors or an adequate buffer as determined by the commissioner between the abatement and the demolition or floor removal work.
(2) Work Place Safety Plan requirements. The WPSP must include, but not be limited to, the following items, depending on the size and scope of the asbestos project:
(i) Floor plans showing the locations of all asbestos project work areas and decontamination enclosure systems required under subdivision (a) of this section.
(ii) Floor plans indicating the locations of any components of the fire alarm system which have been deactivated, and setting forth mitigation measures to be implemented for the duration of the project.
(iii) Floor plans indicating the locations of obstructed or removed exit signage and lighting and setting forth mitigation measures to be implemented for the duration of the project.
(iv) Floor plans indicating the locations of any obstructed means of egress or required exit and setting forth mitigation measures to be implemented for the duration of the project.
(v) Floor plans or riser diagrams indicating the locations of any disengaged or removed components of the fire protection system and setting forth mitigation measures to be undertaken for the duration of the project.
(vi) A written description of all measures taken to mitigate compromised fire protection systems or means of egress, including but not limited to surveillance by a fire watch and an action plan setting forth procedures to be taken for the safety of building occupants in the event of an emergency.
(vii) If the asbestos project is being performed in a building where any dwelling unit is to be occupied for the duration of the permit, the WPSP shall include a tenant protection plan as required by Chapter 1 of Title 28 of the Administrative Code. If the asbestos project is being performed in a building where both asbestos abatement workers and non-asbestos abatement workers are working at any time during the permitted project, the WPSP must include an Occupant Protection Plan as specified in Chapter 1 of Title 28 of the Administrative Code.
(3) Approval. The documents submitted pursuant to subsection (b) will be reviewed by DEP's asbestos technical review unit (A-TRU) and by any other relevant city agencies. Upon approval by A-TRU, DEP will issue an asbestos abatement permit to the building owner or its authorized representative, who must post a copy of the permit at the work place.
(4) Failure to comply with the approved WPSP is a violation of these rules.
(c) Inspections required.
(1) All inspections required, pursuant to Title 28 of the Administrative Code, including but not limited to special inspections required by Chapter 17 of the Building Code, must be performed by a registered design professional who is independent of the abatement contractor and hired by the building owner or that owner's authorized representative.
(2) A final inspection shall be performed by a registered design professional after all work authorized by the asbestos abatement permit is completed. The person performing the inspection shall note all failures to comply with the provisions of the Building Code or approved asbestos abatement permit and shall promptly notify the owner in writing. All defects noted in such inspection shall be corrected. The final inspection report shall either:
(i) confirm:
(A) that the construction work is complete, including the reinstallation or reactivation of any building fire safety or life safety component; and
(B) that any defects previously noted have been corrected; and
(C) that all required inspections were performed; and
(D) that the work is in substantial compliance with the approved asbestos abatement permit construction documents, the Building Code, and other applicable laws and rules; or
(ii) confirm:
(A) that the construction work does not return the building (or portion thereof) affected by the abatement project to a condition compliant with the Building Code and other applicable laws and rules, but that the registered design professional has reviewed an application for asbestos abatement permit construction documents approval that has been approved by the department of buildings, and the subsequent scope of work as approved will, upon completion, render all areas affected by the asbestos project in full compliance with the Building Code and all applicable laws and rules; and
(B) that any defects previously noted that are not addressed by the subsequent scope of work as approved by the department of buildings, have been corrected; and
(C) that all required inspections that are not addressed by the subsequent scope of work as approved by the department of buildings were performed; and
(D) that all completed work pursuant to an asbestos abatement permit is in substantial compliance with the approved asbestos abatement permit construction documents.
(3) Final inspection reports shall be filed with the DEP on A-TR1 form. Records of final inspections made by registered design professionals must be maintained by such persons for a period of six years after final inspection, or for such other period as the commissioner shall require, and shall be made available within 72 hours. These records may be maintained in an electronic recordkeeping system instead of in paper form. Records must be stored in a manner that minimizes the possibility of water damage. The registered design professional must immediately notify DEP if any records are lost, damaged or destroyed.
(d) Duration of Permit. An asbestos abatement permit shall expire upon the earlier of one year from the date of issuance or when terminated pursuant to one of the following:
(1) The holder of an asbestos abatement permit submits a final inspection report pursuant to (c)(2)(i).
(2) The holder of an asbestos abatement permit submits a final inspection report pursuant to (c)(2)(ii) and obtains a Department of Buildings permit for work which, when completed, will render all areas affected by the project fully compliant with the Building Code and all other applicable rules and laws.
(3) The expiration date of the asbestos project notification ACP-7 form.
(e) Failure to terminate asbestos abatement permit within year.
(1) Failure to terminate an asbestos abatement permit pursuant to subsection (d) within a year from the date of issuance of said permit shall be a violation subject to fine. Each 60-day period during which such violation continues to occur constitutes a separate offense that may be subject to a separate fine.
(2) If the holder of an asbestos abatement permit fails to terminate an asbestos abatement permit within a year from the date of issuance, the holder shall maintain the work area in a safe manner including but not limited to any mitigation measures set forth in the WPSP and shall not perform work.
(f) Insurance. Entities other than NYSDOL-licensed asbestos contractors performing work pursuant to an asbestos abatement permit which does not involve the disturbance of asbestos-containing materials shall maintain insurance of the same type and amount as would be required if the entity were working pursuant to a permit issued by the Department of Buildings.
(g) Permit fee. The WPSP, asbestos abatement permit construction documents, as applicable, shall be accompanied by a filing fee, as follows:
Project Size Fee Small projects up to 99 linear feet or 49 square feet of ACM $100 100 to 259 linear feet or 50 to 159 square feet of ACM $300 Large projects up to 1,000 square/linear feet of ACM $500 1,000 to 4,999 square/linear feet of ACM $700 5,000 to 9,999 square/linear feet of ACM $1,100 10,000 or more square/linear feet of ACM $1,300
(h) Work covered by the asbestos abatement permit shall not commence until said permit is issued with a specified start date and posted with the approved WPSP by the applicant at the work place.
(i) If additional ACM is added to a project that has an approved WPSP, a registered design professional must submit a letter and a revised WPSP through the ARTS-E-file system affirming that the professional has visited the work place and that the additional asbestos abatement is consistent with the approved WPSP and that proposed changes will not impact egress or fire protection requirements. If additional ACM from a different floor with A-TRU triggers is added to a notification that has an approved WPSP or if the abatement phasing sequence is modified, the applicant must submit a new notification through the ARTS E-File system along with a WPSP for review.
(j) DEP may, based on inspections conducted by DEP and other relevant agencies, exempt emergency asbestos projects for which a notification has been filed pursuant to 15 RCNY § 1-27 from all requirements of 15 RCNY § 1-26.
(Amended City Record 12/7/2018, eff. 1/6/2019; amended City Record 4/28/2022, eff. 5/28/2022; amended City Record 1/15/2025, eff. 2/14/2025)
§ 1-27. Emergency Asbestos Project Notification
(a) An emergency asbestos project involves the removal, enclosure, encapsulation or cleanup of asbestos-containing material that was not planned but is undertaken when sudden unexpected event(s) result in a situation in which any delay in abatement would pose an immediate danger to public safety and health.
(b) When such an emergency asbestos project occurs, applicants with an ARTS E-File account must submit an emergency notification, including a detailed scope of work, on the asbestos contractor’s letterhead, and a cover letter from the building owner or authorized agent including the items listed in (1) to (7) through the ARTS E-File system. If the applicant does not have a valid ARTS E-File account or is unable to access the ARTS E-File system, the applicant must immediately call 311 and provide:
(1) Name, affiliation and telephone number of caller;
(2) Nature of the emergency;
(3) Scope of asbestos work to be performed and the quantity and location of ACM to be abated;
(4) Exact location of the project including street address and borough;
(5) Name, address, and telephone number of the asbestos abatement contractor and the air monitoring company;
(6) Starting and projected completion dates; and
(7) Such other factors as the department may determine are relevant for that project.
