15 RCNY E What Properties Qualify for RMP Replacement of Existing Meters?

A reimbursement will be provided for the replacement of a meter in any building class that DEP would otherwise replace itself using its Contractors or Inspection staff. These include inoperable meters of any age, meters 1 1/2” or larger more than seven (7) years old, or a meter smaller than 1 1/2” that is more than 10 years old. Additional qualification requirements are noted above in Section C. If the existing installation does not meet current installation regulations as described by RCNY Title 15 Chapter 20 and the List of Approved Water Meters, the replacement must be brought up to specifications, and for turbine meters, a meter manufacturer’s strainer and test tee or faucet must be installed. Separate reimbursement amounts are provided for replacement of the meter and for the replacement or installation of any required strainer for a turbine meter if a strainer is not already present. Additionally, an AMR device meeting DEP standards must be installed by DEP.

The NYC Licensed Plumber must report the final reading from the old meter on the completed permit.