§ 103-14. Requirements for Reporting Annual Greenhouse Gas (GHG) Emissions for Covered Buildings
This section has 1 picture (figures, equations, or tables drawn as images) that BetaNYC's copy does not show. Read 1 RCNY § 103-14 at American Legal Publishing.
(a) Definitions. Terms defined in Article 320 of Chapter 3 of Title 28 of the Administrative Code have the same meanings in this section. For the purposes of this section, the following terms have the following meanings:
Affordable Housing Reinvestment Fund (AHRF). The AHRF is a third-party fund established by the Department in collaboration with the New York City Department of Housing Preservation and Development (HPD) to receive, encumber, and distribute funds for qualifying building electrification projects and generate offsets for such activities.
Beneficial electrification. “Beneficial electrification” means the installation and use of energy efficient electric-based heating, cooling and domestic hot water systems to displace the use of fossil fuel sources (e.g., fuel oil, natural gas, district steam) and/or less efficient electric-based heating systems. Qualifying equipment shall have a minimum efficiency as determined based on the reference test procedure associated with the equipment as follows:
Equipment Type Minimum Efficiency Test Procedure Service hot water heat pumps with max current 24A at 250 V NA 10 C.F.R. Part 430, Subpart B, Appendix E; or other test procedure approved by the Department. Service hot water heat pumps with Input capacity > 12kW and £ 50kW NA AHRI 1300-2013; or ASHRAE 118.1-2012; or 10 C.F.R. Part 431.106, Subpart G, Appendix E; or other test procedure approved by the Department. Unitary heat pump equipment – air source only > 1.5 COP @ 5°F outdoor dry bulb (maximum heating capacity) AHRI 210/240-2023, or AHRI 340/360-2022, as applicable Variable refrigerant flow (VRF) multi-split heat pump – air source only AHRI 1230-2021 Packaged terminal heat pumps AHRI 310/380-2017 Packaged terminal heat pumps AHRI 310/380-2017, or AHRI 390-2021, as applicable
Note: Equipment and systems not listed in the table that otherwise meet the definition of beneficial electrification shall have a coefficient of performance (COP) for the system equivalent to greater than 1.5 when the outdoor dry bulb temperature is 5°F or lower, where the COP of the system is calculated based on the energy required for all parts of the system to deliver the peak capacity.
Biofuel. Biofuel means biodiesel and renewable diesel.
Campus energy resource. A campus energy resource is any form of energy that is generated by a central plant energy system and distributed to multiple buildings in a campus setting. A campus energy resource may include but is not limited to electricity, chilled water, condenser water, steam, high temperature hot water, medium temperature hot water, and low temperature hot water.
Critical facility. A critical facility means a facility the operation of which is critical to human life or safety, such as a hospital, dialysis clinic, or a facility that manufactures vaccines.
Emissions factor. An emissions factor is the building emissions intensity limit for an occupancy group or property type as determined in accordance with § 28-320.3 of the Administrative Code.
Energy audit. An energy audit is a systematic process of identifying and developing modifications and improvements of the base building systems, including but not limited to alterations of such systems and the installation of new equipment, insulation, or other generally recognized energy efficiency technologies to optimize energy performance of the building and achieve energy savings.
For buildings 50,000 square feet and greater, such process shall not be less stringent than the Level 2 energy audit in accordance with ANSI/ASHRAE/ACCA Standard 211-2018 – Standard for Commercial Building Energy Audits.
For buildings below 50,000 square feet, such process shall not be less stringent than the Level 1 energy audit in accordance with ANSI/ASHRAE/ACCA Standard 211-2018 – Standard for Commercial Building Energy Audits.
Energy service. Energy service is the delivery of energy from the energy supply or energy distribution system to or throughout a building, including any equipment used for such delivery. Two or more buildings may share energy service. Two or more buildings share energy service if such buildings share a meter or other point of connection to the energy supply or energy distribution system.
Fund Administrator. The fund administrator is a third party retained to administer the Affordable Housing Reinvestment Fund pursuant to a contract with the City.
Gross floor area. Gross floor area is the total area in square feet of all floors and spaces in a covered building, as measured between the exterior surfaces of the enclosing fixed walls. Gross floor area includes vent shafts, elevator shafts, flues, pipe shafts, vertical ducts, stairwells, light wells, basement space, cellar space, mechanical / electrical rooms, and interior parking. Gross floor area does not include unroofed courtyards or unroofed light wells. For atria, gross floor area only includes the area of atrium floors. For the purposes of calculating gross floor area in tenant spaces, interior demising walls should be measured to the centerline of the wall.
Location based marginal price. A location based marginal price (LBMP) is the value, expressed in dollars per megawatt hour (MWh), of a particular type of fuel for a particular hour on the day preceding the day of use, as published by the New York Independent System Operator (NYISO) for Zone J.
Marginal fuel. The marginal fuel is natural gas or fuel oil, whichever has the lower marginal fuel spot price on a particular day and time.
Marginal fuel spot price. The marginal fuel spot price on a given day and time is the price of natural gas or fuel oil, expressed in dollars per Million British thermal units (MMBtu), for the day preceding the day of use, as determined as follows utilizing spot prices published by the United States Energy Information Administration:
Marginal Fuel Spot Price for Natural Gas Calendar Day Mon* Tue* Wed* Thu* Fri* Sat Sun Marginal Fuel Spot Price publication date for calendar day hours before 10 a.m. EST Fri Spot Price Fri Spot Price Mon Spot Price Tues Spot Price Wed Spot Price Thu Spot Price Fri Spot Price Marginal Fuel Spot Price publication date for hours beginning at 10 a.m. EST or after Fri Spot Price Mon Spot Price Tue Spot Price Wed Spot Price Thu Spot Price Fri Spot Price Fri Spot Price Marginal Fuel Spot Price publication date Fri Spot Price Mon Spot Price Tue Spot Price Wed Spot Price Thu Spot Price Fri Spot Price Fri Spot Price
*For calendar days following a holiday, the marginal fuel spot price shall be determined utilizing the most recently published spot price.
Plant input energy. Plant input energy is energy, such as electricity, fossil fuel, district steam, hot water, and chilled water, that is purchased from a public utility or commercial energy provider and is used to generate energy in a central plant in a campus-style energy system.
Qualified energy auditor. The term qualified energy auditor means a person who holds one of the following credentials in good standing:
(i) Certified Energy Manager (CEM), certified by the Association of Energy Engineers (AEE);
(ii) Certified Energy Auditor (CEA), certified by AEE;
(iii) Certified Measurement and Verification Professional (CMVP), certified by AEE;
(iv) High Performance Building Design Professional (HBDP), certified by ASHRAE;
(v) Building Energy Assessment Professional (BEAP), certified by ASHRAE;
(vi) Multifamily Building Analyst (MFBA), certified by the Building Performance Institute (BPI), for portions of a covered building that are classified by the US EPA’s Energy Star Portfolio Manager as a multifamily property type; or
(vii) Registered Design Professional (RDP).
Qualified generation facility. A qualified generation facility is any combined heat and power system, permitted prior to September 1, 2024, that (i) operates at a minimum annual average efficiency as established by this rule, (ii) emits levels of Nitrogen Oxide (NOx) below the limits established by this rule, (iii) is not owned by a utility, and (iv) meets the requirements of the New York City Air Pollution Control Code.
Variable operating and maintenance cost. The variable operating and maintenance cost (VOM) is the total cost incurred by operating a generator, excluding fuel costs. For reporting purposes, VOM shall be $3.00 per megawatt hour (MWh).
(b) Reporting. By May 1, 2025, a building emissions report for calendar year 2024, and by May 1 of every year thereafter, except as provided in paragraph 8 of this subdivision, a building emissions report for the previous calendar year is required to be submitted to the Department by the owner of a covered building and must be submitted in accordance with the requirements of this section.
(1) Reporting tool. Energy use and emissions information for a covered building must be submitted in a form and manner as determined by the Department. Owners must maintain all documentation and information used in preparing the building emissions report for a minimum of six (6) years. Such documentation and information shall be submitted to the Department upon request.
(2) Condominium buildings. Building emissions for a covered building held in the condominium form of ownership must be submitted in a single report that includes the emissions for all condominium units in such building. Such report shall be submitted to the Department by the board of managers of such covered building.
(3) Multiple buildings that do not share energy service. Where two or more covered buildings (i) are on the same tax lot, and (ii) do not share energy service, the owner must submit individual and separate building emissions calculations for each covered building on the tax lot.
(4) Multiple buildings that share energy service. For building emissions reports for calendar years 2024 - 2029, emissions for two or more covered buildings, regardless of whether such buildings are on the same tax lot, may be included in an aggregated building emissions calculation in a single building emissions report, provided all such covered buildings share energy service.
(5) New buildings. An owner of a new covered building for which a Certificate of Occupancy or a Temporary Certificate of Occupancy is issued on or after January 1, 2023, must begin reporting for such building for the first full calendar year following the year that such Certificate of Occupancy or Temporary Certificate of Occupancy is issued.
(6) Buildings with change in ownership. Notwithstanding any other provision of this section, for any covered building for which title is transferred to a new owner during a calendar year, such new owner is not required to submit a building emissions report for such building for such calendar year, provided the new owner is a subsequent bona fide purchaser of the covered building pursuant to Department rules.
(7) Full demolition of a covered building. An owner of a covered building for which a full demolition permit has been issued is not required to submit a building emissions report for the calendar year during which demolition work has commenced, provided that, no later than May 1 of the following year, the owner submits a written certification by a registered design professional that one or more energy-related systems within such building have been compromised and legal occupancy is not possible prior to January 1 of such following year.
(8) Extension for certain income-restricted housing and other covered buildings. The reporting requirement described in the opening paragraph of subdivision b of this section is modified for certain covered buildings as follows:
(i) For a covered building that has at least 1 but fewer than 35% of dwelling units required by law or by an agreement with a governmental entity to be regulated in accordance with the emergency tenant protection act of 1974, the rent stabilization law of 1969, or the local emergency housing rent control act of 1962, as set forth in § 28-320.3.10.1 of the Administrative Code, the initial report must be submitted by May 1, 2027;
(ii) For a covered building that is owned by a limited-profit housing company organized under article 2 of the private housing finance law, as set forth in § 28-320.3.9 of the Administrative Code, the initial report must be submitted by May 1, 2036;
(iii) For a covered building that has at least 1 dwelling unit for which occupancy or initial occupancy is restricted based upon the income of the occupant or prospective occupant thereof as a condition of a loan, grant, tax exemption, tax abatement, or conveyance of property from any state or local governmental agency or instrumentality pursuant to the private housing finance law, the general municipal law, or section 420-c of the real property tax law, as set forth in § 28-320.3.9 of the Administrative Code, the initial report must be submitted by May 1, 2036.
(c) Occupancy groups and emissions factors. For purposes of reporting annual greenhouse gas emissions pursuant to subdivision (b) of this section, occupancy groups and emissions factors are to be identified in accordance with the provisions of this subdivision.
(1) For each covered building, the owner must submit the following information:
(i) Each occupancy group or property type within the building during the calendar year for which building emissions are reported; and
(ii) The total floor area of each such occupancy group or property type in such building.
(2) The occupancy group for each space in a covered building must be determined according to the Energy Star Portfolio Manager (ESPM) property type as set out in this rule, or any successor ESPM name for such property type, that most accurately describes the use of such space during the year for which building emissions are reported, provided that the ESPM property types “Other” and “Mixed Use” may not be assigned to any portion of a covered building. Such determination must be made by the registered design professional preparing the building emissions report.
(3) Annual emission factors. For purposes of reporting annual greenhouse gas emissions pursuant to this section, emissions factors shall be determined in accordance with this paragraph.
(i) Except as provided in subparagraph (ii) of this paragraph, for the purposes of reporting for calendar years 2024 – 2029, the following emissions factors apply to the following Energy Star Portfolio Manager (ESPM) property types:
ESPM Property Type 2024 – 2029 Emissions Factor in tCO 2 e per sf Adult Education 0.00758 Ambulatory Surgical Center 0.01181 Automobile Dealership 0.00675 Bank Branch 0.00987 Bowling Alley 0.00574 College / University 0.00987 Convenience Store without Gas Station 0.00675 Courthouse 0.00426 Data Center 0.02381 Distribution Center 0.00574 Enclosed Mall 0.01074 Financial Office 0.00846 Fitness Center / Health Club / Gym 0.00987 Food Sales 0.01181 Food Service 0.01181 Hospital (General Medical & Surgical) 0.02381 Hotel 0.00987 K-12 School 0.00675 Laboratory 0.02381 Library 0.00675 Lifestyle Center 0.00846 Mailing Center / Post Office 0.00426 Manufacturing / Industrial Plant 0.00758 Medical Office 0.01074 Movie Theater 0.01181 Multifamily Housing 0.00675 Museum 0.01181 Non-Refrigerated Warehouse 0.00426 Office 0.00758 Other - Education 0.00846 Other - Entertainment / Public Assembly 0.00987 Other - Lodging / Residential 0.00758 Other - Mall 0.01074 Other - Public Services 0.00758 Other - Recreation 0.00987 Other - Restaurant / Bar 0.02381 Other - Services 0.01074 Other - Specialty Hospital 0.02381 Other - Technology / Science 0.02381 Outpatient Rehabilitation / Physical Therapy 0.01181 Parking 0.00426 Performing Arts 0.00846 Personal Services (Health / Beauty, Dry Cleaning, etc.) 0.00574 Pre-school / Daycare 0.00675 Refrigerated Warehouse 0.00987 Repair Services (Vehicle, Shoe, Locksmith, etc.) 0.00426 Residence Hall / Dormitory 0.00758 Residential Care Facility 0.01138 Restaurant 0.01181 Retail Store 0.00758 Self-Storage Facility 0.00426 Senior Care Community 0.01138 Social / Meeting Hall 0.00987 Strip Mall 0.01181 Supermarket / Grocery Store 0.02381 Transportation Terminal / Station 0.00426 Urgent Care / Clinic / Other Outpatient 0.01181 Vocational School 0.00574 Wholesale Club / Supercenter 0.01138 Worship Facility 0.00574
(ii) For purposes of reporting for calendar years 2024 and 2025, an owner may utilize a building emissions intensity limit for an occupancy group set forth in § 28-320.3.1 of the Administrative Code, provided such building emissions intensity limit is greater than the emissions factor assigned pursuant to subparagraph (i) for the ESPM property type that most accurately describes the use of the building or space, as determined in accordance with paragraph (2) of this subdivision. Building emissions must be calculated in accordance with either this subparagraph or subparagraph (i) of this paragraph, and may not be calculated by using a combination of such provisions.