(c) When such an emergency asbestos project occurs, an asbestos project notification (ACP-7 Form) shall be submitted through the ARTS E-File system in accordance with the provisions of 15 RCNY § 1-25 as soon as possible, but not later than 48 hours after the project begins. In such cases, the ACP-7 Form shall be accompanied by a cover letter from the building owner or their authorized agent including the following information:
(1) the nature of the emergency;
(2) a description of the scope of work. With respect to projects commenced under this section, the department, based on inspection by the department and other relevant agencies, may exempt the emergency project from the requirements of 15 RCNY § 1-26.
(Amended City Record 12/7/2018, eff. 1/6/2019; amended City Record 4/28/2022, eff. 5/28/2022; amended City Record 1/15/2025, eff. 2/14/2025)
§ 1-28. Record Keeping Requirements for Investigators
(a) The asbestos investigator must maintain a permanent record as required under this section for every building survey for asbestos that is conducted, pursuant to or submitted in accordance with 15 RCNY §§ 1-22 through 1-27 and 1-38.
(b) For each building survey conducted prior to preparation of either the asbestos project notification (ACP-7) or asbestos assessment report (ACP-5), the investigator must compile a record. Each of the requirements listed below must be satisfied independently. A requirement to maintain a particular record may not be satisfied by inclusion of the information required to be set forth in that record in another record (e.g., information that is required to be set forth in the blueprint, diagram, or drawing must be in that record and the requirement to provide certain information in the blueprint, diagram, or drawing cannot be satisfied by its inclusion of the specified information in a survey report). The record must include at a minimum:
(1) A survey report that includes, at a minimum, the building or structure address and the name, address, and contact information of the building or structure owner; a description of the scope of work, the location (floor, section, room) of areas where bulk samples were collected or material was assumed to contain asbestos; the material type, name dimensions and condition of all suspect ACM, and the number of samples taken of each material; and the name, address and contact information of any non-certified individual who participated in the survey, along with a description of the activities engaged in by said person; and
(2) A blueprint, diagram, or drawing of each building or portion thereof inspected by the investigator that identifies clearly each exact location and type of material where bulk samples were collected or assumed to be ACM. The blueprint, diagram or drawing must include the approximate linear or square footage of all areas affected by the proposed work where material was sampled and/or assumed to be ACM and the date of collection; and
(3) The printed name and signature of any and all persons who collect bulk samples for the purpose of determining the presence of ACM, a copy of the current New York State asbestos inspector certificate of each such person, the name of the firm performing the survey and a copy of its current NYSDOL asbestos handling license, the name and address of the laboratory analyzing the samples, the date of analysis, the results of the analysis, the method of analysis and the name and signature of the person performing the analysis; and
(4) A chain of custody for all bulk samples collected as part of the survey. The chain of custody must be prepared in accordance with EPA recording requirements (QA Handbook Volume II Section 8.00).
A record that lacks any of the foregoing components will be deemed defective.
(c) Reserved.
(d) The investigator must maintain these records for thirty (30) years. These records may be maintained in an electronic recordkeeping system instead of in paper form. Upon the death of the investigator, records may be destroyed and notification must be sent to the Asbestos Control Program.
(e) The investigator shall make these records available during normal business hours, pursuant to an appointment without cost or restriction for inspection by a representative of the Department.
(f) Records must be stored in a manner that minimizes the possibility of damage from water. The investigator must immediately report if any records are damaged, lost or destroyed.
(g) The investigator must respond to the Department's request for inspection within fourteen (14) business days and provide a date, time and location for an inspection which is within 21 days of the date of the request. Failure of the investigator to either respond to the Department's request for an appointment or provide a date, time, and address for an inspection will result in suspension of the Certified Asbestos Investigator's (CAI) certificate until such appointment is completed and these records are made available for inspection.
(Amended City Record 12/7/2018, eff. 1/6/2019; amended City Record 4/28/2022, eff. 5/28/2022; amended City Record 1/15/2025, eff. 2/14/2025)
§ 1-29. Maintenance of Project Record and Project Summary
(a) A project record shall be maintained for all small and large asbestos projects. During the project, the project record shall be kept on site at all times and may be maintained by the building owner or his authorized representative, which may be the asbestos abatement contractor or the air monitoring company. Upon completion of the project, the project record shall be maintained by the building owner. The project record shall be produced upon verbal or written request by any DEP inspector. Upon transfer of ownership of the building, all project records for past asbestos projects shall be turned over to the new owner. The project record shall consist of:
(1) Copies of licenses of all contractors involved in the project.
(2) Copies of DEP and NYSDOL supervisor and handler certificates for all workers engaged in the project;
(3) Copies of all project notifications and reports filed with DEP and NYSDOL for the project, with any amendments or variances;
(4) Copies of all asbestos abatement permits, including associated approved plans and work place safety plan;
(5) A copy of the project air sampling log, chain of custody forms, and all air sampling results;
(6) A copy of the abatement contractor's log;
(7) All data related to bulk sampling including the results of any asbestos surveys performed by an asbestos investigator;
(8) Copies of all waste manifests;
(9) A copy of all project monitor's reports.
(b) In addition to the project record required in subsection (a), the asbestos abatement contractor shall maintain, for at least thirty (30) years after the end of the project, a project summary for each asbestos project in which they engage. These records may be maintained in an electronic recordkeeping system instead of in paper form. That project record must consist of the following:
(1) Name, address, and DEP certificate number of all individuals who worked on the project;
(2) Location and general description of the project;
(3) Amount of ACM abated;
(4) Start and completion dates;
(5) Name, address, and NYSDOL asbestos handling license number of the air monitoring company;
(6) Name, address, and ELAP registration number of the laboratory used for air sample analysis;
(7) Name and address of the site used for disposal of the ACM waste generated by the project;
(8) Name and address of the asbestos hauler;
(9) Copy of the abatement contractor's log and the project air sampling log;
(10) Copy of the project monitor's report.
(c) The building owner, contractor or air monitor, as applicable, must make the project record or project summary required by this section available for inspection by DEP within 72 hours of request, except that during the project the project record must be made available upon request.
(d) In addition to the project record required in subdivision (a), the air monitoring company must maintain, for at least thirty (30) years after the end of the project, a project summary for each asbestos project in which the company engages. These records may be maintained in an electronic recordkeeping system instead of in paper form. The project summary must consist of the following:
(1) The DEP certificate number of all air monitoring technicians who worked on the project;
(2) The location and general description of the project;
(3) The start and completion dates for the project;
(4) The name, address, and ELAP registration number of the laboratory used for air sample analysis; and
(5) A copy of the air sampling log, chains of custody, laboratory reports, and sample location sketches.
(e) All records required to be kept by this section must be stored in a manner that minimizes the possibility of water damage. The party responsible for maintaining the records must immediately notify DEP if any records are lost, damaged, or destroyed.
(Amended City Record 12/7/2018, eff. 1/6/2019; amended City Record 8/21/2019, eff. 9/20/2019; amended City Record 4/28/2022, eff. 5/28/2022; amended City Record 1/15/2025, eff. 2/14/2025)
§ 1-31. Performance of Air and Bulk Sampling, Monitoring and Analysis
Air sampling, monitoring, and analysis on asbestos projects, and bulk sampling and analysis to determine asbestos content, shall be performed in accordance with the provisions of the following 15 RCNY §§ 1-31 through 1-45 inclusive.
§ 1-32. Abatement Not to Proceed Without Air Monitor
The abatement contractor shall not perform any abatement activities unless the air monitoring technician is physically present at the work place and the air monitoring required by this subchapter is being conducted.
