1 RCNY Chapter 100 [Administration; Enforcement; Maintenance of Buildings; Licensing; Miscellaneous Provisions], part 4 of 7

§ 103-07 to § 103-13: 7 sections.

§ 103-07. Energy Audits and Retro-commissioning of Base Building Systems

Open this section

(a) Definitions. As used in this section, the following terms have the following meanings:

ACCEPTABLE ENERGY EFFICIENCY REPORT (EER). An acceptable EER is a technical energy audit and retro-commissioning report filed by an energy auditor and retro-commissioning agent that meets the requirements of the Administrative Code and this section, as determined by the department.

COMMON AREA. Common area is an area that is not considered a tenant area. Common area typically includes but is not limited to non-occupiable spaces such as egress corridors, egress stairwells, elevators, lobbies, public restrooms, janitorial closets, shared amenities, storage, mechanical or electrical rooms containing equipment that is owned, maintained and operated by the building owner.

MAJOR EQUIPMENT, SUB-EQUIPMENT AND COMPONENTS. Major equipment is a base building system listed in Table 1:

Table 1 – Major Equipment

Group R occupancies All occupancies other than Group R Boilers All boilers with rated input capacity greater than or equal to 300,000 Btu/h Chillers All chillers All chillers Cooling towers and dry coolers All cooling towers and dry coolers All cooling towers and dry coolers Air handling units (AHU), fan coil units (FCU), heat recovery units (HRU), heating and ventilation units (H&V), packaged and split air conditioning units Capacity greater than or equal to 2,500 CFMs Capacity greater than or equal to 5,000 CFMs HVAC motors, fans and pumps Greater than or equal to 2.5HP Greater than or equal to 5 HP Heat exchangers Serving 10,000 square feet or more Domestic hot water heaters (Storage and instantaneous) All water heaters with rated input capacity greater than 155,000 Btu/h Domestic water pumps Greater than or equal to 10 HP

Sub-equipment and components of the associated major equipment are listed in Table 2:

Table 2 – Sub-Equipment and Components of the Major Equipment

Sub-equipment and components Existing cabinets/casing Valves Grilles Terminal and induction units Actuators Filters Access doors Dampers Air outlets Control panels Chilled or hot water coils Fans and motors Controls and sensors Steam or DX coils VFDs Interlocks Belts Ductwork Electrical/mechanical switches VAV and fan powered boxes Piping Operating and modulating pressure controls Steam traps

NON-COMMON OWNER AREA. A non-common owner area is an occupiable space, as defined in Section 202 of the Building Code, that: (1) is not a non-common tenant area; and (2) is maintained by and accessible to the building owner.

NON-COMMON TENANT AREA. A non-common tenant area is an area of a dwelling unit or other space leased or intended to be leased.

(b) References.

Energy audit: Article 308 of Chapter 3 of Title 28 of the Administrative Code (Article 308); American Society of Heating, Refrigerating and Air-conditioning Engineers Inc. ("ASHRAE") Standard for Commercial Building Energy Audits – ASHRAE 211-2018 (American National Standards Institute (ANSI) approved/Air Conditioning Contractors of America (ACCA) co-sponsored).

Retro-commissioning: Article 308; National Environmental Balancing Bureau (NEBB) Standard S120-2016 – Technical Retro-Commissioning of Existing Buildings (ANSI approved).

(c) Energy auditor and retro-commissioning agent qualifications.

(1) The energy auditor performing or supervising the audit may not be on the staff of the building being audited. The energy auditor must be a registered design professional, and the energy auditor or an individual under the direct supervision of the energy auditor must be one of the following:

(i) a Certified Energy Manager or Certified Energy Auditor, certified by the Association of Energy Engineers (AEE);

(ii) a High-Performance Building Design Professional certified by ASHRAE;

(iii) a Building Energy Assessment Professional certified by ASHRAE;

(iv) for audits of multifamily residential buildings only, a Multifamily Building Analyst, certified by the Building Performance Institute; or

(v) an Energy Management Professional certified by the Energy Management Association.

(2) The retro-commissioning agent performing or supervising the retro-commissioning may not be on the staff of the building being retro-commissioned. The retro-commissioning agent must be a registered design professional, a certified Refrigerating System Operating Engineer, or a licensed High Pressure Boiler Operating Engineer. In addition, the retro-commissioning agent or an individual under the direct supervision of the retro-commissioning agent must be one of the following:

(i) a Certified Commissioning Professional certified by the Building Commissioning Association;

(ii) a Certified Building Commissioning Professional certified by the AEE;

(iii) an Existing Building Commissioning Professional as certified by the AEE;

(iv) a Commissioning Process Management Professional certified by ASHRAE;

(v) an Accredited Commissioning Process Authority Professional approved by the University of Wisconsin;

(vi) a Certified Commissioning Authority certified by the Associated Air Balance Council Commissioning Group;

(vii) a Building Commissioning Professional certified by ASHRAE;

(viii) a Commissioning Process Professional certified by NEBB;

(ix) a Technical Retro-Commissioning Professional certified by NEBB; or

(x) a Building Systems Commissioning Professional certified by NEBB.

(3) Registrations. An energy auditor or a retro-commissioning agent who is currently registered with the department and is not a registered design professional may continue to submit the EER as an approved agent until the expiration of the registration or December 31, 2021, whichever occurs first. No registration shall be renewed once expired. The provisions of §§ 28-401.6, 28-401.8 and 28-401.19 of the Administrative Code apply to such registered energy auditors and retro-commissioning agents.

(d) Energy audit procedures. An energy audit must be performed on the base building systems of a covered building prior to filing an EER. The scope of such energy audit must be at a minimum equivalent to the procedures, requirements, and reporting described for a Level 2 energy audit in accordance with ANSI/ASHRAE/ACCA Standard 211-2018 – Standard for Commercial Building Energy Audits, published by ASHRAE.

(e) Contents of the energy audit report. An audit report must be prepared for the owner that is at a minimum equivalent to the report prescribed by ANSI/ASHRAE/ACCA Standard 211-2018, or any subsequent, edition – Standard for Commercial Building Energy Audits, published by ASHRAE, and must include the information required by § 28-308.2 of the Administrative Code. The table of contents of the audit report must include all of the sections provided in the Level 2 energy audit report outline in Informative Annex D of standard 211-2018, or subsequent edition. Such report must be retained by the owner in accordance with subdivision (j) of this section. The energy auditor must certify that the audit satisfies the requirements of § 28-308.2 of the Administrative Code and this section. The energy audit report and certification form must be uploaded through the web-based Energy Audit template tool.

(f) Retro-commissioning procedures. The base building system components subject to retro-commissioning as per § 28-308.3 of the Administrative Code must be assessed in accordance with NEBB Standard S120-2016,or any subsequent, edition – Technical Retro-Commissioning of Existing Buildings and § 28-308.3 of the Administrative Code, as applicable to the requirements of this section, including the technical retro-commissioning process, the testing protocols, master list of findings and repairs and deficiencies corrected, deliverables and documentation. Deficiencies found in the assessment must be corrected, prior to submission of the EER, as required by this subdivision.

The Current Facility Requirements (CFR) will be the following for all space uses served by a base building system, unless the agent provides acceptable rationale demonstrating otherwise. Acceptable rationale must be documented and can include needs of a space use as defined by owner interviews, tenant leasing requirements, and tenant controlled set points and setbacks. The CFR must be justified by references including ASHRAE fundamentals, heating, ventilation, and air conditioning (HVAC) systems and equipment, and applications handbooks, ANSI references, Illuminating Engineering Society (IES) lighting handbook, New York City Housing Maintenance Code (HMC), New York City Building Code (BC), approved design drawings and/or manufacturer's guidelines. Acceptable rationale does not include needs as a result of deficient equipment or historic operations.

• Winter indoor space temperatures should be between 68 and 76 degrees F and summer indoor space temperatures should be between 72 and 80 degrees F during occupied periods of time for non-common tenant areas (without individual HVAC controls) and non-common owner areas of the facility.

• Operating steam system pressure (cut-out setting) should not be greater than four psig for low pressure steam heated buildings. For any building requiring higher operating steam pressure, substantial documentation, including design/as-built documents indicating design operating steam pressure shall be submitted to, and accepted by the department.

• Domestic hot water is stored and delivered per the HMC for Group R occupancies and per the New York City Plumbing Code requirements for all other occupancies.

• Minimum outside air requirements are met in areas with mechanical supply ventilation per the design and/or New York City Mechanical Code effective at the time of installation of the major equipment.

• Lighting levels (foot candles) are in accordance with the BC and HMC for all egress lighting, including common laundry rooms, and in accordance with the IES lighting handbook for all other space use types in the common areas and non-common owner areas.

• Daily, weekly, and seasonal operating hours, including occupied and non-occupied hours, of the building and base building systems.

• A description of the current space use of base building areas.

• A description of any changes in space use that impact the energy consumption of the heating, cooling, ventilation, or domestic hot water systems.

Retro-commissioning agent must consider the following to develop, document, and define the CFR:

• Age of facility.

• Interviews with owners, facility manager, and occupants.

• Available design or as-built drawings.

• Lease terms with regard to energy usage.

(1) HVAC and service water equipment.

(i) Pre-testing verification. An inspection, documented through pre-test verification forms, of all major equipment and its sub-equipment and components located in all common areas, at least 20% of such equipment located in non-common owner areas and at least 10% of such equipment located in accessible non-common tenant areas must be conducted to check for cleanliness and proper operation. Such inspection ensures that the system is able to be tested. Where major equipment, sub-equipment, and components are found to require cleaning, repair or correction for proper operation, correct all deficiencies prior conducting functional performance testing and document the post-correction condition in the retro-commissioning report under issues log.

(ii) Functional performance testing. Performance verification through functional performance testing for all major equipment and its sub-equipment and components located in the common areas, at least 20% of such equipment located in the non-common owner areas and at least 10% of such equipment located in the non-common tenant areas must be performed during normal operating conditions. Functional performance testing includes but is not limited to all controls, actuation, automation and sequencing functions impacting energy consumption of the major equipment such as control sequence of operation, economizer function, staging and load distribution, automatic reset function and integrated system level testing. The functional performance test process and results must be reported on forms acceptable to the department. Proper function must be determined from field observation and may include interviews with facility staff, trend analysis, or dedicated data loggers. Where equipment requires correction, the condition must be corrected and the post-correction condition must be documented in the retro-commissioning report. Completed functional performance test forms must be included in the retro-commissioning report.

(iii) Temperature and pressure setpoints and setbacks. All major equipment and its sub-equipment and components located in all common areas, at least 20% of such equipment located in the non-common owner areas and at least 10% of such equipment located in the non-common tenant areas must be tested to verify that such system set points are appropriate to the CFR and setbacks operate during unoccupied periods as stated by the CFR. Where set points and setbacks require correction, the condition must be corrected and the post-correction condition must be documented in the retro-commissioning report.

(iv) Sensors. Sensors include the following in Table 3 below, if present and serving major equipment(s).

Table 3 – Critical and Monitoring Sensors Associated with Major Equipment

AHU/FCU/H&V/packaged and split AC units Boiler Cooling tower Chiller OA temp OA temp OA temp (Dry bulb and wet bulb) OA temp Supply and return air temp Return temp Inlet water temp Evap. water temp in Mixed air temp Supply temp Outlet water temp Evap. water temp out Supply and return air flow rate System pressures (Steam Boilers) Flow rate Cond water temp in Static pressure Indoor zone temp Humidity Cond water temp out Zone temp - Supply and return temp Zone temp and system pressures

(A) All critical sensors that are part of a control sequence and have direct control of major equipment located in the common area must be tested for proper calibration. Acceptable and allowable tolerances for proper calibration must be supported by a reference acceptable to industry or manufacturer's guidelines. Where sensors require correction, the condition must be corrected and the post-correction condition must be documented in the retro-commissioning report.

(B) For monitoring sensors that are not part of a control sequence, a sample set constituting at least 10% of all monitoring sensors within the common area must be tested for proper calibration. Acceptable and allowable tolerances for proper calibration must be supported by a reference acceptable to industry or manufacturer's guidelines. If more than 80% of the sample set is found to be satisfactory, then no further sampling is required for the purposes of the retro-commissioning report. If less than 80% of the sample set is found to be satisfactory, then all monitoring sensors must be tested for proper calibration. Where sensors require correction, the condition must be corrected and the post-correction condition must be documented in the retro-commissioning report.

(v) Simultaneous heating and cooling. All major equipment air handling units located in the common areas and at least 20% of the major equipment air handling units in the non-common owner areas must be tested to verify that simultaneous heating and cooling is not occurring, unless intended. Where unintended simultaneous cooling and heating is occurring, the condition must be corrected and post-correction condition must be documented in the retro-commissioning report.

(vi) Boilers tuned for optimal efficiency. A combustion efficiency test must be conducted for each low pressure major equipment boiler (includes H-stamped domestic hot water heater). Each boiler must be tuned and cleaned to perform as per manufacturer's guidelines for combustion efficiency (%), oxygen (%), carbon dioxide (%), ambient air temperature (degrees F), stack temperature (flue gas temp minus combustion air temp, degrees F), carbon monoxide (ppm), and smoke number, as applicable. If manufacturer's guidelines are not available, cleaning/tuning and combustion efficiency testing must be conducted to meet the requirements in Table 4 below at high and low fire rates for all fuel types. Results (Actual print-outs directly obtained from the calibrated combustion analyzer) of the combustion efficiency test must be included in the retro-commissioning report.