(iii) For the purposes of reporting for calendar years 2030 – 2034, the following emissions factors apply to the following Energy Star Portfolio Manager property types:
ESPM Property Type 2030 – 2034 Emissions Factor in tCO 2 e per sf Adult Education 0.003565528 Ambulatory Surgical Center 0.008980612 Automobile Dealership 0.002824097 Bank Branch 0.004036172 Bowling Alley 0.003103815 College / University 0.002099748 Convenience Store without Gas Station 0.003540032 Courthouse 0.001480533 Data Center 0.014791131 Distribution Center 0.000991600 Enclosed Mall 0.003983803 Financial Office 0.003697004 Fitness Center / Health Club / Gym 0.003946728 Food Sales 0.005208880 Food Service 0.007749414 Hospital (General Medical & Surgical) 0.007335204 Hotel 0.003850668 K-12 School 0.002230588 Laboratory 0.026029868 Library 0.002218412 Lifestyle Center 0.004705850 Mailing Center / Post Office 0.001980440 Manufacturing / Industrial Plant 0.001417030 Medical Office 0.002912778 Movie Theater 0.005395268 Multifamily Housing 0.003346640 Museum 0.005395800 Non-Refrigerated Warehouse 0.000883187 Office 0.002690852 Other - Education 0.002934006 Other - Entertainment / Public Assembly 0.002956738 Other - Lodging / Residential 0.001901982 Other - Mall 0.001928226 Other - Public Services 0.003808033 Other - Recreation 0.004479570 Other - Restaurant / Bar 0.008505075 Other - Services 0.001823381 Other - Specialty Hospital 0.006321819 Other - Technology / Science 0.010446456 Outpatient Rehabilitation / Physical Therapy 0.006018323 Parking 0.000214421 Performing Arts 0.002472539 Personal Services (Health / Beauty, Dry Cleaning, etc.) 0.004843037 Pre-school / Daycare 0.002362874 Refrigerated Warehouse 0.002852131 Repair Services (Vehicle, Shoe, Locksmith, etc.) 0.002210699 Residence Hall / Dormitory 0.002464089 Residential Care Facility 0.004893124 Restaurant 0.004038374 Retail Store 0.002104490 Self-Storage Facility 0.000611830 Senior Care Community 0.004410123 Social / Meeting Hall 0.003833108 Strip Mall 0.001361842 Supermarket / Grocery Store 0.006755190 Transportation Terminal / Station 0.000571669 Urgent Care / Clinic / Other Outpatient 0.005772375 Vocational School 0.004613122 Wholesale Club / Supercenter 0.004264962 Worship Facility 0.001230602
(iv) For the purposes of reporting for calendar years 2035 – 2039, the following emissions factors apply to the following Energy Star Portfolio Manager property types:
ESPM Property Type 2035 – 2039 Emissions Factor in tCO 2 e per sf Adult Education 0.002674146 Ambulatory Surgical Center 0.006735459 Automobile Dealership 0.002118072 Bank Branch 0.003027129 Bowling Alley 0.002327861 College / University 0.001236322 Convenience Store without Gas Station 0.002655024 Courthouse 0.001110400 Data Center 0.011093348 Distribution Center 0.000549637 Enclosed Mall 0.002987852 Financial Office 0.002772753 Fitness Center / Health Club / Gym 0.002960046 Food Sales 0.003906660 Food Service 0.005812060 Hospital (General Medical & Surgical) 0.004654044 Hotel 0.002640017 K-12 School 0.001488109 Laboratory 0.019522401 Library 0.001663809 Lifestyle Center 0.003529387 Mailing Center / Post Office 0.001485330 Manufacturing / Industrial Plant 0.000975993 Medical Office 0.001683565 Movie Theater 0.004046451 Multifamily Housing 0.002692183 Museum 0.004046850 Non-Refrigerated Warehouse 0.000568051 Office 0.001652340 Other - Education 0.001867699 Other - Entertainment / Public Assembly 0.002250122 Other - Lodging / Residential 0.001329089 Other - Mall 0.001006426 Other - Public Services 0.002856025 Other - Recreation 0.003359678 Other - Restaurant / Bar 0.006378806 Other - Services 0.001367536 Other - Specialty Hospital 0.004741365 Other - Technology / Science 0.007834842 Outpatient Rehabilitation / Physical Therapy 0.004513742 Parking 0.000104943 Performing Arts 0.001399345 Personal Services (Health / Beauty, Dry Cleaning, etc.) 0.003632278 Pre-school / Daycare 0.001772155 Refrigerated Warehouse 0.002139098 Repair Services (Vehicle, Shoe, Locksmith, etc.) 0.001658024 Residence Hall / Dormitory 0.001332459 Residential Care Facility 0.004027812 Restaurant 0.003028780 Retail Store 0.001216050 Self-Storage Facility 0.000404901 Senior Care Community 0.003336443 Social / Meeting Hall 0.002874831 Strip Mall 0.000600493 Supermarket / Grocery Store 0.004256103 Transportation Terminal / Station 0.000428752 Urgent Care / Clinic / Other Outpatient 0.004329281 Vocational School 0.003459842 Wholesale Club / Supercenter 0.003198721 Worship Facility 0.000866921
(v) For the purposes of reporting for calendar years 2040 – 2049, the following emissions factors apply to the following Energy Star Portfolio Manager property types:
ESPM Property Type 2040 – 2049 Emissions Factor in tCO 2 e per sf Adult Education 0.001782764 Ambulatory Surgical Center 0.004490306 Automobile Dealership 0.001412048 Bank Branch 0.002018086 Bowling Alley 0.001551907 College / University 0.000180818 Convenience Store without Gas Station 0.001770016 Courthouse 0.000740266 Data Center 0.007395565 Distribution Center 0.000123568 Enclosed Mall 0.001991901 Financial Office 0.001848502 Fitness Center / Health Club / Gym 0.001973364 Food Sales 0.002604440 Food Service 0.003874707 Hospital (General Medical & Surgical) 0.002997851 Hotel 0.001465772 K-12 School 0.000809607 Laboratory 0.013014934 Library 0.001109206 Lifestyle Center 0.002352925 Mailing Center / Post Office 0.000990220 Manufacturing / Industrial Plant 0.000508346 Medical Office 0.000407851 Movie Theater 0.002697634 Multifamily Housing 0.002052731 Museum 0.002697900 Non-Refrigerated Warehouse 0.000163152 Office 0.000581893 Other - Education 0.000839571 Other - Entertainment / Public Assembly 0.001355610 Other - Lodging / Residential 0.000762093 Other - Mall 0.000067983 Other - Public Services 0.001904017 Other - Recreation 0.002239785 Other - Restaurant / Bar 0.004252537 Other - Services 0.000911691 Other - Specialty Hospital 0.003160910 Other - Technology / Science 0.005223228 Outpatient Rehabilitation / Physical Therapy 0.003009161 Parking 0 Performing Arts 0 Personal Services (Health / Beauty, Dry Cleaning, etc.) 0.002421519 Pre-school / Daycare 0.001181437 Refrigerated Warehouse 0.001426066 Repair Services (Vehicle, Shoe, Locksmith, etc.) 0.001105349 Residence Hall / Dormitory 0.000528616 Residential Care Facility 0.002272629 Restaurant 0.002019187 Retail Store 0.000176040 Self-Storage Facility 0.000132282 Senior Care Community 0.002277912 Social / Meeting Hall 0.001916554 Strip Mall 0.000038512 Supermarket / Grocery Store 0.002030027 Transportation Terminal / Station 0.000285834 Urgent Care / Clinic / Other Outpatient 0.002886187 Vocational School 0.002306561 Wholesale Club / Supercenter 0.002132481 Worship Facility 0.000549306
(vi) For purposes of reporting for calendar years 2050 or later, an emissions factor of 0.00 applies to all Energy Star Portfolio Manager property types.
(d) Calculations. An annual building emissions report submitted pursuant to subdivision (b) of this section must be prepared using the calculation methodologies set forth in this subdivision.
(1) Gross floor area. The owner must calculate and report the gross floor area of a covered building, and the floor area of each occupancy group or property type in a covered building. The floor area of each occupancy group or property type reported must add up to the covered building's gross floor area.
(2) Building emissions limits.
(i) Buildings with a single occupancy group. The building emissions limit for a covered building with a single occupancy group or property type must be calculated as the gross floor area multiplied by the emissions factor for the building's occupancy group or property type.
(ii) Buildings with multiple occupancy groups. The building emissions limit for a covered building with multiple occupancy groups or property types must be calculated as the sum of the emissions factor for each occupancy group or property type multiplied by the floor area of each occupancy group or property type in the covered building:
B = S l k • s k (Equation 103-14.1)
Where:
B = the total building emissions limit for a covered building with multiple occupancy groups.
l k = the emissions factor of each given occupancy group or property type, k , as specified in Article 320 of Chapter 3 of Title 28 of the Administrative Code or in this rule, in tCO 2 e per square foot.
s k = the total floor area in square feet of each property type or occupancy group, k , in a covered building.
(3) Greenhouse gas coefficients of energy consumption. Greenhouse gas coefficients for energy consumption shall be determined in accordance with this paragraph (3):
(i) Greenhouse gas coefficients for certain fuels combusted or consumed on premises for calendar years 2024 - 2034. For building emissions reports for calendar years 2024 - 2034, the GHG coefficients for fuel types combusted or consumed on premises provided in § 28-320.3.1.1 of the Administrative Code apply, except as provided in this subparagraph (i) or in subparagraph (ii) of this paragraph.
a. For the following fuel types combusted or consumed on premises, greenhouse gas emissions must be calculated as generating the following amounts of tCO 2 e per kBtu:
Fuel Emissions Coefficient (tCO 2 e per kBtu) Butane 0.00006502 Butylene 0.00006897 Diesel 0.00007421 Distillate Fuel Oil No. 1 0.00007350 Ethane 0.00005985 Ethylene 0.00006621 Gasoline 0.00007047 Isobutane 0.00006519 Isobutylene 0.00006911 Kerosene 0.00007769 Naphtha (< 401 deg F) 0.00006827 Other Oil (> 401 deg F) 0.00007647 Pentanes Plus 0.00007027 Propane 0.00006425 Propylene 0.00006802 Special Naphtha 0.00007259 Coke Oven Gas 0.00004689 Fuel Gas 0.00005925
b. Exceptions. Notwithstanding any other provision of this subparagraph, for building emissions reports for calendar years 2030 – 2034:
1. Number two (No. 2) fuel oil combusted on the premises of a covered building shall be calculated as 0.00007421 tCO 2 e per kBtu.
2. Number four (No. 4) fuel oil combusted on the premises of a covered building shall be calculated as 0.00007529 tCO 2 e per kBtu.
c. For any fuel type that is combusted or consumed on site, not listed in this subparagraph or § 28-320.3.1.1 of the Administrative Code and not prohibited by applicable rule or law, the owner must propose a carbon coefficient, in tCO 2 e per kBtu, that serves the public interest of reducing GHG emissions, to be used for calculating greenhouse gas emissions for such fuel type. Such proposed coefficient and documentation supporting such proposed coefficient shall be provided to the Department, in a form and manner determined by the Department. Such proposed carbon coefficient is subject to approval by the Department, which may alternatively assign a different coefficient for such fuel type.
(ii) Greenhouse gas coefficients for utility energy consumption for calendar years 2030 through 2034. For building emissions reports for calendar years 2030 - 2034, the GHG coefficients for consumption of energy generated by a utility shall be determined in accordance with this subparagraph (ii).
a. Utility electricity consumed on the premises of a covered building that is delivered to the building via the electric grid shall be calculated as generating 0.000145 tCO 2 e per kWh, provided, however that, at the owner's option, utility electricity may be calculated based on time of use, in accordance with subparagraph (iii) of this paragraph.
b. Natural gas delivered by a utility combusted or consumed on the premises of a covered building shall be calculated as generating 0.00005311 tCO 2 e per kBtu.
c. District steam delivered by a utility and consumed on the premises of a covered building shall be calculated as 0.0000432 tCO 2 e per kBtu.
(iii) Greenhouse gas coefficient for utility electricity based on time of use (TOU). Notwithstanding any other provision of this paragraph, an owner may elect to calculate emissions generated by utility electricity based on time of use (TOU) in accordance with this subparagraph (iii).
a. Such an owner shall submit to the Department documentation of hourly consumption of all utility electricity consumed on the premises of the covered building during the calendar year for which emissions are being reported. Utility records must be made available to the Department upon request.
b. A TOU coefficient may be utilized to calculate emissions generated by utility electricity where:
1. Hourly utility electricity consumption for the covered building is separately metered by the utility; or,
2. Hourly utility electricity consumption for the covered building is separately metered or sub-metered by the owner in a manner that produces data on such hourly consumption for the year being reported.
c. Calculations.
1. Until such time that hourly TOU electric emissions coefficients for New York City are published by a source approved by the Department, TOU coefficient values must be calculated for each hour of each day in the calendar year being reported, as follows:
TOU n = ( HM n - RAM n ) + g ue (Equation 103-14.2)
Where:
TOU n = the hourly time of use electricity coefficient in tCO 2 e per kWh, for n, a given hour on a given day in the calendar year being reported.
HM n = the hourly marginal emissions coefficient in tCO 2 e per kWh (see Equation 103-14.3).
RAM n = the hourly rolling average marginal emissions coefficient in tCO 2 e per kWh (see Equation 103-14.6).
g ue = the GHG coefficient for utility electricity for the calendar year being reported, in tCO 2 e per kWh, as provided pursuant to Article 320 of Chapter 3 of Title 28 of the Administrative Code or this paragraph.
If TOU n < 0, then TOU n = 0.
2. The hourly marginal emissions coefficient must be calculated as follows:
HM n = IHR n × 1kbtu/kWh × MF n (Equation 103-14.3) MMbtu/MWh
Where:
IHR n = the implied heat rate in MMBtu per MWh, for n every hour of the calendar year, see Equation 103-14.4.
MF n = the marginal fuel emissions coefficient, in tCO 2 e per kBtu, for the fuel that is the marginal fuel for n during the calendar year being reported, provided pursuant to Article 320 of Chapter 3 of Title 28 of the Administrative Code or this paragraph.
3. The hourly implied heat rate must be calculated as follows:
IHR n = LBMP n - VOM (Equation 103-14.4) RE n + MSP n
Where:
LBMP n = hourly location based marginal price, in dollars per MWh, as defined in subdivision (a) of this section.
VOM = $3 per MWh (the variable operating and maintenance cost, as defined in subdivision (a) of this section.
RE n = Regional greenhouse gas initiative (RGGI) emissions cost, in dollars per MMBtu (see Equation 103-14.5).
