1 RCNY Chapter 100 [Administration; Enforcement; Maintenance of Buildings; Licensing; Miscellaneous Provisions], part 6 of 7

§ 104-09 to § 105-03: 15 sections.

§ 104-09. Hoisting Machine Operators

Open this section

(a) Qualifications. In addition to the qualification requirements set forth in the Administrative Code, an applicant for a Hoisting Machine Operator license shall satisfy the following requirements:

(1) Driver's license. An applicant for a Hoisting Machine Operator license shall possess a valid driver's license, without conditions or restrictions which the Department has determined may impact the safe operation of hoisting machinery, effective for the term of the Hoisting Machine Operator license sought.

(2) Physical fitness. An applicant for a Hoisting Machine Operator license shall provide evidence on a form prescribed by the Commissioner that he or she meets the physical qualifications of Section 5-3.1.2(a) of ASME B 30.5-2021, and has passed a physical exam and a substance abuse test to verify such physical qualification. Such evidence shall include the name, address and telephone number of the laboratory that performed the tests and consent to the release by such laboratory of the test results to the Department upon request of the Department.

(3) Certifications. An applicant for a hoisting machine operator license must provide copies of certifications required by subdivision (d) of this section.

(4) Experience qualifications. In order to satisfy the experience qualifications as set forth in § 28-405.3 of the New York City Administrative Code, the experience must have been obtained in accordance with the following:

(i) Class A license applicants. An applicant for a Class A Hoisting Machine Operator license must provide proof demonstrating that the three (3) years of experience required by § 28-405.3 of the New York City Administrative Code was acquired operating hoisting machines in New York City City in the presence of and under the direct supervision of a licensed Class A or Class B Hoisting Machine Operator in accordance with 1 RCNY § 104-23. The experience must have been obtained on hoisting machines of a type, size, and capacity authorized to be operated by a Class A licensed hoisting machine operator. At least two (2) years of the required three (3) years of experience must have been in the operation of mobile cranes with a manufacturer's rated capacity in excess of 50 tons (45.36 t) or in the operation of tower cranes, other than self-erecting tower cranes. The remaining year of experience can be on any type of mobile or tower crane, derrick, or rotating telehandler authorized to be operated by a Class A HMO licensee; this includes but is not limited to cranes with a capacity under 50 tons (45.36 t).

(ii) Class C and limited hoisting machine operator license applicants. An applicant for a Class C or a Limited Hoisting Machine Operator license must provide proof demonstrating:

(A) That at least one (1) year of the two (2) years of experience required by § 28-405.3 of the New York City Administrative Code was acquired in New York City in the operation of hoisting machines as specified for each license in Table 1, and that such operation was in connection with building or infrastructure construction, alteration, or demolition work, or the installation or removal of temporary structures or temporary construction installations, or the delivery or retrieval of materials, equipment, or other items to or from a building; but excluding work in industrial or commercial plants or yards;

(B) That all experience obtained in New York City was acquired operating mobile or tower cranes or rotating telehandlers in the presence of and under the direct supervision of a New York City licensed Hoisting Machine Operator in accordance with 1 RCNY § 104-23; and

(C) That experience obtained outside of New York City was acquired in the United States operating mobile or tower cranes or rotating telehandlers in the presence of and under the direct supervision of a hoisting machine operator licensed, registered, or certified in good standing to operate such equipment within the relevant jurisdiction. Applicants who are duly licensed, registered, or certified in good standing to operate the equipment in the relevant jurisdiction for which the experience is being credited may credit self-supervision toward this requirement.

Exceptions:

1. Where the applicant already possesses a New York City Limited Hoisting Machine Operator license, such possession is deemed to satisfy one (1) year of the required two (2) years of experience. Such applicants need only comply with clauses (A) and (B) of this subparagraph.

2. Applicants for a Limited Hoisting Machine Operator license for the equipment for which such license is sought and obtained may credit experience earned in New York City operating an articulating boom crane, mini crane, or rotating telehandler neither in the presence nor under the direct supervision of a New York City licensed Hoisting Machine Operator, provided, however, that such experience was earned prior to November 7, 2024 and no more than three (3) years prior to the date of application for licensure, and provided further that such operation was performed in connection with building or infrastructure construction, alteration, or demolition work, or the installation or removal of temporary structures or temporary construction installations, or the delivery or retrieval of materials, equipment, or other items to or from a building, but excluding work in industrial or commercial plants or yards. Such experience will be credited as satisfying the provisions of clause (A) of this subparagraph at a rate of 125 hours of operator experience equaling one month of experience. Where the operator has in excess of 1,500 hours of qualifying experience, the remainder of the experience will be credited towards satisfying the second year of experience required by § 28-405.3 of the New York City Administrative Code at a rate of 125 hours of operator experience equaling one month of experience. Proof of such experience shall be documented in the form of an affidavit provided by the department and signed by the applicant and the applicant’s employer or union. However, the department may decline to credit such experience to any individual who defaulted on or has been found liable for unsafe operation of a crane or telehandler after proceedings before the environmental control board or in an adjudication in criminal court, if such default or judgment occurred within the five (5) years preceding such application. The department may also delay a determination under this exception for any applicant against whom there is an open violation for the unsafe operation of a crane or telehandler issued within the five (5) years preceding such application. Applicants subject to this exception may be asked by the department to submit proof, in addition to the affidavit described above, in support of their operating record.

Table 1: Specific experience requirements for HMO C and limited license applicants

License Type Required one (1) year of experience in NYC Class C license Wheel mounted cranes, other than telehandlers, with a telescoping boom, including jibs and any other extensions to the boom, not exceeding 200 feet (60.96 m) in length and with a manufacturer’s rated capacity in excess of 3 tons (2.72 t). Limited license for articulating boom cranes An articulating boom crane, including jibs and any other extensions to the boom, not exceeding 200 feet (60.96 m) in length and with a manufacturer’s rated capacity in excess of 1 ton (0.91 t) attached to a commercial truck chassis. Limited license for boom trucks Boom trucks with a telescoping boom, including jibs and any other extensions to the boom, not exceeding 200 feet (60.96 m) in length and with a manufacturer’s rated capacity in excess of 3 tons (2.72 t). Limited license for mini cranes Mobile cranes, other than boom trucks or telehandlers, with a telescoping boom, including jibs and any other extensions to the boom, not exceeding 50 feet (15.240 m) in length and with a manufacturer’s rated capacity of 3 tons (2.72 t) or less. Limited license for sign hanging cranes Boom trucks with a telescoping boom, including jibs and any other extensions to the boom, not exceeding 135 feet (41.148 m) in length and with a manufacturer’s rated capacity of 3 tons (2.72 t) or less, used exclusively for the erection, maintenance, or removal of signs. Limited license for telehandlers Wheel mounted rotating telehandlers with a telescoping boom, including jibs and any other extensions to the boom, not exceeding 200 feet (60.96 m) in length and with a manufacturer’s rated capacity in excess of 3 tons (2.72 t).

(iii) Limited license alternate pathway. Individuals who submit an application for a Limited Hoisting Machine Operator license for articulating boom cranes, mini cranes, or telehandlers on or before November 6, 2024, may, in lieu of the requirements set forth in subparagraph (ii) of this paragraph, provide proof in the form of an affidavit provided by the department and signed by the applicant and the applicant’s employer or union, attesting that the applicant:

(A) for a limited license for articulating boom cranes has obtained 1,500 hours of experience on or after January 1, 2019, operating, in New York City, articulating boom cranes attached to a commercial truck chassis, with the operation performed in connection with building or infrastructure construction, alteration, or demolition work, or the installation or removal of temporary structures or temporary construction installations, or the delivery or retrieval of materials, equipment, or other items to or from a building; but excluding work in industrial or commercial plants or yards;

(B) for a limited license for mini cranes, has obtained 1,500 hours of experience on or after January 1, 2019, operating, in New York City, mobile cranes, other than boom trucks or telehandlers, with a telescoping boom, including jibs and any other extensions to the boom, not exceeding 50 feet (15.24 m) in length with a manufacturer’s rated capacity of 3 tons (2.72 t) or less, with the operation performed in connection with building or infrastructure construction, alteration, or demolition work, or the installation or removal of temporary structures or temporary construction installations, or the delivery or retrieval of materials, equipment, or other items to or from a building; but excluding work in industrial or commercial plants or yards; or

(C) for a limited license for a telehandler, has obtained 1,500 hours of experience on or after January 1, 2019, operating, in New York City, rotating telehandlers, with the operation performed in connection with building or infrastructure construction, alteration, or demolition work, or the installation or removal of temporary structures or temporary construction installations, or the delivery or retrieval of materials, equipment, or other items to or from a building; but excluding work in industrial or commercial plants or yards.

Exception: The department may decline to issue a Limited Hoisting Machine Operator pursuant to this subparagraph to any individual who defaulted on or has been found liable for unsafe operation of a crane or telehandler after proceedings before the environmental control board or in an adjudication in criminal court, if such default or judgment occurred within the five (5) years preceding such application. The department may also delay a determination under this subparagraph for any applicant against whom there is an open violation for the unsafe operation of a crane or telehandler issued within the five (5) years preceding such application. Applicants subject to this exception may be asked by the department to submit proof, in addition to the affidavit described above, in support of their operating record.

(5) Outrigger setup. For a Class A, Class C, or Limited Hoisting Machine Operator license, the qualifying experience as specified in subparagraphs (i) and (ii) of paragraph (4) of this subdivision shall include outrigger placement incorporating at least one hundred (100) crane set-ups. In no case shall qualifying set-ups be obtained on a crane that has a boom, including jibs and any other extensions to the boom, exceeding 200 feet (60.96 m) in length, unless the boom and all its attachments are fully retracted or stowed according to the manufacturer’s specifications. Such set-ups must occur at a jobsite, crane yard, training center, or other location acceptable to the commissioner, and must be witnessed by a New York City licensed Hoisting Machine Operator. However, the witnessing licensee may only witness outrigger placement on equipment which their New York City license authorizes them to operate.

(i) Class A license applicants. For a Class A Hoisting Machine Operator license, at least 25 of the set-ups must have occurred on mobile cranes with a manufacturer’s rated capacity in excess of 50 tons (45.36 t). Where an applicant for a Class A Hoisting Machine Operator license already possesses a Class C Hoisting Machine Operator license, the requirement for the remaining 75 set-ups is waived.

(ii) Class C license applicants. For a Class C Hoisting Machine Operator license, at least 25 of the set-ups must have occurred on the type of machinery specified Table 1 for the Class C license. Where an applicant for a Class C Hoisting Machine Operator license already possesses a Limited Hoisting Machine Operator license, the requirement for the remaining 75 set-ups is waived.

(iii) Limited license applicants. For a Limited Hoisting Machine Operator license, at least 25 of the set-ups must have occurred on the type of machinery specified Table 1 for the type of limited license sought. Where an applicant for a Limited Hoisting Machine Operator license already possesses a different Limited Hoisting Machine Operator license, the requirement for the remaining 75 set-ups is waived.

(6) Additional qualification requirements. In addition to the qualification requirements set forth in the Administrative Code and in this subdivision (a), all Hoisting Machine Operator license applicants must, during the one (1) year immediately prior to application, complete a training course that is at least forty (40) hours in length, approved by the Department, covering those provisions of local law and regulation that are unique to New York City for the operation of a hoisting machine and the unique hazards of operating a hoisting machine within New York City.

Exception: Individuals who submit an application for a Limited Hoisting Machine Operator license for articulating boom cranes, mini cranes, or telehandlers on or before November 6, 2024, need only complete a training course that is at least eight (8) hours in length, approved by the Department, covering those provisions of local law and regulation that are unique to New York City for the operation of a hoisting machine and the unique hazards of operating a hoisting machine within New York City. Such course must have been completed during the two (2) years immediately prior to application.

(b) Fitness requirements for renewal. As a condition of license renewal, a licensed or previously licensed Hoisting Machine Operator shall provide evidence of fitness to perform the work authorized to be performed by a holder of the license held or once held by the applicant. Such evidence shall consist of:

(1) Physical fitness. Evidence on a form prescribed by the Commissioner that the licensee meets the physical qualifications of Section 5-3.1.2(a) of ASME B 30.5-2021, and has passed a physical exam and a substance abuse test to verify such physical qualification. Such evidence shall include the name, address and telephone number of the laboratory that performed the tests and consent to the release by such laboratory of the test results to the Department upon request of the Department.

(2) Certifications. Copies of certifications as required by subdivision (d) of this section.

(3) Driver's license. A renewal applicant shall possess a valid driver's license, without conditions or restrictions which the Department has determined may impact the safe operation of hoisting machinery, effective for the term of the renewal sought.

(4) Renewal. A renewal applicant shall satisfy the requirements of this rule at every subsequent renewal.

(c) Additional limited hosting machine operator licenses. The following additional Limited Hoisting Machine Operator licenses are hereby established.

(1) Limited license for telehandlers. Limited license to operate wheel mounted telehandlers (non-rotating (“fixed”) or rotating) with a telescoping boom, including jibs and any other extensions to the boom, not exceeding 200 feet (60.96 m) in length with a manufacturer’s rated capacity of 50 tons (45.36 t) or less.

(d) Certifications for a hoisting machine operator license. Where a certification for the operation of a type of hoisting machine has been established by Table 2 of this subdivision, no licensed hoisting machine operator may operate such type of machinery until the licensee possesses a certification for that type of hoisting machine and such certification has been listed on the hoisting machine operator's license by the department.

Exception: The licensee is operating the hoisting machine as a learner in accordance with 1 RCNY § 104-23.

(1) Certifications to be acceptable and accredited. The certification must be acceptable to the commissioner and be issued by a hoisting machine operator certification program that is accredited by the National Commission for Certifying Agencies (NCCA) or the American National Standards Institute (ANSI) for the specific type of hoisting machine to be operated.