(Added City Record 1/15/2025, eff. 2/14/2025)
§ 1-36. Persons Qualified to Perform Sampling and Analysis
(a) Sampling and analysis shall be performed by:
(1) A third party who is contracted by the building owner, holds a current NYSDOL asbestos handling license, and is completely independent of all parties involved in the asbestos project. The third party who conducts air sampling on an asbestos project shall not be a subcontractor of the abatement contractor, and shall not have any business, personal, or other relationship with the abatement contractor. The building owner must select and hire the air monitoring company without recommendation or reference from the abatement contractor. It shall be a violation of this subsection, chargeable against the abatement contractor, the air monitoring company, and the building owner, for an air monitoring company to conduct air monitoring on an asbestos project where there is a business or personal relationship between the abatement contractor and the air monitoring company. It shall be considered prima facie evidence of a business or personal relationship between an abatement contractor and an air monitoring company when the same company performs air monitoring on all or virtually all of a given abatement contractor's projects. The person who conducts air sampling must be currently certified as a New York State Asbestos Project Air Sampling Technician when performing air sampling. Failure to have a valid certification based either on office records or upon request shall be a violation chargeable against the individual conducting the sampling; or
(2) Sampling and analysis staff which may not be independent of the building owner but are independent of the abatement contractor involved in the asbestos project, but only if such staff:
(i) performs in conjunction with a third-party quality assurance program in which 10 percent of the samples, except for bulk samples initially found to contain ACM, from each project are randomly selected and will be analyzed by both entities; and
(ii) in the case of air sampling, possesses valid New York State Asbestos Project Air Sampling Technician Certification.
(3) Sampling and analysis staff of a public service corporation with respect to asbestos projects that involve electric, steam or gas generation, distribution or transmission facilities provided that the requirements of subparagraphs (i) and (ii) of paragraph 2 of this section are complied with.
(b) One air sampling technician must be present per three work areas in one work site to observe and maintain air sampling equipment for the duration of the air sample collection, except that if there are multiple work areas on the same floor, only one air sampling technician is required for that floor.
(c) Bulk sample analysis (PLM or gravimetric reduction and TEM analysis) must be performed by laboratories with the appropriate accreditation in the ELAP.
(d) Air Sample Analysis (PCM) must be performed by laboratories with the following qualifications:
(1) Successful completion by the laboratory's active analysts of the NIOSH 582 training course which outlines the NIOSH 7400 method; and
(2) Analysts with skills in the appropriate methodology and proficiency in the NIOSH PAT Program for PCM analysis; and
(3) Accreditation in ELAP for the appropriate analytical method.
(e) Air Sample Analysis (TEM) must be performed by analysts who possess skills in TEM analysis, are accredited in ELAP, and participate in an in-house quality assurance program using the National Institute of Standards and Technology (NIST SRM 1876 b) or traceable standard.
(Amended City Record 12/7/2018, eff. 1/6/2019; amended City Record 8/21/2019, eff. 9/20/2019; amended City Record 4/28/2022, eff. 5/28/2022; amended City Record 1/15/2025, eff. 2/14/2025)
§ 1-37. Sampling Equipment Requirements
(a) Bulk sampling requirements.
(1) Bulk samples shall be taken by whatever method minimizes the potential for fiber release.
(2) Any material which remains exposed as a result of the sampling procedure shall be sealed.
(b) Area air sampling requirements. Area air sampling equipment for Phase Contrast Microscopy (PCM) shall be utilized in accordance with the equipment and sampling procedures specified within the NIOSH 7400 Method modified for area sampling.
(c) Area air sampling equipment for Transmission Electron Microscopy (TEM) shall be utilized in accordance with the sampling procedures specified within 40 C.F.R. Part 763, Subpart E, Appendix A – Section II Mandatory Transmission Electron Microscopy Method, Subsection B - Sampling.
(d) Air sampling pumps must have a constant controlled flow and must have the flow rate capacity to perform sampling as specified in these rules. A properly calibrated rotometer must be used to check the flow rate. A rotometer, along with its current calibration sheet, must be available at the work place for the duration of air sample collection. Primary and secondary calibration devices must be calibrated as per NYSDOH ELAP requirements.
(e) Sampling pumps, cassettes, and tubing shall be checked before, during and after use. Cassettes must be labelled with a sample identification number prior to the commencement of air sampling. The sampling assembly shall be checked for leaks and occlusions throughout the shift and documented in the project air sampling log by the Asbestos Project Air Sampling Technician or project monitor.
(f) A project air sampling log must be created and maintained in a permanently bound book by the air monitoring company. The project air sampling log must be available at the work site. A copy of the project air sampling log must be submitted to the department within 72 hours of request. The project air sampling log must contain the following information for all area air samples collected on the asbestos project:
(1) Name of the company and the Asbestos Project Air Sampling Technician performing the project air sampling, per work shift or day for all area air samples collected.
(2) Dates of project air sample collection, per work shift or day of area air samples, with appropriate reference to the work area to which the air samples apply.
(3) Sample location sketch, showing the sample ID numbers, identifying all project air sample locations, per work shift or day of area air samples. The sketch must be made within one hour of the beginning of sample collection.
(4) Flow rate primary or secondary calibration device identification number, method of flow rate primary or secondary device calibration and date of last calibration, per work shift or day of area air samples.
(5) Flow rate of sampling pumps with pre and post calibration listed for each area air sample collected.
(Amended City Record 12/7/2018, eff. 1/6/2019; amended City Record 4/28/2022, eff. 5/28/2022)
§ 1-38. Asbestos Assessment Report – Asbestos Survey and Sampling Requirements
(a) The asbestos survey shall at a minimum identify and assess the exact locations and quantities of ACM, PACM, and suspect miscellaneous ACM. The asbestos investigator is responsible for the identification and assessment of all types of ACM, PACM and suspect miscellaneous ACM within each area, as indicated by the proposed scope of work or job description(s) indicated in the DOB permit applications or plans.
(b) The asbestos investigator shall assume that some or all of the areas investigated contain ACM, and for each area that is not assumed to contain ACM, must collect bulk samples and submit for analysis in accordance with 15 RCNY §§ 1-36(c), 1-37(a) and 1-44(c) and EPA publications 560/5-85-024 and 560/5-85-030A, and 40 C.F.R. Part 763.80, 763.85, and 763.86.
(1) PACM Sampling Requirements.
(a) Surfacing Material. Surfacing material includes but is not limited to fireproofing, acoustical plaster, finish plasters and skim coats of joints. Surfacing materials must be sampled as follows:
i. At least 3 samples from each homogeneous area that is 1,000 square feet (sf) or less.
ii. At least 5 samples from each homogeneous area that is greater than 1,000 sf but that is 5,000 sf or less.
iii. At least 7 samples from each homogeneous area that is greater than 5,000 sf.
(b) Thermal System Insulation (TSI). TSI includes, but is not limited to, equipment insulation, boiler, breeching, boiler rope, duct, or tank insulation, cement or mortar used for boilers and refractory brick, piping and fitting insulation including but not limited to wrapped paper, aircell, millboard, rope, cork, preformed plaster, job molded plaster and coverings over fibrous glass insulation. TSI must be sampled as follows:
i. At least 3 samples from each homogeneous area of TSI.
ii. At least one sample from each homogeneous area of patched TSI if the patched section is less than 6 linear feet or 6 square feet.
iii. In a manner sufficient to determine if the material is ACM, for packed fittings such as elbows, valves, tees, etc.
iv. Samples are not required where the asbestos investigator has determined that the TSI is fiberglass, foam glass, rubber, or other non-asbestos containing building material.