MSP n = Hourly marginal fuel spot price, in dollars per MMBtu.
If IHR n < 5 MMBtu / MWh for a given hour n , then IHR n = 0 Btu per MWh for that hour n .
If IHR n > 17 MMBtu / MWh for a given hour n , then IHR n = 17 MMBtu per MWh for that hour n .
4. The RGGI emissions costn must be calculated as follows:
RE n = RA n × 1.10231 US ton × g n × 1,000 kBtu (Equation 103-14.5) metric ton MMBtu
Where:
RA n = RGGI allowance cost, in dollar per US ton, of CO 2 e, as published by RGGI.
g n = Greenhouse gas coefficient for the marginal fuel at a given hour, in tCO 2 e per kBtu.
5. The hourly rolling average marginal emissions must be calculated as follows:
RAM n = (Equation 103-14.6)
Where:
HM i = hourly marginal emissions coefficient, in tCO 2 e per kWh (see Equation 103-14.3).
HLF i = the hourly load forecast, which is the day-ahead load projection, published by the New York State Independent System Operator (NYISO) as the day-ahead zonal forecast for New York City, in MW.
(iv) Greenhouse gas coefficient for campus-style electric systems. The greenhouse gas coefficient for electricity generated by a campus-style electric system, where electricity consumed by any covered building served by such system is generated in whole or in part on the premises of the campus, must be calculated in accordance with this subparagraph (iv).
a. The GHG coefficient for electricity generated by the campus-style electric system, must be calculated as follows:
g ce = S n ( m n • g n ) (Equation 103-14.7) m ce
Where:
g ce = the on-site campus generated electricity GHG coefficient in tCO 2 e per kWh.
m n = the plant input energy for each energy source consumed, n , in kBtu.
g n = the GHG coefficient for each plant input energy source, n , in tCO 2 e per kBtu as provided pursuant to Article 320 of Chapter 3 of Title 28 of the Administrative Code or this paragraph.
m ce = the total electricity consumed by buildings and other campus loads from the campus-style electric system, in kWh, during the year being reported, including any electricity delivered into the utility grid, provided that such electricity delivered into the utility grid results in lower GHG emissions than grid purchased electricity.
b. Where a covered building consumes electricity generated by the campus-style electric system and also consumes utility electricity, the combined GHG coefficient for campus electricity must be calculated as follows:
g e = ( m ue • g ue ) + ( m ce • g ce ) (Equation 103-14.8) m ue + m ce
Where:
g e = the GHG coefficient for electricity generated by a campus-style electric system on-site, in tCO 2 e per kWh.
m ue = the total electricity consumed by buildings and other campus loads from the utility grid, in kWh.
g ue = the GHG coefficient for utility electricity, in tCO 2 e per kWh, provided pursuant to Article 320 of Chapter 3 of Title 28 of the Administrative Code or this paragraph.
m ce = the electricity consumed by buildings and other campus loads from the campus-style electric system, in kWh, excluding any electricity delivered into the utility grid.
g ce = the on-site campus generated electricity GHG coefficient in tCO 2 e per kWh (see Equation 103-14.7).
c. Where electricity consumed by any covered building on the campus is generated on the site of the campus, and the owner elects to calculate emissions from such electricity based on time of use (TOU), the GHG coefficient shall be calculated as follows:
g e = ( S h ( m euh • g TOU ) h ) + ( m ce • g ce ) (Equation 103-14.9) m ue + m ce
Where:
g e = the GHG coefficient for electricity generated by a campus-style electric system on-site, in tCO 2 e per kWh.
m euh = the hourly electricity consumed by buildings and other campus loads from the utility grid, in kWh.
g TOU = the hourly TOU GHG coefficient, as calculated in accordance with subparagraph (iii) of this paragraph for the calendar year being reported, in tCO 2 e per kWh.
m ce = the electricity consumed by buildings and other campus loads from the campus- style electric system, in kWh, including any electricity delivered into the utility grid, provided that such electricity delivered into the utility grid results in lower GHG emissions than grid purchased electricity, see Equation 103-14.7.
g ce = the on-site campus generated electricity GHG coefficient in tCO 2 e per kWh, see Equation 103-14.7.
m ue = the total electricity consumed by buildings and other campus loads from the utility grid, in kWh, see Equation 103-14.8.
(v) Greenhouse gas coefficients for certain campus-style energy systems. Notwithstanding any other provision of this section, the GHG coefficient for energy generated by a campus-style energy system must be calculated in accordance with this subparagraph (v). Such energy may include district heating and cooling or other district energy.
a. The GHG coefficient for each type of campus energy resource that is generated by a system or equipment in a campus central plant and consumed by a covered building shall account for the plant input energy utilized by such plant to generate and deliver such campus energy resource. Such systems or equipment in a campus central plant may include, but need not be limited to, prime generators, such as boilers, chillers, and cooling towers; ancillary equipment, such as pumps and fans; and associated controls. Any energy generated by any such system or equipment that serves a single building shall not be included in the input energy for the campus-style energy system and shall be considered part of the energy use of the covered building it is serving. Any plant input energy recovered by the campus-style energy system from any other plant energy source on campus and included in the calculation of the emissions coefficient for such other central plant energy source may be assigned an emissions coefficient of zero for purposes of calculating the GHG coefficient for a campus energy resource generated by the campus-style energy system.
b. Calculations.
1. For each type of campus energy resource generated by the campus-style energy system, the GHG coefficient shall be calculated as follows:
g cx = S n ( m n • g n ) (Equation 103-14.10) m cx
Where:
g cx = the campus-style energy system GHG coefficient, in tCO 2 e per kBtu, for the campus energy resource, cx.
m n = the plant input energy consumed by each campus-style energy system used to generate the campus energy resource, n, in kBtu.
g n = the GHG coefficient for each plant input energy source, n, in tCO 2 e per kBtu.
m cx = the total amount, in kBtu, of the campus energy resources, cx, consumed by all covered buildings served by the campus-style energy system.
2. Where, for each type of campus energy resource, a group of covered buildings consumes energy generated by the campus-style energy system and consumes energy generated by a utility, a combined GHG coefficient for such campus energy resource shall be calculated as follows:
g x = ( m ux • g ux ) + ( m cx • g cx ) (Equation 103-14.11) m ux + m cx
Where:
g x = the combined GHG coefficient, in tCO 2 e per kBtu, for a campus energy resource, x.
m ux = the amount of the campus energy resource, ux, from the utility consumed by the covered building or campus, in kBtu.
g ux = the applicable GHG coefficient for the campus energy resource, ux, as supplied by a utility, in tCO 2 e per kBtu, as provided pursuant to Article 320 of Chapter 3 of Title 28 of the Administrative Code or this paragraph.
m cx = the total amount, in kBtu, of the campus energy resource, cx, consumed by all covered buildings served by the campus-style energy system.
g cx = the campus-style energy system GHG coefficient, in tCO 2 e per kBtu, for the campus energy resource, cx.
(vi) GHG coefficients for distributed energy resources. For the purposes of this subparagraph, all distributed energy resources must be separately metered or sub-metered in a manner that produces data for the year being reported. Notwithstanding any other provision of this section, the GHG coefficient for the distributed energy resources described in this subparagraph may be determined as follows:
a. GHG coefficient for certain distributed energy resources. Except as provided in clause b, c, d or e of this subparagraph, the GHG coefficient for energy generated by distributed energy resources, such as microturbines, combined heat and power generation, and fuel cells, including natural gas-powered fuel cells that commenced operation on or after January 19, 2023, shall be determined in accordance with subparagraph (i) or (ii) of this paragraph, for the energy source used to generate the energy for such distributed energy resource and the calendar year being reported. Where an owner chooses to utilize a utility electricity GHG coefficient based on TOU to account for operation of distributed energy resources, such owner must use a TOU coefficient for all utility electricity consumption for their reporting.
b. Greenhouse gas coefficient for subscription to off-site solar energy generation.
1. The GHG coefficient for electricity generated by an off- site solar energy system purchased by the owner of a covered building is 0.0 tCO 2 e per kWh, provided such energy sinks directly into the zone J load zone and the other requirements of this clause b are satisfied.
2. Such coefficient may be applied to the utility electricity consumption, in kWh, for the covered building in an amount that is no more than the amount of electricity from the off-site solar energy system, provided that the exports of such electricity are not also registered or retired as renewable energy credits claimed by any covered building for purposes of compliance with § 28-320.3 of the Administrative Code. Owners must submit documentation of the amount of solar electricity purchased by the owner to the Department with the building emissions report, or such information may be submitted by a utility on behalf of the owner. Where an owner opts to use a coefficient for electricity based on TOU, electricity generated by an off-site solar energy system must also be reported pursuant to subparagraph (iii).
c. GHG coefficient for energy storage. In reporting annual building emissions, an owner of a covered building that utilizes an energy storage system may account for on-site or off-site storage of energy, in accordance with this subparagraph. A GHG coefficient for electricity consumption based on TOU may be applied to the electricity consumed during hours that such energy storage system is charging and discharging, provided that such a TOU coefficient may only be utilized to calculate electricity consumption for an off-site energy storage system where the discharged electricity of such system sinks directly into Zone J.
1. An owner of a covered building with behind the meter energy storage that is using the utility electricity GHG coefficient as provided pursuant to Article 320 of Chapter 3 of Title 28 of the Administrative Code or subparagraphs (i) or (ii) of this paragraph for utility electricity consumption in lieu of TOU may account for such storage as provided by this subparagraph, provided that such storage must be separately metered or sub-metered and must be reported using the TOU coefficient methodology pursuant to subparagraph (iii).
2. An owner of a covered building that contracts with an off- site energy storage provider via subscription may report an equal portion of their electricity consumption, in kWh, as if it were supplied from an energy storage system on premises. Such owner shall calculate the carbon savings for that owner's share of the stored energy using the TOU coefficient methodology pursuant to subparagraph (iii) and submit such data to the Department in the building emissions report for the calendar year being reported.
d. GHG emissions differential for certain natural gas-powered fuel cells. In reporting annual building emissions, an owner of a covered building that utilizes natural gas-powered fuel cells that commenced operation prior to January 19, 2023 may account for the differential emissions to be added to their annual building emissions, in accordance with this clause. An owner of a covered building must submit to the Department documentation of the natural gas consumed annually by the fuel cell, and the electricity generated by the natural gas-powered fuel cell annually during the calendar year for which emissions are being reported. Records for natural gas consumed and electricity generated by the fuel cell must be made available to the Department upon request.
The differential emissions shall be calculated as follows for the calendar year being reported:
FCEM = (FCNG × NGC) - (FCEL × MGC) (Equation 103-14.12)
Where:
FCEM = the annual natural gas-powered fuel cell differential emissions in tCO 2 e.
FCNG = the annual natural gas consumed by the natural gas-powered fuel cell, in kBtu.
NGC = the natural gas coefficient per this paragraph in units of tCO 2 e per kBtu.
MGC = the annual average marginal grid coefficient per Table 103-14.1.
FCEL = the annual electricity generated by the natural gas-powered fuel cell, in kWh.
Table 103-14.1
Year MGC (tCO 2 e/kWh) 2024 0.000247038 2025 0.000237178 2026 0.000191739 2027 0.000167898 2028 0.000129971 2029 0.000113712
e. GHG coefficients for qualified generation facilities. For the purposes of reporting emissions, an owner of a qualified generation facility may utilize the coefficients listed in § 28-320.3.1.1 of the Administrative Code for electricity and district steam where such owner is able to demonstrate in a form and manner established by the Department that such co-generation plant operates as a qualified generation facility. For annual electric output of the plant, the coefficient for utility electricity may be utilized, and for annual heat output of the plant, the coefficient for district steam may be utilized, provide that:
1. Average annual efficiency. The average annual efficiency of the plant, as calculated pursuant to Department guidance based on all generation units, must be no less than the efficiency of the utility grid identified by the Department in guidance based on the published Inventory of New York City Greenhouse Gas Emissions.
Exceptions. A co-generation plant may be eligible as a qualified generation facility without meeting the minimum efficiency requirement if:
(1) The co-generation plant operates year-round and is essential to prevent voltage drops serving a critical facility; or
(2) The co-generation plant serves a building in an area designated by the Department as having limited spare electrical capacity as verified by the utility.
2. Nitrogen oxide (NOx) emissions limit. For each power generation unit that is part of the co-generation plant, the owner must confirm that the NOx emissions are below 1.6 lbs-Nox/MWh, or 4.4 lbs-Nox/MWh if the interconnection application and/or air permit application were accepted on or before January 1, 2017.
(vii) GHG Coefficient for beneficial electrification. For each building emissions report required pursuant to § 28-320.3.7 of the Administrative Code, the beneficial electrification coefficient for qualifying electrical equipment and systems meeting the definition of beneficial electrification shall be as established herein. Such coefficient may be modified by the department as necessary.
a. Equipment installed and operating between January 1, 2027, and December 31, 2029, shall be -0.00065 tCO 2 e/kWh.
b. Equipment installed and operating prior to January 1, 2027, shall be -0.0013 tCO 2 e/kWh.
(4) Annual building emissions. Annual building emissions for a covered building must be calculated in accordance with this paragraph (4).
(i) Calculation. Annual building emissions must be calculated as follows:
X = S n m n • g n (Equation 103-14.13)
Where:
X = the total building emissions for a covered building, for the calendar year reported, in tCO 2 e.
m n = the energy consumed for each energy source or fuel type, n , in kBtu for the year reported.
g n = the GHG carbon coefficient for the year reported for each energy source or fuel type, in tCO 2 e per kBtu.
(ii) Energy consumption to be included. All energy consumed by a covered building, including fuels used for normal testing of emergency or stand-by power generators, must be included in the calculation of the annual building emissions for such covered building, provided, however:
a. Energy used for unidirectional charging of electric vehicles may be deducted where separately metered or sub-metered pursuant to guidance issued by the Department.
b. Energy consumed during a local state of emergency declared pursuant to section 24 of the NYS Executive Law or a state of emergency declared pursuant to sections 28 of the New York State Executive Law, where such state of emergency has an impact on building emissions, such as a state of emergency resulting from severe thunderstorms or flooding.