(2) Licensee to inform department of changes to certification. The licensed hoisting machine operator must immediately notify the department if a certification identified in Table 2 of this subdivision and held by the licensee is suspended, revoked, not renewed, or otherwise lapses. The licensed hoisting machine operator must provide a copy of re-certifications and new certifications identified in Table 2 of this subdivision to the department within 30 days.

(3) Friction cranes or derricks. No person who holds a Class A or Class C hoisting machine operator license may operate a friction crane or a friction derrick, or supervise the operation of a learner on a friction crane or a friction derrick, until the licensee has passed at least one of the practical certification exams listed in Table 2 on a friction crane, and such authorization to operate a friction crane or a friction derrick has been listed on the hoisting machine operator's license by the department. For a Hoisting Machine Operator Class B applicant, one of the practical certification exams must, in accordance with the requirements of Table 2 of this subdivision, be on a friction crane. In addition, no person who holds a Limited Hoisting Machine Operator License may operate a friction crane or friction derrick, or supervise the operation of a learner on a friction crane or a friction derrick.

(4) Derricks. No licensed hoisting machine operator may operate a derrick, or supervise the operation of a learner on a derrick, unless the licensee possesses a tower crane certification, and such certification has been listed on the hoisting machine operator's license by the department.

Table 2: Certifications by licensing class 1

Certification Hoisting machine operator licensing class A B C NCCCO Telescopic Boom Crane - Fixed Cab Required Required Required NCCCO Telescopic Boom Crane - Swing Cab Required Required Required NCCCO Lattice Boom Crane 2 Required Required NCCCO Tower Crane Additional Required NCCCO Articulating Boom Crane - or - NCCCO Boom Crane w/Winch - or - NCCCO Articulating Boom Loader 3 Additional Additional Additional NCCCO Dedicated Pile Driver Additional Additional Additional NCCCO Rotating Telehandler 4 Additional Additional Additional

Table 2 (cont.): Certifications by licensing class 1

Certification Hoisting machine operator licensing class Limited articulating boom crane Limited boom truck Limited mini crane Limited sign hanger Limited telehandler NCCCO Telescopic Boom Crane - Fixed Cab Required 5 Required 6 Required 5 NCCCO Telescopic Boom Crane - Swing Cab NCCCO Lattice Boom Crane 2 NCCCO Tower Crane NCCCO Articulating Boom Crane - or - NCCCO Boom Crane w/Winch - or - NCCCO Articulating Boom Loader 3 Required Additional Additional Additional NCCCO Dedicated Pile Driver NCCCO Rotating Telehandler 4 Additional Required

Legend to Table 2: • “NCCCO” means “National Commission for the Certification of Crane Operators.” • "Required" means must possess. • "Additional" means not mandated, but required if licensee intends to operate listed type of hoisting machinery. • Blank indicates not authorized for the class of license, except where otherwise indicated by footnote 1.

Footnotes to Table 2: 1 Individuals may only operate equipment within the scope of their license, even if a certification authorizes operation of a broader class of equipment. 2 For a Hoisting Machine Operator Class B applicant, the practical certification exam for the lattice boom crane must be on a friction crane. 3 Individuals are not permitted to operate machinery exceeding the scope of their certification, even if such machinery is within the scope of their license. 4 Individuals who hold a “Rotating Telehandler” certification are authorized to operate a non-rotating (“fixed”) telehandler and need not separately hold a “Fixed Telehandler” certification. 5 Licensees who prior to the effective date of this subdivision hold a certification for a “Boom truck” must provide a certification for “NCCCO Telescopic Boom Crane - Fixed Cab” upon renewal of their license.

6 For a Limited Hoisting Machine Operator License for a mini crane, a certification from the National Center for Construction Education and Research (“NCCER”) that authorizes the operation of a telescopic boom is acceptable in lieu of a NCCCO certification for a “Telescopic Boom Crane - Fixed Cab”.

(e) Additional requirements. The provisions of this rule shall be in addition to the qualification and renewal requirements prescribed by Articles 401 and 405 of Title 28 of the Administrative Code.

(f) Obligation to keep documents. In addition to any other documents required to be maintained on site by a licensed Hoisting Machine Operator, such Operator shall have on site at all times the following documents:

(1) The certification(s) issued to him or her by the certifying entity; and

(2) The hoisting machine operator license issued to him or her by the Department.

(g) Additional powers of the commissioner. The commissioner may, upon a determination of good cause, extend the dates and deadlines set forth in this rule.

(h) Ratings for class B licensed hoisting machine operators. In addition to satisfying the requirements as set forth in subdivisions (a) through (g) of this section, Class B Licensed Hoisting Machine Operators must possess one or more ratings when required by § 28-405.2 of the Administrative Code.

(1) Prerequisites to obtain rating. To apply for a rating the Class B Licensed Hoisting Machine Operator must demonstrate to the satisfaction of the Commissioner that he or she has successfully completed, during the one (1) year immediately prior to the application to add such rating, for the make and model of hoisting machine for which the rating is sought, the following, for the make and model of hoisting machine for which the rating is sought, the following:

(i) A course of at least 8 hours in length that meets the following requirements:

(A) The course must be conducted by the manufacturer of the hoisting machine, an entity authorized by the manufacturer of the hoisting machine, a registered New York State Department of Labor apprenticeship training program, an educational institution or school chartered by the New York State Department of Education, or an entity acceptable to the Commissioner.

(B) The course must be presented by an instructor who has been trained by the manufacturer of the hoisting machine.

(C) The course must, at a minimum, include instruction on the following topics:

1. The controls of the hoisting machine, including differences in controls based on operation mode;

2. The computer systems of the hoisting machine, including setup of the computer to match the configuration of the hoisting machine;

3. Operational aids and safety devices of the hoisting machine;

4. Wind and weather restrictions for the hoisting machine, including differences based on configuration, with emphasis on requirements when set up in configurations with a boom or boom/jib combination greater than 300 feet (91.44 m) in length; and

5. The procedures to boom-up, jackknife, and laydown the boom or boom/jib combination of the hoisting machine, including differences based on configuration, with emphasis on requirements when set up in configurations with a boom or boom/jib combination greater than 300 feet (91.44 m) in length.

(D) Instruction on makes and models of hoisting machines deemed by the Commissioner to be substantially equivalent may be included in the course.

(ii) A practical exam that meets the following requirements:

(A) The practical exam must be witnessed by a Class B Licensed Hoisting Machine Operator who must attest to the department that the hoisting machine operator who took the exam successfully passed the exam.

(B) The practical exam must be visually recorded. The record must be made available to the department upon request and must be maintained for a period of three (3) years by the entity that conducted the course required by subparagraph (i) of this paragraph, or, where such entity does not conduct the exam, by the Class B Licensed Hoisting Machine Operator who witnessed the exam.

(C) The exam must be conducted on one of the following:

1. On the hoisting machine configured with a boom or boom/jib combination greater than 300 feet (91.44 m) in length, and with the hoisting machine set back from all areas accessible to the public; or

2. On a simulator acceptable to the Commissioner. At a minimum, the simulator must be capable of recreating the controls and operating characteristics of the hoisting machine. During the exam, the simulator must recreate the hoisting machine in a configuration with a boom or boom/jib combination greater than 300 feet (91.44 m) in length.

(D) The practical exam must assess the candidate on the following:

1. Knowledge of the hoisting machine's controls, including operational modes where the controls may be reversed; and

2. For a crane with a luffing jib, ability to raise, jackknife, and laydown the boom with the luffing jib attached; or

3. For a crane with a telescoping boom, ability to extend or retract the boom with an attached jib.

(2) Substantially equivalent hoisting machines. A hoisting machine operator who already possesses a rating may, in lieu of satisfying the requirements of paragraph (1) of this subdivision, receive additional ratings if the commissioner deems the additional makes and models of hoisting machines to be substantially equivalent to a hoisting machine for which the hoisting machine operator already possesses a rating. For a hoisting machine to be deemed substantially equivalent, it must, at a minimum, be manufactured by the same manufacturer and possess the same carrier type.

(3) Renewal of ratings. Ratings expire at the same time as the underlying Class B Hoisting Machine Operator license unless they are renewed at the same time the underlying license is renewed. A rating will be considered to be renewed if the licensee demonstrates to the satisfaction of the Commissioner that he or she has successfully complied, during the preceding term of the license, with the course and examination requirements of paragraph (1) of this subdivision, or as applicable, with paragraph (2) of this subdivision.

(i) Multiple limited licenses. An individual may possess multiple Limited Hoisting Machine Operator licenses.

(Amended City Record 1/31/2017, eff. 3/2/2017; amended City Record 12/6/2017, eff. 1/5/2018; amended City Record 4/4/2018, eff. 5/4/2018 & 10/4/2018; amended City Record 6/23/2020, eff. 7/23/2020; amended City Record 4/29/2024, eff. 5/29/2024; amended City Record 6/25/2024, eff. 7/25/2024; amended City Record 8/21/2025, eff. 9/20/2025)

§ 104-10. Riggers

Open this section

(a) Qualifications. In addition to the qualification and examination requirements of the Administrative Code, an applicant for the following types of rigger licenses shall satisfy the following requirements:

(1) Fitness. An applicant for a Master, Special or Climber or Tower Crane Rigger license shall provide evidence of fitness to perform the work authorized by the license. Such evidence shall be on a form prescribed by the Commissioner and shall establish that the applicant has passed a physical exam that complies with subdivision (c) of this section, and that the applicant has complied with the substance abuse testing provisions and standards of subdivision (c) of this section. Such evidence shall include the name, address and telephone number of the laboratory that performed the tests and consent to the release by such laboratory of the test results to the Department upon request of the Department.

(2) Additional requirements.

(i) Where a licensed master rigger chooses to personally supervise the installation or use of a suspended scaffold, the licensee shall have completed all additional training required by section 3314.4.5.3 of the New York City Building Code.

(ii) Where a licensed master rigger chooses to personally supervise the assembly, jump, or disassembly of a climber/tower crane, the licensee shall have completed all additional training required by section 3319.10 of the New York City Building Code.

(iii) Where a licensed special rigger chooses to personally supervise the installation or use of a suspended scaffold, the licensee shall have completed all additional training required by section 3314.4.5.3 of the New York City Building Code.

(b) Fitness requirements for renewal. As a condition of license renewal, a licensed or previously licensed Master, Special or Tower crane rigger shall provide evidence of fitness to perform the work authorized to be performed by a holder of the license held or once held by the applicant. Evidence shall be on a form prescribed by the Commissioner and shall establish that the applicant has passed a physical exam that complies with subdivision (c) of this section, and that the applicant has received a negative result for a substance abuse test as required in subdivision (c) of this section. Such evidence shall include the name, address and telephone number of the laboratory that performed the tests and consent to the release by such laboratory of the test results to the Department upon request of the Department. A renewal applicant shall satisfy the requirements of this rule at every subsequent renewal.

(c) Physical exam. Applicants for a Master, Special or Tower Crane Rigger license shall meet the following physical qualifications, unless it can be shown that failure to meet the qualifications will not affect the ability to perform the work authorized to be performed by a holder of the license sought. In such cases, specialized clinical or medical judgments and tests may be required. The following physical qualifications shall be met at all times throughout the term of the license.

(1) Vision of at least 20/30 Snellen in one eye and 20/50 in the other, with or without corrective lenses.

(2) Ability to distinguish colors, regardless of position, if color differentiation is required to perform the work authorized to be performed by the license.

(3) Adequate hearing to meet operational demands, with or without hearing aid.

(4) Sufficient strength, endurance, agility, coordination, and speed of reaction to meet job demands.

(5) Normal depth perception, field of vision, reaction time, manual dexterity, coordination, and no tendencies to dizziness or similar undesirable characteristics.

(6) A negative result for a substance abuse test.

(7) No evidence of having physical defects or emotional instability that could create a hazard for the rigger or others, or that in the opinion of the examiner could interfere with the rigger's performance.

(8) No evidence of being subject to seizures or loss of physical control.

(d) Certifications for master riggers. Individuals who, on or after November 7, 2022, apply for a new master rigger license, or apply to renew a master rigger license whose initial application for licensure was filed on or after November 7, 2022, must provide copies of certifications required by Table 1.

(1) Required certifications must be maintained throughout the duration of the term of the license;

(2) The licensee must immediately notify the department if a certification identified in Table 1 of this subdivision and held by the licensee is suspended, revoked, not renewed, or otherwise lapses; and

(3) The licensee must provide a copy of re-certifications and new certifications identified in Table 1 of this subdivision to the department within 30 days.

Table 1: Certifications for Master Riggers

Certification Requirement NCCCO Rigger Level II Required NCCCO Lift Director - Mobile Cranes Required NCCCO Lift Director - Tower Cranes Additional

Legend to Table 1:

• “NCCCO” means “National Commission for the Certification of Crane Operators.”

• “Required” means must possess.

• “Additional” means not mandated but required if licensee intends to serve as a lift director for the type of crane specified.

(Amended City Record 12/7/2023, eff. 1/6/2024)

§ 104-11. Welders

Open this section

(a) Qualifications. An applicant for a welder license shall satisfy the qualification and examination requirements of the Administrative Code by complying with the following requirements:

(1) Applicants shall furnish to the Department a welder certification issued by the American Welding Society or the State of New York. The applicant shall provide to the Department a copy of the certification, a copy of future re-certifications and documentation of new certifications acquired. The applicable certification shall be maintained continuously for the duration of the license term and shall authorize performance of the type of welds the licensee performs.

(2) Applicants shall provide evidence of fitness to perform the work authorized to be performed by a holder of the license sought. Such evidence shall consist of documentation on a form prescribed by the Department that the applicant has passed a visual acuity test effective for the term of the license sought.

(b) Fitness requirements for renewal. As a condition of license renewal, a licensed or previously licensed welder must provide evidence of fitness to perform the work authorized to be performed by a holder of the license held or once held by the licensee. Such evidence shall consist of:

(1) A welder certification issued by the American Welding Society or the State of New York. The licensed or previously licensed welder shall provide to the Department a copy of the certification, a copy of future re-certifications and documentation of new certifications acquired. The applicable certification shall be maintained continuously for the duration of the license term and shall authorize performance of the type of welds the licensee performs.