(c) Suspect Miscellaneous Materials. Other suspect miscellaneous materials including, but not limited to, insulation board, vapor barriers, coatings, non-metallic or non-wood roof decking, felts, cementitious board (transite), pipe (transite), flashing, shingles, galbestos, dust and debris, floor tiles, cove base, floor leveler compound, ceiling tile, vermiculite insulation, gaskets, seals, sealants (including for condensate control), vibration isolators, laboratory tables and hoods, chalkboards, pipe penetration packing and other fire-stopping materials, millboard, electrical wire insulation, fire curtains, fire blankets, fire doors, brakes and clutches, mastics, adhesives, glues, caulks, sheet flooring (linoleum), wallpaper, drywall, plasterboard, spackling/ joint compound, textured paint, grout, glazing compound, and terrazzo. Suspect miscellaneous materials must be sampled as follows: At least 2 samples shall be taken, or samples shall be taken in a manner sufficient to determine if the material is ACM.
(d) Only persons certified by DEP as asbestos investigators or by NYSDOL as Asbestos Inspectors may select and collect bulk samples for analysis. NYSDOL-certified Asbestos Inspectors may only do so in the physical presence of and under the supervision of a DEP-certified asbestos investigator.
(Added City Record 12/7/2018, eff. 1/6/2019; amended City Record 1/15/2025, eff. 2/14/2025)
§ 1-41. Air Sampling Schedule
(a) At a minimum, air sampling shall be conducted in accordance with the following schedule:
Abatement Activity Pre-Abatement During Abatement Post-Abatement Equal to or Greater than 10,000 ft. 2 or 10,000 linear ft. of ACM per work area PCM PCM TEM Less than 10,000 ft. 2 or 10,000 linear ft. of ACM PCM PCM PCM Large Asbestos Projects 1. Full Containment 10 5 10 2. Glovebag inside Tent 5 a 5 a 5 a 3. Exterior Foam and Vertical Surfaces – 5 c 5 d 4. Interior Foam 10 5 c 10 d Small Asbestos Projects 1. Full Containment 6 3 6 2. Glovebag inside Tent 3 b 3 b 3 b 3. Tent 3 b 3 b 3 b 4. Exterior Foam and Vertical Surfaces – 3 c 3 d 5. Interior Foam 6 3 c 6 d Minor Projects 1. Glovebag inside Tent – 1 1 d 2. Tent – 1 1 d 3. Exterior Foam and Vertical Surfaces – – 1 d 4. Interior Foam – 1 1 d
a if more than three (3) tents then two (2) samples required per enclosure.
b if more than three (3) tents then one (1) sample required per enclosure.
c samples shall be taken within the work area(s).
d area sampling is required only if:
– visible emissions are detected during the project;
– during-abatement area sampling results exceeded 0.01 f/cc or the pre-abatement area sampling result(s) for interior projects where applicable; or
– the work area to be reoccupied is an interior space at a school, healthcare, or daycare facility.
Note: TEM is acceptable wherever PCM is required. TEM is required in schools in accordance with AHERA regulations.
(b) Pre-Abatement. Prior to commencement of abatement activities, the number of samples specified below shall be taken during normal occupancy activities and circumstances at the work site. Samples shall be taken at the following locations:
(1) For large full-containment and interior foam method asbestos projects, a minimum of five samples inside and five samples outside the proposed work area.
(2) For small full-containment and interior foam method asbestos projects, a minimum of three samples inside and three outside the proposed work area.
(3) For large and small asbestos projects employing the glovebag procedure within a tent, a minimum of five and three samples, respectively, or two samples per enclosure if more than three enclosures.
(4) For small asbestos projects solely employing tent procedure, a minimum of three samples inside each proposed work area, or two samples per enclosure if more than three enclosures.
(5) For all exterior projects (foam or vertical surface), no pre-abatement sampling is required.
(c) During abatement. Frequency and duration of the air sampling during abatement shall be representative of the actual conditions during the abatement. Area sampling shall be conducted daily and continuously during a work shift. If more than one daily work shift is required to accomplish the work, area sampling shall be performed on each work shift. Area sampling is not required on days when there are no abatement activities. For project air samples collected during the abatement, the period of time permitted between completion of air sample collection and receipt of results on the job site shall not exceed 48 hours. The following minimum schedule of samples shall be required during the work shift.
(1) For large asbestos projects employing full containment, area air sampling shall be performed at the following locations:
(i) Two area samples outside the asbestos project work area in uncontaminated areas of the building, remote from the decontamination facilities.
(A) Primary location selection shall be within 10 feet of isolation barriers.
(B) Where negative ventilation exhaust ducting runs through uncontaminated building areas, one area sample will be required in these areas to monitor any potential fiber release.
(C) Where exhaust tubes have been grouped together in banks of up to five (5) tubes, with each tube exhausting separately and the bank of tubes terminating together at the same controlled area, one area air sample shall be taken.
(ii) One area sample within five feet of the uncontaminated entrance to each worker decontamination and waste decontamination enclosure system, or parallel worker and waste decontamination system, if applicable; and
(iii) One area sample within 5 feet of the unobstructed exhaust from a negative pressure ventilation system exhausting indoors but not within a duct.
(iv) One area sample outside, but within 25 feet of, the building or structure, if the entire building or structure is the work area.
(2) For large asbestos projects involving interior foam method, area air sampling shall be performed at the following sampling locations:
(i) One area sample taken outside the work area within 10 feet of isolation barriers.
(ii) One area sample taken within five feet of the uncontaminated entrance to each worker decontamination and waste decontamination enclosure system, or parallel worker and waste decontamination system, if applicable.
(iii) One area sample within 5 feet of the unobstructed exhaust from a negative pressure ventilation system exhausting indoors but not within a duct, if applicable.
(iv) Three area samples inside the work area, which must be representative of the work area. The air samplers must be placed separate and apart from one another and must not be grouped together.
(v) One area sample where the negative ventilation exhaust ducting runs through uncontaminated building areas, if applicable.
(3) For large asbestos projects involving exterior foam method or removal of ACM from vertical surfaces, a minimum of five continuous area samples shall be taken concurrently with the abatement for each work area using the following minimum requirements:
(i) Four area samples inside the work area and remote from the decontamination systems, which must be representative of the work area. The air samplers must be placed separate and apart from one another and shall not be grouped together.
(ii) One area sample within five feet of the uncontaminated entrance to each worker and waste decontamination enclosure system, or parallel worker and waste decontamination system, if applicable.
(iii) One area sample outside the work area within 25 feet of the building or structure, if the entire building or structure is the work area.
(iv) One area sample inside the building or structure at the egress point to the work area, if applicable.
(4) For large asbestos projects employing the glovebag procedure within a tent, a minimum of five continuous air samples shall be taken concurrently with the abatement for each work area, unless there are more than three enclosures, in which case two area samples per enclosure are required.
(i) Four area samples taken outside the work area within ten feet of tent enclosure(s).
(ii) One area sample taken within five feet of the uncontaminated entrance to each worker and waste decontamination enclosure system, or parallel worker and waste decontamination system, if applicable.
(iii) One area sample within five feet of the unobstructed exhaust from a negative pressure ventilation system exhausting indoors, but not within a duct, if applicable.
(iv) One area sample where negative ventilation exhaust ducting runs through uncontaminated building areas, if applicable.
(5) For small asbestos projects employing full containment, a minimum of three continuous area samples shall be taken concurrently with the abatement for each work area at the following locations:
(i) Two area samples taken outside the work area within ten feet of the isolation barriers.
(ii) One area sample within five feet of the uncontaminated entrance to each worker or waste decontamination enclosure system, or parallel worker and waste decontamination system, if applicable.
(iii) One area sample within five feet of the unobstructed exhaust from a negative pressure ventilation system exhausting indoors, but not within a duct, if applicable.
(iv) One area sample where negative ventilation exhaust ducting runs through an uncontaminated building area, if applicable.
(6) For small asbestos projects involving the use of foam method on the exterior of a building or the removal of ACM from exterior surfaces, a minimum of three continuous area samples shall be taken concurrently with the abatement for each work area at the following locations:
(i) Two area samples inside the work area and remote from the decontamination systems. Air samples inside the work area must be representative of the work area. The air samplers must be placed separate and apart from one another and shall not be grouped together.