(iii) GHG emissions generated under beneficial electrification. An owner may utilize the beneficial electrification coefficient in calculating GHG emissions resulting from the use of qualifying electric equipment as set forth in subparagraph (vii) of paragraph 3 of this subdivision. The annual electric energy use for beneficial electrification shall be determined based on either (a) Metered Electric Use or (b) Deemed Electric Use approach as described in this subparagraph. GHG emission savings accrued from beneficial electrification may be banked for future use for the covered building in which the qualifying equipment was installed as described herein.
a. Metered electric use. An owner may calculate electricity emissions based on the measured annual electricity use of the qualifying installed electric equipment using the coefficients for beneficial electrification as established in paragraph (3) of this subdivision. Such owner must be able to document hourly records, monthly energy consumption, and total annual electricity consumption for such equipment. Such documentation may be requested by the Department. Records should be retained for a minimum of six years. The installation must meet at least one of the following to qualify for use of a beneficial electrification coefficient for metered electric use:
i. must be separately metered by the utility; or
ii. must be separately metered or sub-metered by the owner in a manner that produces auditable data aligned with the reporting year; or
iii. must be capable of and configured to produce data that records the electricity supplied to the equipment over the course of the reporting year by means of hardware and software integrated with the equipment.
b. Deemed Electric Use. For installed electric equipment, qualifying as beneficial electrification, with a rated heating capacity of less than 1,200,000 btu/h, an owner may calculate electricity emissions based on the installed capacity of the equipment and using the coefficients for beneficial electrification as established in paragraph (3) of this subdivision. Only equipment that meets the requirements of the test procedures listed in the definition of beneficial electrification are eligible to calculate using deemed electric use; other equipment or systems whose test procedures are not listed in the definition of beneficial electrification shall determine beneficial electric use based on the requirements for Metered Electric Use. The deemed electric use shall be calculated based on the following:
AS de = ( HC ) × ( 1 × EFLH ) (Equation 103-14.14) 3.412 151
Where:
AS de = Annual electric energy use associated with beneficial electrification for an air source heat pump (ASHP) used for space heating in units of kWh.
HC = Heating capacity of ASHP equipment rated at an outside air temperature of 5°F, in units of kBtu per hour.
EFLH = Equivalent full loaded hours for the occupancy type served by the ASHP pursuant to guidance issued by the Department.
WH de = ( GPD ) × (14.2 × CF ) (Equation 103-14.15)
Where:
WH de = Annual electric energy use associated with beneficial electrification for a heat pump water heater (HPWH) used for water heating in units of kWh.
GPD = Daily hot water usage in gallons per day (GPD) based on heat pump water heater usage rates pursuant to guidance issued by the Department.
CF = Heating capacity of HPWH as per Equation 103-14.16.
CF = C / PL (Equation 103-14.16)
Where:
CF = HPWH Capacity Factor. The ratio of installed HPWH capacity to peak service hot water load, limited to a maximum value of 1.0.
C = The aggregate capacity of HPWH equipment in units of kBtu/h.
PL = Peak load factor multiplied by the associated occupancy metric (i.e., 1,000 square feet, number of people, number of dwelling units, number of students, etc.) from Peak Service Hot Water Load Table
Peak Service Hot Water Load
Occupancy Peak Load Factor Occupancy Metric Assembly 0.310 per 1,000 square feet Community College 0.084 per person Dormitory 0.759 per resident Elementary School 0.022 per student Fast Food Restaurant 22.07 per restaurant Full-Service Restaurant 110.4 per restaurant Grocery 0.151 per 1,000 square feet High School & Middle School 0.084 per person Hospital 2.403 per 1,000 square feet Hotel / Motel 2.010 per 1,000 square feet Office 0.049 per person Multifamily 2.031 per dwelling unit Religious 0.310 per 1,000 square feet Retail 0.151 per 1,000 square feet University 0.022 per student Warehouse 0.041 per 1,000 square feet Other 0.216 per 1,000 square feet
c. A pplying and reserving beneficial electrification GHG savings. Owners who have qualifying equipment that is installed and remains in operation in the covered building, may apply GHG emissions savings or accrue savings for future use in reporting emissions for such building, provided that in any reporting year between 2024 and 2036 in which such covered building’s emissions are not below the emissions limit set forth in § 28-320.3 of the Administrative Code, any such savings must be applied. Beneficial electrification savings from a calendar year may be applied in whole to reporting for that calendar year or in whole to another future calendar year but may not be combined with accrued savings from other years. Such savings may be accrued as follows:
Year equipment was operated Years eligible for application of the GHG savings 2024 and prior Any 6 calendar years between 2024 and 2036 2025 Any 5 years between 2025 - 2035 2026 Any 4 years between 2026 - 2034 2027 Any 3 years between 2027 - 2034 2028 Any 2 years between 2028 - 2034 2029 Any 1 year between 2029 - 2034
d. When submitting a building emissions report in which an owner applies the beneficial electrification coefficient to a portion of their annual energy consumption, such owner must document installation of the equipment with the letter of completion for such equipment along with the DOB job number.
(e) Deductions from reported annual building emissions. Deductions from the total annual emissions for a covered building are authorized in accordance with this subdivision (e).
(1) Deductions from reported annual building emissions for Renewable Energy Credits (RECs). Deductions from reported annual building emissions for renewable energy credits may be made to annual building emission calculations as follows:
(i) Applicability of renewable energy credits (RECs). Renewable energy credits may only be deducted from the emissions attributed to consumption of utility supplied electricity in a covered building.
(ii) RECs generated by clean distributed energy resources on the premises of the covered building. Notwithstanding any other provision of this section, where an owner elects to register RECs generated by a clean distributed energy resource located on the premises of the covered building, the owner may not take an additional deduction for the energy generated by the clean distributed energy resource pursuant to paragraph (2) of this subdivision.
(2) Deductions from reported annual building emissions for clean distributed energy resources. A deduction for energy generated by a clean distributed energy resource located on the premises of a covered building is authorized in accordance with this paragraph.
(i) Deduction for solar electric generation. For calendar years 2024 to 2029, a deduction from emissions resulting from annual electricity consumption is allowed where electricity is generated by a solar energy system on the premises of the covered building, in accordance with this subparagraph.
a. Where electricity is generated by the solar energy systems, in front of the meter or behind the meter, and exported to the grid, an owner may deduct from the total utility electricity consumed by the covered building in the year being reported, an amount equal to the electricity exported, in kWh.
b. Where the greenhouse gas coefficient used to calculate emissions from electricity is calculated based on the TOU methodology pursuant to subparagraph (iii) of paragraph (3) of subdivision (d) of this section, such owner shall submit a record of hourly generation of on-site solar energy during the calendar year being reported.
(ii) Deduction for on-site energy storage system. For calendar years 2024 to 2029, a deduction from annual building emissions is allowed where energy is stored on the premises of the covered building as electricity, in accordance with this subparagraph. Such deduction may be calculated as follows:
ESS = CAP • TES • Eff (Equation 103-14.17)
Where:
ESS = The amount of GHG emissions that may be deducted from the annual emissions resulting from electricity consumption in tCO 2 e.
CAP = The rated capacity of the energy storage system in kWh.
TES = The total emissions spread, as determined by the Department, for the year preceding the reporting year.
Eff = Roundtrip efficiency, defined as 85% for calendar years 2024-2029.
(3) Deductions from reported annual building emissions for offsets. Deductions from reported annual building emissions for offsets may be made to annual building emission calculations for each compliance period as follows:
(i) Offsets generated by the New York City Affordable Housing Reinvestment Fund (AHRF) are eligible for compliance with this section.
(ii) The AHRF will be administered by the fund administrator.
(iii) The fund administrator will receive, encumber, and distribute funds for qualifying building electrification projects and generate offsets for such activities pursuant to a methodology developed by HPD, which uses a deemed savings approach and assumptions vetted by an independent, qualified third-party to estimate the emissions reductions for such projects.
(iv) The AHRF will be used to finance qualifying building electrification projects at buildings subject to affordable housing regulatory agreements in New York City. In order to qualify, such projects must demonstrate the following principles of environmental integrity:
a. Additionality: The projects are not otherwise required to be completed in order to reduce emissions by international, federal or local law;
b. Unique: The projects allow for tracking of each offset to ensure that such offset corresponds to one tCO 2 e reduced;
c. Real and quantifiable: Emissions reductions accomplished through the project represent genuine impact that is replicable in accordance with a credible, transparent methodology determined by HPD and vetted by an independent, qualified third party in consultation with HPD;
d. Validation and verification: The project designs are validated and verified by an independent, qualified third party in consultation with HPD;
e. Permanence of greenhouse gas benefits: The projects replace fossil fuel equipment, thereby resulting in permanent emissions reductions; and
f. Robust baselines: The baselines for such projects are verified by an independent, qualified third party to ensure that only incremental emissions reductions are counted in order to avoid over-crediting.
(v) A building owner may purchase offsets from the fund administrator as described by the Department in guidance. The fund administrator shall provide confirmation of a building owner’s offset purchase.
(vi) The price for an offset representing one tCO 2 e will be set by the fund administrator, in consultation with the Department and HPD, taking into consideration the cost of compliance with this rule and the cost of the work associated with the offset projects.
(vii) AHRF offsets may be applied to reduce a building’s annual emissions up to a maximum of 10 percent of a building’s annual building emissions limit.
(viii) The fund administrator will maintain a registry to track each offset purchase, the assignment of each offset to a specific project, the retirement of each offset, and the emissions reductions corresponding to each offset.
(f) Adjustments. An adjustment to the annual building emissions limits for a covered building may be requested by an owner in accordance with Article 320 of Chapter 3 of Title 28 of the Administrative Code and this subdivision.
(1) Where an owner has been granted an adjustment to their building emissions limit pursuant to § 28-320.8 of the Administrative Code for any calendar year between 2024 – 2029, or has been granted an extension of such an adjustment, the adjustment expires where the special circumstance justifying the adjustment no longer exists. The owner must certify that the special circumstance justifying an adjustment continues, as part of any annual emissions report in which the adjustment is sought after it is initially granted.
(2) Where an owner has been granted an adjustment to their building emissions limit pursuant to § 28-320.9 of the Administrative Code for any calendar year between 2024 – 2034, the adjustment expires on January 1 of the calendar year following the date on which the building ceases being classified as a not-for-profit hospital, not-for-profit health center, or a not-for-profit HIP center.
(3) Where an owner has been granted an adjustment to their building emissions limit pursuant to § 28-320.7(1) of the Administrative Code, the adjustment expires no later than January 1 of the calendar year three years following the first year covered by the building’s adjustment.
(4) Where an owner has been granted an adjustment to their building emissions limit pursuant to § 28-320.7(2) of the Administrative Code, the adjustment expires no later than January 1 of the calendar year following the year covered by the building’s adjustment.
(g) Penalty for failing to file a building emissions report. An owner of a covered building shall be liable for a civil penalty for failing to file a building emissions report within 60 days of the reporting deadline or by the date of any extension deadline granted by the Department pursuant to this rule.
(1) Calculation. Such penalty shall be an amount equal to the gross floor area of such building, multiplied by $0.50, for each month such report is not submitted within the 12 months following May 1 of each year, including the 60 days following the deadline.
(2) Extension of time to file. An owner who is unable to file the building emissions report by the reporting deadline despite such owner’s good faith efforts may apply for an extension in accordance with § 28-320.3.7.1 of the Administrative Code and this paragraph. An application for an extension must be filed with accompanying documentation no earlier than 30 days before and no later than 60 days after May 1 of each year. For purposes of this subdivision, an owner demonstrates good faith efforts for consideration of an extension where:
(i) The registered design professional hired for purposes of completing the building emissions report could not complete such report by the reporting deadline. For purposes of this paragraph, acceptable documentation in support of such extension request includes a contract between the owner and the registered design professional executed no later than February 1 of the year such report is required to be filed and an affidavit signed by the owner and the registered design professional stating that such professional was unable to complete the report on time and that the report will be completed and filed within 120 days of the reporting deadline; or
(ii) The owner has challenged a determination by the Department of Finance regarding whether the square footage of the building qualifies such building as a covered building, provided that such owner must file the building emissions report within 120 days of the first determination by the Department of Finance that such building qualifies as a covered building following the commencement of such challenge. For purposes of this paragraph, acceptable documentation in support of such extension request includes an attestation signed by the owner indicating why the square footage of the building does not qualify such building as a covered building and all correspondence between the Department of Finance and such building owner related to such dispute.
(h) Penalty for exceeding building emissions limits. An owner of a covered building shall be liable for a civil penalty for exceeding the building emissions limits established for a calendar year pursuant to Article 320 of Chapter 3 of Title 28 of the Administrative Code and rules promulgated thereunder. Such penalty shall be an amount equal to the difference between the building emissions limit established for a calendar year and the actual emissions reported for such calendar year in the building emissions report, multiplied by $268.
(i) Mitigating factors during the 2024-2029 compliance period. Notwithstanding any other provision of the Department’s rules, an owner not in compliance with such emissions limits may be eligible for a mitigated penalty based on mitigating factors as specified in this subdivision. Any such mitigating factors must be filed with the building emissions report and must be documented in a form and manner established by the Department.
(1) Unexpected or unforeseeable event. An owner may demonstrate that an unexpected or unforeseeable event or condition outside of their control precluded compliance during a calendar year where a building was damaged as a result of a disaster, including but not limited to a hurricane, severe flooding, or fire. Such owner must provide photographs demonstrating the nature and extent of any such damage, and a description of how such damage precluded compliance in such calendar year. Demonstration of such an unexpected or unforeseeable event or condition may result in a penalty of zero dollars for such calendar year for which such demonstration is claimed.