(2) Documentation on a form prescribed by the Department that the licensee has passed a visual acuity test effective for the term of the license held or once held by the licensee.

(3) A renewal applicant shall satisfy the requirements of this subdivision at every subsequent renewal.

(Amended City Record 4/29/2024, eff. 5/29/2024)

§ 104-12. Gas Work Qualification

Open this section

(a) Requirement. Beginning January 1, 2020, no person may perform gas work, as defined in § 28-423.1 of the Administrative Code, unless such person satisfies one of the following:

(1) Is a licensed master plumber; or,

(2) Holds a gas work qualification pursuant to this section and is working under the direct and continuing supervision of a licensed master plumber; or,

(3) Holds a limited gas work qualification pursuant to this section and is performing such work under the personal and immediate supervision of either a person who holds a gas work qualification pursuant to this section, or a licensed master plumber.

(4) For purposes of this section, the term "direct and continuing supervision" shall have the same meaning as set forth in § 28-401.3 of the Administrative Code.

(5) For purposes of this section, the term "personal and immediate supervision" shall mean responsible continuous control exercised by a licensed master plumber or a person who holds a gas work qualification, who is present on site, over a person who holds a limited gas work qualification who is performing the actual gas work in the direct employ of a licensed master plumber.

(i) Such supervision shall be evidenced by the supervising individual's signature, and seal where applicable, upon any required statements, certifications, applications and/or permits and by demonstrating involvement of the supervising individual in the operations of the business, including but not limited to hiring of employees, responsibility for financial matters, and oversight of work performance.

(ii) The term "direct employ" shall have the same meaning as set forth in § 28-401.3 of the Administrative Code.

(b) Applications for a gas work qualification.

(1) Application and fee. Applicants must submit to the Department, in a form and manner determined by the commissioner, an application accompanied by all required documentation and, if applicable, an application fee as specified in 1 RCNY § 101-03. No application fee is required for a gas work qualification, provided that the applicant is, at the time of filing, a registered journeyman plumber or is concurrently applying for registration as a journeyman plumber pursuant to Article 409 of Chapter 4 of Title 28 of the Administrative Code.

(2) Examination. Applicants must submit to the Department acceptable documentation establishing satisfactory proof that such applicant has successfully passed a Department-sponsored gas work qualification examination.

(i) Applicants must apply for the examination by submitting an examination application, in a form and manner determined by the commissioner, to the Department's Licensing & Exams Unit or its designee. The examination application must be accompanied by an examination fee as specified in 1 RCNY § 101-03. Applicants reapplying to take such examination, including after a failure, must do so in accordance with the requirements in this paragraph.

(ii) Applicants have six (6) months from the date of submission of the examination application to take the examination.

(iii) Applicants who fail the examination must wait at least fourteen (14) days before reapplying to take the examination. Each time an applicant wishes to take the examination, including after a failure, the applicant must reapply to the Department and pay the required fee as specified in 1 RCNY § 101-03. Applicants may take the examination no more than three (3) times within a six (6) month period. Applicants who fail the examination three (3) times within six (6) months must wait six (6) months from the date of the third failed examination before reapplying to take such examination.

(3) Experience and education. Applicants must submit to the Department acceptable documentation establishing satisfactory proof of one or more of the following:

(i) Applicant is a registered journeyman plumber pursuant to Article 409 of Chapter 4 of Title 28 of the Administrative Code;

(ii) Applicant has successfully completed an apprenticeship in plumbing program approved by the New York State Department of Labor and has at least one (1) year of full-time experience performing or supervising plumbing work under the direct and continuing supervision of a licensed master plumber; or,

(iii) Applicant has at least five (5) years of full-time experience performing or supervising plumbing work under the direct and continuing supervision of a licensed master plumber, provided that at least one (1) year of such experience must have occurred within the City of New York.

(c) Applications for a limited gas work qualification.

(1) Application and fee. Applicants must submit to the Department, in a form and manner determined by the commissioner, an application accompanied by all required documentation and an application fee as specified in 1 RCNY § 101-03.

(2) Experience. Applicants must submit to the Department acceptable documentation establishing satisfactory proof that such applicant has at least six (6) months of full-time experience performing plumbing work under the direct and continuing supervision of a licensed master plumber.

(3) Education. Applicants must submit to the Department acceptable documentation establishing satisfactory proof of one or more of the following:

(i) Successful completion of a Department-sponsored gas work training course of not less than sixteen (16) hours of instructional time; or,

(ii) Applicant's status as an apprentice in plumbing registered in an apprenticeship program approved by the New York State Department of Labor.

(d) Documentation of education, training and experience submitted with the application. Applicants must submit to the Department acceptable documentation evidencing all claimed education, training and experience required by this section. For verification of such claimed education, training and experience, the Department may require additional supporting documentation satisfying the requirements set forth in Subdivision (e) of 1 RCNY § 104-01.

(e) Gas work and limited gas work qualification cards.

(1) Upon issuance of a notice of approval, the Department shall issue a "Gas Work Qualification Card" to applicants who have satisfied all the requirements for a gas work qualification pursuant to this section.

(i) Demonstration of gas work qualification while engaged in gas work. The gas work qualification card and a government issued photo identification card must be carried by the qualified individual at all times while engaged in any gas work, as defined in § 28-423.1 of the Administrative Code, and must be presented upon the demand of any authorized enforcement officer.

(2) Upon issuance of a notice of approval, the Department shall issue a "Limited Gas Work Qualification Card" to applicants who have satisfied all the requirements for a limited gas work qualification pursuant to this section.

(i) Demonstration of limited gas work qualification while engaged in gas work. The limited gas work qualification card and a government issued photo identification must be carried by the qualified individual at all times while engaged in any gas work, as defined in § 28-423.1 of the Administrative Code, and must be presented upon the demand of any authorized enforcement officer.

(f) Expiration and renewal.

(1) Gas work qualification. A gas work qualification will not expire and does not require renewal.

(2) Limited gas work qualification. A limited gas work qualification will expire five (5) years after the date of issuance and may not be renewed.

(Added City Record 11/7/2019, eff. 12/7/2019)

§ 104-13. Elevator Agency Directors, Elevator Agency Inspectors, Elevator Agency Technicians and Restricted Elevator Agency Technicians and Elevator Helpers

Open this section

(a) New York State elevator license required. In addition to the licenses issued pursuant to Articles 421, 422, 425 and 426 of Title 28 of the Administrative Code, the applicable license issued by the New York State Department of Labor pursuant to Article 33 of the state labor law is required in order to perform elevator work as defined in § 28-401.3 of the Administrative Code.

(b) Permit applications. No application for an elevator work permit shall be accepted by the Department unless the applicant possesses a valid New York state license, as described in subdivision (a).

(c) Permit expiration. Elevator work permits expire upon the expiration or revocation of the required state license during the term of the permit.

(d) Inspection and test reports. No required elevator inspection or test reports shall be accepted by the Department unless the elevator agency inspector possesses a valid New York state license, as described in subdivision (a).

(e) Qualifications. Elevator agency technicians, restricted elevator agency technicians and elevator helpers must meet all applicable qualifications and license requirements in Chapter 4 of Title 28 of the Administrative Code.

(Added City Record 3/4/2022, eff. 4/3/2022)

§ 104-20. Supervisory Responsibilities of a Licensed Rigger

Open this section

(a) Applicability. This section shall apply to all rigging work performed by or under the direct and continuing supervision of a licensed rigger pursuant to § 28-404.1 of the Administrative Code.

(b) Definitions.

(1) For the purposes of this section, the term "critical pick" shall have the same meaning as set forth in Chapter 2 of the Building Code.

(2) For the purposes of this section, the term "direct and continuing supervision" shall have the same meaning as set forth in § 28-401.3 of the Administrative Code.

(3) For the purposes of this section, the term "registered design professional" shall have the same meaning as set forth in § 28-101.5 of the Administrative Code.

(4) For the purposes of this section, the term "rigging foreman" shall mean an individual designated by a licensed rigger in accordance with subdivision (i) of this section. Such person shall have the qualifications set forth in subdivision (h) of this section. The term shall also refer to "suspended scaffold foreman" where such term is used in Chapter 2 of the Building Code.

(c) Planning. Except where the design prepared by a registered design professional is authorized by Chapter 33 of the Building Code or as otherwise specifically provided in paragraph (2) of subdivision (g) of this section, the licensee must personally plan the equipment set-up and operation of all rigging operations. This responsibility may not be delegated.

(d) Supervision of rigging operations other than critical picks and tower crane erection, jumping, climbing or dismantling. Except as otherwise provided in subdivision (e) of this section, the licensee need not be personally on site during rigging operations provided that a rigging foreman designated by the licensee pursuant to subdivision (i) of this section is continuously on site and that such rigging foreman performs and/or manages the work under the off-site supervision of the licensee as follows:

(1) the licensee and the rigging foreman at the work site are in frequent and direct contact with each other during the course of the rigging operation;

(2) for work involving the use of cranes, derricks, work platforms, suspended scaffolds, or other rigging setup where the safe founding or support of such equipment is a cause of concern (i.e. placed atop sidewalks, roadways or yards where vaults or other subsurface structures exist; or where the person performing a suspended scaffold inspection in accordance with Section 3314.4.3.1 or 3314.4.3.2 of the Building Code has identified a concern, etc.), the licensee personally visits the work site to inspect and approve the rigging equipment founding and setup prior to commencement of rigging operations and each time the founding or support changes;

(3) the licensee is readily available to provide on-site supervision should the need arise; and,

(4) the rigging foreman has in his or her possession at the work site the "Designated Foreman Card" issued by the department pursuant to subdivision (j) of this section, which shall be presented upon the demand of any authorized enforcement officer.

(e) Supervision of critical picks and tower crane erection, jumping, climbing, or dismantling. The licensee must be continuously on site during critical picks and tower crane erection, jumping, climbing, or dismantling, and must personally perform or personally supervise all such work. Off-site supervision of such work is not permitted.

(f) Rigging Crew. Except as otherwise provided in subdivision (g) of this section, all members of the rigging crew must be under the direct and continuing supervision of the licensee.

(1) For work conducted by a master rigger, other than the erection, jumping, or dismantling of a tower crane, the master rigger must provide a letter, signed and dated by the licensee, attesting that all members of the rigging crew are under the direct and continuing supervision of the licensee. The letter must be maintained at the site by the master rigger and made available to the commissioner upon request. In addition, where the work requires a certificate of on-site inspection or a permit, including but not limited to an on-site waiver, the letter must be submitted with the application for the certificate of on-site inspection or permit, and the plans for the certificate of on-site inspection or permit must be stamped or otherwise clearly marked, in a format acceptable to the commissioner, indicating the work will be performed under the direct and continuing supervision of the master rigger.

(2) For the erection, jumping, or dismantling of a tower crane, the master or tower crane rigger must provide a letter, signed and dated by the licensee, attesting that all members of the “jumping” crew are under the direct and continuing supervision of the licensee. The letter must be submitted as part of the plan required by Section 3319.8.1 of the New York City Building Code.

(g) Specialty Crew. Notwithstanding the provisions of § 28-401.17 of the Administrative Code, where rigging work is best handled by or requires crews of a specialty trade (e.g. handling hazardous materials or chemicals such as asbestos, or tower crane erection, jumping, climbing, or dismantling) the licensee and/or a rigging foreman designated by such licensee may perform or supervise work on behalf of a person, partnership, corporation or business association engaged in such specialty trade by making an application on a form provided by the department subject to the following conditions:

(1) the department must approve the licensee's application for such proposed rigging operation;

(2) the licensee must either plan the equipment setup and operation or be an active participant of the planning team;

(3) for loads of two thousand pounds or more, for all critical picks, and for tower crane erection, jumping, climbing, or dismantling, the licensee must provide continuous on-site personal supervision to the rigging crew;

(4) for loads below two thousand pounds and which are not critical picks, or which are not related to tower crane erection, jumping, climbing, or dismantling, the licensee need not be on site if a rigging foreman designated by such licensee is continuously on site. The rigging foreman shall manage the work under the off-site supervision of the licensee in accordance with the conditions set forth in subdivision (d) of this section;

(5) the licensee and/or his or her designated rigging foreman must have full authority to examine rigging hardware, to approve rigging setups, to mandate changes and to stop the job;

(6) the licensee is responsible for all aspects of rigging safety on the job; and

(7) the licensee shall confirm that members of the specialty crew are insured to the minimum requirements specified in § 28-401.9 of the Administrative Code and are covered by worker's compensation under the specialty crew's employer.

(h) Qualifications for designation as a rigging foreman.

(1) An individual designated as a rigging foreman by a licensed special or master rigger shall:

(i) be an employee on the payroll and covered by the worker's compensation insurance of the licensee or the business association of the licensee;

(ii) be at least 18 years of age;

(iii) be able to read and write English;

(iv) be able to identify critical picks;

(v) be familiar with the relevant sections of Chapter 33 of the Building Code, OSHA safety standards as contained in 29 C.F.R. Part 1926, and industry safety practices;

(vi) have been trained to react properly to mechanical malfunctions or adverse weather; and

(vii) be able to evaluate the fitness of the rigging crew, including, where applicable, the issuance of a certificate of fitness pursuant to subdivision (k) of this section.

(2) An individual designated as a rigging foreman by a licensed special rigger shall, in addition to the qualifications set forth in the first paragraph of this subdivision, have the following additional qualifications:

(i) at least one year's practical experience in the hoisting and rigging business; and

(ii) the knowledge of and ability to explain the risks related to such business and any particular job for which the individual is designated, and precautions to be taken in connection therewith.