(ii) One area sample within five feet of the uncontaminated entrance to each worker and waste decontamination enclosure system, or parallel worker and waste decontamination system, if applicable.
(iii) One area sample inside the building or structure at the egress point to the work area, if applicable.
(7) For small asbestos projects using the tent procedure (with or without the use of glovebags), a minimum of three area samples shall be taken concurrently with the abatement for each work area unless there are more than two enclosures, in which case one sample per enclosure is required.
(i) Two area samples taken outside of the work area within ten feet of the tent.
(ii) One area sample within five feet of the uncontaminated entrance to each worker and waste decontamination system, or parallel worker and waste decontamination system, if applicable.
(iii) One area sample within five feet of the unobstructed exhaust from a negative pressure ventilation system exhausting indoors, but not within a duct, if applicable.
(iv) One area sample where negative ventilation exhaust ducting runs through uncontaminated building areas, if applicable.
(8) For small asbestos projects employing interior foam procedures, a minimum of three continuous area samples shall be taken concurrently with the abatement for each work area at the following locations:
(i) One area sample taken inside the work area.
(ii) One area sample taken within five feet of the uncontaminated entrance to each worker and waste decontamination enclosure system, or parallel worker and waste decontamination system, if applicable.
(iii) One area sample taken outside the work area within ten feet of the isolation barriers.
(iv) One area sample where negative ventilation exhaust ducting runs through uncontaminated building areas, if applicable.
(9) For minor projects employing glovebag or tent procedures, one area sample shall be taken outside the glovebag or tent, not more than five feet from the uncontaminated entrance to the glovebag or tent.
(d) Post-abatement. Post-abatement clearance air monitoring shall include at a minimum the number of area samples specified below, to be taken for each homogeneous work area.
(1) For small asbestos projects:
(i) involving full containment or interior foam method (if required by 15 RCNY § 1-41(a)), three area samples inside and three outside the work area;
(ii) involving tent procedure (with or without the use of glovebags), three area samples inside each work area or one area sample inside each tent if there are more than three tents;
(iii) involving exterior foam method or removal from vertical surfaces, three area samples inside the restricted area beneath and/or immediately adjacent to the work area, only if visible emissions were detected during the project, or abatement area samples exceeded 0.01 f/cc.
(2) For large asbestos projects:
(i) a minimum of five area samples inside and five outside the work area, for projects involving full containment or interior foam method (if required by 15 RCNY § 1-41(a)). In addition to the five sample minimum, one representative area sample must be collected both inside and outside the work area for every 5,000 square feet above 25,000 square feet of floor space when ACM has been abated.
(ii) a minimum of five area samples inside each tent enclosure where glovebag procedures are being used, or two area samples inside each tent where glovebag procedures are being used if there are more than three tents;
(iii) involving exterior foam method or removal from vertical surfaces, five area samples inside the restricted area beneath and/or immediately adjacent to the work area, only if visible emissions were detected during the project, or abatement area samples exceeded 0.01 f/cc.
(3) When TEM analysis is employed a minimum of 5 samples from outside the work area shall also be collected.
(4) For minor projects post-abatement clearance air monitoring is not required, unless visible emissions were detected outside the work area and/or levels exceeded 0.01 f/cc during abatement, or the project was conducted inside a school, daycare, or healthcare institution. In such cases, one area sample shall be taken.
(Amended City Record 12/7/2018, eff. 1/6/2019; amended City Record 4/28/2022, eff. 5/28/2022)
§ 1-42. Monitoring Requirements
Monitoring requirements and procedures for other than post-abatement clearance air monitoring are as follows:
(a) The sampling zone for air samples shall be representative of the building occupants' breathing zone. However, at no time shall the sampling cassette be placed less than 4 feet from the ground. Air samplers shall be placed so that they are not influenced by unusual air circulation patterns or by the configuration of the space or by each other. Air sampling cassettes shall be mounted upon commercially-available aluminum tripods and shall not be placed within two feet of walls or obstructions such as the corners of rooms or furniture.
(b) If possible, ambient samplers should be placed about 6 feet above the ground surface in reasonable proximity to the building and away from obstructions and drafts that may unduly affect airflow. For outdoor samples, if access to electricity and concerns about security dictate a rooftop site, locations near vents and other structures on the roof which would unduly affect airflow shall be avoided.
(c) Samples shall have a chain of custody record. The project air sampling log required pursuant to 15 RCNY § 1-37(f) does not satisfy the chain of custody requirement.
(d) In accordance with the above criteria, area samples (see 15 RCNY § 1-41) shall conform to the following schedule:
Area Samples for Analysis by Minimum Volume Flow Rate PCM 25 mm 560 5 to 15 liters/min. TEM 25 mm 560 1 to 10 liters/min. TEM 37 mm 1,250 1 to 10 liters/min.
(e) For small projects including tent procedures, sampling shall start with the installation of the containment and shall run concurrently with the procedure.
(Amended City Record 8/21/2019, eff. 9/20/2019)
§ 1-43. Post-Abatement Clearance Air Monitoring
Post-abatement clearance air monitoring requirements are as follows:
(a) (1) Sampling shall not begin until a visual inspection, conducted by a project monitor who is independent of the abatement contractor and by the asbestos handler supervisor, confirms that all containerized waste has been removed from work and holding areas and there is no visible ACM debris or residue on or about all abated surfaces; and
(2) Sampling shall not begin until at least 1 hour after the area is dry from the third cleaning (see 15 RCNY § 1-112(h)) and no visible pools of water or condensation remain. For pre-demolition asbestos abatement activity, sampling shall begin 2 hours after the area is dry and no visible pools of water or condensation remain.
(b) Samplers shall be placed at random around the work area. If the work area contains the number of rooms equivalent to the number of required samples based on floor area, a sampler shall be placed in each room. When the number of rooms is greater than the required number of samples a representative sample of rooms shall be selected.
(c) The samplers must be placed separate and apart from one another in locations outside the work area but within the building and shall be located to capture any air that might escape through the isolation barriers and shall be no further than 50 feet from the entrance to the work area, and 25 feet from the isolation barriers.
(d) The following aggressive sampling procedures shall be used within the work area during all clearance air monitoring:
(1) Before starting the sampling pumps, use forced air equipment (such as a 1 horsepower leaf blower) to direct exhaust air against all walls, ceilings, floors, ledges and other surfaces in the work area.
(i) For asbestos projects: this pre-sampling procedure shall take at least 5 minutes per 1,000 sq. ft. of floor area; then install one 20-inch fan per 10,000 cubic feet of room space. Then immediately place the fan on slow speed and point it toward the ceiling.
(ii) For pre-demolition asbestos abatement activity, this pre-sampling procedure shall take at least three minutes, after which the 20-inch fan shall be left running unattended in the work area throughout sampling. This procedure shall be acceptable when the floor area of the work area is less than 500 square feet. At or above 500 square feet of floor area within the work area, the aggressive sampling procedures specified in this subdivision (d) for asbestos projects shall be conducted.
(2) Start the sampling pumps and sample for the required time or volume.
(3) Turn off the pump and then the fan(s) when sampling is completed.
(e) For post-abatement monitoring, area samples shall conform to the following schedule:
Area Samples for Analysis by Minimum Volume Flow Rate PCM 1,800 Liters 5 to 15 liters/min. TEM 1,250 Liters 1 to 10 liters/min.
(f) Each homogeneous work area which does not meet the clearance criteria shall be thoroughly recleaned using wet methods, with the negative pressure ventilation system in operation. New samples shall be collected in the work area as described above. The process shall be repeated until the work site passes the test.
(g) For an asbestos project with more than one homogenous work area, the release criterion shall be applied independently to each work area.