Table 4 – Acceptable Range for Combustion Efficiency Test Results

High fire Low fire Residential/Commercial gas fired Commercial oil fired Commercial gas fired Commercial oil fired Atmospheric and fan assist boilers Power burners Power burners Power burners Power burners Oxygen (%) 6% to 9% 3% to 6% 3% to 6% 5% to 8% 6% to 10% Stack temperature (deg. F) 325 to 450 350 to 550 350 to 500 300 to 380 300 to 400 Carbon monoxide (ppm) air free <50 ppm <100 ppm <100 ppm <100 ppm <100 ppm Smoke number - - Zero or per manufacturer requirements - Zero or per manufacturer requirements

(vii) Manual override remediation. In all cases where the major equipment has the capability of being operated automatically, the retro-commissioning agent must confirm that major equipment is not being manually operated. Where a manual override condition exists, it must be noted as a deficiency to be corrected, and the post-correction condition must be documented in the retro-commissioning report.

(viii) Leaks. Major equipment and its sub-equipment and components in all common areas, at least 20% of such equipment located in non-common owner areas and at least 10% of such equipment located in the accessible non-common tenant areas must be visually checked for water, steam, oil, or air leaks. These checks do not include duct tightness testing. All leaks identified must be repaired, and the post-correction condition must be documented in the retro-commissioning report.

(2) HVAC and service water distribution.

(i) Pipe insulation. All exposed (uninsulated and/or with deteriorated insulation) pipes three inches or greater in diameter, pipe fittings, and associated valves located in the common areas, at least 20% of such equipment located in non-common owner areas and at least 10% of such equipment located in the non-common tenant areas, containing steam or fluid outside the operating temperature range of 60 degrees F and 105 degrees F must be thermally insulated in accordance with the New York City Energy Conservation Code in effect at the time of installation, and the post-correction condition must be documented in the retro-commissioning report.

Exception: Existing insulation with asbestos containing materials is not required to be removed or replaced for the purposes of the retro-commissioning report. The condition must be noted on the retro-commissioning report and correction of such condition is not required.

(ii) High pressure steam traps. All high pressure steam traps operating above 15 PSI of pressure must be tested using ultrasonic leak detection to verify proper operations or replaced. All steam traps found to be functioning improperly must be replaced, repaired or rebuilt, and the condition must be noted on the retro-commissioning report.

(iii) One-pipe steam distribution.

(A) All one-pipe steam distribution systems serving the major equipment must have steam traveling from the steam header to the end of each main loop vent(s) at an average of less than five minutes. Retro-commissioning agents must conduct the steam and travel time test using temperature data loggers (temperature sensors/thermocouples) that provide an output of timestamps and surface temperature readings. At the beginning of each test, the temperature at the end of each main loop vent must be 140 degrees F or less. At the end of the test, the end of each main loop vent must be 195 degrees F or more.

(B) The average time at which the steam header reaches at least 195 degrees F and the end of each main loop vent(s) reaching at least 195 degrees F must be less than five minutes. A temperature (degrees F) vs. time (minutes) curve to be plotted in 10-second intervals and all data points logged used to plot this curve must be provided in a tabular format in the report. Data points must include time from the start of the boiler/burner until the steam reaches the header and then to the end of all main loops.

(C) The retro-commissioning agent must provide a schematic plan of the steam piping distribution in the common area. This schematic plan should indicate the location of the boiler(s), supply lines, header and each main line vent.

(iv) Two-pipe steam distribution.

(A) The main supply and main return piping surface temperatures for all two-pipe steam distribution systems serving major equipment must have a differential of 30 degrees F or more. The retro-commissioning agent must conduct the differential temperature test utilizing temperature data loggers (temperature sensors or thermocouples) that provide an output listing timestamps and surface temperature readings. The retro-commissioning agent must provide Pressure vs. Time and Temperature vs. Time plots, as recorded in intervals of 5 minutes. The temperature readings must be recorded using data loggers insulated and located on the main supply/header and main return piping, and on the inlet of a condensate/vacuum tank. This test cannot be performed on systems with master traps or double steam traps; it also cannot be performed on systems with heat exchangers and heat recovery that are used to cool the condensate down. The data loggers must provide readings during two consecutive cycles of the boiler where each cycle (boiler run time) takes at least 30 minutes at the design operating pressure.

(B) In the event that a two-pipe steam distribution system has a differential between the main supply and main return piping surface temperatures of not more than 30 degrees F for any duration of the test specified above, all steam traps in the common areas, at least 20% of steam traps in the non-common owner areas and at least 10% of steam traps in the non-common tenant area, served by the major equipment, must be tested to verify for proper function. If less than 80% of the sample set, for each sample size, is found to be functioning properly, then all respective areas served by the two pipe steam distribution system must be tested to verify the steam traps are functioning properly. All steam traps found to be functioning improperly must be replaced, repaired, rebuilt, or removed and the post-correction condition must be documented in the retro-commissioning report. Steam trap testing must utilize ultrasonic leak detection technology and/or a thermal imaging camera, as necessary to determine the trap condition. A comprehensive steam trap schedule including number, type, location, size (orifice) of traps and test results must be included in the retro-commissioning report. If the work required is so extensive that it would require more time than available to meet the compliance deadline, the condition may be corrected within two years of submitting the retro-commissioning report to the department and must be noted in the report. Documented verification must be submitted on a form provided by the department showing that the differential between the main supply and main return piping surface temperatures is more than 30 degrees F for any duration of the test specified in the differential temperature test described in subparagraph (A), above, after replacement, repair or rebuilding of deficient steam traps.

Exception: If all steam traps in the common areas, at least 20% of steam traps in the non-common owner areas and at least 10% of the steam traps in the non-common tenant areas have been replaced and/or tested and verified as functioning properly, within five years from the date the EER was submitted, and supporting documentation acceptable to the department is provided, then testing of steam traps is not required. Acceptable supporting documentation includes, but is not limited to, copies of paid invoices for the completed work, steam trap test reports and post-correction findings.

(v) Air-side distribution. All dampers, fans, actuators and controls associated with air-side distribution serving major equipment must be functionally tested for proper operation as per CFR. Where deficiency is identified, the condition must be corrected and the post-correction condition must be documented in the retro-commissioning report. Completed functional performance test forms must be included in the retro-commissioning report.

(vi) Water-side distribution. All valves on coils, automatic isolation valves at pumps, actuators and controls associated with water-side distribution serving major equipment must be functionally tested for proper operation as per CFR. Where deficiency is identified, the condition must be corrected and the post-correction condition must be documented in the retro-commissioning report. Completed functional performance test forms must be included in the retro-commissioning report.

(vii) Domestic hot water system temperature settings. All storage and delivery hot water temperatures of major equipment hot water heaters must be checked to verify that the water temperature settings are appropriate for the CFR. Where the temperature settings are found to require correction, the condition must be corrected and the post-correction condition must be documented in the retro-commissioning report.

(viii) Mechanical ventilation rates. A sample set constituting at least 10% of all mechanical outdoor air intakes, but in no event fewer than three outdoor air intakes, must be measured to verify that the flow rates are appropriate for the CFR. If more than 80% of the sample set is found to be appropriate, then no further sampling is required for the purposes of the retro-commissioning report. If less than 80% of the sample set is found to be appropriate, then all mechanical outdoor air intakes serving base building systems must be measured. Where flow rates require correction, the condition must be corrected and the post-correction condition must be documented in the retro-commissioning report.

(3) Lighting system.

(i) Light levels. Lighting levels (foot candles) in all common areas and lighting levels in at least 20% of the non-common owner areas must comply with the CFR. The sample set should include at least 10% of each area of different use. Where the light levels are found to require correction, the condition must be corrected and the post-correction condition must be documented in the retro-commissioning report.

(ii) Sensors and controls. All interior lighting systems in the common areas, at least 20% of the interior lighting systems in the non-common owner areas, and all exterior lighting systems must be checked to verify that the lighting sensors and associated automatic lighting controls are functioning properly. Where lighting sensors and controls are found to require correction, the condition must be corrected and the post-correction condition must be documented in the retro-commissioning report.

(4) Envelope.

(i) Sealants and weather-stripping. An inspection must be conducted in all common areas, at least 20% of non-common owner areas and at least 10% of non-common tenant areas to confirm that accessible sealants and weather stripping are installed around doors, windows, conduits, piping, joints, and other areas of potential major air infiltration and in good condition. Where any sealant or weather stripping is found to require correction, the condition must be corrected and the post-correction condition must be documented in the retro-commissioning report.

Exception: Sealants and weather stripping with asbestos containing materials shall not be required to be removed or replaced for the purposes of retro-commissioning. The condition must be noted on the retro-commissioning report and correction of such condition is not required.

(ii) Windows and doors. An inspection must be conducted in common areas to confirm that all windows and doors are in good condition. Where any door or window is not in good condition, the condition must be corrected and the post-correction condition must be documented in the retro-commissioning report.

(5) Training and documentation. On-site documentation in accordance with § 28-308.3(3) of the Administrative Code must be verified and noted on the retro-commissioning report. Training of critical operations and maintenance staff on the energy conservation techniques and preventative maintenance schedules, based on manufacturer's guidelines or recognized industry standards, for all major equipment and subsystems must be documented in the retro-commissioning report.

(g) Contents of the retro-commissioning report. In accordance with § 28-308.3.1 of the Administrative Code, the retro-commissioning agent must prepare and certify a retro-commissioning report that satisfies the requirements of § 28-308.3 of the Administrative Code and this rule. In establishing the table of contents, the retro-commissioning agent shall refer to "K. Informative Appendix – Retro-Commissioning Report" of the NEBB Standard S120-2016, or any subsequent, edition – Technical Retro-Commissioning of Existing Buildings as guidelines until a final retro-commissioning report outline is prescribed by the department. Such report must include the model number, serial number, last calibration date and manufacturer recommended calibration frequency for each reference instrument used for functional performance testing. The report must also include photos of deficiencies, adjustments and repairs. All photos must include a timestamp visible on the front of the photo within the report. Calibration certificates and additional photos must be provided, if requested by the department. The retro-commissioning report must be uploaded through the web-based Energy Audit template tool when submitting to the department. Such report must be retained by the owner in accordance with subdivision (j) of this section.

(h) Contents of the EER. An EER in accordance with § 28-308.5 of the Administrative Code must be submitted to the department in accordance with § 28-308.4 of the Administrative Code on forms prescribed by the department. The EER must include the Deep Energy Retrofit Plan Analysis tool when submitted to the department. The results of this tool must also be presented to the owner prior submitting to the department.

(i) Multiple buildings.

(1) Multiple buildings on a lot. Two or more buildings on a lot that constitute a covered building in accordance with § 28-308.1 of the Administrative Code are subject to an energy audit and retro-commissioning of base building systems as follows:

(i) Multiple buildings on a covered lot that are equipped with base building systems that are wholly separate from each other are subject to the requirements for an EER for each individual building.

(ii) Multiple buildings on a covered lot that share base building systems are subject to the requirements for an EER for each grouping of buildings that share base building systems.

(2) Multiple buildings on multiple tax lots that share systems. Two or more buildings on more than one tax lot that share base building systems are subject to the requirements for an EER for each grouping of buildings that share base building systems.

(3) Buildings on different blocks with shared base building systems. Two or more buildings on separate blocks that constitute a covered building in accordance with § 28-308.1 of the Administrative Code are subject to the requirements for an EER for each grouping of buildings that share base building systems. The due date for the EER will be in the calendar year with a final digit that is the same as the last digit of the block number that is highest or with respect to a city building as defined in § 28-308.1 of the Administrative Code in accordance with the schedule of the Department of Citywide Administrative Services. The owner must notify the department by December 31 of the year in which the earliest covered building is due to comply, out of all covered buildings on different blocks with shared base building system(s), through the form prescribed by the department.

(4) Multiple covered buildings under cooperative corporations. A cooperative corporation that owns multiple covered buildings located on different tax block numbers that is required to file an EER for more than one covered building in different calendar years, may consolidate all such EERs into one report, disaggregated by covered building, due no later than the year in which the last EER would be due, which shall be accepted by the department in satisfaction of the requirements of this section for each covered building included in such consolidated report. The owner must notify the department by December 31 of the year in which the earliest covered building is due to comply through the form prescribed by the department.

(j) Record retention. Owners of covered buildings as defined in § 28-308.1 of the Administrative Code must maintain the Energy Audit Report required by § 28-308.2.1 of the Administrative Code and the Retro-commissioning Report required by § 28-308.3.1 of the Administrative Code as proof of energy audits and retro-commissioning as required in Article 308. Such records must be retained for eleven years from the required submission date and must be made available to the department upon request.

(k) Fees. Owners of covered buildings must pay a filing fee as provided in 1 RCNY § 101-03.

(l) Extension of time to file report.