(3) An individual designated as a rigging foreman by a licensed master rigger shall, in addition to the qualifications set forth in the first paragraph of this subdivision, have the following additional qualifications:

(i) at least five years of practical experience in the hoisting and rigging business, or at least two years of practical experience in the hoisting and rigging business and possession of a Level II Rigging certification issued by the National Commission for the Certification of Crane Operators, or possession of both a Level II Rigging certification and a Lift Director certification issued by the National Commission for the Certification of Crane Operators; and

(ii) the knowledge of and ability to explain the risks related to such business and any particular job for which the individual is designated, and precautions to be taken in connection therewith, including but not limited to:

(A) rigging operations and precautions to be taken in connection therewith;

(B) safe loads and computation thereof;

(C) types and methods of rigging; and

(D) pertinent hardware such as ropes, cables, blocks, poles, derricks, sheerlegs and other tools used in connection with rigging operations.

(i) Designation of a Rigging Foreman.

(1) The licensed rigger must submit a notification of designation, on a form provided by the department, which includes the following information:

(i) A list of all rigging foremen employed by the licensee or by the business association of the licensee. Each rigging foreman's full name, home address, and home phone number shall be included as part of the list.

(ii) A photograph of any newly designated rigging foreman.

(iii) The notification shall be signed and notarized by the licensee and shall contain his or her license number.

(iv) The notification shall contain a representation by the licensee that all of the rigging foremen designated by him or her have the qualifications specified in subdivision (h) of this section.

(2) A newly designated rigging foreman cannot perform foreman duties until such notification is received by the department and the department has issued a "Designated Foreman Card" pursuant to subdivision (j), below.

(3) The list must be updated within one week of the termination of a designation. When a list is updated, the licensee must file a new notification listing all rigging foremen designated by the licensee. The new notification must be filed in a manner required by the department and must contain the information set forth in subparagraphs (i), (ii), (iii) and (iv) of Paragraph (1) of this Subdivision. The new list will supersede any earlier filed notification.

(4) The designation of one or more rigging foremen shall not detract from the licensee's responsibility or liability, individually and/or through his business, for all aspects of rigging safety. This includes, but is not limited to, the actions of rigging foremen, rigging crews and specialty crews, if any.

(j) Designated Foreman Card.

(1) The department shall issue a "Designated Foreman Card" for each designated rigging foreman. Such card and a photo identification card acceptable to the department shall be carried by the rigging foreman at all times while he or she is engaged in any of the duties requiring such designation and shall be presented upon the demand of any authorized enforcement officer.

(2) It shall be the responsibility of the licensee to take possession of the "Designated Foreman Card" when such designation is terminated and return the card to the department. A designation shall be terminable by the licensee at any time, including if:

(i) the person leaves the employ of the licensee or the business associated with the license holder under § 28-401.17 of the Administrative Code;

(ii) the licensee finds that the designee is not competently performing his or her duties; or

(iii) the licensee finds that the designee has acted in an unsafe or irresponsible manner in performing his or her duties.

(k) Certificate of Fitness for Scaffold Users. In addition to the training requirements of section 3314.4 of the Building Code, individuals who use a suspended scaffold under the direct and continuing supervision of the licensed rigger shall possess a certificate of fitness.

(1) An individual issued a certificate of fitness must:

(i) be found capable of performing the scaffold work in a safe and responsible manner by the issuer at the time of issuance;

(ii) be able to communicate without difficulty with the supervising licensed rigger or rigging foreman; and

(iii) have been trained in accordance with section 3314.4 of the Building Code and possess a valid certificate card from the training provider evidencing successful completion of the training.

(2) Certificates of fitness may be issued by the licensed master or special rigger and the rigging foreman designated pursuant to this section.

(3) It shall be the sole responsibility of the licensee who issues the certificate of fitness, either personally or through a designated foreman, to ensure that the individual who receives the certificate meets the requirements of paragraph one of this subdivision for the particular job. It shall be the licensee's responsibility to maintain written records and copies relating to whom and when certificates were issued, as well as each certificate holder's certificate card. If a person issued a certificate of fitness is later found to be unqualified or to have failed to use a suspended scaffold in a safe and workmanlike manner, it shall be the licensee's responsibility to rescind the certificate of fitness and to remove the individual from the job.

(4) The certificate of fitness must be issued in a form acceptable to the department and include the name of the holder, the date of the issuance, the name and license number of the licensee, the name, address, and telephone number of the licensee's company, and the signature of the issuer.

(5) Such certificate of fitness, as well as the certificate card issued pursuant to 3314.4.5.8 of the Building Code, and photo identification of the certificate holder acceptable to the department, must be available on site for inspection.

(l) Failure to comply with rule. If this rule is not complied with, the department may order that rigging operations stop, initiate disciplinary action against the licensee and/or contractor, and/or initiate proceedings for the impositions of fines or civil penalties.

(Amended City Record 4/25/2017, eff. 5/25/2017; amended City Record 12/7/2023, eff. 1/6/2024; amended City Record 8/21/2025, eff. 9/20/2025)

§ 104-21. Supervisory Responsibilities of a Licensed Sign Hanger

Open this section

(a) Applicability. This section shall apply to all sign hanging work performed by or under the direct and continuing supervision of a licensed sign hanger pursuant to § 28-415.1 of the Administrative Code.

(b) Definitions.

(1) For the purposes of this section, the term "critical pick" shall have the same meaning as set forth in section 3302.1 of the Building Code.

(2) For the purposes of this section, the term "direct and continuing supervision" shall have the same meaning as set forth in § 28-401.3 of the Administrative Code.

(3) For the purposes of this section, the term "registered design professional" shall have the same meaning as set forth in § 28-101.5 of the Administrative Code.

(4) For the purposes of this section, the term "sign hanging foreman" shall mean an individual designated by a licensed sign hanger in accordance with subdivision (h) of this section. Such person shall have the qualifications set forth in subdivision (g) of this section.

(c) Planning. Except where the design prepared by a registered design professional is authorized by Chapter 33 of the Building Code, the licensee must personally plan the equipment set-up and operation of all sign hanging operations. This responsibility may not be delegated.

(d) Supervision of sign hanging operations other than critical picks. Except as otherwise provided in subdivision (e) of this section, the licensee need not be personally on site during sign hanging operations provided that a sign hanging foreman designated by the licensee pursuant to subdivision (h) of this section is continuously on site and that such sign hanging foreman performs and/or manages the work under the off-site supervision of the licensee as follows:

(1) the licensee and the sign hanging foreman at the work site are in frequent and direct contact with each other during the course of the sign hanging operation;

(2) for work involving the use of cranes, derricks, work platforms, suspended scaffolds, or other rigging setup where the safe founding or support of such equipment is a cause of concern (i.e. over sidewalks, roadways or yards where vaults or other subsurface structures exist; or where hooks or clamps are used on parapet walls to support hanging scaffolds, etc.), the licensee personally visits the work site to inspect and approve the sign hanging equipment founding and setup prior to commencement of sign hanging operations and each time the founding or support changes;

(3) the licensee is readily available to provide on-site supervision should the need arise; and

(4) the sign hanging foreman has in his or her possession at the work site the "Designated Foreman Card" issued by the department pursuant to subdivision (i) of this section, which shall be presented upon the demand of any authorized enforcement officer.

(e) Supervision of critical picks. The licensee must be continuously on site during critical picks and must personally perform or personally supervise all critical picks. Off-site supervision of critical picks is not permitted.

(f) Sign Hanging Crew. All members of the sign hanging crew must be under the direct and continuing supervision of the licensee.

(g) Qualifications for designation as a sign hanging foreman.

(1) An individual designated as a sign hanging foreman by a licensed special or master sign hanger shall:

(i) be an employee on the payroll and covered by the worker's compensation insurance of the licensee or the business association of the licensee;

(ii) be at least 18 years of age;

(iii) be able to read and write English;

(iv) be able to identify critical picks;

(v) be familiar with the relevant sections of Chapter 33 of the Building Code, OSHA safety standards as contained in 29 C.F.R. Part 1926, and industry safety practices;

(vi) have been trained to react properly to mechanical malfunctions or adverse weather;

(vii) be able to evaluate the fitness of the sign hanging crew, including, where applicable, the issuance of a certificate of fitness pursuant to subdivision (j) of this section;

(viii) be able to read plans and specifications relating to sign construction and erection, including supporting framework and other supports;

(ix) have a knowledge of the problems and practices of sign construction and hanging; and

(x) be familiar with the equipment and tools used in sign installations.

(2) An individual designated as a sign hanging foreman by a licensed special sign hanger shall, in addition to the qualifications set forth in the first paragraph of this subdivision, have at least three years of practical experience in sign hanging work.

(3) An individual designated as a sign hanging foreman by a licensed master sign hanger shall, in addition to the qualifications set forth in the first paragraph of this subdivision, have at least five years of practical experience in sign hanging work.

(h) Designation of a Sign Hanging Foreman.

(1) The licensed sign hanger must submit a notification of designation, on a form provided by the department, which includes the following information:

(i) A list of all sign hanging foremen employed by the licensee or by the business association of the licensee. Each sign hanging foreman's full name, home address, and home phone number shall be included as part of the list.

(ii) A photograph of any newly designated sign hanging foreman.

(iii) The notification shall be signed and notarized by the licensee and shall contain his or her license number.

(iv) The notification shall contain a representation by the licensee that all of the sign hanging foremen designated by him or her have the qualifications specified in subdivision (g) of this section.

(2) A newly designated sign hanging foreman cannot perform foreman duties until such notification is received by the department and the department has issued a "Designated Foreman Card" pursuant to subdivision (i), below.

(3) The list must be updated within one week of the termination of a designation. When a list is updated, the licensee must file a new notification listing all sign hanging foremen designated by such licensee. The new notification must be filed in the manner required by the department and must contain the information set forth in Subparagraphs (i), (ii), (iii) and (iv) of Paragraph (1) of this subdivision. The new list will supersede any earlier filed notification.

(4) The designation of one or more sign hanging foremen shall not detract from the licensee's responsibility or liability, individually or through his licensed business, for all aspects of sign hanging safety. This includes, but is not limited to, the actions of sign hanging foremen and sign hanging crews.

(i) Designated Foreman Card.

(1) The department shall issue a "Designated Foreman Card" for each designated sign hanging foreman. Such card and a photo identification card acceptable to the department shall be carried by the sign hanging foreman at all times while he or she is engaged in any of the duties requiring such designation and shall be presented upon the demand of any authorized enforcement officer.

(2) It shall be the responsibility of the licensee to take possession of the "Designated Foreman Card" when such designation is terminated and return the card to the department. A designation shall be terminable by the licensee at any time, including if:

(i) the person leaves the employ of the licensee or the business associated with the license holder under § 28-401.17 of the Administrative Code;

(ii) the licensee finds that the designee is not competently performing his or her duties; or,

(iii) the licensee finds that the designee has acted in an unsafe or irresponsible manner in performing his or her duties.

(j) Certificate of Fitness for Scaffold Users. In addition to the training requirements of section 3314.4 of the Building Code, individuals who use a suspended scaffold under the direct and continuing supervision of the licensed sign hanger shall possess a certificate of fitness.

(1) An individual issued a certificate of fitness must:

(i) be found capable of performing the scaffold work in a safe and responsible manner by the issuer at the time of issuance;

(ii) be able to communicate without difficulty with the supervising licensed sign hanger or sign hanging foreman; and,

(iii) have been trained in accordance with section 3314.4 of the Building Code and possess a valid certificate card from the training provider evidencing successful completion of the training.

(2) Certificates of fitness may be issued by the licensed master or special rigger and the sign hanger foreman designated pursuant to this section.

(3) It shall be the sole responsibility of the licensee who issues the certificate of fitness, either personally or through a designated foreman, to ensure that the individual who receives the certificate meets the requirements of paragraph one of this subdivision for the particular job. It shall be the licensee's responsibility to maintain written records and copies relating to whom and when certificates were issued, as well as each certificate holder's certificate card. If a person issued a certificate of fitness is later found to be unqualified or to have failed to use a suspended scaffold in a safe and workmanlike manner, it shall be the licensee's responsibility to rescind the certificate of fitness and to remove the individual from the job.

(4) The certificate of fitness must be issued in a form acceptable to the department and include the name of the holder, the date of the issuance, the name and license number of the licensee, the name, address, and telephone number of the licensee's company, and the signature of the issuer.

(5) Such certificate of fitness, as well as the certificate card issued pursuant to 3314.4.5.8 of the Building Code and photo identification of the certificate holder acceptable to the department, must be available on site for inspection.

(k) Failure to comply with rule. If this rule is not complied with, the department may order that sign hanging operations stop, initiate disciplinary action against the licensee and/or contractor, and/or initiate proceedings for the impositions of fines or civil penalties.

(Amended City Record 4/25/2017, eff. 5/25/2017)

§ 104-22. Other Obligations

Open this section

(a) Licensees shall promptly notify the Department in writing of any address change within thirty (30) days of the change.

(b) Licensees, as part of their obligation to maintain good moral character, shall notify the Department in writing of any criminal conviction within ten (10) days of the occurrence.

§ 104-23. Hoisting Machine Operator Learners and Supervision of Learners

Open this section

(a) Applicability. The operation of hoisting machines by a learner must be in accordance with the requirements of this section.

(b) Definitions. For the purposes of this section, the following terms have the following meanings:

Direct supervision. See § 28-401.3 of the New York City Administrative Code.

Hoisting machine. See Section 3302.1 of the New York City Building Code.

Hoisting machine operator. An individual licensed as a hoisting machine operator in accordance with Article 405 of Chapter 4 of Title 28 of the New York City Administrative Code.

Learner. An individual learning to become a hoisting machine operator.

Supervising licensee. The hoisting machine operator who is supervising the learner.

(c) Basic requirements for learners. Learners must, at a minimum:

(1) Be at least 18 years of age;

(2) Hold a valid driver's license;

(3) Be able to communicate in the language of the supervising licensee;

(4) Be able to read plans and load charts;

(5) Be familiar with the controls, operating characteristics, and emergency procedures of the hoisting machine to be operated; and

(6) Meet the physical qualifications of Section 5-3.1.2(a) of ASME B 30.5-2021, as verified by passing a physical exam and a substance abuse test.

