15 RCNY Chapter 18 Protection from Contamination, Degradation and Pollution of the New York City Water Supply and Its Sources, part 2 of 2
§ 18-38 to Appendix 18-B: 26 sections.
§ 18-38. Subsurface Sewage Treatment Systems
(a) Minimum Requirements for new subsurface sewage treatment systems.
(1) The design, treatment, construction, maintenance and operation of new subsurface sewage treatment systems, and the plans therefor, require the review and approval of the Department, provided that the requirements of this section shall not apply to subsurface sewage treatment systems necessary for an agricultural activity that are designed, provide treatment and are constructed, maintained and operated in compliance with State and Federal law.
(2) All new individual sewage treatment systems shall comply with the requirements of 10 NYCRR Part 75 and Appendix 75-A except where a local government or agency has enacted, or these rules and regulations specify, more stringent standards, in which case, the more stringent standards shall apply.
(3) All new intermediate sized sewage treatment systems shall comply with the requirements set forth in New York State Design Standards for Intermediate Sized Wastewater Treatment Systems, New York State Department of Environmental Conservation (2014), except where a local government or agency has enacted, or these rules and regulations specify, more stringent standards, in which case, the more stringent standards shall apply.
(i) As a condition of approval the Department may require evidence of financial security prior to construction, from any owner or operator of a new intermediate sized sewage treatment system or a substantial alteration or modification to an existing intermediate sized sewage treatment system. Such financial security shall consist of a bond, or an equivalent guaranty, to be deposited with the Department, covering the full cost of the construction of such facility and an additional bond or an equivalent guaranty for the payment of labor and material furnished in the course of such construction. Upon completion of construction and payment of labor and materials, such bonds or other guaranties shall be released. Additionally, a bond or equivalent guaranty may be required for the maintenance and operation of the facility for a period of five years post-construction. No bond or guaranty is required where the owner or operator of such a facility is a village, town, county or city.
(4) No part of any absorption field for any new subsurface sewage treatment system shall be located within the limiting distance of 100 feet of a watercourse or wetland or 300 feet of a reservoir, reservoir stem or controlled lake. For a new conventional individual subsurface sewage treatment system or for a new Ulster County Fill System the Department may recommend a greater limiting distance from an absorption field to a watercourse, wetland, reservoir, reservoir stem or controlled lake.
(5) Raised systems, as described in 10 NYCRR Part 75 and Appendix 75-A, are allowed on undeveloped lots not located in a subdivision or on undeveloped residential lots located in a subdivision which was approved prior to the effective date of these rules and regulations, where site conditions are not suitable for a conventional system provided that:
(i) The system shall be located at least 250 feet from any watercourse or wetland and 500 feet from any reservoir, reservoir stem or controlled lake provided that the greater limiting distance for raised systems does not preclude construction on the subject lot or lots of the use proposed by the applicant, and further provided that the site conditions and the subsurface sewage treatment system comply with the other provisions of these rules and regulations and other applicable Federal, State and local laws, as cited in 15 RCNY § 18-38(a)(1); or
(ii) Raised systems which cannot meet the limiting distances set forth in subparagraph (i) due to size or location of the lot shall be located at the greatest limiting distance possible within the property lines and at least 100 feet from any watercourse or wetland and 300 feet from any reservoir, reservoir stem or controlled lake.
(6) Where a watershed county has adopted a subdivision code that allows a raised system, as described in 10 NYCRR Part 75 and Appendix 75-A, or where the New York State Department of Health approved such raised systems for use in subdivisions located in the watershed, such raised systems are allowed in subdivisions that are approved subsequent to the effective date of these rules and regulations, provided that no part of such systems shall be located within 250 feet of a watercourse or wetland or 500 feet of a reservoir, reservoir stem or controlled lake.
(7) Any approval of a subsurface sewage treatment system issued by the Department expires and is null and void unless construction is substantially completed such that the system is functioning as designed within five (5) years of the date of issuance for systems located within approved subdivisions, or within two (2) years of the date of issuance for all other subsurface sewage treatment systems. Following expiration of the approval, the plans for the subsurface sewage treatment system may be resubmitted to the Department for consideration for a new approval.
(b) Minimum requirements for alteration and modification, repair and remediation, and discontinuation of subsurface sewage treatment systems.
(1) All subsurface sewage treatment systems, which are operating in accordance with their Federal, State, and local approvals, but which do not comply with the requirements for new subsurface sewage treatment systems set forth in this section, shall be allowed to continue to operate.
(2) If the use of a subsurface sewage treatment system is, for any reason, subject to discontinuation for a period of five consecutive years or more, operation may resume if it comes into compliance with the standards for alterations or modifications of subsurface sewage treatment systems in accordance with 15 RCNY § 18-38(b)(4) below. If, however, the system cannot come into compliance with these standards, the use must permanently desist. The owner or operator bears the burden of proof for showing that there has been no discontinuation in the use of a subsurface sewage treatment system.
(3) Any proposed alteration or modification of any subsurface sewage treatment system requires the review and approval of the Department, except as provided in subparagraphs (i) through (iii) below.
(i) The volume, character, or strength of the flow to a subsurface sewage treatment system may be reduced without review and approval provided that such reduction does not cause any increase in the existing discharge or any increase in the potential for contamination to or degradation of the water supply from that discharge. If the reduction in the volume, character, or strength results from an alteration or modification of a system component, or the addition of a new system component (such as installation of a peat filter or aerobic treatment unit), then such alteration, modification, or addition requires review and approval of the Department, except that:
a. Any such review and approval shall be limited to the affected system component; and
b. No such review and approval is required where the alteration, modification, or addition of the system component is otherwise exempt from review under this section (such as the replacement of a septic tank with a larger tank of an appropriate size for the subsurface sewage treatment system).
(ii) Except as set forth in this subdivision, for an intermediate sized subsurface sewage treatment system that has a State Pollutant Discharge Elimination System (SPDES) permit, review and approval is not required for any proposed alteration or modification that does not deviate from the engineering design and site plan approved by the New York State Department of Environmental Conservation.
a. Review and approval by the Department is required if the alteration or modification requires a modification of the SPDES permit for the SSTS for any reason including, but not limited to:
i. the alteration or modification involves physical alteration or modification of the SSTS, or
ii. the alteration or modification results in the system receiving sewage that either exceeds the treatment system design flow, or has a strength or characteristic beyond the design capability of the treatment system.
b. If the Department has previously issued an approval for an intermediate sized subsurface sewage treatment system, review and approval by the Department is required for any alteration or modification that results in the system receiving sewage that either exceeds the design flow of the system as approved by the Department, or has a strength or characteristic beyond the design capability of the system as approved by the Department.
(iii) In the following circumstances, where an ancillary, non-residential use of a residence served by an individual subsurface sewage treatment system does not result in an increase in or change in the nature of the flow of sewage, the subsurface sewage treatment system shall not be considered an intermediate-sized sewage treatment system, nor shall such use require review and approval by the Department:
a. Where the residence is used to provide accommodations for transient lodgers and no food service is provided other than to overnight guests, unless such use requires a temporary residence permit pursuant to 10 NYCRR Subpart 7-1.
b. Where the individual residence is used for a home office or home business, provided that:
i. The individual who operates the home office or home business occupies the home as his or her primary or secondary residence;
ii. The home office or home business is of a type that is estimated to generate 50 gallons per day of water or less based on Table B-3 of the New York State Design Standards for Intermediate Sized Wastewater Treatment Systems, New York State Department of Environmental Conservation (2014); and
iii. The conversion does not involve an increase in the individual residence's number of bedrooms.
(4) Standards for Alterations or Modifications of Subsurface Sewage Treatment Systems.
(i) Any proposed alteration or modification of any subsurface sewage treatment system must be performed in accordance with the requirements applicable to new subsurface sewage treatment systems under this section.
(ii) Alterations or modifications of subsurface sewage treatment systems that cannot meet these requirements, due to site constraints, must be performed in accordance with the requirements applicable to new subsurface sewage treatment systems to the extent possible. Applications for proposed alterations or modifications of such subsurface sewage treatment systems must include the information described in 15 RCNY § 18-38(d)(4).
(iii) Standard of review. The department will authorize use of a subsurface sewage treatment system that has been subject to a period of discontinuation for five consecutive years or more, or a proposed alteration or modification of a subsurface sewage treatment system, if the applicant demonstrates that such use, alteration, or modification does not present a threat to public health or water quality as determined by the Department.
(5) If a subsurface sewage treatment system fails or needs remediation, the owner or operator of the subsurface sewage treatment system must comply with the following:
(i) Any proposed remediation of any part of a subsurface sewage treatment system shall require the prior review and approval of the Department, and if approved, shall be completed as soon as possible in accordance with a schedule approved by the Department;
(ii) Any proposed remediation of any part of a subsurface sewage treatment system shall be implemented, to the extent possible, in accordance with the design standards set forth in this section, and shall require the prior review and approval of the Department. However, if the Department determines, based upon the application submitted by the owner or operator of the subsurface sewage treatment system, that such system cannot comply with this section, the owner or operator of the subsurface sewage treatment system shall cooperate with the Department to determine the most suitable location and design for the system on the specific site. The Department may require the owner to agree to a regular schedule for the pump out of the septic tank or other remedial action, including the use of holding tanks, before the proposed remediation is approved by the Department and implemented; and
(iii) The provisions of this paragraph shall not apply to the routine repair and maintenance of a subsurface sewage treatment system, including, but not limited to, the pump out of a septic tank, the replacement of a septic tank, whether in kind or with a larger tank of an appropriate size for the subsurface sewage treatment system, the repair of a broken lateral, the leveling of a distribution box, or the removal of a blockage.
(6) Any approval issued by the Department to use a subsurface sewage treatment system following a discontinuation expires and is null and void unless any required enhancements are implemented and such use is commenced within one (1) year of the date of issuance or such longer period as the Department may authorize in writing. Following expiration of the approval, the plans for the subsurface sewage treatment system may be resubmitted to the Department for consideration for a new approval.
(7) Any approval of an alteration or modification of a subsurface sewage treatment system issued by the Department expires and is null and void unless any required enhancements are implemented within two (2) years of the date of issuance. Following expiration of the approval, the plans for the subsurface sewage treatment system may be resubmitted to the Department for consideration for a new approval.
(8) Any property owner may request that the Department review and approve a proposed use of a subsurface sewage treatment system by demonstrating that it is capable of treating a specified volume and type of wastewater flow. The proposal may include proposed enhancements to the system. A determination by the Department that the subsurface sewage treatment system complies with the standards applicable to new subsurface sewage treatment systems or, if it cannot come into compliance the standards applicable to alterations or modifications of subsurface sewage treatment systems to the extent possible pursuant to 15 RCNY § 18-38(b)(4), for the proposed use and volume, shall be binding upon the Department for five years following the date of the determination.
(c) Design, operation, treatment, and maintenance requirements.
(1) All subsurface sewage treatment systems shall be designed, operated and maintained to prevent the exposure of sewage to the surface of the ground or the discharge of sewage to ground- water.
(2) Limitations on certain systems in the watershed.
(i) Mound systems, galley systems, seepage pits, evaporation-transpiration (ET) and evaporation-transpiration absorption (ETA) systems are prohibited from use for subsurface sewage treatment systems installed in the watershed on or after June 30, 2002.
(ii) Drip and low profile dispersal systems, as described in New York State Design Standards for Intermediate Sized Wastewater Treatment Systems, New York State Department of Environmental Conservation (2014) are prohibited from use for subsurface sewage treatment systems installed in the watershed on or after September 25, 2019.
(iii) Sand filters are prohibited from use for individual sewage treatment systems in the watershed.