(1) An owner may apply for an extension of time to file an EER if, despite good faith efforts, the owner is unable to complete the required energy audit and retro-commissioning prior to the due date of the report, for reasons other than financial hardship of the building. The application must be on a form provided by the department and must be filed by December 31 of the year in which the report is due.

(2) An owner may apply for annual extensions of time to file an EER based on the financial hardship of the building. The application must be on a form provided by the department and must be filed by October 1 of the year in which the report is due and by December 31 of every subsequent year for which an extension is requested.

(m) EER under comprehensive review. A violation will be issued if an EER submission that is chosen for comprehensive review fails to resolve all issued objections after three revisions, or two years from the date of issuance of the first Notice of Objections, whichever occurs first. Such EER submission shall be subject to a penalty for failure to submit an acceptable EER in accordance with subdivision (n) of this section.

(n) Violation and penalty. Failure to submit an acceptable EER is a Major (Class 2) violation which may result in a penalty of $3,000 in the first year and $5,000 for each additional year until the EER is submitted to the department.

(o) Challenge to violations.

(1) An owner may challenge a violation issued, pursuant to this section by providing:

(i) proof from the Department of Finance that the building in question is not a "covered building" as defined in § 28-308.1 of the Administrative Code; or

(ii) proof of early compliance with the filing requirements, pursuant to § 28-308.7 of the Administrative Code; or

(iii) proof that the building is a new building (NB) with a first temporary certificate of occupancy less than ten years old at the time the building was due to comply; or

(iv) proof that the application to defer filing an EER was approved; or

(v) proof that the owner was granted an extension of time to file the report.

(2) Such challenge must be made in writing on a form provided by the department within thirty days from the postmark date of the violation served by the department.

(Amended City Record 10/13/2017, eff. 11/12/2017; amended City Record 7/5/2019, eff. 8/4/2019 & 1/1/2020; amended City Record 12/20/2024, eff. 1/19/2025)

§ 103-08. Machine-room-less Elevators. [Repealed]

Open this section

(Repealed City Record 7/24/2015, eff. 8/23/2015)

§ 103-09. Periodic Inspection of Retaining Walls

Open this section

(a) Definitions. For the purposes of this section, the following terms have the following meanings.

Acceptable report. A report of critical examination filed by a qualified retaining wall inspector that meets the requirements of the Administrative Code and this section as determined by the Department.

Amended report. A report of critical examination filed by a qualified retaining wall inspector who certifies that the unsafe conditions reported in the initial report have been repaired and that the retaining wall is no longer unsafe.

Appurtenance. A retaining wall element including, but not limited to, fences (including attachments and other hardware), lighting fixtures, railings, protective screening, signs, mesh wires for gabion walls, coping, and any non-structural components attached to or protruding from the retaining wall.

Close-up inspection. A physical examination performed on a retaining wall for the purpose of performing a critical examination.

Critical examination. An examination conducted to review a retaining wall and all parts of it, including any appurtenances of such wall, to determine whether the retaining wall and its parts are either safe, unsafe, safe with minor repairs, or safe with a repair and maintenance program and whether, in the judgment of a qualified retaining wall inspector, it requires remedial work.

Filed report. A report is deemed filed with the Department when it has been received by the Department. The filed report must be completed in accordance with the provisions of paragraph (3) of subdivision (c) of this section.

Filing window. The one-year period during which an acceptable report for a particular retaining wall may be filed with the Department without penalty.

Height (of retaining wall). The vertical distance, measured from the ground surface above the toe of the wall to the top of the wall, wall stem, or wall step for tiered walls, including any parapets or fencing intended for retaining material.

Maintenance. The cyclical or recurring upkeep of a retaining wall including, but not limited to, vegetation removal, weep holes, cleaning wall drains, removing debris from culverts, replacing dislodged chinking, painting soldier piles, cleaning and sealing concrete and wood facings.

Physical examination. Hands-on engineering inspection of retaining walls and appurtenance elements applying various methods of examination other than visual, including, but not limited to, sounding, probing, coring, testing, soil test pits and soil borings.

Public right-of-way. A public highway, railroad, street, avenue, alley, public driveway, sidewalk, roadway or any other public place or public way.

Qualified retaining wall inspector ("QRWI"). A qualified retaining wall inspector as defined in 1 RCNY § 101-07.

Repair. The non-routine fixing and restoring of wall elements to their intended function, including, but not limited to, resetting dislodged stonework, repointing stone masonry, re-grading or reseeding adjacent slopes, patching concrete spalls, mending damaged wire baskets, and repair or replacement of the drainage system.

Report of critical examination ("Report"). A written report filed with the Department by a QRWI clearly documenting the conditions noted during the assessment; areas that need repair, maintenance, or engineering monitoring; a final wall rating; and any other requirements mandated by this rule.

Report filing cycle. The five-year time interval established by the Commissioner for the filing of each successive report for each successive critical examination of every retaining wall subject to the requirements of Article 305 of Title 28 of the Administrative Code.

Retaining wall. A wall that resists lateral or other forces caused by soil, rock, water, or other materials, thereby preventing lateral displacement and the movement of the mass by sliding to a lower elevation. Such term does not include basement walls and vault walls that are part of a building, and underground structures, including but not limited to utility vault structures, tunnels, transit stations and swimming pools.

Safe condition. A wall rating in which a retaining wall is determined to be fully functional with no action required at the time of assessment and that will not become unsafe during the next five years.

Safe with minor repairs ("SMR") condition. A wall rating in which a retaining wall is found at the time of assessment to be safe but requires minor repair or routine maintenance within the next five years to correct minor deficiencies in order to minimize or delay further wall deterioration and remain safe.

Safe with repairs and/or engineering monitoring ("SREM") condition. A wall rating in which a retaining wall is found at the time of assessment to be safe but requires repair within the next five years, but not less than one year, to correct deficiencies in order to prevent its deterioration into an unsafe condition during that five-year period. In addition to repair, the QRWI deems it necessary to regularly monitor and/or investigate further the retaining wall to determine the nature or cause of observed distress and what action may be required.

Staggered filing cycle. The separate time intervals for filing reports as determined by borough beginning January 1, 2024, and continuing thereafter for each subsequent report filing cycle.

Subsequent report. A technical examination report that is filed by a QRWI after an acceptable report in order to change the status of a retaining wall for that reporting cycle to reflect changed conditions or the recommended time frame for repairs of SREM or unsafe conditions, except where an amended report should be filed.

Unsafe condition. A condition of a retaining wall and any appurtenances found at the time of assessment that is a hazard to persons or property and requires repair within one (1) year of completion of critical examinations. In addition, any condition that was reported as SREM in a previous report and that is not corrected at the time of the current inspection must be reported as an unsafe condition.

(b) Responsibilities of qualified retaining wall inspectors.

(1) A QRWI must conduct critical examinations and file reports in accordance with this section and § 28-305.4 of the Administrative Code.

(2) A QRWI must maintain records of inspections and tests for at least six years and must make such records available to the Department upon request.

(3) A QRWI must maintain insurance coverage as set forth in paragraph (7) of subdivision (b) of 1 RCNY § 101-07. Copies of such insurance policies must be made available to the Department upon request.

(4) A QRWI must be in good standing with the New York State Education Department and the New York City Department of Buildings.

(c) Critical examinations.

(1) Periodic inspection requirements. In order to maintain a retaining wall and its appurtenances in a safe condition, and in accordance with Article 305 of Title 28 of the Administrative Code, a critical examination of any retaining wall: (i) with a height of ten feet or more at any point along the length of such wall; and (ii) which fronts on a public right-of-way must be conducted by a QRWI once every five (5) years. The results of the critical examination must be submitted to the Department in accordance with the requirements of paragraph (3) of this subdivision.

(2) Inspection procedures.

(i) Before performing a critical examination of a retaining wall, the QRWI retained by or on behalf of the owner must review the most recent report and any available previous reports, structural design or repair drawings, and violations. The Department will maintain a file of such reports submitted in conformance with Article 305 of Title 28 of the Administrative Code and provide copies upon payment of fees set forth in the rules of the Department.

(ii) Examination of retaining walls and appurtenances thereof pursuant to § 28-305.4 of the Administrative Code and this section must be performed by or under the direct supervision of a QRWI retained by the owner of such wall or a representative of the owner.

(iii) The QRWI must design and implement an assessment program that is specific to the retaining wall to be assessed, including, but not limited to, observations of the entire length of the wall from both sides of the retaining wall, data collection and method of evaluation. The assessment program and methods to be employed must be based on the consideration of the wall construction type, wall function, year built, location, age of materials, specific exposure to environmental conditions, and the presence of specific details and appurtenances. Consideration must be given to the retaining wall's history of maintenance and repairs as described in previous reports and submittals to the Department, if applicable. Professional Engineers, individuals with a bachelor's degree in engineering and three years of relevant experience, or individuals with five (5) years of relevant experience working under the QRWI's direct supervision may be delegated to perform selected inspection tasks other than the final inspection.

(iv) The methods used to assess the retaining wall in question must permit a complete critical examination of the wall, including, but not limited to, retaining wall type, cross sections, architectural finishes, selective probes, cores, measurements of wall dimensions, including, but not limited to, thickness and soil investigation.

(v) The QRWI must utilize a professional standard of care to assess the condition of the retaining wall and surrounding elements that impact the wall's stability. The known history of the retaining wall, the nature of the materials used, and the conditions observed will dictate the extent of the critical examination, provided, however, that the following elements must be assessed whenever they are present:

(A) Primary wall elements, including, but not limited to, piles and shafts, lagging, anchor heads, wire or geo-synthetic facing elements, bins or cribs, concrete, shotcrete, mortar, manufactured block or brick, placed stone and wall foundation material.

(B) Secondary wall elements and appurtenances, including, but not limited to, wall drains and water management systems, architectural facing, traffic barrier, fencing, roads, sidewalks, shoulders, upslope, downslope, lateral slope, vegetation, culverts, curbs, berms and ditches.

(vi) The QRWI must amend the scope of the critical examination and add additional testing and investigation as required to characterize wall distresses, overall performance or if distresses warrant additional investigations.

(vii) During the course of the critical examination, photographs must be taken and maps made to document the exact location of all distresses that require repair, maintenance, or monitoring, or that cause a retaining wall to have a final wall rating of unsafe, SREM, or SMR.

(viii) Upon the discovery of an unsafe condition, the QRWI must immediately notify the Department and the owner of the property on which the retaining wall is located. The QRWI must identify the location of any unsafe condition, advise the owner on the appropriate protective measures to be taken, and include the recommended type and location of public protection in the notification to the Department.

(ix) A critical examination is complete when the QRWI has conducted a final physical inspection to determine that the retaining wall conditions described in the report are consistent with actual conditions. Such final inspection must, at a minimum, include an in-person visual examination of the entire length from both sides of the retaining wall. A drive-by inspection is not acceptable.

(3) Report requirements.

(i) The QRWI must file a written report of critical examination with the Department and submit a copy to the owner of the retaining wall. The report must clearly document all conditions noted during the assessment and state that the assessment was performed and completed in accordance with the Administrative Code and this section. A separate acceptable report must be prepared and filed for each property with a retaining wall that meets the conditions set forth in paragraph (1) of this subdivision.

(ii) Technical information in the report must adhere to and follow the sequence and the labeling of the report requirements listed in subparagraph (iii) of this paragraph, and must be provided on such forms and in such format as the Department requires. Additional information may be provided. If a requirement is not applicable, this must be indicated on the report under the relevant number.