(d) Supervision by licensee. The learner must be in the presence of and under the direct supervision of a licensed hoisting machine operator during all times the learner is operating the hoisting machine, as follows:

(1) The supervising licensee and the learner must be in direct communication with each other, either verbally or by hand signals, at all times; and

(2) For hoisting machines other than tower cranes, the supervising licensee and the learner must be in the direct line of sight of each other at all times. For a tower crane, the supervising licensee must be present in or near the crane cab or operators station.

(e) Breaks. The learner may not operate the hoisting machine when the supervising licensee is on a break. The hoisting operation must stop and the hoisting machine must be properly secured before the supervising licensee goes on break.

(f) Responsibility of supervising licensee. The supervising licensee must:

(1) Ensure the learner safely operates the hoisting machine in accordance with all department regulations, manufacturer specifications, and approved permits or certificates; and

(2) Perform the frequent inspection and the parking/securing inspection for the crane or derrick in accordance with subdivision (k) of 1 RCNY § 3319-01 and maintain the log for the crane or derrick in accordance with subdivision (h) of 1 RCNY § 3319-01.

(g) Authority to stop operation. The supervising licensee has the authority to issue orders to the learner, order the learner to stop operation, and, if necessary, prohibit the learner from operating the hoisting machine.

(h) Attention to monitoring. While supervising the learner, the supervising licensee may not perform any tasks that detract from his or her ability to monitor the learner.

(i) Tasks within learners ability. The tasks performed by the learner while operating the hoisting machine must be within the learner's ability.

(j) Restrictions on learners operation. The learner may not operate a hoisting machine in any of the following circumstances:

(1) If any part of the hoisting machine, load line, or load (including rigging and lifting accessories), if operated up to the hoisting machine's maximum working radius in the work zone as established by clause (A) of subparagraph (ii) of paragraph (3) of subdivision (s) of 1 RCNY § 3319-01, could get within 20 feet of a power line that is up to 350 kV, or within 50 feet of a power line that is over 350 kV;

(2) If the hoisting machine is used to hoist personnel;

(3) In multiple-equipment lifts;

(4) If the hoisting machine is used over a shaft, cofferdam, or in a tank farm;

(5) In multiple-lift rigging operations;

(6) If the pick is a critical pick as defined in Section 3302.1 of the New York City Building Code; or

(7) If the operation is related to the erection, climbing, jumping, or dismantling of a tower crane.

(k) Type, size, and capacity of hoisting machine supervised is within scope of license. Licensed hoisting machine operators may only supervise the operation of a learner on hoisting machinery that is authorized to be operated by the licensee, and where a certification for the operation of a type of hoisting machine has been established in rules promulgated by the commissioner, the licensee possesses the certification for that type of hoisting machine, and such certification has been listed on the hoisting machine operator's license by the department.

(l) Type, size, and capacity of hoisting machine operated by learner to be within scope of license sought. The learner may only operate hoisting machinery that is authorized by the scope of the license sought. Only a person who possesses a Class A hoisting machine operator license may operate as a learner on hoisting machinery that is authorized to be operated only by a Class B hoisting machine operator; except that only individuals who hold a Class B hoisting machine operator license with the appropriate rating may operate in New York City hoisting machinery that requires a rating in accordance with § 28-405.2 of the New York City Administrative Code. Nothing in this section prohibits an individual who began training to obtain a Class C hoisting machine operator license from pursuing a Class A hoisting machine operator license instead and from operating Class A machinery as a trainee in accordance with the provisions of this section. Nothing in this section prohibits an individual who began training to obtain a limited hoisting machine operator license from pursuing a Class C or Class A hoisting machine operator license and from operating Class C or Class A machinery as a trainee in accordance with the provisions of this section.

(m) Employment. A learner for a hoisting machine operator does not need to be employed by the hoisting machine operator supervising the learner. The learner and supervisor do not need to be employed by the same entity.

(Added City Record 12/6/2017, eff. 1/5/2018; amended City Record 6/23/2020, eff. 7/23/2020; amended City Record 6/25/2024, eff. 7/25/2024; amended City Record 8/21/2025, eff. 9/20/2025)

§ 104-24. Registered Filing Representatives

Open this section

This section establishes two types of filing representatives and sets forth the training, education, and experience requirements necessary at registration for both classes of representatives.

(a) References. See Article 416 of Title 28 of the New York City Administrative Code and § 28-416.2 of same for a list of persons exempt from filing representative registration.

(b) Definitions. For the purposes of this chapter, the following terms mean:

(1) Architect. A person licensed and registered to practice the profession of architecture under the education law of the state of New York.

(2) Engineer. A person licensed and registered to practice the profession of engineering under the education law of the state of New York.

(3) Job. An application with an individual job number filed by the registered design professional of record. This does not include limited alteration applications, post-approval amendments, electrical applications, or demolition applications.

(4) Registered design professional. An architect or engineer.

(5) Registered design professional of record. The registered design professional who prepared or supervised the preparation of applicable construction documents filed with the department.

(c) Class 1 registered filing representatives. Class 1 filing representatives may, following registration and issuance of an identification card, present, submit, furnish or seek approval of applications or construction documents, and remove documents from the possession of the department. However, beginning July 1, 2013, such filing representatives cannot appear before or attend appointments with plan examiners and other department technical staff including, but not limited to code and zoning specialists, plan examiners, chief plan examiners, borough commissioners, and deputy borough commissioners, regarding construction document approvals, including, but not limited to, plan review, audit review, pre-determinations, and determinations.

(d) Class 1 filing representative registration requirements.

(1) Beginning May 1, 2013, those seeking class 1 filing representative status must submit proof of the successful completion of a department-approved, integrity training at registration.

(2) Beginning May 1, 2014, those seeking class 1 filing representative status must submit the following at registration:

(i) Proof of the successful completion of a sixteen- (16) hour training course, approved by the department, within one (1) year of application for registration, in the following areas:

(A) The New York City Building Code;

(B) The New York City Energy Conservation Code;

(C) The New York City Zoning Resolution; and

(D) Relevant provisions of the New York City Administrative Code and department practices.

(ii) Proof of the successful completion of a department-approved, integrity training.

(e) Class 1 filing representative renewal requirements. Beginning July 1, 2014, during the one (1) year immediately prior to renewal, or beginning July 1, 2017, during the three (3) years immediately prior to renewal, a class 1 registered filing representative must have attended and successfully completed a Department-administered or Department-approved integrity training and the sixteen- (16) hour training course required by subdivision (d) of this rule. If the sixteen- (16) hour training course was successfully completed prior to registration, it need not be completed again prior to renewal. Proof of completion of such course(s) must be submitted to the Department at renewal.

(f) Class 2 registered filing representatives. Class 2 registered filing representatives (also referred to as "code and zoning representatives") may, following registration and issuance of an identification card, perform all of the activities of a class 1 registered filing representative and may also appear before and attend appointments with plan examiners and other department technical staff regarding construction document approvals, including, but not limited to, plan review, audit review, pre-determinations, and determinations. However, class 2 registered filing representatives can only appear before, or attend such appointments at, the NYC Development Hub for New Building applications, Alteration Type 1 applications, and any and all related applications, in person or online, if they are employed and supervised by the registered design professional of record. If not, when appearing before or attending such appointments at the NYC Development Hub, class 2 registered filing representatives must be accompanied by the registered design professional of record or an individual employed and supervised by the registered design professional of record in the preparation of the construction documents being discussed.

(g) Class 2 filing representative requirements.

(1) Beginning May 1, 2013, those seeking class 2 filing representative status must submit the following:

(i) Proof of:

(A) A four (4) year degree in Architecture or Engineering from an accredited college; or

(B) A four (4) year degree in another field from an accredited college, and proof of two (2) years as a registered filing representative with the department with at least fifty (50) jobs filed within four (4) years of application for class 2 filing representative status; or

(C) Those who do not meet the requirements of paragraphs (i) or (ii) above may register and submit proof of the following during the limited time period of May 1, 2013 through June 30, 2013 only: four (4) years as a registered filing representative with the department with at least one hundred and twenty-five (125) jobs filed within eight (8) years of application for class 2 filing representative status.

(ii) Proof of the successful completion of a department-approved, integrity training.

(2) Beginning May 1, 2014, those seeking class 2 filing representative status must submit the following:

(i) Proof of:

(A) A four (4) year degree in Architecture or Engineering from an accredited college; or

(B) A four (4) year degree in another field from an accredited college, and proof of two (2) years as a registered filing representative with the department with at least fifty (50) jobs filed within four (4) years of application for class 2 filing representative status.

(ii) Proof of the successful completion of a thirty-six- (36) hour training course approved by the department, within one (1) year of application for class 2 filing representative status, in the following areas:

(A) The New York City Building Code;

(B) The New York City Energy Conservation Code;

(C) The New York City Zoning Resolution; and

(D) Relevant provisions of the New York City Administrative Code and department practices.

(iii) Proof of the successful completion of a department-approved, integrity training.

(h) Class 2 filing representative renewal requirements.

(1) Beginning July 1, 2014, during the one (1) year immediately prior to renewal, a class 2 registered filing representative must have attended and successfully completed a Department-administered or Department-approved integrity training and the thirty-six- (36) hour training course required by subdivision (g) of this rule. If the thirty-six- (36) hour training course was successfully completed prior to registration, it need not be completed again prior to renewal. Proof of completion of such course(s) must be submitted to the Department at renewal.

(2) Beginning July 1, 2017, during the three (3) years immediately prior to renewal, a class 2 registered filing representative must have attended and successfully completed a Department-administered or Department-approved integrity training and a sixteen- (16) hour, Department-approved, refresher course. Proof of completion of such course(s) must be submitted to the Department at renewal.

(i) Additional powers of the commissioner. The commissioner may, upon a determination of good cause, extend the dates and deadlines set forth in this rule.

(j) Suspension or revocation. Filing representative registration may be suspended or revoked in accordance with § 28-401.19 of the New York City Administrative Code.

§ 104-25. Requirement of a Seal for Use by Licensed Oil-Burning Equipment Installers. [Repealed]

Open this section

(Repealed City Record 4/29/2024, eff. 5/29/2024)

§ 104-26. Deactivation of License

Open this section

If the holder of a license issued pursuant to § 28-401.10 of the Administrative Code is no longer engaged in a business or trade licensed by the department, but does not wish to leave the licensed trade, the license holder may so notify the department and submit his or her license and seal to the department for deactivation. If the licensee deactivates such license, the deactivated license shall no longer represent an authorization to engage in a particular trade, occupation, or business. While a licensee who chooses to deactivate his or her license may continue to work in the licensed trade under the supervision of an active licensee, he or she may not practice in the trade or business as a licensee or hold him or herself out as a licensee while the license is deactivated.

(a) Applicability. This section applies to Master Plumbers, Master Fire Suppression Piping Contractors, High Pressure Boiler Operating Engineers, Welders, Riggers, Sign Hangers, Oil Burners, Site Safety Managers, Hoist Machine Operators, Elevator Agency Inspectors, Elevator Agency Directors, Elevator Agency Technicians, Restricted Elevator Agency Technicians, Master Electrician, and Special Electrician.

(b) Deactivation. A license can remain deactivated for a maximum of twelve years after the date of deactivation. If a licensee fails to reactivate a license after this twelve year period, the deactivated license will lapse. In order to deactivate a license, at the time of application for deactivation, the licensee must ensure that:

(1) All outstanding fines, penalties, or fees related to the licensee's professional dealings with the city or any governmental entity are paid, and

(2) There are no violations for work performed under such license pending hearing or in default, and

(3) Open applications filed under such license – including permits, jobs, scaffold notifications, and Limited Alteration Applications (LAAs) that name the licensee, as well as permits issued to the licensee – have been scheduled for inspection in accordance with department procedures, re-filed by another licensee, or withdrawn, and

(4) He or she surrenders his or her license card, plate and/ or seal, if applicable.

(c) Deactivation renewal. While the license is deactivated, the licensee must still submit a renewal application, continue to pay the license renewal fees required during each deactivation period, take any required continuing education courses and maintain certifications required by rule. If the licensee submits the renewal application after the date on which the license would have otherwise expired, the licensee must comply with the relevant provisions of Administrative Code § 28-401.13, and any other applicable rules and regulations. If a license has been deactivated for more than five, but fewer than twelve, years:

(1) At renewal, the commissioner may require the licensee submit an affidavit and supporting documentation satisfactory to the department stating that, during each of the last three years, the individual has continuously been actively and legally engaged in the trade for which the applicant's license was issued, under the direct supervision of a licensee for their specific trade in order to prevent the deactivated license from expiring.

(2) If the licensee cannot satisfactorily demonstrate active and legal engagement in the relevant trade, in order to prevent the license from expiring, the licensee must reactivate the license for at least one license term. If the license expires, applicants must comply with late renewal requirements of Administrative Code § 28-401.13, and any other applicable rules and regulations.

(d) Reactivation. To reactivate a license, the licensee must comply with the license issuance requirements for his or her specific trade, pay all applicable fees, and submit all forms as prescribed by the commissioner.

(1) If the licensee has complied with the deactivation requirements of this rule, the license may be reactivated up to five years after the date of deactivation.

(2) The department may refuse to reactivate a license on any grounds on the basis of which it could deny, suspend or revoke such license.

(e) Master Plumbers and Master Fire Suppression Piping Contractors must also comply with the certificate of competence requirements of Chapter 4 of Title 28 of the Administrative Code.

(Added City Record 9/2/2016, eff. 10/2/2016; amended City Record 3/4/2022, eff. 4/3/2022; amended City Record 4/29/2024, eff. 5/29/2024; amended City Record 11/21/2025, eff. 12/21/2025)

§ 105-01. Requirements for the Approval of a Property Tax Abatement Application for the Installation of a Green Roof

Open this section

(a) Purpose and applicability. This section establishes the procedure for a property tax abatement application for a green roof as defined in Title 4-B of Article 4 of the New York State Real Property Tax Law (“Title 4-B”). A green roof shall not be eligible for a tax abatement pursuant to Title 4-B if the construction of any of the required elements of the green roof set forth in Title 4-B § 499-aaa(10), except § 499-aaa(10)(a), was commenced prior to August 5, 2008.