(iv) For new subsurface sewage treatment systems within the 60-day travel time, and for new subsurface sewage treatment systems that require State Pollutant Discharge Elimination System (SPDES) permits, trench length reductions will not be offered for use of any enhanced subsurface sewage treatment systems.
(v) No trench length reductions shall be granted for use of any open-bottom gravelless absorption system, as described in 10 NYCRR Appendix 75-A.8(c)(3)(i). One linear foot of a gravelless absorption system is equivalent to one linear foot of conventional (24" wide) absorption trench.
(3) An additional area of at least 100 percent of the primary absorption field shall be set aside as a reserve absorption field for any subsurface sewage treatment system.
(4) No part of any primary or reserve absorption field shall be built under pavement or other impervious surfaces, and pavement and other impervious surfaces shall not be built over such absorption fields after installation.
(5) At least one percolation test and at least one deep hole test must be performed in the primary absorption field. At least one percolation test and at least one deep hole test must be performed in the reserve absorption field. An applicant must notify the Department in writing at least seven (7) days prior to performance of such tests, and specify the location and the time of the tests. Such soils testing must be performed during normal business hours on weekdays other than legal holidays. At the option of the Department, a Department representative may witness such tests.
(6) Proposed sites with soil percolation rates faster than 3 minutes per inch or slower than 60 minutes per inch shall not be approved by the Department for locating a subsurface sewage treatment system.
(7) Whenever possible, gravity flow systems shall be used for subsurface sewage treatment systems. The use of electrically operated pumps shall require a chamber equipped with an alarm to indicate malfunction and any other safety features required by the Department to prevent sewage overflow. An intermediate sized sewage treatment system that uses electrically operated pumps is required to have either a backup pump or a backup storage tank capable of holding two days' flow. An individual sewage treatment system that uses electrically operated pumps shall have a backup storage tank capable of holding one day's flow.
(8) A reserve absorption field is intended to be left undisturbed to be used in the event that the primary absorption field fails in the future. If the reserve absorption field is used because the primary absorption field has failed, the owner should, but is not required to, identify a new reserve absorption field. If the reserve absorption field is used for purposes of expanding the subsurface sewage treatment system, a new reserve absorption field or Department-approved alternative must be identified.
(d) Application Requirements.
(1) An application for review and approval of any subsurface sewage treatment system shall include the following information:
(i) Soil investigation report including:
(a) percolation test results;
(b) deep hole test pit results or boring analysis indicating the depth of useable soil;
(c) indication of surface water or ledge rock observed;
(d) design rate of flow; and
(e) delineation of United States Department of Agriculture Soil Conservation Service soil type boundaries.
(ii) Building permit number and tax map number where available.
(iii) Four (4) sets of plans prepared by a design professional showing:
(a) site location, including distances to wells, watercourses, rock outcroppings, wetlands, controlled lakes and reservoirs, and any property boundaries within 10 feet of any subsurface sewage treatment system component;
(b) site/system plans, drawn to scale, with topography showing two-foot contour intervals;
(c) system profile;
(d) details of system components; and
(e) a report containing:
(1) a description of the project characteristics; and
(2) a detailing of the design process.
(2) An application for review and approval of an intermediate sized sewage treatment system shall include all of the information in paragraph (1) of subdivision (c) of this section, and additionally shall contain:
(i) An Environmental Assessment form and State Environmental Quality Review Act determination, if applicable; and
(ii) A SPDES permit, if applicable.
(3) All approvals for new subsurface sewage treatment systems are conditioned on the applicant's submission of as-built drawings, prepared by a design professional, once construction is complete.
(4) An application for review and approval of an alteration or modification of a subsurface sewage treatment system, or of the resumption of use of a subsurface sewage treatment following discontinuation, that cannot satisfy the requirements applicable to new subsurface sewage treatment system must include all of the information in paragraph (1) of subdivision (d) of this section, except that the Department may, at its option, waive the requirement to submit a soil investigation report. For an intermediate sized sewage treatment system, the application must include the information in paragraph (2) of subdivision (d) of this section. An application must also contain:
(i) Plans or other design information, consisting of:
(a) If available, design plans for the subsurface sewage treatment plans, indicating all known regulatory approvals for such plans;
(b) If design plans are not available, a description of the components of the system prepared by a licensed professional engineer;
(ii) A proposal for enhancements to the system to meet the standards in 15 RCNY § 18-38 applicable to a new subsurface sewage treatment system to the extent possible, including the information required under 15 RCNY § 18-38(c); and
(iii) Any additional information demonstrating any or all of the following:
(a) A reduction in the potential for contamination to or degradation of the water supply from the subsurface sewage treatment system,
(b) A reduction in flow to the subsurface sewage treatment system, or
(c) Mitigation measures to avoid contamination to, or degradation of, the water supply.
(e) Construction Requirements.
(1) The applicant must notify the Department at least two business days before the start of construction of a subsurface sewage treatment system. The locations of the absorption field corners, septic tanks, pump or dosing chambers, and other treatment components must be staked out before the start of construction, so that the Department can, at its option, verify compliance with separation distance to wells, watercourses, and property lines. The ends of absorption trenches and the corners of absorption beds must be staked out before the start of construction. Stakes must be marked with applicable line and grade information and may not be disturbed during construction.
(2) If construction of a subsurface sewage treatment system ceases for more than seven days, the applicant must make best efforts to notify the Department at least two business days before restarting construction.
(3) The applicant must notify the Department at least one day before burying any component of a subsurface sewage treatment system.
(4) All notifications to the Department pursuant to this subsection (d) must be made via the email address and/or telephone number listed on the approval.
(Amended City Record 10/30/2019, eff. 11/29/2019)
§ 18-39. Stormwater Pollution Prevention Plans and Impervious Surfaces
(a) Impervious surfaces.
(1) The construction of an impervious surface within the limiting distance of 100 feet of a watercourse or wetland, or within the limiting distance of 300 feet of a reservoir, reservoir stem, or controlled lake, is prohibited.
(2) Paragraph (1) shall not apply to the following activities:
(i) Construction of a new individual residence, which shall comply with paragraph (5) of this subdivision;
(ii) Non-commercial ancillary improvements or additions to an individual residence;
(iii) Construction of an impervious surface for a driveway serving an individual residence constructed or having obtained all discretionary approvals necessary for construction prior to March 1, 2010;
(iv) Construction of an impervious surface for a driveway serving an individual residence that obtains all discretionary approvals necessary for construction on or after March 1, 2010, which shall comply with paragraph (5) of this subdivision;
(v) Agricultural activities;
(vi) Construction of bridges or crossings of watercourses or wetlands constructed pursuant to a valid permit from the appropriate regulatory agencies. If a permit from a regulatory agency other than the Department is not required, the applicant shall comply with paragraph (9) of this subdivision;
(vii) Creation of an impervious surface made necessary by the construction of a wastewater treatment plant or alteration or modification of a wastewater treatment plant approved by the Department;
(viii) Creation of an impervious surface that is made necessary by the construction of a new facility or alteration or modification of an existing facility used in connection with the operation of a public water supply system; or
(ix) Creation of an impervious surface, such as a culvert, needed as an integral component of diversion or piping of a watercourse, but only with the review and approval of the Department and only if the Department determines that such impervious surface will not have an adverse impact on water quality.
(3) Paragraph (1) shall not apply to creation of an impervious surface in the West of Hudson watershed within a village, hamlet, village extension, or area zoned for commercial or industrial uses, which complies with paragraph (8) of this subdivision or to the creation of an impervious surface in the East of Hudson watershed within a Designated Main Street Area, which complies with paragraph (11) of this subdivision.
(4) Paragraph (1) shall not apply to the creation of an impervious surface in connection with the following activities occurring in the East of Hudson watershed outside a Designated Main Street Area or in the West of Hudson watershed outside a village, hamlet, village extension, or an area zoned for commercial or industrial uses:
(i) Construction of a new road or widening of an existing road, which shall comply with paragraph (6) of this subdivision;
(ii) Creation of an impervious surface within a designated village center, which shall comply with paragraph (7) of this subdivision; or
(iii) Expansion of an existing impervious surface within the limiting distance of 100 feet of a watercourse or wetland, at an existing commercial, institutional, municipal, industrial, or multi-family residential facility, provided that the total area of all expanded impervious surfaces, including all impervious surfaces allowed under this provision after May 1, 1997, does not exceed 25 percent of the area of the existing impervious surface at that commercial, institutional, municipal, industrial, or multi-family residential facility, which shall comply with subdivisions (b), (c) and (d) of this section.
(5) The following requirements are applicable to construction of a new individual residence and of impervious surfaces for driveways serving individual residences that obtain all discretionary approvals necessary for construction on or after March 1, 2010:
(i) Whether or not a new individual residence will be located in a subdivision, construction of a new individual residence within the limiting distance of 300 feet of a reservoir, reservoir stem, or controlled lake is prohibited;
(ii) Construction of a new individual residence in a subdivision within the limiting distance of 100 feet of a watercourse or wetland is prohibited where:
(a) The subdivision plat received preliminary approval on or after October 16, 1995; or
(b) The subdivision plat received preliminary approval before October 16, 1995, the person who owned the subdivision on October 16, 1995 was the same person, or a principal or affiliate of the person, who owned the subdivision at the time the subdivision plat received preliminary approval, and construction activity related to infrastructure improvements for the subdivision had not begun as of October 16, 1995;
(iii) Construction of a new individual residence not in a subdivision, or in a subdivision approved before October 16, 1995 and not prohibited by paragraph (a)(5)(ii)(b) of this subdivision, within the limiting distance of 100 feet of a perennial stream or wetland requires an individual residential stormwater permit from the Department, pursuant to subdivision (e) of this section;
(iv) Construction of an impervious surface for a driveway serving an individual residence that obtains all discretionary approvals necessary for construction on or after March 1, 2010 within the limiting distance of 300 feet of a reservoir, reservoir stem, or controlled lake is prohibited;
(v) Construction of an impervious surface for a driveway to serve an individual residence that obtains all discretionary approvals necessary for construction on or after March 1, 2010, within the limiting distance of 100 feet of a perennial stream or within the limiting distance of 50 feet of an intermittent stream or wetland, requires an individual residential stormwater permit from the Department, pursuant to subdivision (e) of this section.
(6) The following requirements are applicable to construction of an impervious surface for a new road or the widening of an existing road:
(i) Construction of an impervious surface for a new road within the limiting distance of 300 feet of a reservoir, reservoir stem or controlled lake is prohibited, except paving an existing dirt or gravel road is permitted. Construction of a new impervious surface by paving an existing dirt or gravel road requires a stormwater pollution prevention plan which complies with subdivisions (b), (c) and (d) of this section.
(ii) Construction of an impervious surface for a new road within the limiting distance of 50 feet of an intermittent stream or wetland, or within the limiting distance of 100 feet of a perennial stream, is prohibited, except for paving an existing dirt or gravel road or where necessary to provide an access road. Construction of an impervious surface for paving such existing dirt or gravel road or for such a new access road requires a stormwater pollution prevention plan which complies with the requirements of subdivisions (b), (c) and (d) of this section for the entire impervious surface. An access road constructed pursuant to this paragraph shall be constructed as far as practicable from all watercourses and wetlands, as determined by the Department.
(iii) Construction of an impervious surface for a new road between the limiting distances of 50 feet and 100 feet of an intermittent stream or wetland requires a stormwater pollution prevention plan which complies with the requirements of subdivisions (b), (c) and (d) of this section.
(iv) Widening of an existing road located within the limiting distance of 50 feet of an intermittent stream or wetland, within the limiting distance of 100 feet of a perennial stream, or within the limiting distance of 300 feet of a reservoir, reservoir stem or controlled lake shall be performed on the side of such existing road furthest from the watercourse, wetland, reservoir, reservoir stem or controlled lake, to the extent practical.