(iii) The report must include an executive overview that consists of a summary of findings and recommendations, a concise statement of the scope of the assessment and findings, the conclusions and recommendations, and a final wall rating that categorizes the retaining wall as "safe," "SMR," "SREM," or "unsafe." The report must also include, but not be limited to:

(A) The address, any a.k.a. addresses, the Block and Lot number, the Building Identification Number ("BIN"), when applicable, for the block and lot on which the retaining wall is located, and the location from the nearest cross street;

(B) The name, mailing address and telephone number of the owner of the retaining wall, or, if the owner is not an individual, the name, mailing address, telephone number, and position/title of a principal of the owner;

(C) A detailed description of the retaining wall, including the height, plan and section dimensions, construction type, all materials present, age, and type of veneer if applicable;

(D) A detailed description of any maintenance, repairs, or the results of engineering monitoring performed to the retaining wall since the previous report, including but not limited to foundation settlement, bulging or cracking of the retaining wall, movement of any elements of the remaining wall or appurtenances, or other defects or changes;

(E) A detailed description of the scope and procedures used in making the critical examination;

(F) The following information:

1. The extent and location of all physical examinations and tests performed;

2. The names, addresses, telephone numbers, and license or registration numbers of contractors and consultants involved in the critical examination;

3. A location or plot plan of a discernible scale and with a north arrow that shows the entire earth-retaining length of the wall;

4. All structures located on the lot or on the adjacent lots and within the zone of influence of the wall. The information provided shall include the number of stories and the type of occupancy of all structures, and all public rights-of-way;

5. The dates when the critical examination was started and completed and when tests were performed; and

6. Dated photo documentation of the QRWI or, where applicable, persons supervised by the QRWI as permitted by this section, performing physical examinations;

(G) At least one cross-section of the retaining wall with details adequate to indicate the following:

1. Retaining wall construction type;

2. Architectural finishes or surface treatment;

3. Maximum exposed wall height;

4. Height of earth on each side of the retaining wall;

5. Average vertical distance from the public right-of-way to cut wall toe or ground-line at the top of the fill wall;

6. Horizontal distance to wall face from the edge of the public right-of-way;

7. Wall face angle (batter) measured from the vertical;

8. Maximum earth retaining length of the wall;

9. Surcharges applied to the wall; and

10. Additional cross-sections when the wall geometry or plumbness changes;

(H) A description, classification and the location of each significant condition observed, including deterioration and any movement detected. The description must also include a list of all appurtenances and their condition. Each condition must be classified as safe, unsafe, SMR, or SREM. If the retaining wall structure is classified as unsafe, SMR, or SREM, the compliance report must include the locations and descriptions of all unsafe, SREM, or SMR conditions. If unsafe conditions are noted, the report must recommend the type and location of public protection or clearly delineate the extent of areas that have been cordoned off and the methods used. Photographs must be labeled and the report must include key plans and locator drawings documenting these conditions. Guards and railings must be inspected to ensure that their components, including balusters, intermediate railings, and panel fillers, are positively secured against movement, such as by welds, bolts, or screws. If any guard or railing is found not to be positively secured, the condition must be classified as unsafe and made safe pursuant to the requirements of paragraph (5) of this subdivision;

(I) An analysis of the causes of the conditions reported as unsafe or SREM;

(J) A detailed status report of maintenance work performed up to the date of submission of the report and the maintenance plan implemented for the retaining wall;

(K) Where a retaining wall is categorized with a final wall rating of SREM:

1. A plan detailing the proposed monitoring program;

2. The name of the engineer performing the monitoring;

3. A stability analysis of the retaining wall that reports a factor of safety which shows that the wall is stable under current and expected loading conditions; and

4. If only repairs are required, with no monitoring, a statement to that effect.

(L) A comparison of currently observed conditions with conditions observed during the previous examinations, including the status of the repairs or maintenance performed with respect to the prior conditions. The following must be included and discussed:

1. Work permit numbers relating to repairs performed;

2. Job numbers, status and sign-off dates for any retaining wall related jobs, where applicable; and

3. Violation numbers of any open Environmental Control Board ("ECB") violations associated with the retaining wall and the status of the repairs of the conditions cited in the ECB violations.

(M) Recommendations for repairs or maintenance of conditions classified as unsafe, SMR or SREM, including:

1. If a retaining wall is categorized as SREM:

A. The QRWI must provide the time frame for any required repairs or maintenance to be completed (MM/DD/YYYY) to prevent the conditions from becoming unsafe and not the date on which work is planned or scheduled; and

B. Time frames of less than one (1) year, "ASAP," or "immediately," will not be accepted.

2. If a retaining wall is categorized as unsafe:

A. The QRWI must provide the time frame for repairs to be completed to bring the retaining wall to SREM, SMR, or safe status and must indicate the date by which the work will be completed (MM/DD/YYYY); and

B. Time frames of more than five (5) years will not be accepted.

(N) A list and description of the work permits required to accomplish the necessary work. If no work permits will be required, the reason must be indicated;

(O) All photographs must be dated, printed in color, clearly legible, and high resolution. Digital photos must be a minimum of 800 x 600 pixels. Photographs must be arranged into PDF no larger than 11" x 17". The following photos must be submitted:

1. Elevation photos. Color photographs of at least one view of the entire public right-of-way facing elevation for all reports, regardless of the retaining wall's filing condition;

2. Representative photos. Color photographs showing the general conditions of the retaining wall must be included with the report. Additionally, photographs of the high side of the retaining wall, including ground conditions immediately behind and in the front of the retaining wall are also required.

3. Detailed condition photos. Color photographs of specific conditions must be clearly labeled and indicate the status designation. The locations of conditions required by item H of this subparagraph (iii) must be provided.

A. All SREM, SMR, and unsafe conditions must be cataloged.

B. If retaining wall status is safe, submit a minimum of three typical conditions.

(P) The classification of the retaining wall for the current report filing cycle, as determined by the following guidelines:

1. If there are no unsafe conditions, no conditions that are SREM or SMR, then the retaining wall is classified as safe.

2. If there is at least one unsafe condition, then the retaining wall must be classified as unsafe.

3. If there is at least one condition that is SREM and there are no unsafe conditions, then the retaining wall must be classified as SREM.

4. If there is at least one condition that is SMR and there are no unsafe or SREM conditions, then the retaining wall must be classified as SMR.

5. A report may not be filed describing the same condition at the same location as SREM for two consecutive report filing cycles. The QRWI must certify that all of the conditions identified in the previous report as requiring repair have been corrected, or the retaining wall must be classified as unsafe;

(Q) The seal and signature of the QRWI who performed the critical examination, or under whose direct supervision the critical examination was performed.

(4) Report filing requirements.

(i) The requirements of this rule apply to owners of retaining walls with a height of ten feet or more and fronting a public right-of-way. The Commissioner will determine which additional retaining walls and/or parts thereof are required to file in accordance with this section.

(ii) Owners of retaining walls who are required to file a report must do so once during each five-year report filing cycle established by the Department, depending on the borough, as described in subparagraph (v) below.

(iii) An acceptable report must be filed within the applicable one-year filing window to avoid a late filing penalty.

(iv) The report must be submitted to the Department along with a filing fee as specified in the rules of the Department.

(v) Staggered inspection cycle. Beginning January 1, 2024 an acceptable report is due in accordance with the following windows:

(A) For retaining walls located within the Borough of the Bronx, an acceptable report must be filed within the one-year window starting January 1, 2024 and ending December 31, 2024, and every fifth year thereafter.

(B) For retaining walls located within the Borough of Manhattan, an acceptable report must be filed within the one-year window starting January 1, 2025 and ending December 31, 2025, and every fifth year thereafter.

(C) For retaining walls located within the Borough of Staten Island, an acceptable report must be filed within the one-year window starting January 1, 2026 and ending December 31, 2026, and every fifth year thereafter.

(D) For retaining walls located within the Borough of Queens, an acceptable report must be filed within the one-year window starting January 1, 2027 and ending December 31, 2027, and every fifth year thereafter.

(E) For retaining walls located within the Borough of Brooklyn, an acceptable report must be filed within the one-year window starting January 1, 2028 and ending December 31, 2028, and every fifth year thereafter.

Exception: Beginning on January 1, 2029, owners whose retaining walls have their most recent status as "No Report Filed" may file a report prior to the start of their designated filing window provided that all applicable civil penalties set out in subdivision (d) of this section are paid at the time of filing. No additional filing is required in the designated filing window.

(vi) Initial compliance reports for new retaining walls that are subject to this rule shall be filed as follows:

(A) The report must be filed five years from the date of first work permit issued for the construction of retaining wall, if that five-year date falls within the applicable filing window according to the location of the wall.

(B) If five years from the date of first work permit issued falls outside the applicable filing window according to the location of the wall, then the initial report must be filed within the applicable one-year filing window for the next five-year cycle.

(vii) A report must be filed within sixty (60) days of the date on which the QRWI completed the critical examination, as defined in subparagraph (ix) of paragraph (2) of subdivision (c) of this section. If such report is not filed within such sixty (60) days, a new critical examination is required.

(viii) A report may not be filed more than one (1) year after completion of the critical examination.

(ix) If the report is not acceptable and is rejected by the Department, a revised report must be filed within forty-five (45) days of the date of the Department's rejection, after which the original file date will no longer be valid. If the report is not acceptable after two (2) rejections, a new initial filing fee must be paid, as specified in the rules of the Department.

(x) Failure to submit a revised report addressing the Department's objections within one (1) year of the initial filing requires a new critical examination, including a new close-up inspection.

(xi) A subsequent report may be filed within a five-year report filing cycle to change a retaining wall's status or the completion date for repairs of SREM or unsafe conditions for that cycle.

(5) Unsafe conditions.

(i) Upon discovery of an unsafe condition, the owner of the retaining wall, his or her agent, or the person in charge of the retaining wall must immediately commence such repairs or reinforcements and any other appropriate measures, such as cordoning off areas that may be dangerous, and erecting fences, sidewalk sheds and safety netting as may be required to secure the safety of the public and to make the retaining wall's structure and appurtenances conform to the provisions of the Administrative Code.

(ii) All unsafe conditions must be corrected within 90 days from the submission of the critical examination report.

(iii) If, due to the scope of the repairs, the unsafe conditions cannot be corrected within the required 90 days, the QRWI must recommend a timeframe for repairs as noted in item (M) of subparagraph (iii) of paragraph (3) of subdivision (c). The owner of the retaining wall is responsible for ensuring that the conditions described in the compliance report as unsafe are corrected and all actions recommended by the QRWI are completed within this timeframe. The owner must notify the Department of any deviation from the timeframe to make corrections as specified in the QRWI's report. The subsequent report must include supporting documents from the QRWI justifying the request for a new time frame.

(iv) Within two weeks after repairs to correct the unsafe condition have been completed, the QRWI must inspect the premises. The QRWI must promptly file with the Department a detailed amended report stating the revised report status of the retaining wall, along with a filing fee as specified in the rules of the Department, and the owner must obtain permit sign-offs as appropriate.

(v) If the report is not acceptable and is rejected by the Department, a revised report must be filed within forty-five (45) days of the date of the Department's rejection.

(vi) If the report is not acceptable after two (2) rejections, a new amended filing fee as specified in the rules of the Department is required.

(vii) Protective measures must remain in place until an amended report is accepted; however, the QRWI may request permission for the removal of the protective measures upon submission of a signed and sealed statement certifying that an assessment was conducted, the conditions were corrected, and the protective measures are no longer required. Permission may be granted at the Commissioner's sole discretion.

(viii) The Commissioner may grant an extension of up to ninety (90) days to complete the repairs required to correct an unsafe condition upon receipt and review of an extension application submitted by the QRWI on behalf of the owner, together with:

(A) Notice that the premises have been secured for public safety by means of a fence or other appropriate measures as may be required;

(B) A copy of the contract indicating scope of work to correct unsafe conditions;

(C) The QRWI's estimate of length of time required for repairs;

(D) A statement of all applicable permit requirements;

(E) A fee as specified in the rules of the Department;

(F) An unforeseen delay or circumstance (e.g., weather, labor strike, fire) affecting the substantially completed work; and

(G) Progress photos showing current repairs.

Financial considerations will not be accepted as a reason for granting an extension.

(6) Conditions classified as SREM.

(i) The owner of the retaining wall is responsible for ensuring that the conditions described in the report of critical examination as safe with repair and/or engineering monitoring are corrected and all actions recommended by the QRWI are completed within the time frame recommended by the QRWI and are not left to deteriorate into unsafe conditions. It is the owner's responsibility to notify the Department of any deviation from the timeframe to make corrections as specified in the QRWI's report. The subsequent report must include supporting documents from the QRWI justifying the request for a new time frame.

(ii) A report may not be filed describing the same condition and pertaining to the same location on the retaining wall as SREM for two consecutive report filing cycles.

(iii) The QRWI must certify the correction of each condition reported as requiring repair in the previous report filing cycle, report conditions that were reported as SREM in the previous report filing cycle as unsafe if not corrected at the time of the current critical examination, or report corrections that were made in the previous cycle as unsafe if they need further or repeated repair at the time of the current cycle.

(d) Civil penalties.

(1) Failure to file. An owner who fails to file the required acceptable initial compliance report will be liable for a civil penalty of five thousand dollars ($5,000) per year immediately after the end of the applicable filing window.

(2) Late filing. In addition to the penalty for failure to file, an owner who submits a late filing will be liable for a civil penalty of one thousand dollars ($1,000) per month, commencing on the day following the filing deadline of the assigned filing window period and ending on the filing date of an acceptable initial report.

(3) Failure to correct unsafe conditions. An owner who fails to correct an unsafe condition will be liable for a civil penalty of one thousand dollars ($1,000) per month, pro-rated daily, until the unsafe condition is corrected, unless the commissioner grants an extension of time to complete repairs pursuant to this section. This penalty will be imposed until the Department receives an acceptable amended report indicating the unsafe conditions were corrected or an extension of time is granted.

(4) Failure to correct SREM conditions. An owner who fails to correct a SREM condition reported as requiring repair in the previous report filing cycle and subsequently files the condition as unsafe shall be liable for a one-time civil penalty of two thousand dollars ($2,000).

(5) Challenge of civil penalty.

(i) An owner may challenge the imposition of any civil penalty authorized to be imposed pursuant to this subdivision by providing proof of compliance. Examples of such proof must include, but are not limited to, a copy of an acceptable initial report, a copy of the acceptable amended report, copies of approved extension of time requests while work was/is in progress, or written proof from a QRWI that the unsafe conditions observed at the retaining wall were corrected and the violation was dismissed.

(ii) Challenges must be made in writing within thirty (30) days from the date of service of the violation by the Department and must be sent to the office/unit of the Department that issued the violation. The decision to dismiss or uphold the penalty is at the sole discretion of the Department.