(b) Designated agency. For purposes of Title 4-B, the designated agency is the Department of Buildings (“Department”).

(c) Definitions. The terms used in this section have the same meanings as the terms defined in Title 4-B § 499-aaa. In addition, for purposes of this section, the following terms have the following meanings:

(1) Applicant for property tax abatement. The applicant as defined in Title 4-B § 499-aaa, including such applicant’s successors-in-interest.

(2) Applicant of record. The registered design professional who files the application for installation with the Department.

(3) Application for installation. Construction documents filed with the Department for the installation of green roof space.

(4) Compliance period. The tax year, beginning July 1 and ending the following June 30, in which the green roof property tax abatement is taken.

(5) Green roof space. Such part of the eligible rooftop space that consists of a green roof.

(6) Property tax abatement application. The application, including certifications and agreements required by Title 4-B and this section, that is filed with the Department for a green roof property tax abatement in accordance with Title 4-B.

(7) Vegetation layer. The layer of a green roof required by Title 4-B § 499-aaa(10)(g) that, in accordance with generally accepted horticultural practice and as certified by an architect, engineer, New York State licensed and registered landscape architect or a horticulturist with a degree or certificate from an accredited training institute, consists of live plants such as sedum or equally drought resistant and hardy plant species, native plant species, and/or agricultural plant species spaced in such a manner that such plants will cover at least eighty (80) percent of such layer by the end of the compliance period.

(d) Codes. All work relating to the installation of a green roof must comply with the requirements of the New York City Construction Codes (“Construction Codes”) contained in Title 28 of the Administrative Code (“Title 28”). All such work must also comply with the requirements of the New York City Electrical Code, the New York City Fire Code, the New York City Energy Conservation Code, the New York City Zoning Resolution and other applicable laws and rules.

(e) Application for installation of a green roof.

(1) Filing. All property tax abatement applications must be filed with an application for installation that includes an acknowledgement by the applicant of record that the final inspection must be performed by an approved agency in accordance with Administrative Code § 28-116.2.4.2.

(i) At the time of submission of the application for installation, the applicant of record must indicate on forms furnished by the Department that such application will be the subject of a property tax abatement application.

(ii) The application for installation must include, but not be limited to, the following construction documents and information:

(A) Roof plan showing eligible rooftop space and green roof space and providing the net square footage of each. The plan must demonstrate that the green roof does not obstruct access for both firefighting, in accordance with Section 504 of the New York City Fire Code, and maintenance of all roof equipment.

(B) Proof, including but not limited to drawings, details and documentation, demonstrating that the green roof meets the definition set forth in Title 4-B § 499-aaa(10), as well as the requirements in applicable provisions of the codes listed in subdivision (d) of this section. Proof must indicate the depth of the growth medium.

(C) Design and construction drawings reflecting construction work necessary to enable the building, its structure, the roof structure with the green roof, together with any other existing or added rooftop structures and/or equipment, the roof covering and roof drainage systems to comply with the codes enumerated in subdivision (d) of this section and other requirements set forth in this section and/or Title 4-B. The weight of the green roof shall be considered a superimposed dead load. The design shall consider the green roof in saturated condition.

(D) The construction documents required by clauses (A), (B) and (C) of this subparagraph shall not be necessary for an application for a green roof installation of a depth of four inches or less where a structural analysis of the existing building has been performed establishing that such building can, without modification, sustain the load of the green roof in a fully saturated condition in a manner that complies with the codes enumerated in subdivision (d) of this section, provided the applicant of record certifies that the construction work reflected in the application for installation complies with such codes and other requirements set forth in this section and Title 4-B and that the analyses reflected in the requirements of clauses (A), (B) and (C) of this subparagraph have been performed. In making such certifications, the weight of the green roof shall be considered a superimposed dead load. The design shall consider the green roof in saturated condition. Where, in accordance with the provisions of this subdivision, construction documents required by clauses (A), (B) and (C) of this subparagraph are not submitted to the Department, the applicant of record shall perform the inspections for the installation required by paragraph (4) of subdivision (e) and paragraph (1) of subdivision (f) of this section.

(2) Document retention. Construction documents required by clauses (A), (B) and (C) of subparagraph (ii) of paragraph (1) of this subdivision, including structural analyses and calculations, regardless of whether submitted to the Department, must be retained for six years by the applicant of record and must be made available upon request of the Department.

(3) Permits and technical reports. All required permits must be obtained, including any required electrical permits. Technical Report(s) identifying those responsible for any special, progress and final inspections required by the Construction Codes must be filed with the Department.

(4) Inspections. Inspections shall be performed in accordance with Article 116 of Title 28 and Title 4-B after the completion and sign-off of any required electrical work. Final inspection shall be performed in accordance with Administrative Code § 28-116.2.4.2.

(5) Job sign-off. Upon completion of work, the applicant of record must submit to the Department completed Technical Reports, including final inspection, and a request for job sign-off pursuant to Administrative Code § 28-116.4. The request must be accompanied by a completed property tax abatement application. If the property tax abatement application is not submitted together with and at the same time as the request for job sign-off, the property tax abatement application shall be denied, and the Department shall not further review or process the property tax abatement application.

(f) Property tax abatement application.

(1) Title 4-B certification. A registered design professional must inspect the completed green roof and must certify (1) its compliance with the definitions and requirements of Title 4-B, including but not limited to Sections 499-aaa(10) and 499-ccc of Title 4-B and the designation of eligible rooftop space on the drawings, and (2) the square footage of green roof space eligible for tax abatement pursuant to Title 4-B. In making such certification, the registered design professional may rely on the report(s) of a New York State licensed and registered landscape architect or a horticulturist with a degree or certificate from an accredited training institute with respect to whether the green roof’s vegetation layer complies with Title 4-B § 499-aaa(10).

(2) Maintenance plan. A registered design professional, New York State licensed and registered landscape architect or a horticulturist with a degree or certificate from an accredited training institute must prepare a maintenance plan for the green roof. Such maintenance plan shall be sufficient to enable the applicant for property tax abatement to maintain the green roof during the compliance period and for a minimum of three (3) years thereafter in such a way that it continuously constitutes a green roof in accordance with Title 4-B and this section.

(i) The maintenance plan must require at least semi-annual maintenance inspections of the condition of the roof and plants, contingency plans for irrigation during dry or drought conditions when necessary to ensure the survival of plants, contingency plans for replanting areas where plants have died, and any other corrective measures necessary to ensure that the green roof is maintained in accordance with Title 4-B and this section.

(ii) The maintenance plan must include monthly maintenance inspections to ensure that roof drains remain free of debris and in working condition.

(iii) The maintenance plan must identify any problems that may be encountered, describe corrective measures for each such problem and identify when and how often such corrective measures are required in order to maintain the green roof in continuous compliance.

(iv) The individual who prepared the maintenance plan must certify, either on the property tax abatement application, if such individual is a registered design professional, or in a report provided to the registered design professional filing the property tax abatement application, if such individual is a New York State licensed and registered landscape architect or a horticulturist with a degree or certificate from an accredited training institute, that the maintenance plan complies with this section and that he or she has provided the maintenance plan to the applicant for property tax abatement. Such maintenance plan must be provided to the Department upon request.

(3) Application process. A registered design professional must complete the property tax abatement application. Such property tax abatement application must be accompanied by a Title 4-B certification by the property tax abatement applicant or such applicant’s representative that no construction of any required element of the green roof set forth in Title 4-B § 499-aaa(10), except § 499-aaa(10)(a), was commenced prior to August 5, 2008.

(4) The completed property tax abatement application, together with the Technical Reports and request for job sign-off, must be filed with the Department by March 15 in order for the property tax abatement to take effect on July 1 of the same calendar year. If a property tax abatement application is filed after March 15, the property tax abatement to which such application relates shall not take effect until July 1 of the following calendar year.

(5) Upon receipt and acceptance of the completed property tax abatement application and all applicable fees, the Department shall forward any required documents to the Department of Finance for review and the issuance of the tax abatement.

(6) Filing date. The date of filing of the property tax abatement application shall be the date of submission of job sign-off documents and the application for property tax abatement.

(g) Compliance period.

(1) The applicant for property tax abatement must allow all registered design professionals, landscape architects and horticulturists involved in the installation and maintenance of the green roof and the Department to have access to the green roof and any related structures and equipment for inspection thereof at any time during the compliance period upon reasonable notice.

(2) Pursuant to Title 4-B § 499-ddd(1), within the fifteen (15) calendar days prior to the last day of the compliance period, the applicant of record, landscape architect or other registered design professional must inspect the green roof, including without limitation its vegetation layer, to certify its continuing compliance with Title 4-B, this section and applicable provisions of law and rules, including but not limited to the codes enumerated in subdivision (d) of this section. Such inspecting professional must prepare an inspection report and retain such report for six years. Such report must be made available to the Department upon request. If the inspecting professional finds that the green roof is not in compliance with Title 4-B, such inspecting professional must notify the Department in a form and manner prescribed by the Department.

(h) Revocation.

(1) Should the Department have reason to believe at any time during the compliance period that a condition described in Title 4-B § 499-eee(1) exists, the Department shall inspect or otherwise investigate the condition. If the findings of such inspection or investigation indicate that a condition described in Title 4-B § 499-eee(1) exists, the applicant for property tax abatement must pay the inspection and investigation expenses of the Department. The Department shall notify the applicant for property tax abatement of any findings that indicate that a condition described in Title 4-B § 499-eee(1) exists and provide such applicant with an opportunity to dispute the findings.

(2) No later than the ninetieth day after the last day of the compliance period, the Department shall notify the Department of Finance of any findings of noncompliance and shall identify the period of noncompliance.

(3) The Department may declare an applicant for property tax abatement ineligible for future tax abatements in accordance with Title 4-B § 499-eee(4).

(i) Notification of the New York State Department of Education. In accordance with Title 4-B § 499-fff(3), should the Department determine that any registered design professional or landscape architect involved in the installation and maintenance of the green roof engaged in professional misconduct in making certifications required by Title 4-B or this rule, the Department shall so notify the New York State Department of Education.

(Amended City Record 12/30/2024, eff. 1/29/2025)

§ 105-02. Requirements for the Approval of a Property Tax Abatement Application for the Installation of a Solar Electric Generating System or for the Installation of Electric Energy Storage Equipment

Open this section

(a) Purpose and applicability. This section establishes the procedure for a property tax abatement application for a solar electric generating system and electric energy storage equipment as defined in Title 4-C of Article 4 of the New York State Real Property Tax Law ("Title 4-C").

(1) No solar electric generating system expenditures shall be eligible for a tax abatement pursuant to Title 4-C if such expenditures were: (1) incurred before August 5, 2008; or (2) incurred in connection with a solar electric generating system placed in service before August 5, 2008.

(2) No electric storage equipment expenditures shall be eligible for a tax abatement pursuant to Title 4-C if such expenditures were: (1) incurred before January 1, 2019; or (2) incurred in connection with electric storage equipment placed in service before January 1, 2019.

(3) No building shall be eligible for more than one tax abatement pursuant to Title 4-C or this rule prior to January 1, 2024.

(b) Designated agency. For purposes of Title 4-C, the designated agency shall be the Department of Buildings ("Department").

(c) Definitions. The terms used in this section have the same meanings as the terms defined in Title 4-C § 499-aaaa. In addition, for purposes of this section, the following terms have the following meanings:

(1) Applicant for property tax abatement. The applicant as defined in Title 4-C § 499-aaaa, including such applicant's successors-in-interest.

(2) Applicant of record. The registered design professional who files the application for installation with the Department.

(3) Application for installation. Construction documents filed for the installation of solar electric generating system or electric energy storage equipment.

(4) Compliance period. The tax year, beginning July 1 and ending the following June 30, in which the property tax abatement commences and the three tax years, each beginning July 1 and ending the following June 30, immediately thereafter.

(5) Placed in service. The latter of:

(i) The date of the utility company's (i.e. Con Ed, LIPA, etc.) final acceptance of interconnection; or

(ii) The date of the department's electrical division's sign-off, as evidenced on the department's website.

(6) Property tax abatement application. The application, including certifications required by Title 4-C and this section, that is filed with the Department for a solar electric generating system or electric energy storage equipment property tax abatement in accordance with Title 4-C.

(d) Codes. All work relating to the installation of a solar electric generating system and electric energy storage equipment must comply with the requirements of the New York City Construction Codes ("Construction Codes") contained in Title 28 of the Administrative Code of the City of New York ("Title 28"). All such work must also comply with the requirements of the New York City Electrical Code, the New York City Fire Code, the New York City Energy Conservation Code, the New York City Zoning Resolution and other applicable laws and rules.

(e) Procedure for application for installation of a solar electric generating system for the purposes of a tax abatement.

(1) Filing. All property tax abatement applications must be filed with an application for installation that includes an acknowledgement by the applicant of record that the final inspection must be performed by an approved agency in accordance with Administrative Code § 28-116.2.4.2.

(i) At the time of submission of the application for installation, the applicant of record must indicate on forms furnished by the Department that such application will be the subject of a property tax abatement application.

(ii) The application for installation must include, but not be limited to, the following construction documents and information:

(A) Zoning height and setback documents demonstrating that the solar electric generating system complies with height and setback regulations as prescribed by the New York City Zoning Resolution.

(B) Plot plan showing:

1. the metes and bounds and location of the building on the site,

2. the location of the solar electric generating system elements on the building and/or site,

3. the location and description of any trees that, were they to fall, could come into contact with any part of the solar electric generating system, and

4. the location of and type of city infrastructure services, utility lines or other potential hazards on the building and/or site.

(C) Site plan, floor plan(s), roof plan(s), elevation(s) and/or other drawings sufficient to show and describe the solar electric generating array(s), building-integrated solar electric generating panels, solar electric generating laminate and related elements of the solar electric generating system on the building and/or site, and their arrangement and operation.