(7) The following requirements are applicable to creation of an impervious surface within a designated village center:
(i) A local government in the Croton System may delineate an area within the local government's boundaries to be a "designated village center" in a Comprehensive Croton Water Quality Protection Plan prepared and agreed to in accordance with 15 RCNY § 18-82. Such designated village center shall comply with the requirements of this paragraph with regard to the construction of impervious surfaces.
(ii) Within a designated village center the construction of a new impervious surface within the limiting distance of 100 feet of a watercourse or wetland, or within the limiting distance of 300 feet of a reservoir, reservoir stem, or controlled lake requires the review and approval of the Department. An approval issued by the Department pursuant to this subparagraph shall contain a determination by the Department that there is no reasonable alternative to the creation of the proposed new impervious surface within the applicable limiting distance and that the best available measures have been taken to prevent adverse impacts on the quality of the drinking water supply.
(8) The following requirements are applicable to creation of an impervious surface in the West of Hudson watershed within a village, hamlet, village extension or area zoned for commercial or industrial uses:
(i) Creation of any new impervious surface within the limiting distance of 100 feet of a watercourse or wetland, or within the limiting distance of 300 feet of a reservoir, reservoir stem or controlled lake, within a village, hamlet, village extension or area zoned for commercial or industrial uses as of the effective date of these rules and regulations, requires a stormwater pollution prevention plan which complies with the requirements of subdivisions (b), (c) and (d) of this section, except that the foregoing requirements of this subparagraph shall not apply to the creation of a new impervious surface for an activity set forth in paragraph (2) of this subdivision which complies with the provisions of paragraph (2).
(ii) If a local government in the West of Hudson watershed adopts a zoning ordinance designating additional areas for commercial or industrial use after the effective date of these rules and regulations, it may apply to the Department to allow construction of new impervious surfaces in the newly zoned commercial or industrial areas located within the limiting distance of 100 feet of a watercourse or wetland, or within the limiting distance of 300 feet of a reservoir, reservoir stem, or controlled lake. The Department shall approve such application if the Department determines that allowing new impervious surfaces in such newly zoned commercial or industrial area is consistent with the objectives of these rules and regulations and with previously approved zoning ordinances. If approved by the Department, creation of new impervious surfaces within such newly zoned commercial or industrial areas within the aforesaid limiting distances shall be allowed subject to the requirements of subparagraph (8)(i) above.
(9) Construction of a bridge or crossing of a watercourse or wetland which does not require a permit from a regulatory agency other than the Department shall require the review and approval of the Department. Such bridge or crossing shall be constructed to prevent adverse impacts on the quality of the water supply.
(10) Maintenance of an existing impervious surface shall not require the review and approval of the Department.
(11) The following requirements are applicable to creation of an impervious surface in the East of Hudson watershed within a Designated Main Street Area:
(i) Creation of any new impervious surface within a Designated Main Street Area requires a stormwater pollution prevention plan which complies with the requirements of subdivisions (b), (c), and (d) of this section, except that the foregoing requirements of this subparagraph shall not apply to the creation of a new impervious surface for an activity set forth in paragraph (2) of this subdivision which complies with the provisions of paragraph (2).
(ii) The approved boundary descriptions of all Designated Main Street Areas shall be made available by the Department for public inspection at its field offices in the East of Hudson watershed.
(b) Stormwater pollution prevention plans.
(1) Stormwater pollution prevention plans shall not be required to be prepared pursuant to this section for agricultural and silvicultural activities.
(2) Stormwater pollution prevention plans shall not be required to be prepared pursuant to this section for clear cutting and mining activities, provided, however, that such activities shall be subject to the requirements set forth in the applicable New York State Department of Environmental Conservation SPDES Permit which may be required pursuant to Environmental Conservation Law § 17-0808.
(3) Stormwater pollution prevention plans shall be prepared for the activities listed in subparagraph (4) of this subdivision. Such plans shall also be subject to the prior review and approval of the Department. Such plans shall be prepared and implemented in accordance with the requirements of Part III of the New York State Department of Environmental Conservation SPDES General Permit No. GP-0-15-002 that are applicable to construction activities identified in Table 2 of Appendix B, and in accordance with the requirements of subdivision (c) of this section, except that:
(i) plans for redevelopment shall be prepared and implemented in accordance with subdivision (b)(8),
(ii) plans for construction activities identified in Table 1 of Appendix B must be prepared and implemented in accordance with the requirements of Part III of the New York State Department of Environmental Conservation SPDES General Permit No. GP-0-15-002 that are applicable to construction activities identified in Table 1 of Appendix B. A construction activity will be deemed to "alter hydrology from pre to post development conditions," for purposes of Table 1 of Appendix B, if the post-development peak rate of flow for the activity has increased by more than 5% of the pre-developed condition for the one-year, twenty-four hour storm, the ten-year, twenty-four hour storm, or the one hundred-year, twenty-four hour storm as defined herein. A construction activity that is excluded from coverage under Table 1 of Appendix B because it alters hydrology from pre to post development conditions must comply with the requirements of subdivision (b)(3) above,
(iii) plans for construction activities requiring Department review and approval of a stormwater pollution prevention plan under this section that involve disturbance of less than one (1) acre of total land area, other than construction of gasoline stations and construction, alteration, or modification of solid waste management facilities, and which will not result in hot spot runoff, must be prepared and implemented in accordance with subdivision (b)(9), and
(iv) no activity shall be exempt from any such requirements as a result of the size or nature of the watercourse(s) to which stormwater from such activity discharges, except with prior written approval from the Department. Such plans shall also be subject to the prior review and approval of the Department.
(4) The activities for which a stormwater pollution prevention plan must be prepared under subparagraph (3) of this subdivision are:
(i) Plans for development or sale of land that will result in the disturbance of five (5) or more acres of total land area as described in the definition of larger common plan of development or sale in Appendix A of SPDES General Permit No. GP-0-15-002;
(ii) Construction of a subdivision;
(iii) Construction of a new industrial, institutional, municipal, commercial or multi-family residential project that will result in creation of an impervious surface totaling over 40,000 square feet in size;
(iv) A land clearing or land grading project, involving two or more acres, located at least in part within the limiting distance of 100 feet of a watercourse or wetland, or within the limiting distance of 300 feet of a reservoir, reservoir stem or controlled lake or on a slope exceeding 15 percent;
(v) Construction of a new solid waste management facility or alteration or modification of an existing solid waste management facility within 300 feet of a watercourse or wetland or 500 feet of a reservoir, reservoir stem or controlled lake;
(vi) Construction of a gasoline station;
(vii) Construction of an impervious surface for a new road, for an access road, or for an existing dirt or gravel road, as required by paragraph (a)(6) of this section;
(viii) Construction of an impervious surface in the West of Hudson watershed within a village, hamlet, village extension or area zoned for commercial or industrial uses, as required by paragraph (a)(8) of this section;
(ix) Up to a 25 percent expansion of an existing impervious surface at an existing commercial, institutional, municipal, industrial, or multi-family residential facility which is within the limiting distance of 100 feet of a watercourse or wetland, as required in subdivision (a)(4)(iii) of this section; or
(x) Construction of an impervious surface in the East of Hudson Watershed in a Designated Main Street Area.
(5) If there is a significant change in design, construction, operation, or maintenance of an activity which is subject to a Stormwater Pollution Prevention Plan pursuant to subdivision (b)(3) which may have a significant effect on the potential for the discharge of pollutants to surface waters and which has not otherwise been addressed in the Stormwater Pollution Prevention Plan, or if the Stormwater Pollution Plan proves to be ineffective in eliminating or significantly minimizing erosion and sedimentation or the discharge of pollutants associated with construction activity, the Stormwater Pollution Prevention Plan must be amended. Such amended stormwater pollution prevention plan shall be submitted to the Department for prior review and approval and shall comply with the requirements of this section.
(6) Any approval of a stormwater pollution prevention plan issued by the Department expires and is null and void unless construction is completed within five (5) years of the date of issuance or within any extended period of time approved by the Department upon good cause shown. Following expiration of the approval, the application for the stormwater pollution prevention plan may be resubmitted to the Department for consideration for a new approval.
(7) As a condition of approval the Department may require evidence of financial security prior to construction from any owner or operator of a stormwater management system pursuant to a stormwater pollution prevention plan. Such financial security shall consist of a bond, or an equivalent guaranty, to be deposited with the Department, covering the full cost of the construction of such facility and an additional bond or an equivalent guaranty for the payment of labor and material furnished in the course of such construction. Upon completion of construction and payment of labor and materials, such bonds or other guaranties shall be released. Additionally, a bond or equivalent guaranty may be required for the maintenance and operation of the facility for a period of five years post-construction. No bond or guaranty is required where the owner or operator of such a facility is a village, town, county or city.
(8) Where portions of an activity that require a stormwater pollution prevention plan pursuant to subdivision (b)(3) constitute redevelopment as defined herein, those portions of such plan shall:
(i) be prepared and implemented, to the extent possible, in accordance with the requirements of Part III of the New York State Department of Environmental Conservation SPDES General Permit No. GP-0-15-002 that are applicable to the construction activities identified in Table 2 of Appendix B;
(9) Where an activity requiring Department review and approval of a stormwater pollution prevention plan under this section that involves disturbance of less than one (1) acre of total land area, other than construction of a gasoline station or construction, alteration, or modification of a solid waste management facility, and which will not result in hot spot runoff, requires a stormwater pollution prevention plan pursuant to subdivision (b)(3) above, the application must consist of:
(i) A plan of the proposed activity, identifying the area of disturbance, the location of any existing or proposed impervious surfaces, and the location of any watercourses, wetlands, reservoirs, reservoir stems or controlled lakes on or adjacent to the property;
(ii) A description and depiction of proposed erosion controls sufficient to prevent sedimentation of the receiving watercourse, wetland, reservoir, reservoir stem or controlled lake on or adjacent to the property during construction. Erosion controls typically consist of sediment barriers, such as hay bales and silt fencing, temporary sediment traps and temporary stormwater flow diversions;
(iii) A schedule for construction, including grading and site stabilization; and
(iv) A description and depiction of proposed permanent stormwater management practices designed to filter, detain, or infiltrate runoff from impervious surfaces, thereby minimizing the post-construction increase in pollutant loading to the receiving watercourse, wetland, reservoir, reservoir stem or controlled lake.
(c) Additional Requirements for Stormwater Pollution Prevention Plans.
(1) When any activity listed in paragraph (3) of subdivision (b) of this section is proposed to be undertaken in the drainage basin of a terminal reservoir, as identified in the watershed maps in Appendix 18-A, the stormwater pollution prevention plan shall include analysis of coliform runoff, before and after the land disturbance activity.
(i) If such proposed activity causes or contributes to the contravention of the coliform standard set forth in 15 RCNY § 18-48(b)(1), the stormwater pollution prevention plan shall not be approved by the Department, unless the measures required by the stormwater pollution prevention plan in conjunction with any other controls to be imposed that limit future land disturbance at the site, including but not limited to property easements, restrictive covenants, zoning laws and development by-laws, will prevent the contribution of additional coliform.
(2) Stormwater Conveyance Measures. Stormwater pollution prevention plans prepared pursuant to this section shall provide for the maintenance of natural drainage systems, including perennial and intermittent streams, and the use of swales and drainage ditches in an open condition to the maximum extent practicable. A stormwater pollution prevention plan shall ensure that any closed stormwater conveyance measures are sized appropriately to convey, at a minimum, the 10-year, 24-hour storm flow.