(Amended City Record 4/28/2022, eff. 5/28/2022)
§ 1-44. Analysis and Reporting Results
Laboratory analyses and reporting shall be considered evidence of compliance with this chapter only if they conform to the following requirements:
(a) PCM area air samples shall be analyzed and reported in accordance with the NIOSH 7400 method using "A" Counting Rules.
(b) TEM area air samples must be analyzed and reported in accordance with the mandatory or non-mandatory Electron Microscopy Methods set forth at 40 C.F.R. Part 763, Subpart E.
(c) Bulk samples must be analyzed and reported in accordance with analytical methods approved by ELAP and the Method for the Determination of Asbestos in Bulk Building Materials found in 40 C.F.R. Part 763, Subpart E, or other methods approved by the National Institute of Standards and Technology, the National Institute of Occupational Safety and Health, or the United States Environmental Protection Agency.
(d) Bulk and air sampling results/reports shall be submitted directly to the Department upon request within 72 hours.
(Amended City Record 12/7/2018, eff. 1/6/2019; amended City Record 1/15/2025, eff. 2/14/2025)
§ 1-45. Action Criteria
(a) When visible emissions occur outside the work area, or any area air sample has indicated a determinant level of fiber concentrations greater than the larger of baseline levels or 0.01 f/cc, work shall stop for inspection.
(1) For large or small asbestos projects, the integrity of barriers, if disturbed, shall be restored. Clean-up of surfaces outside of the work area using HEPA vacuums or wet cleaning techniques shall be done prior to resuming abatement activities.
(2) For tent procedures, HVAC systems to or in the work area shall be shut down and the work area shall be wet cleaned or HEPA vacuumed until the area air samples indicate the fiber concentration is below the determinant level. If fiber concentrations remain above the determinant level for longer than 24 hours, isolation barriers and engineering controls shall be installed and maintained.
(b) Clearance and/or reoccupancy criteria. (1) The clearance criteria shall be applied to each homogeneous work area independently.
(2) For PCM analysis involved in alteration or renovation projects, the clearance air monitoring shall be considered satisfactory when every sample is less than or equal to 0.01 f/cc or less than the ambient concentration, whichever is larger.
(3) For TEM analysis, the clearance monitoring will be considered satisfactory if conducted in accordance with 40 C.F.R. Part 763, Subpart E, Appendix A Section IV – Mandatory Interpretation of Transmission Electron Microscopy Results to Determine Completion of Response Actions.
(4) Clearance air monitoring results shall be submitted directly to the Department within 24 hours of request.
§ 1-51. Personnel Protection and Hygiene Requirements
(a) Prior to project initiation, all workers engaged in abatement activities on an asbestos project or minor project must be certified by DEP and NYSDOL.
(b) At least one asbestos handler supervisor shall be present at the work site while abatement activities are being conducted on an asbestos project or minor project, except that during minor projects the supervisor does not have to be physically present at all times but must be readily available.
(c) Personal protective equipment must be worn by all individuals inside the work place during abatement activities, except that gloves need not be worn during those work place preparation activities which do not involve the disturbance of ACM. Personal protective equipment must meet the following specifications:
(1) Disposable clothing including head, hand, foot and full body protection shall be provided by the contractor in sufficient quantities and adequate sizes for all workers and authorized visitors.
(2) Hard hats, protective eyewear, gloves, rubber boots and/or other footwear must be provided by the contractor as required for workers and authorized visitors. Safety shoes and hard hats must be in accordance with the most recent ANSI standards.
(3) Contaminated clothing shall be sealed in impermeable bags and the bags shall be appropriately labeled.
(d) Personal air monitoring shall be performed in accordance with current OSHA regulations. Such records shall be made available within 72 hours to authorized Department representatives upon request.
(e) Personal Hygiene at the work site shall meet the following requirements:
(1) There shall be no smoking on any floor of the building where abatement activities are taking place.
(2) Jewelry, watches, and cellular telephones shall not be worn, carried, or kept in contaminated areas.
(3) The contractor shall provide clean change areas for the workers. Change areas shall be equipped with separate storage facilities for protective clothing and street clothing.
(4) If lunch areas are provided, they shall be located outside the work place in an area in which the airborne concentrations are below 0.01 f/cc.
(5) There shall be no eating, drinking, application of cosmetics, or chewing of gum or tobacco inside the work place. There shall be no food or beverages present in the work place.
(6) There shall be no lighters or matches in the work place.
(f) The contractor must have available the following information at the work place:
(1) A copy of the U.S. Environmental Protection Agency Regulations for Asbestos, 40 C.F.R. 61 Subparts A and M and a copy of OSHA Asbestos Regulations, 29 C.F.R. § 1926.1101, and 12 NYCRR Part 56; and
(2) A list of telephone numbers for local hospital, location of hospital and/or emergency squad, local fire department, the building owner (or representative) and the N.Y.C. Asbestos Control Program, and
(3) A copy of these Rules, the most recent Asbestos Abatement Notice (Form ACP-13), asbestos abatement (ATRU) permits, any variance application (Form ACP-9 and all associated documents and drawings) and DEP approval thereof, and
(4) A copy of all Safety Data Sheets (SDS) for chemicals used during the asbestos project, and
(5) Original New York City Asbestos handler and supervisor certificates, or their digital or electronic equivalent as approved by DEP, and NYSDOL asbestos handler and supervisor certificates, of all workers in the work site, and
(6) A copy of the current New York State Department of Labor asbestos handling license of the abatement contractor and air monitoring company.
(7) A copy of any asbestos survey performed in the affected building in accordance with these rules.
(g) The contractor must post signs during all abatement activities. Signs must be posted at all approaches to the work place including internal doorways which provide access to the work place. These signs must include the following information:
DANGER ASBESTOS MAY CAUSE CANCER, CAUSES DAMAGE TO LUNGS AUTHORIZED PERSONNEL ONLY WEAR RESPIRATORY PROTECTION AND PROTECTIVE CLOTHING IN THIS AREA
(h) Warning labels must be affixed to all waste containers containing asbestos material and must include the following information:
DANGER CONTAINS ASBESTOS FIBERS MAY CAUSE CANCER, CAUSES DAMAGE TO LUNGS DO NOT BREATHE DUST AVOID CREATING DUST
(Amended City Record 12/7/2018, eff. 1/6/2019; amended City Record 1/15/2025, eff. 2/14/2025)
§ 1-61. Materials and Equipment
The materials and equipment used during all abatement activities shall conform with the following:
(a) During abatement activities, replacement materials shall be stored outside the work area in a manner to prevent contamination. Materials required for the asbestos project (i.e. plastic sheeting, replacement filters, duct tape, etc.) shall be stored to prevent damage or contamination.
(b) When asbestos-containing material that has been used for fireproofing or insulation is removed, the replacement material shall comply with all applicable provisions of the New York City Administrative Code and regulations.
(c) For plasticizing, fire-retardant polyethylene sheeting with 6-mil thickness or greater, in sizes to minimize the frequency of joints, shall be employed.
(d) Duct tape and selected adhesive shall be capable of sealing joints of adjacent sheets of polyethylene, facilitating attachment of polyethylene sheets to finished or unfinished surfaces, and of adhering under both dry and wet conditions, including during the use of amended water.
(e) Airtight and watertight containers must be provided to receive and retain any asbestos-containing waste materials. Plastic bags used for waste storage or disposal must be a minimum of 6-mil in thickness. All containers must be labeled in accordance with OSHA Regulation 29 C.F.R. 1926.1101.
(f) Materials used to enclose ACM shall be impact resistant and assembled to be airtight Gypsum panels taped at the seams, tongue and groove boards, and boards with spline joints all qualify.
(g) Power tools used to drill, cut into, or otherwise disturb ACM shall be manufacturer-equipped with HEPA filtered local exhaust ventilation. Abrasive removal methods, including the use of beadblasters, are prohibited.