(2) Good faith efforts. An owner may demonstrate they made good faith efforts to comply with Article 320 of Chapter 3 of Title 28 of the Administrative Code and rules promulgated thereunder. Demonstration of good faith efforts may result in a mitigated penalty for the calendar year for which such demonstration is claimed. An owner may demonstrate good faith efforts by meeting all of the following criteria:
(i) Such owner submits the annual building emissions report for the previous calendar year pursuant to Article 320 of Chapter 3 of Title 28 of the Administrative Code and rules promulgated thereunder, and is in compliance with any adjustment granted in accordance with § 28-320.7, 28-320.8, or 28-320.9 of the Administrative Code and rules promulgated thereunder; and
(ii) Such owner uploads benchmarking information for the previous calendar year to the benchmarking tool in accordance with § 28-309.4 of Article 309 of Chapter 3 of Title 28 of the Administrative Code and rules promulgated thereunder as applicable, or the data required by § 28-309.4 of the Administrative Code for the prior calendar year; and
(iii) Such owner submits an attestation in a form and manner determined by the Department that upgrades have been made to lighting systems as required by Article 310 of Chapter 3 of Title 28 of the Administrative Code and rules promulgated thereunder, and electrical sub-meters in tenant spaces have been installed as required by Article 311 of Chapter 3 of Title 28 of the Administrative Code and rules promulgated thereunder; and
(iv) In addition to the information required by subparagraphs (i) through (iii) of this paragraph, a demonstration of good faith efforts includes one or more of the following:
(a) No later than May 1, 2025, an owner submits a copy of a decarbonization plan certified by a registered design professional to the Department that is being implemented at such covered building. Such plan must include:
(1) An energy audit prepared by a qualified energy auditor no earlier than four years prior to the date of submission to the Department; and
(2) An inventory of all HVAC equipment, domestic hot water equipment, electrical equipment, lighting, and conveyance equipment serving the building, including the date of installation of such equipment and, where applicable, whether such equipment serves multiple buildings; and
(3) A description of any work that received a certificate of completion or temporary certification of occupancy on January 1, 2013 or later, that resulted in no less than a 10% emissions reduction for the building as compared to the emissions measured the year prior to the completion of such work; and
(4) A list of alterations and changes to operations and maintenance that will result in the building achieving emissions reductions required by Article 320 of Chapter 3 of Title 28 of the Administrative Code and rules promulgated thereunder and resulting in net zero carbon emissions in 2050, including energy conservation measures to be undertaken during the current and future compliance periods, and the complete schedule for retrofit strategies necessary to reach net zero carbon emissions. Compliance strategies may not include the removal of a tenant. Each item on the list of alterations and changes must include:
i. A timeline for each alteration or change to operations that demonstrates when the work will be completed in order to achieve the necessary emissions reductions required for timely compliance with each compliance period;
ii. A capital plan for such work, including financing and incentives; and
iii. The corresponding emissions reductions estimated to result from each alteration or change to operations; and
(5) An owner who files a decarbonization plan in accordance with this clause must additionally demonstrate all of the following:
i. Within 24 months of the submission of such plan, demonstrate that the work necessary to bring the building into compliance with such building’s emissions limit for calendar year 2024 is completed; and
ii. By May 1, 2028, provide evidence that a complete application has been approved by the Department for the work necessary to comply with such building’s 2030 emissions limit;
(6) An owner who files a decarbonization plan in accordance with this clause may not claim emissions deductions associated with the purchase of renewable energy credits (RECs) for the 2024-2029 compliance period.
(b) An owner provides evidence that a complete application has been approved by the Department for the work necessary to comply with the 2024-2029 emissions limit, a timeline for completion of the project, and the corresponding emissions reductions estimated to result from the alteration, provided that where such work does not require an application to the Department, the owner may submit a copy of a signed contract with a service provider to perform such work and proof of payment in lieu of evidence that a complete application has been approved by the Department; or
(c) An owner provides evidence that the covered building is undergoing work to achieve electric readiness by submitting:
(1) An approved electrical alteration application to make upgrades to the building’s electric service for the purposes of future replacement of fossil fuel-based equipment with electric equipment; and
(2) Certification that the electric utility has received the contractor work request and/or has approved a load letter for service increase; and
(3) An anticipated timeline for completion of the work; or
(d) An owner previously submitted an annual building emissions report during the 2024-2029 compliance period that demonstrated such building was under the established emissions limits for the calendar year that such report was submitted; or
(e) An owner of a critical facility provides a description with documentation, in a form and manner determined by the Department, of how payment of a penalty would impact the operations of such facility; or
(f) An owner attests in a form and manner determined by the Department that such owner has applied for or been granted an adjustment by the Department in accordance with § 28-320.7 of the Administrative Code and rules promulgated thereunder.
(j) Enforcement. Notwithstanding any other provision of the Department’s rules, an owner not in compliance with the requirements of Article 320 of Chapter 3 of Title 28 of the Administrative Code and rules promulgated thereunder will be liable for a penalty calculated as described herein that may be recovered in a proceeding before the Office of Administrative Trials and Hearings (OATH) governed by OATH's rules of practice and procedure pursuant to Title 48 of the Rules of the City of New York.
(1) Notice. The Department shall issue administrative summonses pursuant to this subdivision which shall contain at minimum the following information:
(i) A description of the nature of the violation sufficient to inform the respondent of the prohibited conduct, including a citation to the rule or section of the Administrative Code alleged to have been violated; and
(ii) The maximum penalty amount calculated by the Department; and
(iii) Instructions to the Respondent for how to pay such penalty; and
(iv) The date, time, and location of the scheduled adjudication on such penalty, or instructions to the Respondent for how to schedule an adjudication.
(2) Resolving the administrative summons prior to adjudication. A Respondent may resolve the summons prior to adjudication by:
(i) Paying the penalty amount calculated by the Department; or
(ii) Submitting proof to the Department that the condition has been corrected prior to the scheduled adjudication.
(3) Mediated resolution.
(i) The Department may offer a mediated resolution to an owner not in compliance with the annual building emissions limits, provided that the Department shall offer such resolution only where (i) such owner has filed a report pursuant to § 28-320.3.7 of the Administrative Code; (ii) such owner has demonstrated good faith efforts to meet such emissions limits, including but not limited to the criteria set forth in paragraph 2 of subdivision i of this section or other demonstrated effort to meet such limits; and (iii) such resolution would facilitate the building meeting such building’s annual emissions limit.
(ii) A mediated resolution is an agreement between the owner and the Department not to bring an enforcement proceeding and may provide for terms and conditions determined by the Department, including but not limited to a plan to achieve compliance with the building emissions limit set forth in § 28-320.3.1 of the Administrative Code. The terms of such agreement may contain such provisions as may be agreed upon by the Department and the owner. The Department shall provide guidance with respect to such plan, including examples of appropriate compliance plans.
(iii) Such agreement shall provide that an enforcement proceeding will be commenced and civil penalties may be imposed for the violation of Article 320 of Title 28 of the Administrative Code where the owner fails to comply with the terms of such mediated resolution. Where such agreement covers more than one year, the owner may be subject to an enforcement proceeding and civil penalty pursuant to subdivision (h) of this section for each calendar year that such owner is not in compliance with the annual building emissions limit during that time period.
(iv) A mediated resolution entered into between the department and the owner of a building may be transferred to a subsequent owner of such building who consents to such transfer. Failure to comply with the terms of such mediated resolution by a subsequent owner who consents to such transfer will result in an enforcement proceeding as set forth in subparagraph (iii) of this paragraph.
(Added City Record 12/20/2022, eff. 1/19/2023; amended City Record 12/21/2023, eff. 1/20/2024; amended City Record 12/20/2024, eff. 1/19/2025)
§ 103-15. Periodic Observation of Building Parapets
(a) Definitions. For the purposes of this section, the following terms have the following meanings.
Appurtenance. Any structure attached to or supported by a parapet.
Cornice. A projecting horizontal member or assembly that crowns a wall.
Fronting. Running parallel or near parallel to a public right-of-way.
Gooseneck. A curved section of a handrail which terminates at the top of a roof or parapet.
Observation. A visual examination of a parapet, cornice and other parapet appurtenances conducted to determine their stability and identify any potentially hazardous conditions.
Parapet. The part of any wall entirely above the roof line.
Public right-of-way. A public street, avenue, sidewalk, roadway or any other public place or public way.
(b) Observations. Starting on January 1, 2024, in accordance with the requirements of § 28-301.1.1 of the Administrative Code, every building owner must have an observation performed in accordance with this subdivision. This requirement applies to all buildings with parapets fronting the public right-of-way, regardless of height, except for detached 1- or 2-family homes or buildings with a fence or other barrier preventing access to the exterior wall.
(1) The observation must be performed annually by a person competent to inspect parapets. For the purposes of this subdivision, this includes, but is not limited to, a bricklayer, building superintendent, handyman, mason or a person in a similar construction-related trade, architect, engineer, an inspector working for a New York State-authorized insurance company, a New York State-authorized building inspector or any other individual capable of identifying hazards on the parapet.
(2) The observation must include close-up inspections of the entire parapet. The close-up inspection may be conducted from a fire escape or roof.
(3) The observation must include, but not be limited to:
(i) A determination that the parapet is plumb by a horizontal distance within one-eighth of its cross-sectional thickness in any location.
(ii) A determination of whether there is excessive deterioration, including, but not limited to, displacement, horizontal or diagonal cracks, missing or loose bricks or coping stones, deteriorated mortar joints, spalling, or rot.
(iii) A determination that appurtenances such as telecommunications equipment, railings, roof access rails, gooseneck ladders and handrail attachments for fire escapes, and signs, have been installed and maintained in a stable condition.
(4) If the parapet exhibits a hazardous or unsafe condition:
(i) The person performing the observation must immediately notify the Department of Buildings; and
(ii) The owner must immediately install public protection, such as erecting sidewalk sheds, fences, and safety netting, as may be required to secure the safety of the public, and have the unsafe condition remedied. All unsafe conditions must be corrected within ninety (90) days from the notification to the Department. The public protection must remain in place until the unsafe condition is remedied.
(c) Report Requirements. A report must be prepared by the person performing the observation or by the owner in consultation with the person performing the observation.
(1) The report must include, but not be limited to:
(i) The address and any other associated addresses for the building;
(ii) The name, mailing address and telephone number of the owner of the building, or, if the owner is not an individual, the name, mailing address, telephone number, and position/title of a principal of the owner;
(iii) The name of the person performing the observation. If other than the owner, their mailing address, telephone number, affiliation with the building or owner, and business name, if applicable;
(iv) The date(s) of the observation;
(v) The location plan of the parapet(s) observed;
(vi) The construction of the parapet, including but not limited to material, height, and thickness;
(vii) General conditions noted, whether any unsafe conditions were found, and actions taken to remedy the unsafe conditions;
(viii) Any repairs made to the parapet since the previous report; and
(ix) Dated photos documenting the conditions at the time of observation.
(2) Owners must maintain the observation reports for at least six (6) years and must make such reports available to the Department upon request.
(Added City Record 8/29/2023, eff. 9/28/2023)
§ 103-16. Initial Observation of Parking Structures
(a) Prior to the first required condition assessment of a parking structure required by Article 323 of Chapter 3 of Title 28 of the Administrative Code and 1 RCNY § 103-13, the owner of the building in which a parking structure is located and whose condition assessment report is due as set forth in item (B) or (C) of subparagraph (v) of paragraph (4) of subdivision (c) of 1 RCNY § 103-13, must have a one-time initial observation of the parking structure performed by or under the direct supervision of a qualified parking structure inspector (“QPSI”), as defined in 1 RCNY § 101-07. The results of such initial observation must be filed with the Department by August 1, 2024 on a form provided by the Department.
Exception: Owners whose report is due as set forth in item (B) as previously referenced in this paragraph and who file an acceptable report by August 1, 2024 need not have this initial observation performed.
(b) The QPSI must apply a professional standard of care to assess the parking structure’s condition and the individual building systems that comprise the parking structure including, but not limited to, the building’s structural components, waterproofing systems, fire proofing and fire stopping systems, and wearing surfaces. The QPSI’s observation must be based on the considerations of the type of construction of the parking structure, age of the material components, the parking structure’s specific exposure to environmental conditions and the presence of specific details and appurtenances. The QPSI’s observation must also take into account the structure’s history of maintenance and repairs.
(c) The methods used to evaluate the parking structure in question must permit a complete examination of the parking structure.
(d) The QPSI must identify the most deleterious locations and perform examinations at those locations. If the QPSI finds any deficiencies, he/she must ascertain the cause of these and any other possible building defects detected and immediately notify the Department and the owner of the building in which the parking structure is located of any unsafe conditions.
(e) The results of this initial observation must be filed with the Department in a form and manner acceptable to the commissioner.
(Added City Record 10/24/2023, eff. 11/23/2023)
§ 103-17. Energy Conservation Measure Requirements for Certain Buildings
(a) Definitions. Terms defined in Article 321 of Title 28 of the Administrative Code of the City of New York have the same meanings in this section. For the purposes of this section, the following terms have the following meanings:
Energy service. Energy service is the delivery of energy from the energy supply or energy distribution system to or throughout a building, including any equipment used for such delivery. Two or more buildings may share energy service. Two or more buildings share energy service if such buildings share a meter or other point of connection to the energy supply or energy distribution system.
Qualified retro-commissioning (RCx) agent. A qualified RCx agent is a retro-commissioning agent who is not on the staff of the building being inspected and who holds one of the following credentials in good standing:
(1) Certified Commissioning Professional certified by the Building Commissioning Association;
(2) Certified Building Commissioning Professional certified by the Association of Energy Engineers (AEE);
(3) Existing Building Commissioning Professional as certified by the AEE;
(4) Commissioning Process Management Professional certified by American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE);
(5) Accredited Commissioning Process Authority Professional approved by the University of Wisconsin;
(6) Certified Commissioning Authority certified by the Associated Air Balance Council Commissioning Group;
(7) Building Commissioning Professional certified by ASHRAE;
(8) Commissioning Process Professional certified by National Environmental Balancing Bureau (NEBB);
(9) Technical Retro-Commissioning Certified Professional certified by NEBB;
(10) Building Systems Commissioning Professional certified by NEBB; or
(11) Registered Design Professional.
(b) Required report for certain buildings. No later than May 1, 2025, the owner of a covered building must submit a report, in a form and manner determined by the Department, in accordance with § 28-321.3 of the Administrative Code, demonstrating compliance with either paragraph (1) or paragraph (2) of this subdivision. Where an owner has multiple covered buildings on a lot, such owner may choose to provide a separate report for each such covered building on the lot, or a single report pursuant to either § 28-321.3.1 or § 28-321.3.2 of the Administrative Code for all such covered buildings on the lot. Where buildings share an energy system, such buildings must be reported in a single report pursuant to the same section of the Administrative Code. Two or more covered buildings located on adjacent but separate tax lots may be included in a single report pursuant to the same section of the Administrative Code, provided all such covered buildings share energy service.
(1) Energy compliant buildings report. To demonstrate compliance with this subdivision the owner of a covered building may submit a building emissions report, certified by a registered design professional, in accordance with § 28-321.3.1 of the Administrative Code, this paragraph, and 1 RCNY § 103-14, that for calendar year 2024 such covered building was in compliance with the applicable building emissions limit established pursuant to § 28-320.3.2 of the Administrative Code. The report must include:
(i) Building address(es);
(ii) Building owner and contact information;
(iii) Name of the registered design professional certifying the report; and
(iv) Energy use and emissions information for such covered building calculated as if such building were a covered building as defined in Article 320 of Title 28 of the Administrative Code and 1 RCNY § 103-14.