(3) Stormwater Treatment Volume. All stormwater pollution prevention plans prepared pursuant to this section shall include measures to capture and treat the greater of the volume of runoff generated by the 1-year, 24-hour storm or the Water Quality Volume (WQv), except that a stormwater management practice may be designed to capture and treat the lesser of those volumes if it is a stormwater infiltration practice or it is a bioretention practice in hydrologic soil group A or B. Stormwater management practices which provide treatment shall be designed to accommodate the quantity of runoff flowing to the stormwater management practice, including runoff from off-site areas.
(4) Where a stormwater pollution prevention plan prepared pursuant to this section includes a stormwater infiltration practice, to the maximum extent practicable, no portion of such stormwater infiltration practice shall be located within 100 feet of any portion of the absorption field of a subsurface sewage treatment system.
(5) To the maximum extent practicable, an activity requiring a stormwater pollution prevention plan, and the stormwater pollution prevention plan prepared for such activity, shall be designed:
(i) To minimize the alteration of the existing drainage areas and to maintain the volumes of flow at design points at pre-construction levels, except as necessary to alleviate downstream flooding problems or other adverse conditions in existence prior to construction, or to divert runoff from off-site and/or undisturbed areas away from areas proposed to be disturbed.
(ii) To minimize loss of annual recharge to groundwater by maximizing the use of stormwater infiltration practices where suitable soil conditions exist.
(6) If an activity requiring a stormwater pollution prevention plan will result in impervious surfaces covering twenty percent (20%) or more of the drainage area for which a stormwater management practice is designed, the stormwater pollution prevention plan shall provide for stormwater runoff from that drainage area to be treated by two different types of stormwater management practices in series, except that only one stormwater management practice is required if either:
(i) the stormwater management practice provided is a stormwater infiltration practice; or
(ii) the activity requiring a stormwater pollution prevention plan is in the West of Hudson watershed within a village, hamlet, village extension, or area zoned for commercial or industrial uses or in the East of Hudson watershed within a Designated Main Street Area.
(7) For purposes of the design criteria incorporated by reference in New York State Department of Environmental Conservation SPDES General Permit No. GP-0-15-002, "detention time" shall mean the time runoff is detained in a stormwater management practice. It can be computed using either the center of mass method or the plug flow method.
(d) Application requirements and procedures.
(1) An application for approval of a stormwater pollution prevention plan shall include:
(i) The pollution prevention plan; and
(ii) The information required in a Notice of Intent under New York State Department of Environmental Conservation SPDES General Permit No. GP-0-15-002.
(2) When the Department notifies an applicant that an application for approval of a stormwater pollution prevention plan is complete pursuant to 15 RCNY § 18-23(d)(2) and (3), the Department shall also issue a written notification to the Stormwater Project Review Committee ("Committee") for the Town(s) or Village in which the activity requiring preparation of the stormwater pollution prevention plan is proposed to be located, of the Department's receipt of a complete application.
(i) If requested by one or more members of the Committee, the Department shall submit a copy of the complete application to the Committee for its review and shall convene a meeting, in person or by telephone, of the Committee.
(ii) The Department shall not be required to meet with or otherwise further consult with a member of the Committee concerning an application where the Committee member declines to review the application or fails to attend a meeting of the Committee convened to consider the application.
(3) Upon completion of their review of the application, and upon a majority vote of the Committee members, including the Department's Committee member, who reviewed the application, the Committee may recommend to the Department that an application for approval of a stormwater pollution prevention plan be approved, approved with conditions or disapproved.
(i) If the Department's Committee member agrees with the majority recommendation of the Committee, the Department may proceed to issue its determination to the applicant.
(ii) If the Department's Committee member disagrees with the majority recommendation of the Committee, the application, together with the written recommendation of the Committee, shall be submitted to the Commissioner of the Department for review and a determination. The Commissioner shall issue a written record of decision setting forth the basis for the determination and responding to any contrary written recommendations submitted by any member of the Committee.
(iii) If the Committee fails to make a recommendation to the Department at least fifteen (15) days prior to the date the Department is required to notify an applicant in writing of its determination pursuant to 15 RCNY § 18-23(d)(5), the Department may proceed to issue its determination and the Department shall not be required by these rules and regulations to further consult with or consider the comments of the Committee or any member of the Committee.
(4) Failure of any Committee member, other than the Department Committee member, to act in accordance with the procedures or within the time frames set forth in these rules and regulations, shall relieve the Department of any obligation to consult with or consider the comments of the Committee member. Failure of any Committee member, other than the Department Committee member, to act in accordance with the procedures or within the time frames set forth in these rules and regulations, shall not invalidate any determination issued by the Department.
(5) A Committee may only make recommendations to the Department and shall have no authority to make decisions on behalf of the Department. For purposes of SEQRA, the Department's determination on an application, not the Committee's recommendation to the Department, shall be considered a final decision.
(e) Individual residential stormwater permits.
(1) An individual residential stormwater permit is required for:
(i) Construction of a new individual residence, not located within a subdivision, and located within the limiting distance of 100 feet of a perennial stream or wetland;
(ii) Construction of a new individual residence located within a subdivision approved before October 16, 1995, and not prohibited by paragraph (a)(5)(ii)(b) of this section, and located within the limiting distance of 100 feet of a perennial stream or wetland; and
(iii) Construction of an impervious surface for a driveway to serve an individual residence that obtains all discretionary approvals necessary for construction on or after March 1, 2010, located within the limiting distances of 50 feet of an intermittent stream or wetland or within 100 feet of a perennial stream, except that no individual residential stormwater permit is required if the driveway is included in an activity requiring Department approval of a stormwater pollution prevention plan.
(2) Application requirements. An application for issuance of an individual residential stormwater permit shall include:
(i) A plan of the proposed individual residence and/or driveway;
(ii) A plan or map identifying the location of any watercourses, wetlands, reservoirs, reservoir stems or controlled lakes on or adjacent to the property;
(iii) A plan showing the approximate area of site disturbance;
(iv) A description and depiction of proposed erosion controls sufficient to prevent sedimentation of the receiving watercourse or wetland during construction. Erosion controls typically consist of sediment barriers, such as hay bales and silt fencing, and temporary stormwater diversions;
(v) A schedule for construction, including grading and site stabilization; and
(vi) A description and depiction of proposed stormwater best management practices designed to filter, detain, or filtrate runoff from the individual residence or driveway, thereby minimizing the post-construction increase in pollutant loading to the receiving perennial stream or wetland.
(3) An individual residential stormwater permit issued by the Department shall expire and thereafter be null and void unless construction is completed within two (2) years of the date of issuance of the permit, or within any extended period of time approved by the Department upon good cause shown. Following expiration of the permit, the application for the individual residential stormwater permit may be resubmitted to the Department for consideration for a new permit.
(Amended City Record 10/30/2019, eff. 11/29/2019)
§ 18-40. Miscellaneous Point Sources
(a) Unless otherwise permitted by the rules and regulations, a discharge, or storage which is reasonably likely to lead to a discharge into the environment (including into groundwater), from industrial facilities, including vehicle washing facilities, and which is reasonably likely to cause degradation of surface water quality or of the water supply, is prohibited. It shall be an affirmative defense under this subsection that such discharge, or storage likely to lead to a discharge, is either permitted or not prohibited under federal law, and is either permitted or not prohibited under state law.
(b) Any new point source, excluding point sources otherwise regulated pursuant to these rules and regulations, is prohibited from discharging into a reservoir or controlled lake, reservoir stem, or wetland.
§ 18-41. Solid Waste
(a) Siting or horizontal expansion of a junkyard or a municipal solid waste landfill, within the limiting distance of 250 feet of a watercourse or wetland, or the siting or horizontal expansion of a junkyard or a solid waste management facility within the limiting distance of 1,000 feet of a reservoir, reservoir stem or controlled lake is prohibited except for:
(1) Recyclable handling and recovery facilities that handle non-putrescible solid waste, such as newspapers, magazines, corrugated boxes, glass, cans and plastic, but not non-putrescible solid waste such as batteries, car batteries, and waste oil;
(2) Composting facilities for individual households for personal use; or
(3) Expansion of the existing permitted municipal solid waste landfill located within Delaware County.
(b) Discharge of solid waste directly into any watercourse, wetland, reservoir, reservoir stem or controlled lake is prohibited. For purposes of this subdivision, solid waste includes materials that are otherwise exempt from compliance with 6 NYCRR Part 360, as described in 6 NYCRR § 360.2(a)(3), unless those materials are irrigation return flows, materials that are used for artificial reefs in compliance with applicable State requirements, or authorized to be discharged to waters of the state pursuant to a valid permit issued by the New York State Department of Environmental Conservation pursuant to Environmental Conservation Law article 15, 17, 24, 25, or 34 or a water quality certification issued under Section 401 of the Federal Water Pollution Control Act. This subdivision shall not apply to discharge of treated leachate in accordance with the requirements of these rules and regulations and a valid SPDES permit.
(c) Only construction and demolition debris that is recognizable uncontaminated concrete, asphalt pavement, brick, soil, stone, trees or stumps, wood chips, or yard waste may be used as fill in the watershed.
(d) All new solid waste management facilities, or altered or modified existing solid waste management facilities within the limiting distance of 300 feet of a watercourse or wetland, or within the limiting distance of 500 feet of a reservoir, reservoir stem, or controlled lake, are required to submit stormwater pollution prevention plans to the Department for review and approval, in accordance with 15 RCNY § 18-39(b)(3)(v).
(Amended City Record 10/30/2019, eff. 11/29/2019)
§ 18-42. Agricultural Activities
Any intentional, knowing or reckless act or omission that in the course of an agricultural activity significantly increases pollutants in the water supply is prohibited.
§ 18-43. Pesticides
Unless otherwise permitted by these rules and regulations, the discharge or use, or storage of pesticides which is reasonably likely to lead to a discharge, of pesticides into the environment (including into groundwater), and which is reasonably likely to cause degradation of surface water quality or of the water supply, is prohibited. It shall be an affirmative defense under this subsection that such discharge, or storage likely to lead to a discharge, is either permitted or not prohibited under federal law, and is either permitted or not prohibited under state law.
§ 18-44. Fertilizers
(a) The requirements of this section shall not apply to the application or storage of fertilizers for:
(1) An agricultural activity performed in compliance with State or Federal law; and
(2) Non-commercial application by an individual on residential premises.
(b) No fertilizer activity shall be considered to be a noncomplying regulated activity.
(c) Discharge from the washing of fertilizer application equipment into any watercourse, wetland, reservoir, reservoir stem or controlled lake is prohibited.
(d) Use of water directly from a reservoir, reservoir stem or controlled lake for fertilizer make-up is prohibited.
(e) Use of water directly from a watercourse for fertilizer make-up without the use of an anti-siphon device is prohibited.
(f) Open storage of fertilizer is prohibited.
§ 18-45. Snow Disposal and Storage and Use of Winter Highway Maintenance Materials
(a) Whenever feasible removed snow shall not be disposed of directly into a watercourse, wetland, reservoir, reservoir stem or controlled lake. However, this subdivision shall not be construed to require an owner or operator to transport the removed snow in a vehicle for offsite disposal.
(b) No snow disposal activity shall be considered to be a noncomplying regulated activity.
(c) Commercial, industrial, governmental, or institutional entities shall be restricted to the use of the substances defined in these rules and regulations as winter highway maintenance materials and to the use of the minimum amount needed of such substances in order to protect the public safety. In determining the minimum amount needed for public safety, such entities should consider best management practices developed by the New York State Department of Transportation.
(d) (1) Commercial, industrial, governmental, or institutional entities that store winter highway maintenance materials in quantities of 1,000 pounds or more that contain greater than eight percent chloride compounds shall store such materials in structures constructed on low permeability storage pads.
(2) Any outdoor areas used for loading, handling or mixing of winter highway maintenance materials shall be constructed and maintained to prevent seepage and runoff from entering any watercourse, wetland, reservoir, reservoir stem or controlled lake.