(D) Proof including but not limited to drawings, details and documentation demonstrating that the solar electric generating system meets the definition set forth in Title 4-C § 499-aaaa (10), as well as the requirements in applicable provisions of the codes listed in subdivision (d) of this section.

(E) For a roof installation, a roof plan demonstrating that the solar electric generating system does not obstruct access for both firefighting, in accordance with Sections 504 and 512 of the New York City Fire Code, and maintenance of all roof equipment. For an installation in any other location, the site plan must show access for firefighting and maintenance to and around buildings on site and the solar electric generating system in accordance with the New York City Fire Code.

(F) Drawings showing the foundation and/or anchorage of the solar electric generating system. For rooftop installations ballast must be fully contained and must comply with the requirements in Chapter 15 of the New York City Building Code. For grade-level installations ballast must be fully contained and loose aggregate, gravel or crushed stone shall not be used.

(G) Design and construction drawings reflecting construction work necessary to enable the building, its structure, the roof structure, the structural work related to the solar electric generating system (and, for rooftop installations, any other rooftop structures and/or equipment), the roof covering and roof drainage systems to comply with the codes listed in subdivision (d) of this section and other requirements set forth in this section and Title 4-C.

(H) Proof of compliance with the requirements of Appendix G of the Building Code, if applicable.

(2) Document retention. Construction documents required by clauses (A) through (H) of subparagraph (ii) of paragraph (1) of this section, including structural analyses and calculations, must be retained for six years by the applicant of record and must be made available upon request of the Department.

(3) Permits and technical reports. Permits must be obtained for both the construction work and the electrical work to be performed. Technical Report(s) identifying those responsible for special, progress and final inspections required by the Construction Codes must be filed with the Department.

(4) Construction inspections. Any construction work performed in connection with the application for installation, including but not limited to the solar electric generating system, shall be inspected and have its final inspection, in accordance with Administrative Code § 28-116.2.4.2. Other inspections as required by the Construction Codes or this section shall be performed in accordance therewith.

(5) Job sign-off. The applicant of record must submit to the Department completed Technical Reports and a request for job sign-off pursuant to Administrative Code § 28-116.4. The request for job sign-off must be accompanied by utility company acknowledgement that the application for interconnection is complete or certification by the applicant or such applicant's representative attesting that the solar electric generating system will not be interconnected with the electrical grid. The request must also be accompanied by a completed property tax abatement application. If the property tax abatement application is not submitted together with and at the same time as the request for job sign-off, the property tax abatement application shall be denied, and the Department shall not further review or process the property tax abatement application.

(6) Electrical work. Electrical work associated with applications for the installation of solar electric generating systems must comply with the following:

(i) Such applications must be filed for electrical plan examination in accordance with the Department's rules if such work includes but is not limited to:

(A) Any change in an electrical installation with a rating of 1000 KVA or higher, up to and including the second level overcurrent protection; or

(B) any electrical installation above 600 V; or

(C) an electrical installation that is itself 1000 KVA or greater.

(ii) Such application must include but not be limited to the following:

(A) One line diagram.

(B) Plan view / service equipment room layout.

(C) Selective Coordination Study.

(iii) Permit. An electrical permit must be obtained prior to installation and the electrical work must be performed by a New York City licensed electrician.

(A) For all electrical permit applications related to the solar electric generating system, the applicant must indicate "Sustainable Energy Install".

(B) For installations that require plan examination, the electrical permit must be obtained following approval of the electrical plan examination filing of the electrical work to be performed in connection with the solar electric generating system.

(iv) Electrical inspections. The electrical work performed in connection with the solar electric generating systems must be completed and inspected in accordance with the New York City Electrical Code.

(v) Electrical sign-off. The electrical inspection is deemed signed off when it passes an inspection performed by the Department's Electrical Division and all fees have been paid.

(f) Procedure for application for installation of electric energy storage equipment for the purposes of a tax abatement.

(1) Filing. All property tax abatement applications must be filed with an application for installation that includes an acknowledgement by the applicant of record that the final inspection must be performed by an approved agency in accordance with Administrative Code § 28-116.2.4.2.

(i) At the time of submission of the application for installation, the applicant of record must indicate on forms furnished by the Department that such application will be the subject of a property tax abatement application.

(ii) The application for installation must include, but not be limited to, the following construction documents and information:

(A) Zoning analysis demonstrating that the energy storage equipment complies with all regulations as prescribed by the New York City Zoning Resolution for that particular Zoning District.

(B) Plot plan showing:

1. the metes and bounds and location of the building on the site,

2. the location of the energy storage equipment elements on the building and/or site,

3. the location of and description of any trees that, were they to fall, could come into contact with any part of the energy storage equipment, and

4. the location of and identifying any city infrastructure services, utility lines or other potential hazards on the building and/or site.

(C) Site plan, floor plans(s), roof plan(s), elevation(s) and/or other drawings sufficient to show and describe the energy storage equipment.

(D) Proof that the energy storage equipment meets the definition set forth in Title 4-C § 499-aaaa(11), as well as the requirements in applicable provisions of the codes listed in subdivision (d) of this section.

(E) For a roof installation, a roof plan demonstrating that the energy storage system does not obstruct access for both firefighting, in accordance with Sections 504 and 512 of the New York City Fire Code, and maintenance of all roof equipment. For a site installation, the site plan must show access for firefighting and maintenance to and around site buildings and the energy storage equipment in accordance with the New York City Fire Code.

(F) Drawings showing the foundation and/or anchorage of the energy storage equipment.

(G) For an energy storage system located within a structure, construction details related to the Construction Codes or other codes having jurisdiction to show compliance for fire rated enclosures, clearances and any other requirements related to the equipment.

(H) Design and construction drawings reflecting construction work necessary to enable the building, its structure, the roof structure, any structural work related to the energy storage equipment (and, for rooftop installations, any other rooftop structures and/or equipment), the roof covering and roof drainage systems to comply with the codes listed in subdivision (d) of this section and other requirements set forth in this section and Title 4-C.

(I) Proof of compliance with the requirements of Appendix G of the Building Code, if applicable.

(2) Document retention. Construction documents required by clauses (A) through (I) of subparagraph (ii) of paragraph (1) of this section, including structural analyses and calculations, must be retained for six years by the applicant of record and must be made available upon request of the Department.

(3) Permits and technical reports. Permits must be obtained for both the construction work and the electrical work to be performed. Technical Report(s) identifying those responsible for special, progress and final inspections required by the Construction Codes must be filed with the Department.

(4) Construction inspections. Any construction work performed in connection with the application for installation, including but not limited to the energy storage equipment, shall be inspected and have a final inspection, in accordance with Administrative Code § 28-116.2.4.2. Other inspections as required by the Construction Codes or this section must be performed in accordance therewith.

(5) Job sign-off. The applicant of record must submit to the Department completed Technical Reports and a request for job sign-off pursuant to Administrative Code § 28-116.4. The request for job sign-off must be accompanied by utility company acknowledgement that the application for interconnection is complete or certification by the applicant for property tax abatement or such applicant's representative attesting that the electric energy storage equipment will not be interconnected with the electrical grid. The request must also be accompanied by a completed property tax abatement application. If the property tax abatement application is not submitted together with and at the same time as the request for job sign-off, the property tax abatement application shall be denied and the Department shall not further review or process the property tax abatement application.

(6) Electrical work. Electrical work associated with applications for the installation of electric energy storage equipment must comply with the following:

(i) Such applications must be filed for electrical plan examination in accordance with the Department's rules if such work includes but is not limited to:

(A) Any change in an electrical installation with a rating of 1000 KVA or higher, up to and including the second level overcurrent protection; or

(B) any electrical installation above 600V; or

(C) an electrical installation that is itself 1000 KVA or greater.

(ii) Such application must include but not be limited to the following:

(A) One line diagram.

(B) Plan view / service equipment room layout.

(C) Selective Coordination Study.

(iii) Permit. An electrical permit must be obtained prior to installation and the electrical work must be performed by a New York City licensed electrician.

(A) For all electrical permit applications related to the electric energy storage equipment, the applicant must indicate "Sustainable Energy Install".

(B) For installations that require plan examination, the electrical permit must be obtained: following approval of the electrical plan examination filing of the electrical work to be performed in connection with the electric energy storage equipment.

(iv) Electrical inspections. The electrical work performed in connection with the electric energy storage equipment must be completed and inspected in accordance with the New York City Electrical Code.

(v) Electrical sign-off. The electrical inspection is deemed signed off when it passes an inspection performed by the Department's Electrical Division, and all fees have been paid.

(7) Filing an Office of Technical Certification and Research (OTCR) application.

(i) The applicant of record must file a site-specific application with OTCR to evaluate the electric energy storage equipment pursuant to Article 113 of Title 28 of the Administrative Code and obtain a Final Acceptance letter.

(ii) At the time of submission of the OTCR application, the applicant of record must indicate on forms furnished by the Department that the OTCR application will be the subject of a property tax abatement application.

(g) Property tax abatement application.

(1) Title 4-C certification. A registered design professional must inspect the completed solar electric generating system installation and electric energy storage equipment and must certify its compliance with the definitions and requirements of Title 4-C, including but not limited to Sections 499-aaaa(10), 499-aaaa(11) and 499-cccc.

(2) Property tax abatement application. A registered design professional must complete the property tax abatement application.

(3) Eligible solar electric generating system and/or electric energy storage equipment expenditures.

(i) Such property tax abatement form must include a Title 4-C certification by the property tax abatement applicant or such applicant's representative of the solar electric generating system or electric energy storage equipment expenditures for which the tax abatement is sought.

(ii) Such expenditures shall not include:

(A) any expenditures incurred prior to August 5, 2008 for solar electric generating systems or January 1, 2019 for electric energy storage equipment;

(B) any interest or other finance charges; or

(C) any expenditures incurred using a federal, state or local grant. A federal, state or local grant shall not include another tax benefit, including a tax abatement, tax credit, tax exemption or tax rebate.

(iii) No expenditures shall be eligible for a tax abatement pursuant to Title 4-C if such expenditures were incurred in connection with a solar electric generating system placed in service before August 5, 2008, an electric energy storage equipment placed in service before January 1, 2019, or more than one tax abatement prior to January 1, 2024.

(4) The completed property tax abatement application, together with the Technical Reports, OTCR approval, the electrical sign-off and the request for job sign-off, must be filed with the Department on or before January 1, 2036.

(5) Upon receipt and acceptance of the completed property tax abatement application and all applicable fees, the Department shall forward any required documents to the Department of Finance for review and the issuance of the tax abatement.

(6) Filing date. The date of filing of the property tax abatement application shall be the date of submission of job sign-off documents and the application for property tax abatement.

(h) Compliance period.

(1) The applicant for property tax abatement must allow all registered design professionals involved in the installation and maintenance of the solar electric generating system and the Department to have access to the solar electric generating system and any related structures and equipment for inspection thereof at any time during the compliance period upon reasonable notice.

(2) The applicant for property tax abatement must allow all registered design professionals involved in the installation and maintenance of the electric energy storage equipment and the Department access to the electric energy storage equipment and any related structures and equipment for inspection thereof at any time during the compliance period upon reasonable notice.

(3) Pursuant to Title 4-C § 499-dddd(1), within fifteen (15) calendar days prior to the last day of the compliance period, any registered design professional involved in the installation and maintenance of the solar electric generating system or electric energy storage equipment must inspect the solar electric generating system or the electric energy storage equipment to certify its continuing compliance with Title 4-C, this section and applicable provisions of law and rules, including but not limited to the codes enumerated in subdivision (d) of this section. The applicant of record must prepare an inspection report and retain it for six years. Such report must be made available to the Department upon request. If the applicant of record finds that the solar electric generating system or the electric energy storage equipment is not in compliance with Title 4-C, such applicant must notify the Department in a form and manner prescribed by the Department.

(i) Revocation.

(1) Should the Department have reason to believe at any time during the compliance period that a condition described in Title 4-C § 499-eeee(1) exists, the Department shall inspect or otherwise investigate the condition. If the findings of such inspection or investigation indicate that a condition described in Title 4-C § 499-eeee(1) exists, the applicant for property tax abatement must pay the inspection and investigation expenses of the Department. The Department shall notify the applicant for property tax abatement of any findings that indicate that a condition described in Title 4-C § 499-eeee(1) exists and provide such applicant with an opportunity to dispute the findings.

(2) No later than the ninetieth day after the last day of the compliance period, the Department shall notify the Department of Finance of any findings of noncompliance and shall identify the period of noncompliance.

(3) The Department may declare an applicant for property tax abatement ineligible for future tax abatements in accordance with Title 4-C § 499-eeee(4).

(j) Notification of the New York State Department of Education. In accordance with Title 4-C § 499-ffff(3), should the Department determine that any registered design professional involved in the installation and maintenance of the solar electric generating system or electric energy storage equipment engaged in professional misconduct in making certifications required by Title 4-C or this rule, the Department shall so notify the New York State Department of Education.

(Amended City Record 5/17/2016, eff. 6/16/2016; amended City Record 9/6/2017, eff. 10/6/2017; amended City Record 7/10/2023, eff. 8/9/2023; amended City Record 5/7/2024, eff. 6/6/2024)

§ 105-03. Course Provider Registration and Department-Approved Courses

Open this section

(a) Registration. Beginning on July 1, 2025, no course provider may offer Department-approved courses unless such course provider is registered with the Department in accordance with this section. Such registration is valid for one year from the date of registration.

(1) Current course providers may continue to offer courses until July 1, 2025, provided they apply for registration between the effective date of this section and July 1, 2025, in accordance with the provisions of subdivision (b) of this section. Providers who fail to apply must complete any course currently being offered and upload the certificates as provided in this section but may not offer any additional courses.

(2) Once the department approves the application, the provider will be considered registered as of that date.

(3) In the event the department denies the application, the applicant may reapply or may challenge the determination in accordance with the provisions of § 28-401.21 of the Administrative Code. The provider may continue to operate until the reapplication or challenge is decided.

(b) Course Provider Application and Renewal Process.