(e) Full or partial penalty waivers; eligibility and evidentiary requirements. Owners may request a waiver of penalties assessed for violation of Article 305 of Title 28 of the Administrative Code, or rules enforced by the Department. Requests must be made in writing and must meet eligibility and evidentiary requirements as follows:

(1) Owner status.

(i) A new owner requesting a waiver due to change in ownership who receives a notice of violation that was issued to the property after the transfer of ownership must submit proof of a recorded deed showing evidence of transfer of ownership to the current owner after penalties were incurred, as well as any other documentation requested by the Department. The waiver period shall be from the date of the deed to the date of the violation issuance.

(ii) A new owner of a government-owned property requesting a waiver due to change in ownership must submit official documentation from the government entity affirming that the premises was entirely owned by the government entity during the period for which a waiver is requested.

(iii) An owner may be granted a waiver of penalties upon submission of a copy of an order signed by a bankruptcy judge.

(iv) An owner may be granted a waiver of penalties if a state of emergency is declared that prevents an owner from conducting an inspection, filing a report, or correcting unsafe conditions.

(2) Retaining wall status. An owner requesting a waiver because the wall was removed must submit city or Departmental records showing evidence of the removal of the retaining wall prior to the filing deadline.

(Amended City Record 4/23/2021, eff. 5/23/2021; amended City Record 2/21/2025, eff. 3/23/2025)

§ 103-10. Periodic Inspection of Gas Piping Systems

Open this section

(a) Inspection requirements.

(1) In accordance with Article 318 of Title 28 of the Administrative Code, building gas piping systems, except for gas piping systems in buildings classified in occupancy group R-3 in Section 310.1.3 of the Building Code, must be periodically inspected as set forth in this section.

(2) This requirement for periodic inspections does not apply to buildings that contain no gas piping system, provided that the owner of such a building submits to the Department, in a form and manner determined by the commissioner, along with a filing fee as specified in the rules of the Department, a certification from a utility company, a registered design professional, or a licensed master plumber or an individual under the direct and continuing supervision of a licensed master plumber, stating that the building contains no gas piping system. Such statements need only be submitted once. The due date for submitting such a certification pursuant to this paragraph shall be as follows:

(i) June 30, 2021, as extended by local law 12 for the year 2021, no later than December 31 in calendar year 2024, and every fourth calendar year thereafter, for buildings in community districts 1, 3, and 10 in all boroughs.

(ii) June 30, 2022 as extended by local law 137 for the year 2021, and no later than December 31 in calendar year 2025, and every fourth calendar year thereafter, for buildings in community districts 2, 5, 7, 13, and 18 in all boroughs.

(iii) December 31, 2022, and no later than December 31 within every fourth calendar year thereafter, for buildings in community districts 4, 6, 8, 9, and 16 in all boroughs.

(iv) December 31, 2023, and no later than December 31 within every fourth calendar year thereafter, for buildings in community districts 11, 12, 14, 15, and 17 in all boroughs.

(3) A building that contains gas piping but is not currently supplied with gas, that does not contain any appliance connected to any gas piping, and that complies with § 28-318.3.5 of the Administrative Code is not required to undergo a gas piping inspection otherwise required under this section. The due date for submitting the statements required by § 28-318.3.5, along with a filing fee as specified in 1 RCNY § 101-03, is the same as the due dates set forth in paragraph (2) of this subdivision. Where the owner seeks to resume gas service, the owner must comply with the provisions of § 28-318.3.6.

(4) Inspections of building gas piping systems required under this section must be conducted at least once every four (4) years and in accordance with the following periodic inspection schedule:

(i) Between January 1, 2020 and June 30, 2021 (inclusive), as extended by local law 12 for the year 2021, no later than December 31 in calendar year 2024, and every fourth calendar year thereafter, building gas piping systems shall be inspected in community districts 1, 3, and 10 in all boroughs.

(ii) Between January 1, 2021 and June 30, 2022, and in calendar year 2025, and every fourth calendar year thereafter, building gas piping systems shall be inspected in community districts 2, 5, 7, 13, and 18 in all boroughs.

(iii) In calendar year 2022, and within every fourth calendar year thereafter, building gas piping systems shall be inspected in community districts 4, 6, 8, 9, and 16 in all boroughs.

(iv) In calendar year 2023, and within every fourth calendar year thereafter, building gas piping systems shall be inspected in community districts 11, 12, 14, 15, and 17 and in any community district not specified in this paragraph in all boroughs.

(5) The initial inspection for a new building with a gas piping system must be performed during the tenth year after the Department has issued a certificate of occupancy for such building. Following such initial inspection, a new building's subsequent periodic inspection must be conducted in accordance with the periodic inspection schedule set forth in paragraph (4) of this subdivision.

(6) An inspection entity qualified to conduct inspections of gas piping systems pursuant to subdivision (b) of this section must notify the Department of the performance of a gas piping system inspection. Such notice must be submitted to the Department in a form and manner as determined by the Department at least two (2) days prior to the performance of such gas piping system inspection.

For the purposes of this section, the term "new building" means a building, or any portion thereof, for which the Department has issued a temporary, interim or final certificate of occupancy on or after December 6, 2016.

(b) Inspection Entity Qualifications.

(1) Inspections of gas piping systems required pursuant to Article 318 of Title 28 of the Administrative Code and this section must be conducted by a qualified gas piping system inspector on behalf of the building owner.

(2) Persons qualified to perform such gas piping system inspections shall be either:

(i) Licensed master plumbers; or

(ii) Individuals, working under the direct and continuing supervision of a licensed master plumber, holding a journeyman plumber registration issued in accordance with article 409 of chapter 4 of title 28 of the Administrative Code and who have successfully completed a training program acceptable to the Department. Proof of such qualifications must be demonstrated in a form and manner acceptable to the Department. Such training program must be no less than seven (7) classroom hours and must include the following course content:

(A) Regulations on piping safety;

(B) Properties of natural gas;

(C) Combustible gas indicators and leak detection;

(D) Atmospheric corrosion inspection;

(E) Interior piping leak survey;

(F) Hands-on gas indicator instruction;

(G) Jurisdictional / non-jurisdictional piping connections;

(H) Purging gas piping into/out of service;

(I) Recognizing illegal connections and substandard conditions;

(J) Reporting and documenting inspections; and

(K) Atmospheric corrosion and leak survey inspection procedure.

(c) Inspection scope. Inspections of a building's gas piping system pursuant to this section must be completed in accordance with requirements in § 28-318.3.2 of the Administrative Code and any other requirements prescribed by the Department.

(d) Report and certification requirements.

(1) The inspection entity that performs an inspection of a building's gas piping system pursuant to this section must submit, in a form and manner determined by the commissioner, an inspection report and a certification of inspection to the building owner no later than thirty (30) days following the date of such inspection.

(i) The certification of inspection must be completed by the licensed master plumber who performed or exercised direct and continuing supervision over such inspection, must state that an inspection pursuant to Article 318 of Title 28 of the Administrative Code has been completed for the building, must indicate the date such inspection was performed, and must indicate whether any conditions requiring correction were identified in the inspection report.

(ii) The inspection report must be certified by the licensed master plumber who performed or exercised direct and continuing supervision over the inspection and, if applicable, by any individual who performed the inspection under such supervision. Such inspection report shall include, for each gas piping system inspected, the following information:

(A) A list of conditions requiring correction, including instances where one or more parts of such system is worn to an extent that the safe and reliable operation of the system may be affected;

(B) Gas leaks;

(C) Observed non-code compliant installations or illegal connections;

(D) Observed conditions described in § 28-318.3.4 of the Administrative Code; and,

(E) Any additional information required by the Department.

(iii) The Department will not consider for review an inspection report or a certification of inspection if such report or certification is in a pre-filing or Quality Assurance failed status.

(2) No later than sixty (60) days following a building's inspection date, the building owner must submit to the Department, in a form and manner determined by the commissioner, a certification of inspection as described in paragraph (1) of this subdivision, along with a filing fee as specified in the rules of the Department. Such certification must indicate the date the inspection was performed and whether there are conditions requiring correction. Certifications of inspections submitted more than sixty (60) days after a building's inspection date will not satisfy the requirement of this paragraph. Failure to file a certification of inspection within sixty (60) days of the building's inspection date will require a new inspection.

(3) No later than one hundred twenty (120) days following the building's inspection date, the building owner must submit to the Department, in a form and manner determined by the commissioner, along with a filing fee as specified in the rules of the Department, a certification from a licensed master plumber stating that all conditions identified in the inspection report described in paragraph (1) of this subdivision have been corrected. Such certification may indicate that correction of one (1) or more conditions will take additional time. If such certification of inspection pursuant to paragraph (2) of this subdivision indicates that no conditions requiring correction were identified in the inspection report, then no certification pursuant to this paragraph shall be required. Notwithstanding the foregoing provisions of this paragraph, for building gas piping systems in community districts 1, 3 and 10 in each borough that are inspected between September 1, 2020 and December 31, 2020 (inclusive), such building owners may submit such certification and fee to the department on or before June 30, 2021. Notwithstanding the foregoing provisions of this paragraph, for building gas piping systems in community districts 2, 5, 7,13, and 18 in each borough that are inspected between January 1, 2021 and December 31, 2021 (inclusive), and that contain one or more conditions requiring correction, such building owners may submit such certification and fee to the Department on or before June 30, 2022.

(4) If additional time to correct the condition(s) was indicated in the certification submitted pursuant to paragraph (3) of this subdivision, the building owner must submit to the Department, no later than one hundred eighty (180) days following the building's inspection date, in a form and manner determined by the commissioner, a certification from a licensed master plumber that all conditions identified in the building's inspection report have been corrected, along with a filing fee as specified in the rules of the Department. Notwithstanding the foregoing provisions of this paragraph, for building gas piping systems in community districts 1, 3 and 10 in each borough that are inspected between September 1, 2020 and December 31, 2020 (inclusive), such building owners may submit such certification and fee to the Department on or before June 30, 2021. Notwithstanding the foregoing provisions of this paragraph, for building gas piping systems in community districts 2, 5, 7, 13, and 18 in each borough that are inspected between January 1, 2021 and December 31, 2021 (inclusive), and that contain one or more conditions requiring correction, such building owners may submit such certification and fee to the Department on or before June 30, 2022.

(5) The building owner and inspection entity must keep on file, for ten (10) years following the date of inspection, all reports and certifications required by § 28-318.3.3 of the Administrative Code and make them available to the Department upon request.

(6) Owners who are unable to obtain an inspection of a building's gas piping systems pursuant to this section by the date set forth in paragraph (4) of subdivision (a) of this section may receive a 180-day extension of the due date for such inspection and the filing of any certification required to be filed after such inspection, upon notification to the Department in a form and manner determined by the commissioner and submission of a filing fee as specified in 1 RCNY § 101-03.

(e) Unsafe or hazardous conditions. If an inspection reveals any conditions set forth in § 28-318.3.4 of the Administrative Code, the inspection entity performing such inspection must immediately notify the building owner, the utility providing gas service to such building, and the Department. The building owner must take immediate action to correct such conditions in compliance with the New York City Construction Codes.

(f) Civil penalties for failure to file certification. A building owner who fails to submit a certification required to be submitted pursuant to this section on or before the filing due date specified in paragraph (4) of subdivision (a) of this section will be liable for a civil penalty of:

(1) One thousand five hundred dollars ($1,500.00) for a 3-family building; or

(2) five thousand dollars ($5,000.00) for all other buildings.

To resolve a violation for failure to file certification of a gas piping system periodic inspection, an owner must submit payment of the civil penalty and file a certification of the gas piping system periodic inspection, certification of no gas piping system in the building, or documentation regarding no gas service in the building. Payment of the civil penalty and certification of the gas piping system periodic inspection, certification of no gas piping system in the building, or documentation regarding no gas service in the building may be submitted separately.

A certification is not considered filed if it is in pre-filing or Quality Assurance failed status.

(g) Challenge of a civil penalty. A building owner may challenge the imposition of any civil penalty authorized to be imposed pursuant to this section by submitting satisfactory proof of a timely and acceptable filing to the Department. Challenges must be made in writing, in a form and manner determined by the Department, within thirty (30) days from the date of violation.

(h) Penalty waivers; eligibility and evidentiary requirements. An owner may request a waiver of penalties assessed for violation of Article 318 of Title 28 of the Administrative Code, the New York City Building Code and/or related rules enforced by the Department. Requests must be made through the Department’s website and must meet eligibility and evidentiary requirements as follows:

(1) Owner status.

(i) New owner. A new owner may be granted a waiver of penalties contingent upon the Department’s acceptance of the owner’s proof that transfer of ownership to the new owner occurred after penalties were incurred. Proof includes a recorded deed evidencing a bona fide transfer of ownership to the current owner after penalties were incurred, as well as any other documentation requested by the Department.

(ii) Government ownership. A new owner of a property previously owned by a government entity requesting a waiver due to change in ownership must submit official documentation from the government entity affirming that the premises was entirely owned by the government entity during the period for which a waiver is requested.

(iii) Bankruptcy. An owner may be granted a waiver of penalties upon submission of a copy of an order signed by a bankruptcy court judge reflecting the owner’s bankruptcy.

(iv) State of emergency. If a state of emergency is declared that prevents an owner from conducting an inspection or filing a certification, an owner may be granted a waiver of penalties.