(2) Prescriptive energy conservation measures (PECMs) report. To demonstrate compliance with this subdivision the owner of a covered building may submit a report, certified by a qualified RCx agent, in accordance with this section and § 28-321.3.2 of the Administrative Code, demonstrating that each applicable PECM identified in § 28-321.2.2 of the Administrative Code was fully implemented at the covered building prior to January 1, 2025. The RCx agent must maintain all documentation and information used in preparing such report, including records of inspections conducted, for a minimum of 6 years. Such documentation and information must be submitted to the Department upon request. The report required by this paragraph must include:
(i) Building address(es);
(ii) Building owner and contact information;
(iii) Name, affiliation, contact information, experience, and relevant certifications for the qualified RCx agent and supervised staff performing the PECM inspections;
(iv) Name, affiliation, and contact information for the facility manager for the building;
(v) For each building, an inventory of all HVAC equipment, domestic hot water equipment, electrical equipment, lighting, and conveyance equipment serving the building, including the date of installation of such equipment. Where applicable, the report must indicate where equipment serves multiple buildings; and
(vi) For each PECM, documentation as required in subdivision (c) of this section.
(c) Inspection and documentation for prescriptive energy conservation measures. PECMs must be inspected and documented by the RCx agent in accordance with this subdivision. Documentation of such inspection required by this subdivision must be included with the PECM report required by subdivision (b) of this section.
(1) Temperature set points.
(i) Inspection: The RCx agent must examine the temperature set points for heat and hot water systems in the building. All systems serving multifamily dwelling units must be set to the requirements of the Housing Maintenance Code.
(ii) Documentation: An attestation by the RCx agent certifying completion of such PECM.
(2) Repair heating system leaks.
(i) Inspection: The RCx agent must conduct a visual inspection of all heating equipment for water, steam, oil, refrigerant, and air leaks in systems. Leaks identified must be repaired by January 1, 2025. Exception: Inspection of forced-air and electric-resistance heating systems is not required.
(ii) Documentation: An attestation by the RCx agent certifying completion of such PECM.
(3) Heating system function.
(i) Inspection: The RCx agent must confirm that each heating system in the covered building is functioning in good working order.
(ii) Documentation: An attestation to the Department certifying completion of such PECM.
(4) Temperature controls or enclosures for radiators.
(i) Inspection: The RCx agent must confirm that each dwelling unit has at least one thermostat to control the heating system or that each radiator is installed with an individual temperature control or an insulated radiator enclosure with temperature controls, where applicable. Proper inspection for a thermostatic radiator valve (TRV) or a radiator enclosure survey must include radiators in the covered building that have over- or underheating issues, as reported by testing, facility manager or occupant. Such inspections must be conducted as follows:
(A) Two-pipe steam systems. For two-pipe steam distribution systems, the RCx agent must confirm that either a TRV or an insulated radiator enclosure with temperature controls has been installed at each radiator and is in good working order.
(B) Hydronic systems. For hydronic distribution systems, the RCx agent must confirm that temperature controls are functioning on radiators where present. If controls are found to not be functioning properly, such controls must be repaired or replaced.
(C) Electric-resistance systems. For buildings served by electric resistance radiators, the RCx agent must confirm that each dwelling unit has at least one thermostat to control the radiators in the unit.
(ii) Documentation: For each covered building in a report, the RCx agent must provide one of the following completed on or after November 15, 2019:
(A) Proof of a completed utility TRV or orifice plate incentive program; or
(B) The results of a TRV/radiator enclosure or other temperature control survey by a qualified RCx agent as described herein.
(5) Piping insulation.
(i) Inspection: The RCx agent must verify that all exposed and readily accessible piping that is part of the heating and service hot water system supply is insulated to the extent possible in accordance with section C403.11.3 of the New York City Energy Conservation Code. Where existing insulation is degraded, such insulation must be replaced.
(ii) Documentation: An attestation to the Department certifying completion of such PECM.
(6) Steam and hot water tank insulation.
(i) Inspection: The RCx agent must inspect hot water tanks to confirm that they are insulated. Exception: Vacuum units are not required to be inspected.
(ii) Documentation: An attestation to the Department certifying completion of such PECM.
(7) Indoor/outdoor temperature sensors.
(i) Inspection: The RCx agent must inspect and confirm the presence of indoor/outdoor temperature systems in accordance with section C403.4.1.5 of the New York City Energy Conservation Code. Where such sensors or controls are not present, they must be installed. For steam distribution systems, this requirement may be satisfied by the use of wireless temperature sensors that provide feedback to the boiler or heating system control, provided that such sensors have been installed in a minimum of 25% of dwelling units and are in good working order.
(ii) Documentation:
(A) A screenshot or other output from a digital control system showing that sensors are connected and in good working order and showing sufficient information to identify the covered building; or,
(B) Proof of completion of a utility program to install such indoor/outdoor temperature sensors and/or controls; or,
(C) The location of such temperature sensors and controls, attestation that they were in good working order at the time of inspection, and the date of completion of the inspection.
(8) Functioning steam traps.
(i) Inspection: The RCx agent must inspect radiators to confirm that each has a steam trap or orifice plate in good working order no earlier than January 1, 2022, and no later than December 31, 2024. Proper inspection of steam traps must include the RCx agent surveying the supply equipment and distribution lines for each heating system serving a covered building and confirming the presence of properly functioning steam traps, in accordance with the following requirements for each distribution system type:
(A) Two-pipe steam systems. For two-pipe steam distribution systems, all steam traps must be inspected, or tested to identify areas where the system is not functioning properly. The Department shall provide guidance with respect to such testing. All steam traps found to be functioning improperly must be replaced, repaired, or rebuilt. Steam traps are not required on radiators where functioning TRVs are installed with orifice plates and both are found to be in good working order.
(B) High-pressure steam systems. For high-pressure steam distribution systems, all high-pressure steam traps operating above 15 PSI of pressure must be tested using ultrasonic leak detection to verify proper operations. All steam traps found to be functioning improperly must be replaced, repaired, or rebuilt.
(ii) Documentation: For each covered building in a report, the RCx agent must provide one of the following:
(A) Proof of a completed utility orifice plate and/or steam trap incentive program; or
(B) Results of a steam trap survey by a qualified RCx agent as described herein.
(9) Steam system venting.
(i) Inspection: For one-pipe steam systems and for atmospheric (non-vacuum) two-pipe steam systems, the RCx agent must confirm that master venting is installed at the ends of mains, at large horizontal pipe runs, at the tops of all risers, and at vertical pipes branching off a main where appropriate. Testing, pursuant to guidance issued by the Department, may be employed to identify loops that are not functioning properly.
(ii) Documentation:
(A) Proof of a completed utility program that included installation, repair, or replacement of master venting; or
(B) Schematic diagrams of the steam loops in the covered building identifying the installed vents with a schedule indicating the date of testing of each loop found to be in compliance with this subparagraph or the inspection date of each vent indicating whether the vent was in good working order, repaired, replaced, or rebuilt.
(10) Upgrade lighting.
(i) Inspection: Lighting and lighting controls installed after July 1, 2010 must be compliant with the New York City Energy Conservation Code in effect at the time of installation. Lighting and lighting controls installed prior to July 1, 2010 must be compliant with the New York City Energy Conservation Code in effect on July 1, 2010 or must be replaced. Compliance must be confirmed through examination of installation records or visual inspection.
(ii) Documentation: Documentation of this requirement must be submitted to the Department in accordance with Article 310 of Chapter 3 of Title 28 of the Administrative Code and the Department’s rules.
(11) Building envelope.
(i) Inspection: The RCx agent must perform a visual inspection of the envelope to confirm that required air barriers at fenestration, doors, and other penetrations are in good working order. Where major sources of leakage are identified, these seals must be repaired or replaced.
(ii) Documentation: An attestation to the Department certifying completion of such PECM.
(12) Exhaust fan timers.
(i) Inspection: The RCx agent must inspect exhaust fans intended for intermittent operation to confirm that timers or other controls automatically turn the fan off are installed and are in good working order. The RCx agent must confirm that fans intended for continuous use are in good working order.
(ii) Documentation: An attestation to the Department certifying completion of such PECM.
(13) Radiant barriers.
(i) Inspection: The RCx agent must inspect radiators to confirm that foil-faced radiant barriers or radiator reflectors are installed where applicable prescriptive measures include the installation or replacement of TRVs or installation of thermostatic radiator covers.
(ii) Documentation: An attestation to the Department certifying completion of such PECM.
(d) Penalty for failure to file a report. An owner of a covered building shall be liable for a civil penalty for failing to file a report in accordance with § 28-321.3 of the Administrative Code and subdivision (b) of this section within 60 days of the reporting deadline or by any extension deadline granted by the Department.
(1) Penalty amount. An owner who fails to file such report shall be liable for a civil penalty of $10,000 per covered building.
(2) Extension of time to file. An owner who is unable to file such report by the reporting deadline may apply for an extension in accordance with this paragraph. Such extension application must be filed with accompanying documentation no sooner than 30 days before and no later than 60 days after the reporting deadline. For purposes of this provision, an owner may receive an extension where:
(i) The registered design professional or qualified RCx agent, as applicable, hired for purposes of completing such report could not finish completing such report by the reporting deadline. For purposes of this paragraph, acceptable documentation in support of such extension request includes a contract executed no later than February 1, 2025 and an affidavit signed by the owner and the registered design professional or qualified RCx agent stating that such professional or agent was unable to complete such report on time and that such report will be completed and filed within 120 days of the reporting deadline; or
(ii) Such owner has challenged a determination by the Department of Finance regarding whether the square footage of the building qualifies such building as a covered building, or a determination by the Department regarding whether the building qualifies as a covered building under Article 320 or Article 321, provided that such owner must file the report within 120 days of the first determination by either Department that such building qualifies as a covered building under this rule following such a dispute. For purposes of this paragraph, acceptable documentation in support of such extension request is an attestation signed by the owner indicating why the building does not qualify as a covered building and all correspondence between the applicable agency and the building owner related to such dispute.
(e) Penalty for failure to demonstrate energy conservation measures as required in § 28-321.2 of the Administrative Code. An owner of a covered building shall be liable for a civil penalty of $10,000 per covered building for failing to demonstrate either:
(1) Pursuant to § 28-321.2.1 of the Administrative Code, for calendar year 2024, the annual building emissions of such covered building did not exceed what the applicable annual building emissions limit would be in 2030 pursuant to Article 320 of Chapter 3 of Title 28 of the Administrative Code and rules promulgated thereunder if such building were a covered building as defined in such Article 320; or
(2) Pursuant to § 28-321.2.2 of the Administrative Code, the prescriptive energy conservation measures, as applicable, were fully implemented by December 31, 2024.
(f) Mitigated penalties. An owner not in compliance with this section may be eligible for a mitigated penalty as specified in 1 RCNY § 102-01 and this subdivision.
(1) Unexpected or unforeseeable event. An owner may demonstrate that an unexpected or unforeseeable event or condition outside of their control precluded compliance where a building was damaged as a result of a disaster, including but not limited to a hurricane, severe flooding, or fire. Such owner must provide photographs demonstrating the nature and extent of any such damage, and a description of how such damage precluded compliance. Demonstration of such an unexpected or unforeseeable event or condition may result in zero penalty.
(2) Eligible energy conservation alteration projects. An owner may demonstrate no later than May 1, 2025, in accordance with guidance issued by the Department, that such building received a commitment from a state or local agency or instrumentality no earlier than November 15, 2019 to receive governmental assistance to engage in an eligible energy conservation alteration project with a state or local agency or instrumentality that achieves compliance with the annual building emissions limit described in § 28-321.2.1 of the Administrative Code or the energy conservation measures identified in § 28-321.2.2 of such Code. Such owner must provide a letter from such agency or instrumentality detailing such project and demonstrating that the building will meet the applicable compliance requirements. Demonstration of such eligible energy conservation alteration project may result in zero penalty.
(g) Mediated resolution.
(1) The Department may offer a mediated resolution to an owner not in compliance with § 28-321.2.1 or § 28-321.2.2 of the Administrative Code, provided that the Department will offer such resolution only where such owner has applied for or been granted an adjustment by the Department in accordance with § 28-320.7(2) of the Administrative Code and clause c of subparagraph iii of paragraph 3 of subdivision c of 1 RCNY § 103-12, or the following criteria are met by May 1, 2025:
(i) Such owner submits an attestation in a form and manner determined by the Department that such owner is not in compliance with § 28-321.2.1 or § 28-321.2.2 of the Administrative Code; and
(ii) Such owner submits benchmarking information for the previous calendar year to the benchmarking tool in accordance with Article 309 of Chapter 3 of Title 28 of the Administrative Code and rules promulgated thereunder as applicable, or the data required by § 28-309.4 of the Administrative Code for the prior calendar year; and
(iii) Such resolution would facilitate the building owner achieving compliance with Article 321 of Chapter 3 of Title 28 of the Administrative Code.
(2) A mediated resolution is an agreement between the owner and the Department not to bring an enforcement proceeding and may provide for terms and conditions determined by the Department, including but not limited to requiring the owner to submit a plan for compliance with § 28-321.2 of the Administrative Code. The Department shall provide guidance with respect to such plans, including examples of appropriate compliance plans.
(3) Such mediated resolution shall provide that an enforcement proceeding will be commenced and civil penalties may be imposed for the violation of Article 321 of Title 28 of the Administrative Code of the City of New York where the owner fails to comply with the terms of such agreement, pursuant to subdivision d and subdivision e of this section.
(Added City Record 12/21/2023, eff. 1/20/2024; amended City Record 12/20/2024, eff. 1/19/2025)
§ 103-18. Upgrades of Lighting Systems and Installation of Electrical Sub-meters in Tenant Spaces
(a) Definitions. Terms defined in Article 310 and 311 of Title 28 of the Administrative Code have the same meanings in this section.
(b) Report for required upgrades of lighting systems. No later than May 1, 2025, the owner of a covered building must submit a report, in a form and manner determined by the Department, in accordance with § 28-310.3 of the Administrative Code. Such report must include an attestation by a registered design professional, a licensed master electrician, or a licensed special electrician certifying that the lighting system of the entire building has been inspected and upgrades have been implemented, pursuant to lighting power allowances and controls requirements for each of the spaces, in compliance with the New York City Energy Conservation Code that was in effect at the time of such implementation, provided that the lighting system must comply with a version of the New York City Energy Conservation Code in effect on or after July 1, 2010.
(c) Penalty for failure to file a lighting upgrade report. An owner of a covered building shall be liable for a civil penalty in the amount of $1,500 for failing to file a report in accordance with § 28-310.3 of the Administrative Code and subdivision (b) of this section. Such penalty will be assessed annually until the compliance report is filed.