(e) All commercial, industrial, governmental, or institutional entities that store winter highway maintenance materials in quantities and composition not otherwise subject to paragraph (1) of subdivision (d) of this section, shall store such materials in a manner that minimizes runoff into any watercourse, wetland, reservoir, reservoir stem, or controlled lake. Runoff may be controlled by use of control measures such as berms and covers.
(f) A winter highway maintenance material storage facility may be enlarged provided that the enlarged facility is in compliance with the storage requirements set forth in this section, and any other applicable requirements of these rules and regulations.
(g) Winter highway maintenance material storage facilities that are noncomplying regulated activities shall come into compliance with this section no later than two years from the effective date of these rules and regulations.
§ 18-48. Water Quality Standards
(a) The water in all reservoirs, Lake Gilead, and Lake Gleneida, shall meet the following standards of quality:
(1) 6 NYCRR Parts 701 and 703 (standards applicable to Class AA waters), and
(2) The New York State Department of Environmental Conservation Technical and Operational Guidance Series (TOGS) 1.1.1, Ambient Water Quality Standards and Guidance Values (October 22, 1993, Reissue Date June 1998, as modified and supplemented by the January 1999 Errata Sheet and the April 2000 and June 2004 Addenda) which lists the ambient water quality standards and guidance values for principal organic chemicals and synthetic organic chemicals.
(b) In addition, the water in source water reservoirs shall meet the following phosphorus standard:
(1) Total phosphorus concentrations shall be equal to or less than 15 micrograms per liter.
(c) In addition, the water within 500 feet of the aqueduct effluent chamber located at a terminal reservoir (Kensico, West Branch, New Croton, Ashokan and Rondout) shall meet the following coliform standard:
(1) Raw water fecal coliform concentrations shall be equal to or less than 20 colonies per 100 milliliters or total coliform concentration shall be equal to or less than 100 colonies per 100 milliliters in at least 90 percent of the measurements made over any consecutive six month period. For purposes of determining compliance with this paragraph, a minimum of five samples per week will be taken from each terminal reservoir. If both fecal and total coliform analyses are performed, the fecal coliform results shall take precedence over the total coliform analysis.
(d) For purposes of determining compliance with this subchapter, the Department shall take water samples from the controlled lakes and reservoirs and shall evaluate them in accordance with subdivisions (a), (b), and (c) of this section.
(1) Where total coliform concentrations exceed the standards set forth in 6 NYCRR Parts 701 and 703, and are determined by the Department to be due to non-perennial, non-anthropogenic sources, such exceedances shall not be included in calculating whether a violation of these rules and regulations has occurred.
(2) Where fecal coliform concentrations exceed the standards set forth in subparagraph (c) above, and are determined by the Department to be due to non-perennial, non-anthropogenic sources, such exceedances shall not be included in calculating whether a violation of these rules and regulations has occurred.
(e) The Department shall, on an annual basis, conduct a review of water quality data for the purpose of determining whether each reservoir and controlled lake meets or fails to meet the water quality standards set forth in subdivisions (a), (b), and (c) of this section, as applicable. The results of the Department's review, together with the calculations used in arriving at the results for each reservoir, shall be published in a report which shall be made available to the public upon request.
§ 18-51. Enforcement
(a) The City shall enforce the rules and regulations set forth herein, in a manner consistent with applicable Federal, State and local laws.
(b) The City may, in enforcing the rules and regulations set forth herein, exercise all of its rights and remedies under applicable Federal, State and local laws, including, but not limited to: inspecting facilities engaging in regulated activities and sources of the water supply in accordance with applicable federal and State constitutional requirements; issuing notices of violation or of intention to sue; instituting civil or criminal actions; seeking injunctive relief and legal damages; imposing penalties in accordance with Public Health Law § 1103; and entering into consent orders and agreements.
(c) Nothing contained in these rules and regulations shall be construed as limiting the City's ability to exercise any of its rights and remedies under any other law, statute, rule, regulation, or order, including, but not limited to, the Federal Water Pollution Control Act (aka the Clean Water Act), 33 U.S.C. § 1251 et seq.; the Comprehensive Environmental Response, Compensation, and Liability Act, 42 U.S.C. §§ 9601 et seq.; the Resource Conservation and Recovery Act, 42 U.S.C. §§ 6901 et seq.; the Oil Pollution Act, 33 U.S.C. §§ 2701 et seq.; Federal Insecticide, Fungicide and Rodenticide Act, 7 U.S.C. §§ 136 et seq.; Toxic Substances Control Act, 15 U.S.C. §§ 2601 et seq.; New York State Public Health Law; New York State Environmental Conservation Law; New York State Navigation Law; New York State Department of Health septic system requirements (10 NYCRR Appendix 75-A); New York State Real Property Actions and Proceedings Law; and New York State Penal Law.
(d) Upon completion of the requirements of the State Administrative Procedure Act (SAPA) and the promulgation of these rules and regulations by the New York State Department of Health as State rules and regulations, the requirements of these rules and regulations may also be enforced by the Commissioner of the New York State Department of Health.
§ 18-61. Variances
(a) The Commissioner may, in his or her discretion, upon written application from the applicant, grant a variance from the requirements of these rules and regulations for a regulated activity and for the alteration or modification of a noncomplying regulated activity.
(1) An application for a variance for a regulated activity or for an alteration or modification of a noncomplying regulated activity shall:
(i) Identify the specific provision of the rules and regulations from which the variance is sought or identify the nature and extent of the alteration or modification of the noncomplying regulated activity;
(ii) Demonstrate that the variance requested is the minimum necessary to afford relief; and
(iii) Demonstrate that the activity as proposed includes adequate mitigation measures to avoid contamination to or degradation of the water supply which are at least as protective of the water supply as the standards for regulated activities set forth in these rules and regulations.
(2) In granting variances the Commissioner may impose specific conditions, including evidence of financial security, time limitations and limitations on any transfer of the variance granted. In addition, the Commissioner may grant a lesser variance than that applied for.
(3) Any proposed substantial alteration or modification of an activity that has been granted a variance under this subchapter shall require the review and approval of the Department and shall comply with the provisions of this subchapter.
(4) The burden of proof for a variance shall be on the applicant.
(5) Except for a variance granted for an alteration or modification of a noncomplying regulated activity, a grant of a variance for a regulated activity shall not be deemed to make such activity a noncomplying regulated activity under these rules and regulations.
(b) An appeal of a denial of a variance for a regulated activity or a denial of a variance for an alteration or modification of a noncomplying regulated activity may be made in the manner specified in 15 RCNY § 18-28.
(c) Failure to comply with any condition of a variance for a regulated activity, or for a variance for an alteration or modification of a noncomplying regulated activity shall be a violation of these rules and regulations. The Department shall review the terms and conditions of each variance granted at least once every five years to determine whether the terms and conditions of the variance have been complied with.
(d) Variances within coliform and phosphorus restricted basins.
(1) The Department may grant a variance from the prohibition of locating a new wastewater treatment plant or expanding an existing wastewater treatment plant in a coliform restricted basin, or in a phosphorus restricted basin, where the Department determines that conditions in the area to be served by the new or expanded wastewater treatment plant are resulting in the release or discharge of inadequately treated sewage into the water supply, and that there is no other feasible method of correcting such release or discharge of inadequately treated sewage except to provide a variance from such prohibition. Provided, however, that in such cases, the additional treatment capacity of the new or expanded wastewater treatment plant may only be of a size sufficient to service the area identified as the source of contamination and any immediate area of concern as limited or delineated by the Department.
(2) A request for a variance from the prohibition of expanding an existing wastewater treatment plant located in a phosphorus restricted basin which does not meet the criteria set forth in subdivision (d)(1) may be granted only if the applicant demonstrates that subsurface discharge is impossible and that every one (1) kilogram of projected increase in the phosphorus load resulting from the expansion of the existing wastewater treatment plant and accompanying non-point source runoff, is offset by two (2) kilograms of reductions in phosphorus loading within such basin provided by enhanced treatment, basin-wide phosphorus trading, and/or a watershed protection plan developed pursuant to Subchapter H.
(e) Variances Within the 60 Day Travel Time to Intake in the Croton System.
(1) The Department may grant a variance from the prohibition set forth in 15 RCNY § 18-36(d)(2)(i) against locating a new wastewater treatment plant or expanding an existing wastewater treatment plant in the Croton System, within the 60 day travel time to intake, where the Department has made the following determinations:
(i) One of the following situations is present:
(a) conditions in the area to be served by the new or expanded wastewater treatment plant, including failed subsurface sewage treatment systems, are resulting in the release or discharge of inadequately treated sewage into the water supply; or
(b) influent flow rates to an existing wastewater treatment plant exceed the permitted flow limit for the wastewater treatment plant as specified in its SPDES permit and/or the design capacity of the wastewater treatment plant and have caused, or can reasonably be expected to cause, the release of inadequately treated sewage.
(ii) There is no other feasible method of correcting such release or discharge of inadequately treated sewage except by locating a new or expanding an existing surface-discharging wastewater treatment plant within the 60 day travel time to intake; and
(iii) The applicant has demonstrated that there are no sources of inflow or infiltration to the sewer system of the new or expanded wastewater treatment plant, other than sources that are to be eliminated pursuant to a consent order or other commitment binding on the applicant, that can practicably be eliminated.
(2) The applicant must demonstrate to the Department, that the total flow to the new or expanded wastewater treatment plant authorized pursuant to this subdivision will be limited as follows:
(i) if the applicant seeks to expand a wastewater treatment plant serving a sewer district, the flow to the expanded wastewater treatment plant may include only:
(a) flow from facilities within the sewer district that are connected to the wastewater treatment plant as of the date of the application for a variance (based on the flows reported by the wastewater treatment plant pursuant to its SPDES permit in the year preceding the application for the variance); and
(b) flow from facilities within the sewer district that are served by subsurface sewage treatment systems as of the date of the application for a variance; and
(c) additional flow of no more than ten percent (10%) of the average of the flows reported by the wastewater treatment plant pursuant to its SPDES permit in the year preceding the application for the variance to be allocated within the sewer district; and
(d) reasonably anticipated flows from any area(s) outside the sewer district identified as source(s) of contamination pursuant to clause (a) of subparagraph (i) of paragraph (1) of subdivision (e) of this section.
(ii) if the applicant seeks to expand a wastewater treatment plant without a sewer district, the flow to the expanded wastewater treatment plant may include only:
(a) flows to the wastewater treatment plant as of the date of the application for a variance;
(b) reasonably anticipated flows from any area(s) identified as source(s) of contamination pursuant to clause (a) of subparagraph (i) of paragraph (1) of subdivision (e) of this section.
(iii) if the applicant seeks to construct a new wastewater treatment plant, the flow to the new wastewater treatment plant may include only reasonably anticipated flows from the area(s) identified as source(s) of contamination pursuant to clause (a) of subparagraph (i) of paragraph (1) of subdivision (e) of this section.