(2) Building status.

(i) Building conversion or misclassification. An owner requesting a waiver because the building was converted to an R3 occupancy, or misclassified as other than an R3 occupancy when it is an R3 occupancy, must submit city or departmental records evidencing the R3 occupancy of the building prior to the filing deadline.

(ii) Demolished building. An owner may be granted a waiver if the full demolition of the building occurred prior to the inspection cycle for which the report was due, and such demolition was signed off by the Department, or a new building permit has been issued for the property.

(iii) Sealed or vacated building. An owner requesting a waiver because the entire building was ordered to be sealed or vacated by a government agency, including but not limited to the Department, the Department of Housing Preservation and Development, the Fire Department or the Office of Emergency Management, or by court order prior to the expiration of the inspection cycle for which the report was due, must provide city, court, or departmental records evidencing the order to seal or vacate the entire building.

(3) Building has no gas piping system. An owner may be granted a waiver of penalties contingent upon the Department’s acceptance of proof that there was work in progress for the removal of the gas piping which had a projected date of completion prior to the deadline in paragraph (2) of subdivision (a) of this rule, but was unable to be completed in time to file the certification by the due date because of some unforeseen circumstance, which must be explained in the request. An owner must also submit the certification of no gas piping system that resulted from such work.

(4) Building has no active gas service. An owner requesting a waiver because the building has no active gas service must file the required documentation showing that the building was not supplied with gas and no appliance was connected to any gas piping on the day of the deadline set out in paragraph (3) of subdivision (a) of this rule.

(5) Gas work in progress. An owner may be granted a waiver of the civil penalty imposed for failing to file a certification of correction because there is permitted gas work in progress for the replacement or installation of a gas piping system or a major renovation to correct a defect. An owner must provide the job number for such gas work, proof of compliance with paragraphs (2) and (3) of subdivision (d), and any other documentation requested by the Department.

(Added City Record 9/23/2019, eff. 10/23/2019; amended City Record 7/12/2021, eff. 8/11/2021; amended City Record 9/22/2022, eff. 10/22/2022; amended City Record 11/18/2024, eff. 12/18/2024; amended City Record 12/4/2025, eff. 1/3/2026; amended City Record 5/11/2026, eff. 6/10/2026)

§ 103-11. Sprinkler Reports

Open this section

(a) Sprinkler report required. Owners of buildings required to comply with the provisions of § 27-929.1 of the Administrative Code must file with the department a report prepared by an architect or an engineer, certifying the installation of the required sprinklers as required by subdivision (b) of section 27-228.5.

(b) Civil Penalties.

(1) Failure to file. An owner who fails to file an acceptable sprinkler report, indicating that sprinklers were installed as required by subdivision (b) of § 27-228.5 and § 27-929.1 of the Administrative Code, shall be liable for a civil penalty of five thousand dollars ($5,000) per year beginning January 1, 2022 and ending on the filing date of an acceptable report.

(2) Late filing. In addition to the penalty for failure to file, an owner who submits a late filing shall be liable for a civil penalty of one thousand dollars ($1,000.00) per month, beginning February 1, 2022 and ending on the filing date of an acceptable report.

(3) Challenge of civil penalty.

(i) An owner may challenge the imposition of any civil penalty authorized to be imposed pursuant to this subdivision by providing proof of compliance. Examples of such proof include, but are not limited to, a copy of an acceptable report, or a certificate of occupancy indicating the building does not need to comply with the requirement to install sprinklers in accordance with section 27-929.1.

(ii) Challenges must be submitted in writing to the office/unit of the Department that issued the violation within thirty (30) days from the date of service of the violation. The decision to dismiss or uphold the penalty shall be at the sole discretion of the Department.

(c) Full or partial penalty waivers; eligibility and evidentiary requirements. Owners may request a full or partial waiver of penalties assessed for violation of subdivision (b) of § 27-228.5 and § 27-929.1 of the Administrative Code. Requests must be made in writing and must meet eligibility and evidentiary requirements as follows:

(1) Owner status.

(i) A new owner requesting a waiver due to change in ownership must submit proof of a recorded deed evidencing transfer of ownership to the current owner after penalties were incurred, as well as any other documentation requested by the Department, and only in one of the following circumstances:

(A) A new owner of a property previously owned by a government entity requesting a waiver due to change in ownership must submit official documentation from the government entity affirming that the premises was entirely owned by the government entity during the period for which a waiver is requested.

(B) A new owner who receives a notice of violation for failure to comply with the requirements of subdivision (b) of § 27-228.5 and § 27-929.1 of the Administrative Code that was issued to the property after the transfer of ownership for a violation that occurred before the transfer must submit a recorded deed showing the date that the property was acquired or transferred. The waiver period shall extend from the date of the deed transfer to the date of the violation issuance.

(ii) An owner may be granted a waiver of penalties upon submission of a copy of an order signed by a bankruptcy court judge.

(iii) If a state of emergency is declared that prevents an owner from conducting an inspection, filing a report or correcting unsafe conditions, an owner may be granted a waiver of penalties.

(2) Building status. An owner requesting a waiver because the building was demolished must submit city or departmental records evidencing the demolition of the building prior to the filing deadline.

(Added City Record 10/15/2021, eff. 11/14/2021)

§ 103-12. Requirements for Filing Applications for an Adjustment of Annual Greenhouse Gas Emission Limits

Open this section

(a) Procedures for filing an application for an adjustment of the Greenhouse Gas (GHG) Emission limits pursuant to § 28-320.9 for buildings owned by or leased to not-for-profit hospitals and healthcare facilities. Applications for an adjustment must be filed by a registered design professional. Applications must include the following:

(1) 2018 benchmarking data submitted in accordance with Article 309 of Title 28 of the Administrative Code. Applicants must demonstrate:

(i) the actual building emissions for calendar year 2018,

(ii) the gross floor area, where the whole building is occupied by a not-for-profit healthcare organization, or the total area occupied exclusively by a not-for-profit healthcare organization, and

(iii) the occupancies in the building.

The documentation should confirm the building emissions intensity based on actual emissions for 2018 for the purpose of establishing a new limit if an adjustment is approved. Energy benchmarking data from 2018 may be modified if an applicant can justify the reason for a correction to the energy consumption data, gross floor area, and/or occupancies recorded for the covered building.

(2) Documentation of not-for-profit status. Applicants must submit a copy of the New York City Department of Finance Notice of Property Value as documentation of the owner's designation as a not-for-profit organization. For buildings with a not-for-profit healthcare organization as a tenant, partial adjustments may be granted for area occupied exclusively by a not-for-profit healthcare organization for the purposes of healthcare services. An owner must submit a copy of the tenant's 501(c)(3) determination letter from the Internal Revenue Service.

(3) Documentation of separate metering for electricity. Owners may seek an adjustment for space leased to a not-for-profit healthcare tenant only if the space leased to the tenant is separately metered or sub-metered for electricity.

(4) Documentation of the lessor/lessee agreement. Applicants with a tenant that is a not-for-profit healthcare organization whose space is separately metered or sub-metered must submit documentation of the terms of the lessor/lessee agreement, including the term of the lease and the total area of space leased to the tenant for their exclusive use, in the form of an affidavit, signed by the owner. The current lease or a prior lease for the same space must have been effective for the entirety of calendar year 2018. If the lease is terminated and not renewed at any time between 2024 and 2034, the adjustment will be terminated for that space. The Department may request additional documentation as needed to support the adjustment.

(5) Effective period. An adjustment granted pursuant to § 28-320.9 may be effective for the reporting years 2025 through 2034, provided that, when granted to an owner for a not-for-profit tenant, the tenant remains in the building. Owners may be required to provide additional documentation, as requested by the Department, to support the application for an adjustment.

(b) Procedures for filing an application for an adjustment of the GHG Emission limits pursuant to § 28-320.7(1) for buildings subject to a provision of law or affected by a physical condition. Applications for an adjustment must be filed with the annual building emissions report by a registered design professional. Applications must include the materials listed in paragraphs (1) through (6) below. Owners may be required to provide additional documentation, as requested by the Department.

(1) Confirmation that the building was in existence, or that a permit for construction of such building was issued, prior to November 15, 2019; and

(2) The annual building emissions report for the calendar year prior to the submission of the application for an adjustment, submitted in accordance with Article 320 of Title 28 of the Administrative Code and 1 RCNY § 103-14; and

(3) A detailed description of the provision of law or physical condition of the building or building site preventing compliance with the annual building emissions limit and a technical explanation of how such provision or condition makes it not reasonably possible for the building to achieve strict compliance with the annual building emissions limit; and

(4) A technical explanation of the building’s efforts to achieve compliance with the annual building emissions limit to the maximum extent possible, including:

(i) all carbon reduction alterations and energy efficiency measures implemented since 2019, including actual emissions reductions and efficiency increases achieved,

(ii) a plan for decarbonizing such building to the maximum extent possible, and

(iii) all alternative methods to achieve compliance considered and why such methods were not deemed reasonably possible; and

(5) An affidavit from an entity funded by the city to provide compliance resources, pursuant to guidance issued by the Department, stating the owner availed itself of all city, state, federal, private, and utility incentive programs related to energy reduction or renewable energy, for which they could reasonably apply; and

(6) Evidence that the owner has purchased the maximum amount of greenhouse gas offsets authorized under 1 RCNY § 103-14 and pursuant to guidance issued by the Department.

(7) Effective period. An adjustment granted pursuant to this subdivision may be effective for a maximum of three calendar years.

(c) Procedures for filing an application for an adjustment of the GHG Emission limits pursuant to § 28-320.7(2) for buildings constrained by finances. Applications for an adjustment must be filed with the annual building emissions report by a registered design professional. Applications must include the materials listed in paragraphs (1) through (4) below. Owners may be required to provide additional documentation, as requested by the Department.

(1) Confirmation that the building was in existence, or that a permit for construction of such building was issued, prior to November 15, 2019; and

(2) The annual building emissions report for the calendar year prior to the submission of an application for an adjustment, submitted in accordance with Article 320 of Title 28 of the Administrative Code and 1 RCNY § 103-14; and either paragraph 3 or 4 below:

(3) For the most recent calendar year(s) prior to the application for an adjustment:

(i) An affidavit from an entity funded by the city to provide compliance resources, pursuant to guidance issued by the Department, stating that:

(a) the owner has been working with such entity in an effort to comply with the applicable building emissions limit prior to the application; and

(b) the owner availed itself of all city, state, federal, private, and utility incentive programs related to energy reduction or renewable energy, for which they could reasonably apply; and

(c) the owner availed itself of all programs funded by the city or enabled by local law that provide financing for the purpose of energy reduction or sustainability measures, in which they could reasonably participate; and

(ii) Evidence that the owner has purchased the maximum amount of greenhouse gas offsets or renewable energy credits authorized under 1 RCNY § 103-14 and pursuant to guidance issued by the Department; and

(iii) Documentation prepared by a certified public accountant demonstrating one of the following:

(a) For buildings held in a condominium or cooperative form of ownership: a 3-year average increase in annual carrying charges per unit of 5% above the average rate of inflation for the same 3-year period; or

(b) For buildings exempt from real property taxes pursuant to sections 420-a, 420-b, 446, or 462 of the real property tax law and applicable local law: the building owner had negative revenue after subtraction of expenses for the combined 2 years prior to the application; or

(c) For buildings that are party to an affordable housing regulatory agreement and buildings with no debt: the building’s income-expense ratio, as calculated pursuant to guidance issued by the department, is less than 1.05; or

(d) For all other building types: the building’s debt service coverage ratio, as calculated pursuant to guidance issued by the department, is less than 1.15; or

(4) For the combined 2 calendar years prior to the application for an adjustment:

(i) Attestation that the building had arrears of property taxes or water or wastewater charges that resulted in the property’s inclusion on the Department of Finance’s annual New York City tax lien sale list; or

(ii) Attestation that the building had outstanding balances under the Department of Housing Preservation and Development’s emergency repair program that resulted in the property’s inclusion on the Department of Finance’s annual New York City tax lien sale list.

(5) Effective period. An adjustment granted pursuant to § 28-320.7(2) may be effective for a maximum of 1 calendar year.

(d) Fees. Owners seeking an adjustment pursuant to this section must pay a filing fee as provided in 1 RCNY § 101-03.

(Added City Record 3/10/2021, eff. 4/9/2021; amended City Record 12/20/2024, eff. 1/19/2025)

§ 103-13. Periodic Inspection of Parking Structures

Open this section

(a) Definitions. For the purposes of this section, the following terms have the following meanings.

Acceptable report. A compliance report filed by a qualified parking structure inspector, as defined in section 101-07 of the rules of the Department, that meets the requirements of Article 323 of Title 28 of the Administrative Code and this rule as determined by the Department.

Amended report. A compliance report filed by a qualified parking structure inspector (1) certifying that the unsafe conditions identified in the most recent report have been repaired and that no unsafe conditions exist at the parking structure or (2) certifying, within two years of the most recent safe with repair and/or engineering monitoring (SREM) filing, to the current status of the building based on a condition assessment.