(h) Ladders or scaffolds of sufficient dimension and quantity shall be available so that all work surfaces can be easily and safely reached by inspectors and asbestos handlers.
(1) Ladders. Where ladders are used to access or reach work surfaces for the conduct of abatement activities, care must be taken to prevent breaching of the containment areas and the ladder's integrity must be maintained to ensure safety. Ladders and their use shall comply with OSHA 29 C.F.R. 1926. Subpart X Ladders 1926.1053.
(2) Scaffolds. Where scaffolds are used to reach work surfaces or for the conduct of abatement activities, scaffold joints and ends shall be sealed with tape to prevent incursion of asbestos fibers. Scaffolds and their use shall comply with OSHA 29 C.F.R. 1926. Subpart L Scaffolds 1926.450; 451 and 452.
(3) Walking Surfaces. Walking and working surfaces shall be protected from tripping or stepping into or through holes or openings, including skylights, by covers secured to the surface in accordance with OSHA Section 29 C.F.R. 1926.501.
(i) Electrical equipment shall be Underwriters Laboratory listed and approved.
(j) Surfactants, strippers, sealers, or any other chemicals used during the asbestos project shall be non-carcinogenic and non-toxic.
(k) Plastic sheeting used in the construction of temporary enclosures shall be fire-retardant in accordance with NFPA 701. Wood or other materials used in the construction of temporary enclosures shall be noncombustible or fire-retardant in accordance with NFPA 255, ASTM D 2898, ASTM E 84, and UL 723.
(l) Equipment and materials may be substituted for those specified in this chapter only if determined to be equivalent after review by the Department.
(Amended City Record 12/7/2018, eff. 1/6/2019; amended City Record 4/28/2022, eff. 5/28/2022)
§ 1-71. Applicability
§ 1-81. General Work Place Preparation Requirements
The following procedures shall be followed during the conduct of abatement activities on asbestos projects. The procedures set forth in this subdivision shall be performed in the order set forth below:
(a) The building owner or designated representative must provide notification to all occupants of the work place and immediate adjacent areas of the asbestos project. Information provided in the notification must include contractor, project location and size, amount and type of ACM, abatement procedure, dates of expected occurrence and the Call Center "311" for government information and services. Postings of this notification must be in English and Spanish, at eye level, in a conspicuous, well-lit place, at the entrances to the work place and immediate adjacent areas. The notice must have the following heading: NOTICE OF ASBESTOS ABATEMENT, in a minimum of one inch sans serif, gothic or block style lettering, with the balance of the lettering of the notice to be of the same type lettering in a minimum of one quarter inch size. The notices must be posted 7 calendar days prior to the start of the project and must remain posted until clearance air monitoring is satisfactorily concluded. A lessee initiating an asbestos project must give 10 calendar days notice to the owner of the subject building.
(b) A floor plan showing the areas of the building under abatement and the location of all fire exits in said areas shall be prominently posted in the building lobby or comparable location, along with a notice stating the location within the building of the negative air cutoff switch required under 15 RCNY § 1-91(f), if applicable.
(c) The work place shall be vacated by the occupants prior to work place preparation and until successful clearance air monitoring.
(d) Electric power to all work areas shall be shut down and locked out except for electrical equipment that must remain in service. Safe temporary power and lighting shall be provided in accordance with all applicable codes. Existing light sources (e.g. house lights) shall not be utilized. All power to work areas shall be brought in from outside the area through ground-fault circuit interrupter at the source.
(1) If electrical circuits, machinery, and other electrical systems in or passing though the work area must stay in operation due to health and safety requirements, the following precautions must be taken:
(i) All unprotected cables, except low-voltage (less than 24 volts) communication and control system cables, panel boxes of cables and joints in live conduit that run through the work area shall be covered with three (3) independent layers of six (6) mil fire retardant polyethylene. Each layer shall be individually duct taped and sealed. All three (3) layers of polyethylene sheeting shall be left in place until satisfactory clearance air sampling results have been obtained.
(ii) Any energized circuits remaining in the work area shall be posted with a minimum two (2) inch high lettering warning sign which reads: DANGER LIVE ELECTRICAL – KEEP CLEAR. A sign shall be placed on all live covered barriers at a maximum of ten (10) foot intervals. These signs shall be posted in sufficient numbers to warn all persons authorized to enter the work area of the existence of the energized circuits.
(e) The worker decontamination enclosure system shall be installed or constructed prior to plasticizing the work area or before disturbing ACM.
(f) (1) Prior to erection of partitions, ACM that may be disturbed during this activity must be removed using a tent procedure (including engineering controls) using wet methods.
(2) Removal by the above procedures shall be limited to a maximum of a one foot wide strip running the length and/or height of the partition and is allowed only to facilitate erection of the partitions.
(g) All boilers and other equipment within the work area shall be shut down, locked out, and tagged out and the burner/boiler/equipment accesses and openings shall be sealed in accordance with 15 RCNY § 1-81(n) until abatement activities are complete. If the boiler or other exhausted equipment will be subject to abatement, all breeching, stacks, columns, flues, shafts, and double-walled enclosures serving as exhausts or vents shall be segregated from the affected boiler or equipment and sealed airtight to eliminate potential chimney effects within the work area. Heating, Ventilation and Air Conditioning (HVAC) System Isolation methods are listed below in order of preference; the more complex and potentially problematic methods maybe used when the more preferred procedures are impractical.
(1) shut down and lock out HVAC systems and install isolation barriers (see 15 RCNY § 1-81(n)) to prevent contamination and fiber dispersal to other areas of the structure, or
(2) isolate locally and provide temporary HVAC, or
(3) positive pressurization of the HVAC system. This procedure shall be applied only under the direction and control of a professional engineer, or other knowledgeable licensed professional.
(h) Abatement shall not commence until work place preparation has been completed.
(i) Movable objects within the proposed work areas shall be pre-cleaned (i.e., prior to commencing general abatement) using HEPA filtered vacuum equipment and/or wet cleaning methods and such objects shall be removed from the work area. If carpeting is left in place, it shall be covered with fire retardant 6-mil plastic sheeting, and then 3/8 in. rigid flooring prior to normal plasticizing.
(j) All flammable materials shall be removed from the work area and all sources of ignition (including but not limited to pilot lights) shall be extinguished.
(k) Fixed objects which will remain within the proposed work areas must be pre-cleaned using HEPA filtered vacuum equipment and/or wet cleaning methods as appropriate, and enclosed with two layers of fire retardant 6-mil plastic sheeting sealed to protect from re-contamination. Sprinklers, standpipes, and other fire protection systems must remain in service and must not be plasticized.
(l) Any source of emergency lighting which is temporarily blocked as a result of work place preparation shall be replaced for the duration of the project by battery operated or temporary exit signs, exit lights, or exit path markings.
(m) Prior to plasticizing, the proposed work areas shall be pre-cleaned using HEPA filtered vacuum equipment and/or wet cleaning methods. Methods that raise dust, such as sweeping or vacuuming with equipment not equipped with HEPA filters, are prohibited.
(n) The isolation barriers (i.e., sealing off of all openings, including but not limited to windows, corridors, doorways, barriers, skylights, ducts, grills, diffusers, and any other penetrations of the work place) shall be installed with two layers of fire retardant 6-mil plastic sheeting sealed with tape. All seams of HVAC or other system components that pass through the work place shall also be sealed.
(o) The work area shall be segregated from the remainder of the work site by construction of temporary structural partitions as follows:
(1) Partitions shall be constructed of conventional 2 x 3 (minimum) wood or metal stud framing, 16"CC maximum, to support barriers in all openings larger than 32 ft 2 , except where any one dimension is 1 foot or less, or where openings are exits covered in subdivision (p) below.
(2) A solid construction material (e.g. fire rated plywood) of at least 3/8" thickness shall be applied to the work side of the framing. In secure interior areas where partitions are not subject to access from the public, an additional layer of fire retardant 6-mil plastic sheeting may be substituted for the solid construction material.