(3) A new or expanded wastewater treatment plant authorized pursuant to a variance under this subdivision, and its sewer system, shall meet the following conditions:
(i) The wastewater treatment plant shall provide sand filtration or a Department-approved alternative technology to sand filtration, disinfection, phosphorus removal, and microfiltration or a Department-approved equivalent technology to microfiltration, as required by these rules and regulations; and
(ii) The wastewater treatment plant shall be designed, operated, and maintained to meet a total phosphorus limit of 0.1 mg/l, and the applicant shall seek to have such limit included in the wastewater treatment plant's SPDES permit; and
(iii) The applicant shall develop and implement a Department-approved Capacity, Management, Operation and Maintenance (CMOM) plan for the entire sewer system serving the wastewater treatment plant, and shall seek to have such plan incorporated into the wastewater treatment plant's SPDES permit. At a minimum, such CMOM plan shall include:
(a) a map of the entire collection system;
(b) an assessment of the current capacity of the collection system;
(c) a program and schedule for routine inspections and testing, and preventive operation and maintenance activities;
(d) a list of any structural deficiencies identified in the system and a schedule for short- and long-term rehabilitation measures to address each identified deficiency;
(e) an inflow study, and a plan and implementation schedule, to control and eliminate, to the maximum extent practicable, stormwater contributions from sources such as catch basins, downspouts, and sump pumps; and
(f) a program for training appropriate personnel on collection system operation and maintenance; and
(iv) All wastewater pumping stations in the sewer system serving the new or expanded wastewater treatment plant shall meet the alarm systems and emergency operation requirements applicable to new wastewater pumping stations as set forth in "Recommended Standards for Wastewater Facilities," Great Lakes - Upper Mississippi River Board of State and Provincial Public Health and Environmental Managers (2014); and
(v) The applicant shall seek to have included in the wastewater treatment plant's SPDES permit a condition providing that in the event that the SPDES permitted flow limit is violated, the owner will investigate the violation and prepare a corrective action plan.
(Amended City Record 10/30/2019, eff. 11/29/2019)
§ 18-71. Certification of Administrative Programs
(a) The local government of a town, city, village or county may apply to the Department, care of the Engineering Section (see 15 RCNY § 18-15), for certification of a program to administer specific provisions of these rules and regulations.
(b) A local government's proposed program for administration of specific provisions of these rules and regulations may include processing and review of, and determinations on, applications for approval of specific regulated activities.
(c) An application for certification of a local government's administrative program shall include the following information:
(1) Identification of the specific substantive and procedural provisions of the rules and regulations that the local government is requesting to administer;
(2) Number, technical expertise and experience of personnel and identification of other resources that will be dedicated to administration of the program;
(3) Identification of funding or revenue sources for implementation of the program, including a commitment of such funding for the next fiscal year;
(4) Identification of the specific department, unit or officials who will be designated to administer these rules and regulations;
(5) Identification of information management capability to insure efficient administration and adequate record keeping;
(6) Identification of applicable existing local laws and rules and regulations and plans for coordination of such laws and rules and regulations with the requirements of these rules and regulations; and
(7) Any other information requested by the Department.
(d) (1) The Department shall review an application for certification of an administrative program and make a preliminary determination to certify or deny certification of a program within 60 business days of receipt of such application. A determination to certify shall be based upon a finding by the Department that the resources, funding and administrative program proposed by the applicant will provide a level of efficiency and effective protection of the water supply equal to that which would otherwise be provided by the Department under these rules and regulations. Notice of the preliminary determination shall be provided in writing by the Department to the designated representative of the local government submitting the application for certification.
(2) Within 60 business days of the Department's preliminary certification of the administrative program, the Department and the local government shall commence negotiating and writing a draft memorandum of understanding setting forth the requirements and conditions of the program.
(3) A governmental agency or unit of a town, city, village or county that has a program for administration and/or enforcement that has been certified by the Department pursuant to this subchapter shall be referred to as a "certified local government."
§ 18-72. Administrative Determinations
(a) Each administrative program submitted by a local government under this subchapter shall contain provisions governing the extent and frequency of Department review and approval of administrative determinations made by the local government, as the Department shall agree upon.
(b) Pursuant to each administrative program submitted by a local government under this subchapter, the local government shall provide the Department (Attention: Chief, Sources Division) with a copy of each administrative determination made by such local government, at the same time that the determination is made available to the applicant.
§ 18-73. Annual Review of Administrative Programs
(a) The administrative program of a certified local government shall be reviewed annually by the Department. Such review shall be based upon records that demonstrate the effectiveness of the program which include objective criteria such as:
(1) A review of determinations on applications for approval of regulated activities;
(2) A review of the adequacy of financial, personnel and other resources for the previous year, and evidence of future commitment of adequate financial, personnel, and other resources to continue the administrative program; and
(3) A review of such other records as the certified local government may be required to keep.
§ 18-74. Decertification or Modification of Administrative Programs
(a) The administrative program of a certified local government shall be continued unless decertified or modified by the Commissioner. A preliminary determination to decertify or modify shall be made at any time if the Commissioner determines that the local government's administration of any element of the program is inadequate to protect the water supply.
(b) Where the Commissioner has made a preliminary determination to decertify or modify a local government's administrative program pursuant to subdivision (a) of this section, a notice of proposed decertification or modification, and the reasons therefor, shall be sent by certified mail, to the designated representative of the certified local government. The certified local government may, within ten business days of the sending of such notice, submit information addressing the reasons for decertification or modification stated in the notice. The Commissioner, after receipt and consideration of any information submitted by the certified local government, shall make a final determination to continue, modify, or decertify the program within thirty business days of sending of the notice of proposed decertification or modification. Upon decertification of an administrative program the administration of the rules and regulations set forth herein shall revert to the Department.
(c) A local government which has received a determination of decertification may reapply for certification after one year.
§ 18-75. Certification of Enforcement Programs
(a) The local government of a town, city, village or county may apply to the Department, care of the Engineering Section (see 15 RCNY § 18-15) for certification of a program to enforce specific provisions of these rules and regulations.
(b) A local government's proposed program for enforcement of specific provisions of these rules and regulations may include the following:
(1) Inspection of premises for potential violations of these rules and regulations and the preparation of written reports detailing the results of each such inspection; and
(2) Issuance of notices of violation of specific provisions of these rules and regulations.
(c) An application for certification of a local government's enforcement program shall include the following information:
(1) Identification of the specific provisions of the rules and regulations that the local government intends to enforce;
(2) Number, technical expertise and experience of personnel and identification of other resources that will be dedicated to the enforcement program;
(3) Identification of funding or revenue sources for implementation of the program, including a commitment of such funding for the next fiscal year;
(4) Identification of the specific department, unit or officials who will be designated to enforce the rules and regulations;
(5) Identification of information management capability to insure efficient administration and adequate record keeping; and
(6) Any other information requested by the Department.
(d) The Department shall review an application for certification in accordance with the procedures set forth in subdivision (d) of 15 RCNY § 18-71. A determination to certify shall be based upon a finding by the Department that the resources, funding and enforcement program proposed by the applicant will provide a level of efficiency and effective protection of the water supply equal to that which would otherwise be provided by the Department under these rules and regulations. Any memorandum of understanding for an enforcement program shall provide that the designated enforcement personnel of the local government shall be agents of the Department for purposes of enforcement of specific provisions of these rules and regulations, and provided further, that such memorandum of understanding shall state that the Department shall retain the authority to enforce these rules and regulations in addition to any enforcement by the local government.
§ 18-76. Annual Review of Enforcement Programs
(a) The enforcement program of a certified local government shall be reviewed annually by the Department. Such review shall be based upon records that demonstrate the effectiveness of the program which include objective criteria, such as:
(1) A review of notices of violation issued by the certified local government;
(2) A review of inspection reports prepared by the certified local government;
(3) A review of the determinations made by courts or administrative tribunals on notices of violation issued by the certified local government;
(4) A review of compliance with notices of violation issued by the certified local government;
(5) A review of the adequacy of financial, personnel and other resources for the previous year, and evidence of future commitment of adequate financial, personnel and other resources to continue the enforcement program in accordance with any requirements of a memorandum of understanding; and
(6) A review of such other records as the certified local government may be required to keep in accordance with a memorandum of understanding.
§ 18-77. Decertification or Modification of Enforcement Programs
(a) The enforcement program of a certified local government shall be continued unless decertified or modified by the Commissioner. A preliminary determination to decertify or modify shall be made at any time if the Commissioner determines that the local government's administration of any element of the program is inadequate to protect the water supply.
(b) Where the Commissioner has made a preliminary decision to decertify or modify a local government's enforcement program pursuant to subdivision (a) of this Section, a notice of proposed decertification or modification, and the reasons therefor, shall be sent by certified mail to the designated representative of the certified local government. The certified local government may, within ten business days of the sending of such notice, submit information addressing the reasons for decertification or modification stated in the notice. After receipt and consideration of any information submitted by the certified local government, the Commissioner shall make a final determination to continue, modify, or decertify the program within thirty business days of sending of the notice of proposed decertification or modification. Upon decertification of an enforcement program, the enforcement of the rules and regulations set forth herein shall be the sole responsibility of the Department.
(c) A local government which has received a determination of decertification may reapply for certification after one year.
§ 18-78. Consent of the City
Nothing in this subchapter shall be construed to allow the designated administrative or enforcement personnel of a certified local government, or any representative or attorney of a certified local government, to appear in any court proceeding or before any administrative tribunal on behalf of the City or the Department, for the purpose of enforcing violations of these rules and regulations or defending against any claim or action arising from these rules and regulations without the written consent of the City.
§ 18-81. Local Government Stormwater Protection Plans
(a) A local government of a town, village, or county in the watershed may submit to the Department for review and approval a proposed local government stormwater protection plan ("Stormwater Plan") to undertake all or some aspects of watershed protection as set forth in 15 RCNY § 18-39. The Stormwater Plan may be submitted individually by a local government or jointly with one or more adjoining local government(s) in accordance with the requirements of this subchapter.
(1) Within 90 days of receipt by the Department of a proposed Stormwater Plan, the Department shall review the proposed Stormwater Plan to determine whether it meets the requirements of this Section and notify the local government, in writing, whether the proposed Stormwater Plan is approved;
(2) If the Department fails to notify the local government(s) in writing of its determination within the 90 day period set forth in paragraph (a)(i) of this subdivision, the local government(s) may notify the Department of its failure by means of certified mail, return receipt requested to the local Department representative who is responsible for processing the Stormwater Plan;
(3) If the Department fails to notify the local government(s) within ten (10) business days of the receipt of such notice the Stormwater Plan shall be deemed approved subject to the terms and conditions set forth in the most recent submission by the local government(s).
(b) Pursuant to the terms and conditions of an approved Stormwater Plan, the Department may issue a waiver from specific provisions of 15 RCNY § 18-39, including the prohibition of construction of an impervious surface within the limiting distance of 100 feet of a watercourse or wetland or within the limiting distance of 300 feet of a reservoir, reservoir stem or controlled lake, for all applicants of projects located within some or all of the geographical area of the local government(s). The Department may issue such waivers after a local government(s) has an approved Stormwater Plan.
(c) An approvable Stormwater Plan shall include:
(1) The specific provision(s) of 15 RCNY § 18-39 from which the waiver is sought;
(2) A description of the metes and bounds of the geographical area (town, village, county, or part thereof) for which the waiver is sought, including a map of the described area;
(3) Mechanisms to be established by the local government that are at least as protective of the watershed reservoir drainage basin in which the waiver will be effective as the specific provisions of 15 RCNY § 18-39 from which the waiver is sought;
(4) A commitment by the local government(s) to implement each element of the Stormwater Plan in accordance with the terms of the Stormwater Plan and a schedule for implementation of all elements of the Stormwater Plan;
(5) An agreement by the local government(s) to coordinate with the Department any review by the local government(s) required under the State Environmental Quality Review Act for regulated activities, as defined in these rules and regulations;
(6) The rights, obligations and roles of the local government(s) and the Department under the Stormwater Plan; and
(7) Identification of the approximate number, technical expertise and experience of personnel and all other resources that will be dedicated to carrying out such plan.