Appurtenance. An element including, but not limited to, rolldown gates, attendant booths, lighting fixtures, gates, staircases, fire protection, column protection, signs, parapets, railings, guard rails, enclosures, antennae, bollards, vehicle barriers, vehicle impact protection, electric vehicle charging stations, and any other equipment attached to the parking structure. Appurtenance does not include mechanical devices for vehicles moving from and to street levels or within the structure such as parking machines, lifts, mechanical stackers, automated parking systems, and elevators in which public occupancy is prohibited.

Compliance Report. A report prepared by a qualified parking structure inspector summarizing the condition assessment of the subject parking structure and attesting to its accompanying classification.

Condition assessment. An examination conducted to review a parking structure and all parts thereof, as defined in Article 323 of Title 28 of the Administrative Code, to determine whether the parking structure and all parts thereof are either safe, unsafe, or safe with repairs and/or engineering monitoring and whether, in the judgment of a qualified parking structure inspector, remedial work is required.

Engineer. An engineer as defined in § 28-101.5 of the Administrative Code. The engineer must be in good standing with the New York State Education Department and New York City Department of Buildings.

Filed report. A compliance report shall be deemed filed with the Department when it has been received by the Department. The filed report must be completed in accordance with the provisions of paragraph (3) of subdivision (c) of this section.

Filing window. The two-year period during which a compliance report for a particular parking structure may be filed without penalty.

Parking structure. A building or portion of a building used for the parking or storage of motor vehicles and an open or enclosed parking garage as defined in the New York City Building Code. A parking structure does not include an autobody repair shop, an automotive showroom, a garage with occupancy of fewer than three cars, unenclosed and unattached lots, an automotive service station, an automotive repair shop, or a private garage as such term is defined in the Building Code.

Partial Protection Removal Request. A request submitted by the QPSI to remove public protection from only a section of a building that is classified as “unsafe” and has a large footprint, when work to correct the unsafe conditions on that section is complete.

Physical Examination. Hands-on engineering inspection of parking structure systems and elements applying various methods of examination other than visual, including, but not limited to, sounding, probing or testing.

Qualified Parking Structure Inspector (hereinafter "QPSI"). A qualified parking structure inspector as defined in section 101-07 of the rules of the Department.

Report filing cycle. The six-year time interval established by the Commissioner for the filing of each successive compliance report for every parking structure subject to the requirements of Article 323 of Title 28 of the Administrative Code.

Safe condition. A condition of a parking structure, any appurtenances thereto or any part thereof not requiring repair or maintenance to sustain the structural integrity of the parking structure and that is to remain safe during the next six years.

Safe with repairs and/or engineering monitoring (hereinafter "SREM"). A condition of a parking structure, any appurtenances thereto or any part thereof that is safe at the time of inspection but requires repairs or maintenance during the next one to six years in order to prevent its deterioration into an unsafe condition during that six-year period.

Staggered filing cycle. The separate time intervals for filing compliance reports as determined by borough beginning January 1, 2022 and continuing thereafter for each subsequent report filing cycle.

Subsequent report. A compliance report that is filed by a QPSI after an acceptable report in order to change the status of the parking structure for that report filing cycle to reflect changed conditions or the recommended time frame for repairs of SREM or unsafe conditions.

Unsafe condition. A condition of a parking structure, any appurtenances thereto, or any part thereof that is hazardous to persons or property and requires repair within one year of completion of condition assessments. In addition, any condition that was reported as SREM in a previous compliance report and that is not corrected at the time of the current inspection must be reported as an unsafe condition.

Verification Request. A request submitted by the QPSI or building owner in order to verify that a parking structure is subject to periodic inspection under this rule.

(b) Responsibilities of qualified parking structure inspectors.

(1) A QPSI must conduct condition assessments and file compliance reports in accordance with this section and Article 323 of Title 28 of the Administrative Code.

(2) A QPSI must maintain records of inspections and tests for at least six years and must make such records available to the Department upon request.

(3) A QPSI must maintain insurance coverage as set forth in paragraph (7) of subdivision (b) of 1 RCNY § 101-07. Copies of such insurance policies must be made available to the Department upon request.

(c) Condition Assessments.

(1) Periodic inspection requirements. In order to maintain a parking structure and its appurtenances in a safe condition, and in accordance with Article 323 of Title 28 of the Administrative Code, a condition assessment of all components of a parking structure must be conducted at periodic intervals specified herein. In order to verify if a parking structure is subject to periodic inspection under this rule, a QPSI or an owner can submit a Verification Request, along with a filing fee as specified in 1 RCNY § 101-03.

Exceptions: The facade of the structure does not need to be included in the parking structure compliance report if:

1. the building is subject to the Facade Inspection Safety Program (FISP); or

2. the parking structure occupies less than 50% of the total square footage of the building.

(2) Inspection procedures.

(i) Before any parking structure is inspected, the QPSI retained by or on behalf of the owner of the building in which the parking structure is located must carefully review the most recent compliance report and any available previous reports, all annual observation checklists, as defined in § 28-323.2 of the Administrative Code, for the prior cycle, any available structural design or repair drawings, violations, and FISP reports where applicable.

(ii) A condition assessment of a parking structure and appurtenances thereof pursuant to § 28-323.3 of the Administrative Code must be performed by or under the direct supervision of a QPSI retained by the owner of the building in which the parking structure is located or his or her representative.

(iii) The QPSI must design a condition assessment program for the specific structure to be inspected, which must include, but not be limited to, inspection methods to be employed in the assessment. The program must be based on the considerations of the type of construction of the parking structure, age of the material components, the parking structure's specific exposure to environmental conditions and the presence of specific details and appurtenances. Consideration must be given to the structure's history of maintenance and repairs. Professional Engineers, individuals with a bachelor's degree in engineering and three years of relevant experience, or individuals with five years of relevant building experience, working under the QPSI's direct supervision, may be delegated to perform selected inspection tasks other than the final inspection.

(iv) The methods used to evaluate the parking structure in question must permit a complete physical examination of the structure, including, but not limited to, sounding, load tests, optical survey, non-invasive scanning, and cores. The QPSI must identify the most deleterious locations and perform physical examinations at those locations. Physical examinations as described in this rule must be performed on a minimum of 10% of each structural element including, but not limited to, beams, columns, and slabs.

(v) The known history of the parking structure, the nature of the materials used, and the conditions observed will dictate the extent of the condition assessment. The QPSI must apply a professional standard of care to assess the structure's condition and the individual building systems that comprise the structure including, but not limited to, the building's structural components, waterproofing systems, fire proofing and fire stopping systems, and wearing surfaces. When the QPSI finds any deficiencies, he/she must ascertain the cause of these and any other possible building defects detected. The QPSI must order any special or additional inspections, probes, and/or tests, including sounding procedures, that may be required to support the condition assessment and to determine the causes of any defects.

(vi) The QPSI must develop a unique annual observation checklist, as defined in § 28-323.2 of the Administrative Code, during each condition assessment.

(vii) Photographs must be taken, sketches made and/or any other methods of documentation utilized to properly document the location of all conditions observed during the course of the condition assessment, that are either unsafe or SREM.

(viii) Upon discovery of any unsafe condition, the QPSI must immediately notify the Department and the owner of the building in which the parking structure is located. The QPSI must identify the location of any unsafe condition, advise the owner on the appropriate protective measures to be taken, and include the recommended type and location of public protection in the notification to the Department.

(ix) Completion of a condition assessment means that the QPSI has conducted a final inspection to determine that the parking structure conditions as described in the compliance report are consistent with the actual conditions. Such final inspection must, at a minimum, include an actual visual assessment and a complete walkthrough of each level dedicated to parking with inspectorial equipment. A drive-by inspection is not acceptable.

(3) Report requirements.

(i) The QPSI must file with the Department a written compliance report describing the result of the condition assessment, clearly documenting all conditions noted during the inspection, including the physical examination, and stating that the inspection was performed and completed in accordance with Article 323 of Title 28 of the Administrative Code and this rule. The QPSI must also submit a copy of the report to the owner of the building in which the parking structure is located.

(ii) Technical information in the report must adhere to and follow the sequence and the labeling of the report requirements as listed in subparagraph (iii) of this paragraph and must be provided on such forms and in such format as the Department requires. Additional information may be provided. If a requirement is not applicable, this must be indicated on the report.

(iii) The report must include an executive overview that consists of a summary of findings and recommendations, a concise statement of the scope of the inspection and findings, the conclusions and recommendations and a determination as to whether the parking structure is categorized as "safe," "SREM," or "unsafe." The report must also include, but not be limited to:

(A) The address, any a.k.a. addresses, Block and Lot number, the Building Identification Number ("BIN"), the landmark status of the building in which the parking structure is located, and the location from the nearest cross street;

(B) The name, mailing address and telephone number of the owner of the building in which the parking structure is located, or, if the owner is not an individual, the name, mailing address, telephone number, position/title of a principal of the owner;

(C) A description of the building, including the total number of stories, the number of stories and/or locations occupied by the parking structure, plan dimensions, Certificate of Occupancy number if available, usage, and age and type of construction, specifying all materials present in the parking structure;

(D) A description of the all components of the parking structure's gravity and lateral load carrying systems specific to the area being used as a parking structure or the entirety of the building if its sole use is as a parking structure. Where applicable, areas to be included are:

1. Ramps and other spaces used to access parking areas;

2. In the case of a parking structure located at a floor or floors above floors of other occupancies, the slab and columns immediately below the lowest level of the parking structure;

3. In the case of a parking structure located at a floor or floors below floors of other occupancies, the slab and beams/joists forming the ceiling of the topmost level of the parking structure;

4. Any area outside of that described in 1, 2 and 3 that may exhibit deterioration extending from or caused by the structure comprising the parking area.

(E) A detailed description of any distress, settlements, repairs, or revisions to the structure since the previous compliance report, including, but not limited to, deteriorated framing members, deteriorated joint material, displacement, cracking, spalling of parking structure components, or other defects or changes;

(F) A detailed description of the procedures used in making the condition assessment;

(G) The following information:

1. The extent and location of all physical examinations performed;

2. The names, addresses, telephone numbers, and license or registration numbers for contractors and consultants involved in the condition assessment;

3. A location diagram of a discernable scale and with a north arrow, indicating the main entrance, locations of other entrances, and nearest cross street and locations and dates of physical examinations; and

4. Dates of the start and completion of the condition assessment.

(H) A description, classification, and mapping of each significant condition observed including deterioration and any movement detected and the apparent integrity of the joints and wearing surfaces. The description must also include a list of all appurtenances and their condition. Each condition must be classified as safe, unsafe or SREM. If the parking structure is classified as unsafe or SREM, the compliance report must include the locations and descriptions of all unsafe or SREM conditions. If unsafe conditions are noted, the report must recommend the type and location of public protection or clearly delineate the extent of areas that have been cordoned off and the methods used. Photographs must be labelled and the report must include key plans and locator drawings documenting these conditions. Guards and railings must be inspected to ensure that their components (balusters, intermediate railings and panel fillers) are positively secured against movement (e.g. by welds, bolts or screws). If any guard or railing is found not to be positively secured, the condition is classified as unsafe and must be made safe pursuant to the requirements of paragraph (5) of subdivision (c) of this section;

(I) An analysis of the causes of the conditions reported as unsafe or SREM;

(J) A detailed status report of maintenance work performed up to the date of submission of the report and the maintenance plan implemented for the parking structure;

(K) A blank annual observation checklist as described in § 28-323.2 of the Administrative Code prepared by the QPSI specifically for the parking structure in question

(L) here a parking structure is categorized with a final rating SREM:

1. A plan detailing the proposed monitoring program, including method and frequency of monitoring;

2. The name of the engineer performing the monitoring;

3. A stability analysis of the parking structure that reports the required structural loading conditions and the calculated load carrying capacity of typical and worst case structural framing members which shows that the structure is stable under current and expected loading conditions; and

4. It is to be explicitly stated if only repairs are required with no monitoring.

(M) A comparison of currently observed conditions with conditions observed during the previous report filing cycle condition assessments, including the status of the repairs or maintenance performed with respect to the prior conditions. The following must be included and discussed:

1. Work permit numbers relating to parking structure repairs;

2. Job numbers, status and sign-off dates for any parking structure repair related jobs, where applicable; and

3. Violation numbers of any open Environmental Control Board ("ECB") violations and the status of the repairs of the conditions cited in the ECB violations that are directly associated with the parking structure;

(N) Recommendations for repairs or maintenance of SREM and unsafe conditions, including:

1. If a parking structure is categorized as SREM:

A. The recommended time frame for such repairs or maintenance to be performed, which must indicate the date by which the work must be performed (MM/DD/YYYY) to prevent the conditions from becoming unsafe and not the date on which work is planned or scheduled;

B. Time frames of less than one year, "ASAP," or "immediately," shall not be accepted.

2. If a parking structure is categorized as unsafe:

A. The QPSI must provide a recommended time frame for repairs to be performed to bring the parking structure to SREM or safe status, and must indicate the date by which the work will be completed (MM/DD/YYYY);

B. Time frames of more than six years will not be accepted.

(O) A list and description of the work permits required to accomplish the necessary work. If no work permits will be required, the reason must be indicated;

(P) All photographs must be color, clearly legible, dated, and high resolution. Digital photos must be a minimum of 800 x 600 pixels. Photographs must be arranged into PDF uploads of no larger than 11" x 17". The following photos must be submitted:

1. Elevation photos. Color photographs of all entrances, the primary address and at least one view of each entire street front elevation.