(3) The partitions shall be caulked/sealed at the floor, ceiling, walls, joints and fixtures to form an airtight seal.
(4) Where the opening is an exit covered in subdivision (s) below, or where the partition would block egress, the partition shall consist of two sheets of fire-retardant 6-mil plastic, prominently marked as an exit with signage so as to be visible both in normal light and in the event of a power failure. Cutting tools (e.g., knife, razor) shall be attached to the work area side of the sheeting for use in the event that the barrier must be cut open to allow egress.
(5) Means of egress shall not be obstructed by hardwall barriers.
(p) In addition to the isolation barriers, floor and wall surfaces shall be sealed with a minimum of two layers of fire retardant 6-mil plastic sheeting, except where the only ACM being abated in the project is vinyl asbestos floor tile or other flooring material, in which case the floor need not be sealed; or the only material being abated in the project is wall plaster or other wall material, in which case the walls need not be sealed. The plastic layers on the floor shall extend 6 inches up the walls. Walls shall be covered with plastic sheeting down to the floor level, thus overlapping the floor material by a minimum of 6 inches. There shall be a distance of at least 6 inches between seams of adjacent layers.
(q) After isolation barriers are in place, ceiling-mounted objects not previously sealed that will interfere with ACM abatement shall be removed and cleaned. Amended water spraying or HEPA filtered vacuum equipment shall be used during fixture removal to reduce fiber dispersal.
(r) Suspended ceiling tiles and T-grid components, contaminated by ACM, shall remain in place until the work area has been fully prepared as outlined in this section and electrical and HVAC systems have been shutdown. Suspended ceiling components shall be removed and disposed of as asbestos-containing waste or, if non-porous, retained for reuse after wet cleaning / HEPA vacuuming. Isolation barriers shall be installed in all openings above the ceiling before disturbance of ACM commences.
(s) Entrances to the work place that will not be used for worker entry or emergency exits shall be locked to prevent unauthorized entry.
(t) Exits from the work area shall be maintained, or alternative exits shall be established, in accordance with section 1027 of the New York City Fire Code. Exits shall be checked at the beginning and end of each work shift against blockage or impediments to exiting.
(u) Signs clearly indicating the direction of exits shall be maintained and prominently displayed within the work area. The signs shall bear a horizontal arrow or arrows indicating the direction to the exit, above which the word "EXIT" shall be printed in minimum 5" letter size.
(v) No smoking signs shall be maintained and prominently displayed within the work place. The signs shall be a minimum of 10 by 14 inches and shall bear the International "No Smoking" symbol, under which the words "NO SMOKING" shall be printed in minimum 2" letter size.
(w) Floor drains shall be sealed individually with two layers of fire retardant 6-mil plastic sheeting and tape, and then covered as all other floor surfaces. Pits, sumps, etc., shall be covered with adequate fire rated plywood sheeting and secured to floor slabs in a manner which prevents a tripping hazard, prior to required plasticizing.
(x) Elevators running through the work area must conform to the following:
(1) The elevator door in the work area must be enclosed with conventional 2 x 4 stud framing, covered with 3/8" fire rated plywood sheeting and sealed at all edges and seams. The barrier must be covered and lapped for 8 inches with two layers of fire retardant 6-mil plastic sheeting adhered individually with edges taped for air tightness. There shall be no more than a six inch clearance between the elevator door and hard wall barrier.
(2) Elevators not remaining in service shall have the fuses removed and the power switch locked in the open position.
(3) Elevators that remain in operation shall conform to the following additional procedures to minimize the piston effect that results:
(i) Elevator control shall be modified to bypass the work area.
(ii) A final larger layer of fire retardant 6-mil plastic sheeting is to be taped airtight but with slack forming a larger perimeter diaphragm. Air leakage across the barrier shall be corrected upon discovery, and the elevator shaft shall be checked for airborne asbestos contamination.
(iii) This system shall be smoke tested daily.
(4) Elevator shafts shall not be used as waste chutes or to convey any ACM.
(5) Signage must be posted in the main lobby stating the specific floors where the elevators are out of service due to abatement.
(y) Adequate toilet facilities must be provided in the vicinity of the clean room external to the work place. Where such facilities do not exist, portable service must be provided.
(z) At least one functional fire extinguisher with a minimum rating 2-A:10-B:C shall be required for each work place. In the case of large asbestos projects, at least two such fire extinguishers shall be required.
(Amended City Record 12/7/2018, eff. 1/6/2019; amended City Record 8/21/2019, eff. 9/20/2019; amended City Record 1/15/2025, eff. 2/14/2025)
§ 1-82. Worker Decontamination Enclosure System
The following procedures shall be followed during the conduct of abatement activities on asbestos projects:
(a) Worker decontamination enclosure systems must be located outside the work area and attached to all locations where workers will enter or exit the work area. One system at a single location for each contained work area is required. These systems may consist of existing rooms outside of the work area, that offer direct access to the work area and general egress from the work place. When this situation does not exist, enclosure systems may be constructed or may consist of prefabricated or trailer units. Adequate heat and light shall be safely provided.
(b) The worker decontamination enclosure system shall consist of a clean room, a shower room, and an equipment room, in series, separated from each other by airlocks and from the work area and non-work place by curtained doors (see Illustration I).
(c) Worker decontamination enclosure systems shall be fully lined utilizing two layers of fire retardant 6-mil opaque plastic sheeting at a minimum, or the equivalent.
(d) When the decontamination enclosure is constructed outdoors or in areas with public access it shall be fully framed and fire retardant plywood sheathed or equivalent to prevent unauthorized entry. When located outdoors, it shall be waterproof and windproof.
(e) Prefabricated or trailer decontamination units:
(1) shall at a minimum, have functionality and security equivalent to constructed decontamination enclosure facilities, and
(2) shall be completely decontaminated prior to removal from the work site.
(f) The clean room:
(1) shall contain secure crew lockers or shelves, and clean sealable plastic bags for storage of street clothes, and
(2) shall contain shelves or appropriate facilities for storage of respirators, and
(3) shall contain clean disposable clothing, replacement filters for respirators, towels and other necessary personal protective equipment, and
(4) shall not be used for storage of tools, equipment or materials, other than personal protective equipment, nor used as office space, and
(5) shall be equipped with a lockable door to secure the work place during off-shift hours.
(g) The shower room:
(1) shall contain a minimum of one (1) shower per 6 workers calculated on the basis of the largest shift, and
(2) shall have shower heads supplied with hot and cold water adjustable at the shower, and
(3) shall be constructed to ensure against water leakage, and shall contain a rigid catch basin at least six (6) inches deep, and
(4) shall contain liquid bath soap, shampoo, and clean dry towels in sufficient quantity for each worker for each showering.
(h) Shower water shall be continuously drained, collected and filtered through a system with a least 5.0 micron particle size collection capability. A system containing a series of several filters with progressively smaller pore sizes shall be used to avoid rapid clogging of the filtration system by large particles. Pumps shall be installed, maintained and utilized in accordance with manufacturer's recommendations.
(1) Filtered wastewater shall be discharged either to a sewer or drummed and then properly disposed.
(2) Used filters shall be disposed of as asbestos-containing waste material.
(i) The equipment room:
(1) shall be used for storage of equipment and tools used on the job that have been cleaned previously in the work area, and
(2) may contain a limited supply of replacement filters (in sealed containers until used) for HEPA vacuums and pressure ventilation equipment, extra tools, containers of surfactant and other materials and equipment that may be required during the abatement activity, and
(3) shall contain labeled 6-mil plastic bags for collection of disposable clothing, and
(4) shall be used to store contaminated footwear (e.g. rubber boots and other reusable footwear) and contaminated clothing for reuse for the duration of the abatement activity or until disposed.
(Amended City Record 1/15/2025, eff. 2/14/2025)