(d) Report for required installation of electrical sub-meters in tenant spaces. No later than May 1, 2025, the owner of a covered building must submit a report, in a form and manner determined by the Department, in accordance with § 28-311.5 of the Administrative Code. Such report must include:
(1) A list of all covered tenant spaces in such covered building; and
(2) An attestation by a registered design professional, a licensed master electrician, or a licensed special electrician certifying that sub-meters have been installed for all covered tenant spaces in accordance with Article 311 of Title 28 of the Administrative Code; and
(3) A sample monthly statement in accordance with § 28-311.4 of the Administrative Code.
(e) Penalty for failure to demonstrate installation of electrical sub-meters in tenant spaces.
(1) An owner of a covered building shall be liable for a civil penalty in the amount of $1,500 for failing to file a report in accordance with § 28-311.5 of the Administrative Code and subdivision (d) of this section. Such penalty will be assessed annually until the compliance report is filed.
(2) Failing to install a sub-meter in a covered tenant space in accordance with § 28-311.3 of the Administrative Code and subdivision (d) of this section shall be classified as a lesser violation. An owner of a covered building shall be liable for a civil penalty for such violation. Such penalty will be in the amount of $500 for each covered tenant space where a sub-meter has not been installed as required and will be assessed annually until all required sub-meters are installed.
(f) Procedures for penalties imposed under this section.
(1) Where a civil penalty is imposed for failure to file a report required by subdivision (b) or (d) of this section, the owner may request review of such determination by the department. A request for such review shall be submitted in writing within 30 days in a form and manner determined by the Department. The Department shall review such request and provide a response within 60 days.
(2) A civil penalty imposed for failing to install a sub-meter pursuant to paragraph (2) of subdivision (e) of this section will be processed in accordance with 1 RCNY § 102-01.
(Added City Record 12/21/2023, eff. 1/20/2024)
§ 103-19. Elevator and Escalator Violations Constituting a Condition Dangerous to Human Life and Safety
Any of the following elevator and escalator violations constitute a condition dangerous to human life and safety for which the department may take daily enforcement action against the building owner after issuance of an immediately hazardous violation:
(a) All elevators are out of service in a building or building section. An owner of a building with elevator service outages that extend beyond 14 days is required to provide alternative accommodations for tenants. An alternative accommodation includes, but is not limited to, any or all of the following:
(1) installation of a temporary vertical transportation device in the building;
(2) relocation of tenants to portions of the building where an elevator is not required by section 3002.4 of the New York City Building Code, except that individuals with disabilities must be relocated to an accessible space on the ground floor;
(3) relocation of tenants to a building with elevator service; or
(4) reimbursement of tenant expenses related to hotel or other lodging costs.
An owner must post a notice of tenants’ rights to alternative accommodations, in a form and manner acceptable to the department, adjacent to the elevator hall call buttons in a conspicuous area on each floor where the elevators are out of service.
For elevator outages beyond 14 days, the owner must provide proof of a practical difficulty and an elevator restoration schedule to the department. Proof of a practical difficulty acceptable to the department includes, but is not limited to, letters from part manufacturers or authorized part distributors.
(b) Firefighters’ Emergency Operation not functioning in premises.
(c) Badly worn, defective, or damaged hoist cables and/or governors cables.
(d) Defective hoistway doors.
(e) Defective hoistway door interlocks.
(f) Defective car door / gate.
(g) Defective car door / gate switch.
(h) Defective / missing vision panels.
(i) Defective car safety devices.
(j) Defective brake assembly.
(k) Defective hoist machine.
(l) Defective selector / assembly.
(m) Missing top emergency covers.
(n) Defective escalator fire shutters.
(o) Defective escalator comb plates.
(p) Defective escalator stop switch.
(q) Excessive escalator skirt panel clearances.
(r) Defective or non-functional safety switches.
(s) Badly worn, defective, or damaged relays or controllers and/or selector.
(t) Defective, badly worn, or damaged car safety device parts.
(u) Defective car and/or counterweight buffers.
(v) Any damaged, badly worn or defective equipment, which could result in elevator breakdown.
(Added City Record 5/12/2026, eff. 6/11/2026)
§ 103-20. Failure to Keep or Be Prepared for Scheduled Appointment for the Inspection or Test of an Elevator, Escalator or Other Device, Except Amusement Devices, Listed in Chapter 30 of the New York City Building Code
(a) Cancellation of scheduled appointments. Scheduled appointments for the inspection or tests of an elevator, escalator or other device, except amusement devices, listed in Chapter 30 of the New York City Building Code may be canceled no later than two business days prior to the scheduled appointment.
(b) Unprepared or not present for appointment. Where a department inspector arrives at the site of a scheduled inspection or test and is unable to perform the scheduled inspection or witness the test because the owner or its authorized representative has failed to cancel the appointment in accordance with the provisions of subdivision (a) of this section, or fails to keep or is unprepared for the scheduled appointment, the department will impose a fee for the missed appointment in the amount of $200. The fee is due and payable within thirty days after the date of the missed appointment or prior to the scheduling of a new appointment, whichever is earlier.
(Added City Record 5/12/2026, eff. 6/11/2026)
§ 103-21. Pre-Inspection Clearance of an Elevator, Escalator or Other Device, Except Amusement Devices, Listed in Chapter 30 of the New York City Building Code
An owner or its authorized representative may request the department to perform a pre-inspection clearance of an elevator, escalator, or other device, except amusement devices, listed in Chapter 30 of the New York City Building Code within five business days of the department’s receipt of such request and payment of the required fee of $815 per device. The department reserves the right to schedule a pre-inspection clearance during hours that are operationally feasible, including non-regular business hours.
(Added City Record 5/12/2026, eff. 6/11/2026)
§ 104-01. License Qualifications and Other Requirements
(a) Applicability. This subchapter shall apply to all licenses issued by the Department, except where otherwise specified.
(b) Definitions.
(1) For purposes of this subchapter, the terms "City," "Commissioner" and "Department" shall have the same meanings as set forth in § 28-101.5 of the Administrative Code.
(2) For purposes of this subchapter, the term "license" shall include any license as defined in § 28-401.3 of the Administrative Code, except that the term shall include "certificate of competence" whenever such a certificate is required by Chapter 4 of Title 28 of the Administrative Code, and any Master Electrician's License and Special Electrician's License as defined in § 28-429 and § 28-430 of the Administrative Code.
(c) Examinations.
(1) Applicability. This subdivision shall apply to Department-sponsored examinations administered for the following licenses:
(i) Electrician (Master/Special)
(ii) High Pressure Boiler Operating Engineer
(iii) Master Fire Suppression Piping Contractor (Classes A, B and C)
(iv) Master Plumber
(v) Oil Burning Equipment Installer
(vi) Elevator Agency Director
(vii) Elevator Agency Inspector
(viii) Rigger (Master/Special/Tower Crane)
(ix) Sign Hanger (Master/Special)
(x) Site Safety Manager
(2) Examination procedures.
(i) The examination shall consist of a written test, practical test, or a combination of such tests. The practical test may include oral, reading, and/or practical components. Admission to a test does not imply that the applicant possesses the minimum qualifications required. License applicants may not release or otherwise make public the questions and answers for such tests.
(ii) Applicants must apply for any test by submitting an application on a form prescribed by the Department to the Department's Licensing & Exams Unit or its designee. The application must be accompanied by the examination fee and any other required documents as set forth in the Department's rules. Applicants reapplying to take any test, including after a failure, must do so in accordance with the requirements in this paragraph.
(iii) Where either a written or practical test, but not both, is required, applicants have six (6) months from submission of the application to take the test.
(iv) Where both written and practical tests are required, applicants have six (6) months from submission of the application to take the written test, two (2) months from notification of passing the written test to submit an application for the practical test, and six (6) months from submission of that application to take the practical test.
(v) If an applicant fails the practical test, the applicant has up to twenty-four (24) months from the date of notification of passing the written test to pass the practical test.
(vi) Failed written test.
(A) Applicants who fail the written test must wait at least fourteen (14) days before reapplying to take the test.
(B) Each time an applicant wishes to take the written test, including after a failure, the applicant must reapply to the Department and pay the required fee as set forth in the Department's rules.
(C) Applicants may take the written test no more than three (3) times within a six (6) month period.
(D) Applicants who fail the written test three (3) times within six (6) months must wait six (6) months from the date of the third failed written test before reapplying to take the written test.
(vii) Failed practical test.
(A) Applicants who fail the practical test must wait at least ninety (90) days before reapplying to take the test.
(B) Each time an applicant wishes to take the practical test, including after a failure, the applicant must reapply to the Department and pay the required fee as set forth in the Department's rules.
(C) Applicants may take the practical test no more than two (2) times within a twelve (12) month period.
(D) Applicants who fail the practical test two (2) times within twelve (12) months must wait six (6) months from the date of the second failed practical test before reapplying to take the practical test.
(viii) An applicant who has been notified of failure to pass the written or practical test may appeal such failure only if the applicant has failed by not more than five (5) points. Such appeal must be in writing with an original signature and addressed as the Commissioner may require. The appeal must state the title of the license examination, the applicant's name, return address and social security number, the date of the test and a detailed statement of the grounds for appeal. The appeal must be received not later than thirty (30) days from the date of notification of failure to pass the test.
(ix) Impersonating and cheating.
(A) A person who impersonates another person, allows himself or herself to be impersonated, or otherwise cheats in a license examination shall be disqualified from receiving a license issued by the Department.
(B) A person disqualified for impersonating or otherwise cheating may submit a written request to the Commissioner to appeal the disqualification. The written request must set forth reasons to substantiate the request and must be received not later than thirty (30) days from the date of notification of disqualification.
(x) An applicant who passes a required examination must commence the license application process by submitting an application as defined in subdivision (e) with the department within one year of passing the examination for licensure. Where both written and practical tests are required, the license application process must be commenced within one year of passing the practical test.
(3) License examinations administered by other agencies. License examinations administered by other agencies for licenses regulated by the Department shall continue to be subject to such other agency's rules and regulations regarding examinations and investigations until the responsibility for administering particular licensing examinations is transferred to the Department, at which point the provisions of this rule shall apply.
(d) Education, training and experience. An applicant must possess the minimum education, training and/or experience required by the Administrative Code at the time of filing the application. For purposes of this subdivision, the term "experience" refers to that experience gained in the relevant trade as the result of fulltime compensated employment, unless otherwise determined by the Commissioner.
(e) Documentation of education, training and experience submitted with the application. For the purposes of qualification for licensure, "application" refers to the documents submitted to start the background investigation. An applicant must verify the claimed experience by submitting documentation with the application, unless the applicant is required to pass an examination in which case the documentation must be submitted upon passage of such examination. Such documentation must include but not be limited to:
(1) Notarized affidavits or a notarized form prescribed by the Department from all past or current employers under whom experience is claimed. Affidavits or forms from New York City licensees shall be sealed where applicable. Affidavits or forms must include the following information:
(i) Applicant's job title (helper, journeyman, etc.);
(ii) A detailed description of applicant's duties;
(iii) When applicant worked with the licensee (employment dates shall be in mm/dd/yyyy format);
(iv) Whether employment was on a full or part-time basis, detailing the average weekly hours; and
(v) Where license supervision is required, a statement by the licensee that he or she directly supervised applicant's work.
(2) Social Security History of Earnings for the years applicant is claiming as experience reflecting wages appropriate for the trade.
(3) Where the code requires supervision in the installation of plumbing systems, the planning or design of plumbing systems, or the performance of fire suppression piping work, including the planning or design of fire suppression piping systems, evidence that the supervising licensees performed such work as demonstrated by permits, completed contracts or such other documentation as the Department may require.
(4) Where the applicant is self-employed, the applicant shall verify that he or she performed qualifying work by submitting documentation, including but not limited to personal and business tax returns, route sheets or work logs from the supervising licensee, contracts with customers, and statements from customers detailing the work the applicant performed and when that work was performed.
(5) Where the applicant did not receive monetary compensation from his or her employer as evidenced by payroll records, such as social security payments, income tax withholding or the disbursement of other funds as required by law for the benefit of such employee, the Department may consider such experience if the applicant can provide evidence of an employer-employee relationship. The applicant must provide a detailed explanation of the nature of the employer-employee relationship, which may include, but is not limited to, written agreements between the applicant and the employer, the employer's workers compensation records, time-keeping records, work logs, or other contemporaneous documentation as the Department may require.
(f) Fitness.
(1) An applicant for a license issued by the Department, other than a Master, Special or Tower Crane Rigger or Hoisting Machine Operator, must provide evidence of fitness to perform the work authorized by the license.
(2) An applicant for license renewal, other than a license for Master, Special or Tower Crane Rigger or Hoisting Machine Operator, must provide evidence of fitness to perform the work authorized to be performed by a holder of the license held or once held by the applicant. A renewal applicant must satisfy these requirements at every subsequent renewal.
(3) Such evidence of fitness must be on a form prescribed by the Commissioner and must establish that the applicant has passed a physical examination.
(4) The Department may also require that an applicant take a substance abuse test and provide evidence of a negative result for such test. Such evidence must include the name, address and telephone number of the laboratory that performed the test and consent to the release by such laboratory of the test results to the Department upon request of the Department.
(5) Hoisting Machine Operators and Riggers must comply with the fitness provisions of 1 RCNY § 104-09 and 1 RCNY § 104-10, respectively.
(g) Investigation of applicant.
(1) The Department or its designee shall conduct an investigation of each applicant to determine the applicant's fitness and qualification for the license. The burden of proving that an applicant meets the required qualifications is on the applicant. An applicant's failure to meet the requirements specified by the Administrative Code or by the Department's rules, and/or an applicant's refusal to cooperate with an investigation, will result in denial of the license or certificate of competence.
(2) Applicants who refuse to provide all requested documents within six (6) months of the date of request shall be denied a license or certificate of competence.
(h) Issuance of license after approval.
(1) An applicant who passes an examination required pursuant to this rule, is found to have met the qualifications of § 28-401.6 of the Administrative Code, and has been investigated by the Department or its designee, shall receive a notice of approval from the Department.
(2) The applicant must furnish to the Department all requested forms, documents, and fees within one (1) year of the date of the Department's notice of approval. Failure to do so within the time specified will result in the denial of license issuance and will require a re-examination and reapplication.
(3) Upon issuance of a license, all applicants must provide proof in a form prescribed by the Department, that the business the applicant affixes to such license, is authorized to operate in the State of New York by the New York State Department of State.
(i) Reconsideration. An applicant who has been notified of failure to meet the fitness and qualification requirements and who has additional relevant information or documentation for the Department's review may request reconsideration. Such request for reconsideration must be in writing with a signature and addressed as the Commissioner may require. The request for reconsideration must state the title of the license, the applicant's name and return address, the date of the Department's denial and a detailed statement of the grounds for reconsideration with any supporting documentation. The Department must receive the request for reconsideration not later than sixty (60) days from the date of notification of the denial of the license.