(d) The mechanisms to be established pursuant to paragraph (c)(3) of this subdivision may include:
(1) Stormwater control structures, or best management practices, that capture and treat stormwater from existing non-point pollution sources such as areas of concentrated impervious surfaces;
(2) Mechanisms or programs that address the capture and treatment of stormwater from future non-point pollution sources on a community-wide basis such as the creation of a stormwater district;
(3) Land use controls, zoning, and other local laws, ordinances and rules and regulations that will protect the quality of the water supply, including but not limited to laws and rules and regulations concerning wetland protection, protection of hydrologically sensitive areas, and control of runoff from non-point pollution sources; or
(4) Educational programs providing information to residents of the town, village, or county whose local government is involved in the watershed protection plan process concerning:
(i) The challenges of protecting water quality and the Federal, State and local requirements for watershed protection;
(ii) The water supply system as a natural resource and source of drinking water; and
(iii) Actions that can be taken by residents and the local government to enhance water quality protection.
(e) An annual report shall be submitted by the local government to the Department on each anniversary of the date of the signing of the approved Stormwater Plan. The annual report shall include, but need not be limited to the following information:
(1) A statement by the local government of its compliance with the terms and conditions of the approved Stormwater Plan; and
(2) A statement of future commitment of adequate financial, personnel and other resources to continue compliance with the terms and conditions of the approved Stormwater Plan.
(f) Once the Stormwater Plan is approved by the Department, the Stormwater Plan shall be considered valid and effective.
(1) The local governments proposing the Stormwater Plan may, upon written notice to the City, modify the plan at any time after it has been agreed upon. If the Stormwater Plan is proposed to be modified, the Department shall make a determination within 60 days of notice of the proposed modification, whether the Stormwater Plan as modified shall continue to be valid and effective. In making such a determination, the Department shall consider whether the Stormwater Plan as modified, taken as a whole, continues to be at least as protective of the watershed as the specific provisions of 15 RCNY § 18-39 from which the waiver applies. The Stormwater Plan shall continue to be valid and effective during the period the Department's review of any proposed modification. If the Department determines that the proposed modification would cause the Stormwater Plan to be not as protective as the provisions of 15 RCNY § 18-39 which are being waived, the Department shall so notify the local government(s). The existing and approved Stormwater Plan will then remain valid and effective until and unless the local government(s) implemented the proposed changes to the Stormwater Plan.
(2) If at any time the Department determines that the local government's administration of all or part of the Stormwater Plan is not as protective as the provisions of 15 RCNY § 18-39 which are being waived, the Department may revoke or modify the Stormwater Plan after notice has been given to the local government and an opportunity to meet and discuss the problem has been provided.
(3) Upon a final determination to revoke the Stormwater Plan the waivers issued thereunder shall be void and the watershed rules and regulations contained herein shall be applicable in the area of the watershed that was previously exempt pursuant to the waivers issued under the Stormwater Plan.
(4) Any Stormwater Plan agreed to shall be reviewed by the parties agreeing to such plan fifteen (15) years after such plan becomes effective in order to determine whether such plan has met and will continue to meet its goals.
§ 18-82. Watershed Planning in the Croton System
(a) Notwithstanding the prohibitions set forth in 15 RCNY § 18-36 on new or expanded wastewater treatment plants with surface discharges within the sixty day travel time to intake or within phosphorus restricted basins, the Department shall allow for the preparation and implementation of a Comprehensive Croton System Water Quality Protection Plan ("Croton Plan") and an accompanying phosphorus offset program and diversion credit program in accordance with this 15 RCNY § 18-82. 15 RCNY § 18-82 is independent of, does not govern, and is not governed by, 15 RCNY § 18-81.
(b) (1) At the request of Dutchess, Putnam or Westchester County, and in partnership with Dutchess, Putnam or Westchester County, and the municipalities located in the Croton system watershed, the Department shall prepare or assist in the preparation of a Croton Plan only in a participating County or Counties which:
(i) Identifies significant sources of pollution to the Croton system;
(ii) Recommends measures to be taken by the Department, the Counties, and the municipalities which, in conjunction with other federal, State, local and Department water quality protection programs, will prevent degradation to, and improve, water quality, with the long term goal of attaining water quality standards in the Croton system; and
(iii) Recommends measures to be taken to protect the character and special needs of communities located within the watershed.
(2) A County wishing to do so may, when joined by a majority of municipalities located within the County's watershed, choose to prepare the Croton Plan for the portion of the watershed located within the County. Such Croton Plan shall be prepared in partnership with the Department.
(3) The Croton Plan shall be developed in the manner set forth in subdivisions (c), (d) and (e) below and may allow for new wastewater treatment plants with a surface discharge or for the expansion of existing wastewater treatment plants with a surface discharge, provided the additional flow is either offset by a diversion of wastewater off of the watershed pursuant to subparagraph (e)(4)(i), or the additional phosphorus load is offset pursuant to subparagraph (e)(4)(ii).
(4) Any data that would benefit the Croton Planning process that is in the possession of the Department or one of the Counties or municipalities participating in the development of a Croton Plan shall be shared among the participants and appropriately considered in developing a Croton Plan.
(c) The Croton Plan shall consist of the following three elements:
(1) Identification of water quality problems and community character needs. Such identification shall include the following elements:
(i) An identification of growth or development projected to occur under existing municipal zoning and master plans and allowed under existing land use controls, other than these rules and regulations, and including development necessary to maintain community character, public facilities and institutions and to serve local, regional or special needs;
(ii) An identification of specific existing water quality problem areas and specific sources of pollution to the Croton system, including areas of existing or imminent subsurface sewage treatment system failures, areas of concentrated point source discharges and substantial non-point source pollution, and areas in need of streambank stabilization.
(iii) An assessment of future water quality impacts related to growth or development identified in paragraph (i) above.
(iv) An identification of areas identified in paragraph (i) above where site constraints may prevent the siting of new subsurface sewage treatment systems in accordance with the requirements set forth in these rules and regulations.
(v) An identification of areas identified in paragraph (i) above where these rules and regulations prohibit new surface discharges from wastewater treatment plants and site constraints prevent the siting of a new wastewater treatment plant with a subsurface discharge.
(2) Identification of investments to correct existing water quality problems in accordance with developed priorities. Such identification shall include the following elements:
(i) The identified investments may include investments (i.e., capital projects and best management practices) implemented during the development of the Croton Plan, investments that the participating Counties and municipalities commit to implement, and an identification of priorities for future investments, without any commitment on the part of the Counties and municipalities to implement such investments.
(ii) Proposed measures to address water quality problems identified in paragraph (c)(1)(ii) above. Such measures may include subsurface sewage treatment system maintenance, rehabilitation and replacement programs, installation of community septic systems, the construction of sewer extensions or new sewer systems, stormwater controls, and the permanent diversion of wastewater to a discharge point outside of the watershed.
(3) Strategies for prevention of future water quality problems and the consideration of future community character needs in conjunction with the water quality goals of the Croton Plan. Such strategies shall include the following:
(i) An assessment of the economic, water quality, community character, and special needs impacts of directing growth away from areas identified in paragraphs (c)(1)(iv) and (v) above;
(ii) An identification of the economic, water quality and community character impacts of allowing growth within those areas identified in paragraphs (c)(1)(i), (iv) and (v) above, if directing growth in accordance with paragraph (c)(3)(i) above is not feasible or practical;
(iii) An identification of potential areas for the construction of new or expanded wastewater treatment plants, as provided for in (e) below, either under a future permanent phosphorus offset program or utilizing the 10 percent credit provision for an implemented diversion project and a statement of the reasoning for the selection of such potential areas;
(iv) An identification of land use and local laws and regulations that the participating Counties and municipalities have already implemented and/or agree to implement in the future which are intended, in combination with other measures in the Croton Plan, to mitigate the water quality impacts identified in subsection (c)(1)(iii) above;
(v) With respect to future land use issues, identification of mechanisms to ensure the improvement and protection of water quality is taken into consideration by the local government and that the local government agrees to use best efforts to implement such mechanisms; and
(vi) At the option of the local government, designation of "village centers" as provided for in 15 RCNY § 18-39(a)(7)(i).
(d) (1) If a County requests, pursuant to 15 RCNY § 18-82(b), that a Croton Plan be developed within five (5) years of the effective date of these rules and regulations, the Department, in partnership with the participating Counties and municipalities, and in consultation with the New York State Department of Health, shall complete a draft Croton Plan and release such draft Croton Plan for public review and comment. If a Croton Plan has been prepared by a County and its municipalities, the County and municipalities, in partnership with the Department and in consultation with the New York State Department of Health, shall complete a draft Croton Plan within five (5) years of the effective date of these rules and regulations and release such draft Croton Plan for public review and comment. The Department, the participating Counties and municipalities shall consider and respond to comments received from the public in preparing the final Croton Plan.
(2) Within six (6) months after the release of the draft Croton Plan, the final Croton Plan shall be agreed to by the Department and the Counties and municipalities which participated in the preparation of the Croton Plan, and in consultation with the New York State Department of Health. In determining whether to agree to the Croton Plan, the Department will consider the Croton Plan, including the level of commitments therein, taken as a whole and consistent with subsection (d) of this section, meets the overall goals of the Croton Plan, set forth in subsection (b) of this section. The Department will not approve or disapprove individual components of the Croton Plan. The Department and the participating Counties and municipalities shall make a reasonable effort to resolve any and all issues which preclude their agreement to the Croton Plan. The five (5) year period referred to in paragraph (1) above, and/or the six (6) month period referred to in this paragraph (2) may be extended by agreement of the Department and the participating Counties and municipalities. In addition, the participating Counties and municipalities may, at any time, agree to discontinue the development of the Croton Plan.
(3) A failure of any participating County or municipality to agree to the Croton Plan shall not affect the ability of another participating County or municipality to agree to the Croton Plan and to site new wastewater treatment plants or to expand existing wastewater treatment plants with a surface discharge in accordance with subdivision (e).
(4) Once the Croton Plan is agreed to by the Department and the participating Counties and municipalities, the Croton Plan shall be considered valid and effective. The participating Counties and municipalities agreeing to the Croton Plan may, upon 60 days written notice to the City, modify the Plan at any time after it has been agreed upon. If the Croton Plan is proposed to be modified, the Department shall make a determination within sixty (60) days of notice of the proposed modification, whether the Croton Plan, as modified, shall continue to be valid and effective. In making such a determination, the Department shall consider whether the Croton Plan, as modified and taken as a whole, is consistent with subsection (d) of this section and meets the overall goals of the Croton Plan set forth in subsection (b) of this section. Any approved Croton Plan remains in effect pending any determination on a proposed modification and shall remain in effect until and unless either the Department agrees to a modification or a local government modifies it without the Department's approval or ceases to implement it.
(5) Any Croton Plan agreed to shall be reviewed by the participants to the plan fifteen (15) years after the Croton Plan becomes effective in order to determine whether the Croton Plan has met and will continue to meet its goals, and to determine whether new goals are appropriate.
(6) The Counties and the municipalities agreeing to the Croton Plan shall submit to the Department an annual report each year the Croton Plan is in effect. The annual report shall be submitted on the anniversary of the date the Croton Plan became effective and shall include:
(i) A statement of the status of the development or implementation of measures proposed in the Croton Plan;
(ii) A statement of expenditures incurred by the Counties and municipalities in implementing, and administering measures proposed in the Croton Plan; and
(iii) An identification of the financial, personnel and other resources needed to continue implementation and administration of the measures proposed in the Croton Plan.