2. Representative photos of each parking level showing general conditions.

3. Detailed condition photos. Color photographs of specific conditions must be clearly labeled and indicate the status designation. Detailed conditions must be located on the mapping of the parking structure required by item H of this subparagraph (iii).

A. All SREM and unsafe conditions must be catalogued.

B. If parking structure status is safe, submit a minimum of one representative photograph for each structural element and appurtenance.

(Q) The classification of the parking structure for the current report filing cycle, as determined by the following guidelines:

1. If there are no unsafe conditions and no conditions that are SREM, then the parking structure shall be classified as safe;

2. If there is at least one unsafe condition, then the parking structure must be classified as unsafe.

3. If there is at least one condition that is SREM and there are no unsafe conditions, then the parking structure shall be classified as SREM. A compliance report may not be filed describing the same condition at the same location as SREM for two consecutive report filing cycles. The QPSI must certify that all of the conditions identified in the previous report as requiring repair have been corrected or the parking structure shall be classified as unsafe;

(R) The seal and signature of the QPSI under whose direct supervision the condition assessment was performed.

(4) Report filing requirements.

(i) The requirements of this rule apply to all parking structures. The Commissioner shall determine which additional buildings and/or parts thereof are required to file in accordance with this rule.

(ii) Owners of buildings in which parking structures are located are required to file a compliance report at least once during each report filing cycle established by the Department.

(iii) An acceptable report must be filed within the applicable two-year filing window to avoid a late filing penalty.

(iv) The report must be submitted to the Department along with a filing fee as specified in the rules of the Department.

(v) Staggered filing cycle: Beginning January 1, 2022 an acceptable report for each parking structure to which this rule applies is due in accordance with the following filing windows:

(A) For parking structures located within the Borough of Manhattan Community Districts 1 through 7 an acceptable report must be filed within the two-year filing window starting January 1, 2022, and every sixth year thereafter.

(B) For parking structures located within all Community Districts in the Borough of Manhattan not listed in (A), above, and all Community Districts in the Borough of Brooklyn, an acceptable report must be filed within the two-year filing window starting January 1, 2024, and every sixth year thereafter.

(C) For parking structures located within all Community Districts in the Boroughs of Queens, the Bronx and Staten Island an acceptable report must be filed within the two-year filing window starting January 1, 2026, and every sixth year thereafter.

Exceptions:

1. Starting in Cycle 2, owners whose buildings have their most recent status as "No Report Filed" may file a report prior to the start of their designated filing window provided that all applicable civil penalties set out in subdivision (e) of this section are paid at the time of filing.

2. If the building in which the parking structure is located is included in the FISP, the owner may choose to change the assigned filing window of the parking structure compliance report to a parking structure filing window that corresponds with the next FISP filing window so that both reports may be filed at the same time. This shall be the reassigned parking structure filing window. The owner must inform the Department 180 days prior to the end of the assigned parking structure filing window if this option is chosen. If an owner chooses this option, the owner must continue to file under the reassigned parking structure filing window.

(vi) Initial compliance reports for new buildings in which parking structures that must comply with this rule are located must be filed as follows:

(A) The report must be filed six years from the date the first Temporary Certificate of Occupancy, Interim Certificate of Occupancy or Certificate of Occupancy was issued, if that date falls within the applicable filing window as provided in subparagraph (v) of this paragraph; or

(B) If six years from the date the first Temporary Certificate of Occupancy, Interim Certificate of Occupancy or Certificate of Occupancy was issued falls outside the applicable filing window as provided in subparagraph (v) of this paragraph, then the initial report must be filed within the applicable two-year filing window for the next six-year cycle.

(vii) A report must be filed within 60 days of the date on which the QPSI completed the condition assessment (final inspection date), as described in subparagraph (ix) of paragraph (2) of subdivision (c) of this section. Failure to file a report within 60 days of the completed condition assessment requires a new condition assessment.

(viii) If the report is not acceptable and is rejected by the Department, a revised report must be filed within 45 days of the date of the Department's rejection, or within 5 days of the date it was deemed administratively incomplete, after which the original file date will no longer be valid.

(ix) If the report is not acceptable after two rejections, a new initial filing fee as specified in the rules of the Department is required.

(x) Failure to submit a revised report addressing the Department's objections within one year of the initial filing requires a new condition assessment, including a new physical examination.

(xi) A subsequent report indicating revised conditions may be filed within the six-year report filing cycle to change a parking structure's filing status or the recommended time frame for repairs of SREM or unsafe conditions for that cycle.

(5) Unsafe conditions.

(i) Upon filing a report of an unsafe condition with the Department, the owner of the building in which the parking structure is located, his or her agent, or the person in charge of the building in which the parking structure is located must immediately commence such repairs or reinforcements and any other appropriate measures such as cordoning off areas that may be dangerous, erecting fences, sidewalk sheds and safety netting as may be required to secure the safety of the public and to make the building's structure and appurtenances conform to the provisions of the Administrative Code.

(ii) All unsafe conditions must be corrected within 90 days from the submission of the compliance report.

(iii) If, due to the scope of the repairs, the unsafe conditions cannot be corrected within the required 90 days, the QPSI must recommend a timeframe for repairs as noted in item (N) of subparagraph (iii) of paragraph (3) of subdivision (c). The owner of the building in which the parking structure is located is responsible for ensuring that the conditions described in the compliance report as unsafe are corrected and all actions recommended by the QPSI are completed within this timeframe. The owner must notify the Department of any deviation from the timeframe to make corrections as specified in the QPSI's report. The subsequent report must include supporting documents from the QPSI justifying the request for a new time frame.

(iv) Within two weeks after repairs to correct the unsafe condition have been completed, the QPSI must inspect the premises. The QPSI must promptly file with the Department a detailed amended report stating the revised report status of the parking structure, along with a filing fee as specified in the rules of the Department and the owner must obtain permit sign-offs as appropriate. If the report is not acceptable and is rejected by the Department, a revised report must be filed within 45 days of the date of the Department's rejection after which the original filing date will no longer be valid. If the report is not acceptable after two rejections, a new amended filing fee as specified in the rules of the Department is required. Protective measures must remain in place until an amended report is accepted; however, the QPSI may request permission for the removal of the protective measures, shoring or any other public safety measures upon submission of a Partial Protection Removal Request, along with a filing fee as specified in 1 RCNY § 101-03, certifying that an inspection was conducted, the conditions were corrected, and the protective measures are no longer required.

(v) The Commissioner may grant extensions of up to 90 days to complete the repairs required to correct an unsafe condition upon receipt and review of an extension application submitted by the QPSI, together with:

(A) Notice that the premises have been secured for public safety by means of a fence or other appropriate measures as may be required;

(B) A copy of the contract indicating scope of work to correct unsafe conditions;

(C) The QPSI's estimate of length of time required for repairs;

(D) A statement of all applicable permit requirements;

(E) A fee as specified in the rules of the Department;

(F) An unforeseen delay or circumstance (e.g., weather, labor strike, fire) affecting the substantially completed work; and

(G) Progress photos showing current repairs.

Note: Financial considerations shall not be accepted as a reason for granting an extension.

(6) Conditions that are safe with repairs and/or engineering monitoring (SREM).

(i) The owner of the building in which the parking structure is located is responsible for ensuring that the conditions described in the compliance report as SREM are corrected and all actions recommended by the QPSI are completed within the time frame recommended by the QPSI and are not left to deteriorate into unsafe conditions. It is the owner's responsibility to notify the Department of any deviation from the timeframe to make corrections as specified in the QPSI's report. The subsequent report must include supporting documents from the QPSI justifying the request for a new time frame.

(ii) A condition assessment is required no earlier than 18 months and no later than two years after the initial filing date and an amended report detailing the results of that assessment must be filed with the Department in accordance with § 28-323.9.1 of the Administrative Code within 60 days of the final inspection date but no later than two years after the initial filing date. The amended report must include, but not be limited to:

(A) The scope of the monitoring campaign, if applicable, including but not limited to the name of the engineer performing the monitoring, the type and frequency of monitoring, and all findings;

(B) The status of the conditions identified in the most recent compliance report classifying the building as SREM, including any maintenance and repairs undertaken; and

(C) A description and classification of any new conditions identified and how they have been or will be addressed, including any repairs or maintenance.

Exception: If the SREM compliance report is filed less than 1 year from the start of the next cycle filing window, a condition assessment is not required and an amended report does not need to be filed with the Department.

(iii) A report may not be filed describing the same condition and pertaining to the same location on the parking structure as SREM for two consecutive report filing cycles.

(iv) The QPSI must certify the correction of each condition reported as requiring repair in the previous report filing cycle, report conditions that were reported as SREM in the previous report filing cycle as unsafe if not corrected at the time of the current inspection, or report corrections that were made in the previous cycle as unsafe if they need further or repeated repair at the time of the current cycle.

(d) Annual observation. A building owner is responsible to have an annual observation performed in accordance with the provisions of § 28-323.4 of the Administrative Code. Such annual observation must be based on the checklist included in the most recent compliance report accepted by the Department and as described in § 28-323.2 of the Administrative Code.

(1) This checklist is to be completed annually by a QPSI on behalf of the owner each year after submission of the current cycle's report has been accepted and until the next cycle's report has been accepted.

(2) The completed checklists must be kept on site and be made available to the Department and the QPSI upon request.

(3) The person performing the annual observation shall notify the owner and the Department immediately upon discovering any conditions that may be hazardous to the public.

(e) Civil Penalties.

(1) Late filing. An owner who submits a late filing shall be liable for a civil penalty of one thousand dollars ($1,000) per month, commencing on the day following the filing deadline of the applicable filing window period and ending on the filing date of an acceptable initial compliance report or acceptable amended SREM compliance report.

(2) Failure to file. In addition to the late filing penalty, an owner who fails to file the required acceptable initial or amended SREM compliance report shall be liable for a civil penalty of five thousand dollars ($5,000) per year beginning one year after the end of the applicable filing window.

(3) Failure to correct unsafe conditions. In addition to the penalties provided in this section, an owner who fails to correct an unsafe condition within 90 days shall be liable for a civil penalty of one thousand dollars ($1,000) per month until the unsafe condition is corrected, unless the Commissioner grants an extension of time to complete repairs pursuant to this section. This penalty shall be imposed until receipt of an acceptable amended compliance report by the Department indicating the unsafe conditions were corrected, or an extension of time is granted by the Commissioner.

(4) Failure to correct SREM conditions. An owner who fails to correct a SREM condition reported as requiring repair in the previous report filing cycle and subsequently files the condition as unsafe shall be liable for a one-time civil penalty of two thousand dollars ($2,000).

(5) Challenge of civil penalty.

(i) An owner may challenge the imposition of any civil penalty authorized to be imposed pursuant to this subdivision by providing proof of compliance. Such proof must include, but not be limited to, a copy of an acceptable initial compliance report, a copy of the acceptable amended report, copies of approved extension of time requests while work was/is in progress or written proof from a QPSI that the unsafe conditions observed at the parking structure were corrected and the violation was dismissed.

(ii) Challenges must be made in writing within 30 days from the date of service of the violation by the Department and sent to the office/unit of the Department that issued the violation. The decision to dismiss or uphold the penalty shall be at the sole discretion of the Department.

(f) Full or partial penalty waivers; eligibility and evidentiary requirements. Owners may request a full or partial waiver of penalties assessed for violation of Article 323 of Title 28 of the Administrative Code, and/or rules enforced by the Department. Requests must be made through the Department’s website, submitted with the filing fee, and must meet eligibility and evidentiary requirements as follows:

(1) Owner status.

(i) A new owner requesting a waiver due to change in ownership must submit proof of a recorded deed evidencing transfer of ownership to the current owner after penalties were incurred, as well as any other documentation requested by the Department, and only in one of the following circumstances:

(A) A new owner of a property previously owned by a government entity requesting a waiver due to change in ownership must submit official documentation from the government entity affirming that the premises was entirely owned by the government entity during the period for which a waiver is requested.

(B) A new owner who receives a notice of violation for failure to comply with the requirements of this section or Article 323 of Title 28 of the Administrative Code that was issued to the property after the transfer of ownership must submit a recorded deed showing the date that the property was acquired or transferred. The waiver period shall be from the date of the deed to the date of the violation issuance.

(ii) An owner may be granted a waiver of penalties upon submission of a copy of an order signed by a bankruptcy court judge.

(iii) If a state of emergency is declared that prevents an owner from conducting an inspection, filing a report or correcting unsafe conditions, an owner may be granted a waiver of penalties.

(2) Building status. An owner may be granted a waiver if the full demolition of the parking structure occurred prior to the inspection cycle for which the report was due, and such demolition was signed off by the Department.

(Added City Record 5/23/2022, eff. 6/22/2022; amended City Record 10/24/2023, eff. 11/23/2023; amended City Record 1/24/2025, eff. 2/23/2025; amended City Record 1/2/2026, eff. 2/1/2026)