(j) Denial of issuance. Failure to pay any outstanding fines, penalties or fees related to the individual's professional dealings with the City, within a specified time period, may result in the denial of the issuance of any license or registration.
(k) Change of address.
(1) Applicants must promptly notify the Department in writing of any address change that occurs after filing the license application.
(2) Failure to furnish such notification may result in denial of the license and the loss of the opportunity to complete subsequent portions of the license examination, including any tests or investigation.
(3) All applicants must have an agent for the acceptance of service of process or maintain a New York City address. A Post Office Box is not acceptable for such purposes. The name and address of the agent and any changes to such name or address must be filed with the Department. Failure to do so constitutes a waiver of challenge to service of process.
(l) Place of business.
(1) Where a licensee has a place of business in New York City, that location must comply with all applicable provisions of the Zoning Resolution.
(2) Pursuant to § 28-401.18 of Chapter 4 of Title 28 of the Administrative Code, a place of business in New York City is not required for holders of the following licenses:
(i) Concrete Safety Manager.
(ii) Construction Superintendent.
(iii) Filing Representative.
(iv) General Contractor.
(v) High-Pressure Boiler Operating Engineer.
(vi) Hoisting Machine Operator.
(vii) Lift Director.
(viii) Safety Registrant.
(ix) Site Safety Coordinator.
(x) Site Safety Manager.
(xi) Welder.
(3) A Licensed Master Plumber or Licensed Master Fire Suppression Piping Contractor must have a place of business within New York City and must display prominently to the public in the window of the place of business designated in his or her application or on a sign securely attached to the premises, the licensee’s full name with the words “Licensed Master Plumber” or “Licensed Master Fire Suppression Piping Contractor” and the Department-issued license number immediately thereunder. If the business is conducted under a trade name, or by a co-partnership or corporation, such trade name or co-partnership or corporation name must be placed immediately above the full name or names of the licensee(s) conducting the business as provided by §§ 28-408.6.2 and 28-410.7.2 of the Administrative Code.
(Amended City Record 2/14/2017, eff. 3/16/2017; amended City Record 3/4/2022, eff. 4/3/2022; amended City Record 4/29/2024, eff. 5/29/2024; amended City Record 11/21/2025, eff. 12/21/2025)
§ 104-02. Required Insurance
(a) The following categories of licensee are subject to the requirements set forth in this section:
(1) Elevator Agency Director.
(2) General Contractor.
(3) Master Electrician.
(4) Master Fire Suppression Piping Contractor.
(5) Master Plumber.
(6) Oil Burner Equipment Installer.
(7) Rigger (Master/Special/Tower Crane).
(8) Safety Registrants.
(9) Sign Hanger (Master/Special).
(10) Special Electrician (employer's coverage).
(b) Commercial general liability insurance.
(1) Each applicant for and holder of a license shall, at its expense, procure and maintain commercial general liability (CGL) insurance covering the types and scope of work performed under the license, which satisfies the requirements of this subdivision. All CGL insurance policies shall:
(i) Be issued by a company or companies that may lawfully issue the required policy and has an A.M. Best rating of at least A-VII or a Standard and Poor's rating of at least A;
(ii) Provide coverage at least as broad as set forth in the most recent edition of Insurance Services Office (ISO) Form CG 0001; and
(iii) Provide coverage of at least $1,000,000 (one million dollars) combined single limit per occurrence.
(2) Each applicant for and holder of a license shall provide proof of CGL insurance by submission of a certificate of insurance in a form satisfactory to the Department that:
(i) satisfies the requirements of subdivision (e) of this section;
(ii) identifies the insurance company that issued such insurance policy, the policy number, limit(s) of insurance, and expiration date; and
(iii) is accompanied by a sworn statement in a form prescribed by the Department from a licensed insurance broker certifying that the insurance certificate may be relied upon as accurate in all respects and that the insurance certificate thereon is in force.
(3) Any holder of a license who, during the term of the license, is issued any permit of the types set forth in Administrative Code § 28-105.2 shall cause the City, together with its officials and employees, to be named as an additional insured on the insurance required under this subdivision with regard to all work to be performed pursuant to all such permits. The City's coverage shall be at least as broad as set forth in the most recent edition of ISO Form CG 2012 or CG 2026.
(c) Workers' compensation insurance. Each applicant for and holder of a license shall, at its own expense, procure and maintain workers' compensation insurance, or a waiver of such insurance from the New York State Workers' Compensation Board, and shall submit proof thereof in a form acceptable to the Department and in compliance with subdivision (e) of this section. ACORD forms are not acceptable proof of workers' compensation coverage.
(d) Disability insurance. Each applicant for and holder of a license shall, at its own expense, procure and maintain disability insurance, or a waiver of such insurance from the New York State Workers' Compensation Board, and shall submit proof thereof in a form acceptable to the Department and in compliance with subdivision (e) of this section.
(e) Proof of insurance. Proof of insurance shall not contain any handwritten corrections and shall contain the following information:
(1) The applicant's or licensee's license, registration or tracking number(s);
(2) With regard to all workers' compensation or disability certificates, the applicant's or licensee's federal Employer Identification Number or social security number, and policy expiration date(s);
(3) The policy holder's business address (not a post office box) exactly as it appears on the Department's Buildings Information System ("BIS"); and
(4) New York City Department of Buildings, Attn: Licensing Unit, 280 Broadway, 6th Floor, New York, NY 10007 specified as a certificate holder.
(f) If, at any time after a license has been issued, any policy of insurance required by this section expires, is cancelled or otherwise terminates, the licensee shall notify the Department and procure, at its own expense, a renewal or replacement policy that fully complies with the requirements of this section and, prior to the date of such termination, submit proof thereof in conformity with the requirements of this section.
(g) Any applicant for or holder of a license shall provide a copy of any insurance policy secured in compliance with this section within thirty (30) days of a request for such policy by the Department or the New York City Law Department.
(h) A failure by the City or the Department to enforce any of the foregoing requirements shall not constitute a waiver of such requirement or any other requirement.
(Amended City Record 3/4/2022, eff. 4/3/2022; amended City Record 4/29/2024, eff. 5/29/2024)
§ 104-03. Term of License. [Repealed]
(Amended City Record 3/4/2022, eff. 4/3/2022; repealed City Record 4/29/2024, eff. 5/29/2024)
§ 104-04. Renewal
License renewals shall be governed by the provisions of Administrative Code § 28-401.12.
§ 104-05. Reinstatement of License. [Repealed]
(Amended City Record 4/25/2017, eff. 5/25/2017; repealed City Record 4/29/2024, eff. 5/29/2024)
§ 104-06. Continuing Education Requirements
(a) Applicability. This section shall be applicable to license holders seeking renewal of licenses requiring the completion of continuing education course(s) and to applicants seeking Department approval to provide continuing education courses for the following license types:
(1) Concrete Safety Manager.
(2) Construction Superintendent.
(3) Electrician (Master/Special).
(4) Filing Representative.
(5) Hoisting Machine Operator.
(6) Lift Director.
(7) Master Fire Suppression Piping Contractor.
(8) Master Plumber.
(9) Rigger (Master/Special/Tower Crane).
(10) Site Safety Coordinator.
(11) Site Safety Manager.
(b) Course requirements for license renewals. The following courses are required for renewal of the below listed license types:
(1) Concrete Safety Manager. During the one (1) year immediately prior to renewal, the licensee must have successfully completed a Department-approved course that is at least eight (8) hours in length in concrete operations.
(2) Construction Superintendent. During the one (1) year immediately prior to renewal, the licensee must have successfully completed a Department-approved course that is at least eight (8) hours in length, covering the site safety provisions of Chapter 33 of the New York City Building Code and related rules and regulations, as well as relevant safety precautions.
(3) Electrician (Master/Special). During the one (1) year immediately prior to renewal, the licensee must have successfully completed a Department-approved course that is at least eight (8) hours in length, covering the New York City Electrical Code and other requirements pursuant to 1 RCNY § 105-03 of subchapter E of this chapter.
(4) Filing Representative. Renewals for class 1 or class 2 filing representative registration are subject to the requirements set forth in 1 RCNY § 104-24.
(5) Hoisting Machine Operator. During the one (1) year immediately prior to renewal, the licensee must have successfully completed a Department-approved course that is at least eight (8) hours in length covering those provisions of the administrative code and regulations that are unique to New York City for the operation of a hoisting machine and the unique hazards of operating a hoisting machine within New York City.
(6) Lift Director. During the one (1) year immediately prior to renewal, the licensee must have successfully completed a Department-approved course that is at least eight (8) hours in length covering the lift direction provisions of Chapter 33 of the New York City Building Code and related rules and regulations, as well as relevant safety precautions.
(7) Master Fire Suppression Piping Contractor and Master Plumber. During the one (1) year immediately prior to renewal, the licensee must have successfully completed a Department-approved course that is at least seven (7) hours in length.
(8) Master Rigger. During the one (1) year immediately prior to renewal, the licensee must have successfully completed both:
(i) A Department-approved rigging supervisor course that is at least sixteen (16) hours in length and meets the requirements of Section 3316.9.2 of the New York city building code; and
(ii) A Department-approved lift director course that is at least eight (8) hours in length covering the lift direction provisions of Chapter 33 of the New York city building code and related rules and regulations, as well as relevant safety precautions.
(9) Special Rigger. During the one (1) year immediately prior to renewal, the licensee must have successfully completed both:
(i) A Department-approved suspended scaffold supervisor course that is at least eight (8) hours in length and meets the requirements of Section 3314.4.5.3 of the New York city building code; and
(ii) A Department-approved course that is at least eight (8) hours in length covering hoisting equipment, other than suspended scaffolds, utilized in the special rigger industry.
(10) Tower Crane Rigger. During the one (1) year immediately prior to renewal, the licensee must have successfully completed a Department-approved tower crane rigging course that is at least eight (8) hours in length and meets the requirements of Section 3319.10.1 of the New York City Building Code.
(11) Site Safety Coordinator. During the one (1) year immediately prior to renewal, the licensee must have successfully completed a Department-approved course that is at least eight (8) hours in length covering the site safety provisions of Chapter 33 of the New York City Building Code and related rules and regulations, as well as relevant safety precautions.
(12) Site Safety Manager. During the one (1) year immediately prior to renewal, the licensee must have successfully completed a Department-approved course that is at least eight (8) hours in length covering the site safety provisions of Chapter 33 of the New York City Building Code and related rules and regulations, as well as relevant safety precautions.
(c) Department-approved courses. The Department will approve continuing education courses pursuant to the requirements of 1 RCNY § 105-03.
(d) Additional powers of the commissioner. The commissioner may, upon a determination of good cause, extend the dates and deadlines set forth in this rule.
(Amended City Record 4/25/2017, eff. 5/25/2017; amended City Record 4/29/2024, eff. 5/29/2024 and 1/1/2025)
§ 104-07. Suspension or Revocation
(a) Hearings concerning disciplinary proceedings pursuant to Administrative Code § 28-401.19 seeking suspension or revocation, with or without penalties, against any licensee or holder of a certificate[s] of competence issued by the Department shall be held before the Office of Administrative Trials and Hearings pursuant to 1 RCNY § 105-05 and shall be governed by the rules of procedure utilized at that tribunal.
(b) Stop work and suspension of permits. Upon any suspension or revocation of a license, certificate of competence, approval or authorization, unless replaced by another licensee, certificate holder, approved agency, special inspector, or registered design professional within five (5) business days of such suspension or revocation, all open jobs on which the licensee, certificate holder, approved agency, special inspector, or registered design professional is designated shall be stopped and the permits shall be suspended until such time as another licensee, certificate holder, approved agency, special inspector, or registered design professional is designated or such permits expire. Where the Commissioner has summarily suspended a license or certificate of competence pursuant to Administrative Code § 28-401.19.1, all open jobs on which the licensee, certificate holder, approved agency, special inspector, or registered design professional is designated shall be stopped immediately and the permits shall be suspended immediately for the earlier of the duration of the suspension or until such time as another licensee, certificate holder, approved agency, special inspector, or registered design professional is designated or until such permits expire.
(c) Conduct of hearing by office of administrative trials and hearings. The administrative law judge assigned to hear any matter specified in this rule shall submit his or her proposed findings of fact and recommended decision to the Commissioner. Where the Commissioner has summarily suspended a license or certificate of competence pursuant to Administrative Code § 28-401.19.1, at the conclusion of the hearing on the first return date, the administrative law judge may lift the suspension, finally determine the matter, or, if the administrative law judge finds that the summary suspension was appropriate, but that further hearings are necessary to make a final determination of the charges, the administrative law judge may make a finding as to the need for further hearings and continue the suspension pending such further hearings without need for issuance of a Commissioner's order.
§ 104-08. Qualifications for Site Safety Manager and Site Safety Coordination Certificates
(a) Site safety managers. The Department of Buildings shall issue a site safety manager certificate to an individual who shall have satisfied the requirements of section 28-402.2 of the Administrative Code.
(1) A holder of a site safety manager certificate may not simultaneously hold an active site safety coordinator certificate.
(2) For the purposes of satisfying the requirements of paragraph 3.8 of § 28-402.2, an acceptable 18 month on-the-job training program must be completed within two years prior to application and must meet the following criteria:
(i) The buildings worked on must have been major buildings; and
(ii) The work must have been site safety work performed under the direct supervision of a certified site safety manager. For purposes of this subdivision, direct supervision shall include daily training at the location specified in the monthly summaries in the presence of the supervising certified site safety manager; and
(iii) The trainee must have worked on a paid and full-time basis; and
(iv) Dated and notarized summaries must have been completed by the certified supervising site safety manager at the end of every month. Such summaries must specify the location and the precise nature of the construction activity the trainee was engaged in at the location for the month covered; and
(v) The program must include at least four months of training in soil or foundation work, and at least four months of training in structural erection; and
(vi) The supervising certified site safety manager may supervise a maximum of three trainees simultaneously.
(b) Site Safety Coordinators. The Department of Buildings shall issue a site safety coordinator certificate to an individual who shall have satisfied the requirements of § 28-403.2 of the Administrative Code.
(1) A holder of a site safety coordinator certificate may not simultaneously hold an active site safety manager certificate.
(2) Applicants for a site safety coordinator certificate shall not be required to take an examination in order to qualify for the certificate.
(3) The term of a site safety coordinator certificate issued to a new or renewal applicant is one (1) year, measured from the date the certificate is issued.
(c) The term "major building" as used in this rule shall have the meaning given to it in section 202 of the New York City Building Code.
(Amended City Record 7/15/2022, eff. 8/14/2022; amended City Record 4/29/2024, eff. 5/29/2024)