(e) The Croton Plan may allow for the siting of a new wastewater treatment plant with a surface discharge or the expansion of an existing wastewater treatment plant with a surface discharge in the Croton system within a phosphorus restricted basin or a basin located within the 60 day travel time, but not within a coliform restricted basin, pursuant to the following conditions:
(1) Site constraints prevent the proposed new wastewater treatment plant or the expanded existing wastewater treatment plant from discharging subsurface;
(2) The municipal government and the County in which the wastewater treatment plant would be sited, confirms in writing that the proposed new wastewater treatment plant or the expansion of an existing wastewater treatment plant is consistent with the Croton Plan;
(3) The Department, in consultation with the New York State Department of Health, determines that the proposed new wastewater treatment plant or expansion of an existing wastewater treatment plant is consistent with the water quality objectives of the Croton Plan; and
(4) The discharge from the new wastewater treatment plant or the expansion of an existing wastewater treatment plant complies with one of the following conditions:
(i) The total volume (or flow) of surface discharge from such new wastewater treatment plant or expansion of an existing wastewater treatment plant, together with the total volume of surface discharges from all other new wastewater treatment plants and expansions of wastewater treatment plants which have been permitted in the subject County pursuant to this subparagraph (i), shall not, in the aggregate, exceed 10 percent of the total volume (or flow) of surface discharge from wastewater treatment plants located in the Croton system, within the subject County, which previously discharged into the Croton system but have been permanently diverted, since the effective date of these rules and regulations, to a discharge point outside of the Watershed. The Department may approve applications to construct new wastewater treatment plants with surface discharges pursuant to this subdivision prior to the permanent diversion of wastewater, and allow construction to begin on such new wastewater treatment plants, provided that the wastewater treatment plant may not commence operation until the diversion for which the credit is received has actually occurred.
(5) With respect to any new or expanded wastewater treatment plant allowed pursuant to this subdivision (e), the Department will not impose additional requirements on the siting of such new or expanded wastewater treatment plant other than the requirements specifically set forth in these rules and regulations applicable to all wastewater treatment plants, the requirements of this subdivision (e), and, with respect to new or expanded wastewater treatment plants in phosphorus restricted basins relying on phosphorus offsets, the requirements of any phosphorus offset program pursuant to 15 RCNY §§ 18-82(g), 18-83(a) and 18-84.
(f) (1) A County or municipality wishing to participate in the preparation of the Croton Plan shall indicate its intention to participate by written notice to the Department given within one year of the effective date of these rules and regulations. Such notice shall include a commitment by the subject County or municipality to cooperate with the Department in generating and analyzing the data and information reasonably necessary to address the Croton Plan elements identified in subdivision (c) above, and an agreement to minimize the use of offsets as a basis for new wastewater treatment plants or expansions of existing wastewater treatment plants pursuant to subdivision (e), to the extent that the economic and social needs of such County or municipality can be reasonably addressed without the use of such offsets.
(2) Within thirty (30) days after receipt of a notice as described in subdivision (f)(1) above, the Department shall notify a County or municipality of its inclusion in the preparation of a Croton Plan.
(3) If a County and its municipalities wish to prepare a Croton Plan, in accordance with subdivision (b)(2) above, the Department shall, within thirty (30) days of receipt of a notice as described in subdivision (f)(1) above, authorize the County and municipalities to begin preparation of such a Croton Plan. Such authorization shall include a commitment by the Department to cooperate with the County and municipalities in generating the data and information reasonably necessary to address the Croton Plan elements identified in subdivision (c) above.
(4) The provisions of subdivision (e) above shall not apply in any County or municipality which fails to participate in the preparation of the Croton Plan, fails to cooperate with the Department in the manner described in paragraph (f)(1) above in preparing the Croton Plan; fails or ceases to implement any water quality protection measures which such County or municipality has committed to implement as part of the final Croton Plan agreed upon by the County, municipality and the Department; or where a previously agreed upon Croton Plan is no longer valid and effective.
(g) Nothing in this Subpart is intended to constrain, limit or preclude an applicant from seeking, or the Department from issuing, approval of or a variance for a proposed regulated activity under any other applicable provision of these rules and regulations.
(h) Nothing in this section or in the Croton Plan is intended to constrain or limit the authority of local governments under State law to make local land use and zoning decisions, and nothing in this section or the Croton Plan should be construed to have the effect of transferring such local land use and zoning authority from the participating local governments to the Department or any other entity.
(Amended City Record 10/30/2019, eff. 11/29/2019)
§ 18-83. Watershed Planning in the West of Hudson Watershed. [Repealed]
(Repealed City Record 10/30/2019, eff. 11/29/2019)
§ 18-84. Permanent Phosphorus Offset Program. [Repealed]
(Repealed City Record 10/30/2019, eff. 11/29/2019)
§ 18-91. Severability
The provisions of these rules and regulations shall be severable, and if any item, subclause, clause, sentence, subparagraph, paragraph, subdivision, section or subchapter of these rules and regulations, or the applicability thereof to any person or circumstance, shall be adjudged by any court of competent jurisdiction to be invalid, such judgment shall not affect, impair or invalidate the remainder thereof, and the application thereof, but shall be confined in its operation to the item, subclause, clause, sentence, subparagraph, paragraph, subdivision, section or subchapter thereof, or to the person or circumstance directly involved in the controversy in which such judgment shall have been rendered.
Appendix 18-A. Watershed Maps
This section has 6 pictures (figures, equations, or tables drawn as images) that BetaNYC's copy does not show. Read Title 15, Chapter 18, Appendix 18-A at American Legal Publishing.
(a) The watershed area for the New York City water supply lies in the parts of the following counties and towns that are delineated on Map 18-A.1:
(1) Delaware County: In the towns of Andes, Bovina, Colchester, Delhi, Deposit, Franklin, Hamden, Harpersfield, Kortright, Masonville, Meredith, Middletown, Roxbury, Sidney, Stamford, Tompkins, Walton.
(2) Dutchess County: In the towns of Beekman, East Fishkill, Pawling.
(3) Fairfield County (Connecticut): In the towns of Danbury, Greenwich, New Fairfield, Ridgefield, Sherman.
(4) Greene County: In the towns of Ashland, Halcott, Hunter, Jewett, Lexington, Prattsville, Windham.
(5) Putnam County: In the towns of Carmel, Kent, Patterson, Putnam Valley, Southeast.
(6) Schoharie County: In the towns of Broome, Conesville, Gilboa, Jefferson.
(7) Sullivan County: In the towns of Fallsburg, Liberty, Neversink.
(8) Ulster County: In the towns of Denning, Hardenburgh, Hurley, Kingston, Marbletown, Olive, Rochester, Shandaken, Wawarsing, Woodstock.
(9) Westchester County: In the towns of Bedford, Cortlandt, Harrison, Lewisboro, Mount Kisco, Mount Pleasant, New Castle, North Castle, North Salem, Pound Ridge, Somers, Yorktown.
(b) The watershed areas for the New York City water supply that lie within the 60 day travel time to intake are delineated on Map 18-A.2.
(1) In the East-of-Hudson System, the entire reservoir and controlled lake drainage basins of Boyds Corner, Croton, Kensico, Lake Gleneida, Muscoot, West Branch, and parts of the reservoir drainage basins of Amawalk, Cross River, Croton Falls, and Titicus are within the 60 day travel time to intake.
(2) In the West-of-Hudson System, the entire reservoir drainage basin of Rondout, and parts of the reservoir drainage basins of Ashokan, Cannonsville, Neversink and Pepacton are within the 60 day travel time to intake.
(c) The reservoir drainage basins for each reservoir are delineated on Map 18-A.3.
(d) Detailed maps of each area within the 60 day travel time to intake are available at the regional offices listed in 15 RCNY § 18-15.
Map 18-A.1(a) East of Hudson Watershed: Counties and Towns
Map 18-A.1(b) West of Hudson Watershed: Counties and Towns
Map 18-A.2(a) East of Hudson Watershed: 60 Day Travel Time
Map 18-A.2(b) West of Hudson Watershed: 60 Day Travel Time
Map 18-A.3(a) East of Hudson Watershed: Reservoir Drainage Basins
Map 18-A.3(b) West of Hudson Watershed: Reservoir Drainage Basins
(Amended City Record 10/30/2019, eff. 11/29/2019)
Appendix 18-B. System Specific Water Quality Characteristics and Applicable Monitoring Criteria
This section has 2 pictures (figures, equations, or tables drawn as images) that BetaNYC's copy does not show. Read Title 15, Chapter 18, Appendix 18-B at American Legal Publishing.
(a) The system specific water quality characteristics of the reservoirs and reservoir stems, as of September 1990, are set forth in Tables 1 and 2 of this Appendix. It is the intension of the Department that the System specific characteristics be maintained at the stated levels by implementation and enforcement of these rules and regulations.
TABLE 1 System Specific Characteristics: Reservoir Standards (mg/L)
Croton System Catskill/Delaware System (including Kensico) Annual Mean S/S/M* Annual Mean S/S/M* Alkalinity (mg CaCO3/L) ³40.00 ³10.00 Ammonia Nitrogen 0.05 0.10 0.05 0.10 Chloride 30.00 40.00 8.00 12.00 Nitrite + Nitrate -N 0.30 0.50 0.30 0.50 Organic Nitrogen 0.50 0.70 0.50 0.70 Sodium 15.00 20.00 3.00 16.00 Sulfate 15.00 25.00 10.00 15.00 Total Diss. Solids 150.00 175.00 40.00 50.00 Total Organic Carbon 6.00 7.00 3.00 4.00 Total Susp. Solids 5.00 8.00 5.00 8.00 Chlorophyll-a 0.01 0.015 0.007 0.012
* S/S/M means Single Sample Maximum
TABLE 2 System Specific Characteristics: Reservoir Stem Standards (mg/L)
Croton System Catskill/Delaware System (including Kensico) Annual Mean S/S/M* Annual Mean S/S/M* Alkalinity (mg CaCO3/L) ³40.00 ³10.00 Ammonia Nitrogen 0.10 0.2 0.05 0.25 Chloride 30.00 35.00 100.00 10.00 50.00 Nitrite + Nitrate -N 0.35 1.50 0.40 1.50 Organic Nitrogen 0.50 1.50 0.50 1.50 Sodium 15.00 20.00 5.00 10.00 Sulfate 15.00 25.00 10.00 15.00 Total Diss. Solids 150.00 175.00 40.00 50.00 Total Organic Carbon 9.00 25.00 9.00 25.00 Total Susp. Solids 5.00 8.0 5.00 8.00
* S/S/M means Single Sample Maximum
(b) The following monitoring methods are used by the Department in assessing the impacts of a regulated activity on a reservoir, reservoir stem or controlled lake. An applicant may conduct sampling in waters owned by the City as set forth herein with prior authorization by the Department.
(c) Collection of Samples and Assessment of Impacts.
(1) In conducting tests or making analytical determinations to ascertain conformity or nonconformity with the standards set forth in Subchapter D, samples should be collected from locations which are representative of the general quality of water in the watercourse, reservoir, reservoir stem or controlled lake.
(2) In assessing the impact of a proposed regulated activity on a watercourse, reservoir, reservoir stem, or controlled lake, or in determining compliance with the standards set forth in Subchapter D, the Department will examine the impacts of the proposed activity throughout the year and the impacts on the photic, metalimnion and hypolimnion zones of the reservoir, reservoir stem or controlled lake.
(3) Impacts on reservoirs will be determined on the basis of samples taken on a schedule which is sufficient to reflect temporal variability and to meet regulatory requirements.
(4) Sampling locations in reservoirs will include: dams, intakes, mid-pool stations, and main tributary arms into each reservoir. At every station, a sample of the photic zone shall be taken. At deeper stations, samples will be collected from the metalimnion and hypolimnion.
(5) Reservoir stem samples should be collected in the section of the reservoir stem that is free-flowing and unimpeded by the reservoir when the impoundment is at full pool elevation.
(d) Tests and Analytical Determinations. In determining compliance or noncompliance with the water quality standards in Subchapter D, the Department will only consider tests or analytical determinations made by laboratories certified by the New York State Department of Health.
(Amended City Record 10/30/2019, eff. 11/29/2019)