(1) The course provider applicant must submit:

(i) an application form provided by the Department;

(ii) proof that the applicant has met the requirements of paragraph (2) of subdivision (f) of this section;

(iii) a statement attesting that the applicant will ensure that all instructors comply with the requirements of subdivision(e) of this section and, if applicable, subdivision(h) of this section; and

(iv) a fee as set forth in 1 RCNY § 101-03.

(2) Incomplete applications will be rejected.

(3) Applications for renewal must be accompanied by the renewal fee and such additional information as the commissioner may require. Such applications must be made at least 30 days but not more than 60 days prior to the expiration of the applicant’s registration.

(c) Investigation of Applicant. The Department or its designee will conduct an investigation of each applicant to determine its qualification to become a course provider. The burden of proving that an applicant meets the required qualifications is on the applicant. An applicant’s failure to meet the requirements specified by the Administrative Code or by the Department’s rules, and/or an applicant’s refusal to cooperate with an investigation will result in denial of the application. If an applicant fails to provide all requested documents within six (6) months of the date of the request the application will be denied.

(d) Approved Courses. Unless otherwise authorized under the Administrative Code or Department rules, only Department-approved courses may be offered to fulfill Department course requirements. A listing of registered providers of approved courses is available on the Department’s website. The course provider must ensure compliance with the provisions of this subdivision.

(1) Course Requirements.

(i) All courses must comply with the Department’s course requirements published on its website, which lists the relevant citations for statutory or other requirements listed in this paragraph.

(ii) All requirements must include the following information as applicable to the relevant construction trade:

(A) Business practices;

(B) Relevant Building Code provisions, rules, and policy and procedure notices enacted or promulgated by the Department;

(C) Administrative Code provisions, rules and policy and procedure notices enacted or promulgated by any other City agency;

(D) Overview of Occupational Safety and Health Standards (“OSHS”) for the Construction Industry;

(E) Relevant Department of Buildings filing and inspection requirements;

(F) Safety / hazardous materials;

(G) New technology;

(H) Corruption prevention standards; and

(I) Other subjects identified by the Commissioner.

(iii) All courses must reflect any changes in the Department’s published course requirements or any applicable laws, rules and regulations within ninety (90) days.

(iv) Class Duration: Live and virtual training sessions may not exceed 9 1/2 hours in total per day, including time spent covering course content, lunch/meal and other breaks, and administrative matters such as attendance and hands on and written assessments.

(2) Notification of Approved Courses. The course provider must have its own website and any course provider who offers Department-approved training to the general public must publish course schedules on its website, including dates, times, locations, the cost of the training and whether such cost includes the cost of issuing the identification card or site safety training card required by this section, the cost of such card if it is not included in the training cost, and must submit all course schedules to the Department. The course provider must also notify the Department of any changes to a scheduled course at least three (3) business days prior to it being offered. All information on the course provider’s website, including the location of courses and the courses taught, must be current.

(3) Course Review. At the end of each course, the instructor(s) must conduct a review of the materials taught. The Department may require that a hands-on or written performance evaluation be given to attendees.

(4) Course Facilities. The course facilities must:

(i) Have sufficient room to accommodate all expected attendees and the equipment needed to perform hands-on exercises where required as part of the course;

(ii) Make provisions for the presentation of training material in all media types (e.g., computer, projectors, video/DVD players); and

(iii) Comply with all applicable laws, rules and regulations relating to occupancy, zoning, egress, fire detection, fire suppression, light, ventilation, cleanliness, sanitary facilities, emergency notification and evacuation procedures.

(5) Attendance Record. The course provider must have in place fraud- resistant procedures for confirming the identity and attendance of individuals taking any course(s), including logs reflecting those in attendance at different times during the course, and be able to produce the logs and any other documentation demonstrating that an attendee attended the course(s). The logs must include:

(i) The student’s full name (printed);

(ii) The student’s signature;

(iii) The name of the course;

(iv) The name of instructor(s);

(v) The time the course began;

(vi) The time the course ended;

(vii) The time of a break (if any), including when the break began and when the break ended;

(viii) The address where the class/course or course was conducted;

(ix) The format in which the class was conducted: in-person, virtual, webinar, hybrid online/in-person training (for hands-on training courses); and

(x) An attestation by each instructor confirming that they taught the class and verifying the attendance list. Each instructor must print their name, sign it, and add the date.

(6) Course Completion.

(i) The course provider must issue a certificate of completion to the attendees upon course completion. The course provider must also upload a photograph of the person and a digital copy of the certificate of completion to the Department of Buildings’ platform NYC DOB Training Connect, which is only accessible to registered course providers. The course provider must upload the certificate within 60 days of course completion. Such certificate must contain the following information:

(A) The name of the course;

(B) The name of the person to whom it was issued;

(C) The name and address of the issuing organization;

(D) The certificate number;

(E) The date of issuance and expiration (if any);

(F) An indication of the type of course and the number of credit hours completed;

(G) The name and signature of the course provider;

(H) The name of the instructor; and

(I) The course provider ID number.

(ii) For worker certification courses, the course provider must issue an identification card to attendees upon course completion. Such card must be issued using the Department of Buildings’ platform NYC DOB Training Connect, which is only accessible to registered course providers and can found at https://dob-trainingconnect.cityofnewyork.us/.

(iii) The course provider must maintain a record of all the information required on the identification cards and the certificates of completion for a minimum period of seven (7) years from the date of completion. The course provider must make these records available to the Department upon request.

(7) Department Observation and Evaluation. The Department may observe any Department-approved course without prior notification to the course provider or instructor. The Department may evaluate courses taught by course providers through audit or other means at such intervals as it deems necessary and may require additional information as it deems necessary.

(8) Audits. The Department may periodically audit the course provider to ensure compliance with this section and any rules or other Department requirements related to such training.

(9) Cooperation. The course provider must cooperate with investigations related to the course provider’s compliance with the requirements of this rule or other applicable law.

(e) Course Instructor(s). Course providers must require that course instructor(s) demonstrate that they are credentialed or trained in instructional methods and learning processes. Course providers must also require that the instructor(s) successfully demonstrate their ability to solve or resolve problems relating to the subject matter by possession of a recognized degree, certificate, licensure or professional standing, or by extensive knowledge, training, and experience, in the subject matter being taught. To the extent that the course instructor(s) holds, or has held, a trade license issued by the Department, such license must be in good standing and not be surrendered to, suspended by or revoked by the Department.

(1) For Supported Scaffold, Suspended Scaffold and Mast-Climber training courses, the instructor(s) must also be authorized by the Occupational Safety and Health Administration (“OSHA”) as a trainer(s) for its Construction and Outreach Program.

(2) For Hoisting Machine Operator courses, the instructor(s) must also hold a valid New York City Hoisting Machine Operator’s license or hold a national certification for crane operation.

(3) For Master and Special Electrician courses, the instructor(s) must demonstrate credentials or training in instructional methods and learning processes through licensure or certification, including but not limited to, certification as an electrical course provider in jurisdictions following the National Electrical Code / NFPA 70.

(4) The course instructor(s) must comply with all applicable Federal, State and local laws, rules and regulations.

(5) The course instructor(s) must be in compliance with the Department’s Industry Code of Conduct.

(f) Course Provider Requirements.

(1) The course provider must be a sole proprietorship, a partnership or a corporation that provides training, an educational institution, a governmental agency or authority, a trade union, or a trade association, provided that a governmental agency or authority need not comply with paragraph (2) of this subdivision.

(2) The course provider must provide proof that it is:

(i) approved by or licensed as an educational institution by the New York State Department of Education;

(ii) registered as a New York State Department of Labor vocational, trade or apprenticeship program;

(iii) accredited by an accrediting organization recognized by the United States Department of Education or the Council for Higher Education Accreditation; or

(iv) certified by an organization accredited by the American National Standards Institute (ANSI) as a Standards Developing Organization with published standards for continuing education and training.

For alternative Mast-Climbing work platform training course provider requirements to those listed in paragraph (2) of subdivision(f), herein, see 1 RCNY § 3314-01(m).

(3) Course providers must continuously maintain the qualifications required by paragraphs (1) and (2) of this subdivision and by subdivision(i), if applicable, and must provide a copy of such approval, license, accreditation or certification to the Department upon request. The documentation must reflect the exact name of the entity registering. The course provider must immediately notify the Department of any lapse or expiration of its approval, license, accreditation or certification, including any qualification required by subdivision(i).

(4) The course provider must comply with all applicable Federal, State and local laws, rules and regulations.

(5) The course provider must notify the Department of any changes to the course provider’s name within fourteen (14) days of such change.

(6) Course providers must ensure that all their instructors comply with all applicable provisions of this section.

(7) Course providers must be in compliance with the Department’s Industry Code of Conduct and Course Provider Program Handbook.

(8) Course providers must notify the Department within thirty (30) days if the course provider makes changes to its business name, its website domain, or the owner/director of the business by submitting a new application for provider approval with supporting documentation. The provider may continue to offer courses under its current name pending approval of the new application.

(9) Course providers must collect, process and retain student data records as set forth herein. Course providers must implement privacy and data security practices to guard against the unauthorized access, fraud, theft, and other misuse of such information. Course providers may not use the data collected pursuant to this rule for any other purpose, including but not limited for advertisements, without the student’s consent. Course providers must comply with all applicable City, State, and federal laws relating to personally identifying information and to privacy, including but not limited to those included in the New York State General Business Law.

(g) Department as Course Provider. Notwithstanding the foregoing, the Department may act as a provider, or the sole provider, of any course offered to fulfill a Department course requirement.

(h) Site Safety Training (SST) Course Instructors. For the purposes of providing training in accordance with section 3321.1 of the Building Code and this 1 RCNY § 105-03, a site safety training (SST) provider, as defined in item 1 of the definition of “Site Safety Training (SST) Provider” in Section 202 of the Building Code, means a course instructor as used in this 1 RCNY § 105-03. In addition to the foregoing requirements for course instructors, an SST course instructor must meet one of the following requirements:

(1) has successfully completed all applicable OSHA or Department requirements for conducting OSHA 10-hour classes and OSHA 30-hour classes and is authorized to conduct such classes, except that such course instructor is not required to possess a degree, certificate, licensure or demonstrate any professional standing as required by subdivision(e), beyond what is required in this paragraph;

(2) is providing training through a 100-hour training program; or

(3) is approved by the Department to conduct a 40-hour Site Safety Manager training course in accordance with Article 402 of Chapter 4 of Title 28 of the Administrative Code.

(i) Site Safety Training (SST) Course Providers. A site safety training (SST) provider as defined in item 2 of the definition of “Site Safety Training (SST) Provider” in Section 202 of the Building Code must comply with the requirements for course providers in this 1 RCNY § 105-03 as well as with the applicable requirements of this subdivision.

(1) If a not-for-profit organization or a governmental agency or authority is an SST provider, it must meet the standards set forth by the Department instead of the requirement in paragraph (2) of subdivision (f).

(2) An SST provider must certify to the Department that it has a language access plan that complies with requirements established by another City agency or office designated by the Mayor, as required by item 2.1 of the definition of SST provider in Section 202 of the Building Code.

(3) Training may be conducted in person or in an actively proctored online format and must comply with the following:

(i) If conducted in person in a classroom setting, the SST provider must confirm the identification of the individual taking such training and must ensure that the site of such training is actively observed for the duration of the training.

(ii) If the online training is not performed in person, the SST provider must confirm the identification of the individual prior to providing secure access to the online training. The individual must attest that he/she is the individual who received the online access and will complete the training without assistance. The online program must have secure access and monitor participation during the course of training to ensure that the individual receiving the training is present for the entirety of the training.

(4) Upon completion of the SST course, the SST provider must issue an SST card in accordance with subdivision(j) of this section.

(5) If the SST provider is not the provider of the OSHA course that is required for an SST card, as defined in Section 202 of the Building Code, the SST provider must ensure that the OSHA course was conducted either in person or, if online, was actively proctored before issuing an SST card as provided in subdivision(j) of this section.

(6) The SST provider must accept documentation, including identification cards or certificates of completion, from registered course providers. Course providers must accept SST course equivalent, as set out on the Department’s website, and must apply such course hours to satisfy the training requirements of this section and Section 3321 of the Building Code.

(j) SST Cards to be Issued Upon Verification of Course Completion. An SST provider must issue a temporary SST card, SST card, or SST supervisor card, only after verifying that the applicant has successfully completed all required training and in accordance with subdivision (i), this subdivision and Section 202 of the Building Code. The SST provider must issue the appropriate card using the Department of Buildings’ platform NYC DOB Training Connect, which is only accessible to registered course providers.

(k) Record-Keeping and Verification of SST Cards. The SST course provider must maintain a record of all temporary SST cards, SST cards, or SST supervisor cards issued for a minimum of seven years. The SST course provider must make these records available to the Department or its designee upon request.

(l) Advertising. Course providers may only advertise courses/classes that they are authorized by the Department to deliver.

(m) Third Parties. The course provider may not delegate or outsource any of its duties, responsibilities or functions to any third party that is not registered with the Department. The course provider must maintain full accountability for its operations and ensure that all services provided are conducted in compliance with all applicable Federal, State and local laws, rules and regulations.

(n) Non-traditional Format Courses / Classes.

(1) The course provider may conduct training in a non-traditional format. A non-traditional format is any format other than the traditional in-person classroom format. Non-traditional formats may include virtual classrooms, webinars, on-demand training, or hybrid virtual classroom/in-person training for hands-on courses.

(2) Training conducted in a non-traditional format must comply with the following:

(i) The non-traditional format course must be approved by the Department.

(ii) The provider must confirm the identification of the individual taking such training by adhering to the actively proctored online format requirements.

(iii) The provider must ensure that participants have their web-cameras activated and are on-camera for the duration of classes conducted virtually.

(iv) For courses that include hands-on training, providers may deliver the hands-on portion of the training in-person and the remaining portion through either a live virtual classroom or live webinar.

(v) The provider must notify the Department when the hands-on portion of the course / class is scheduled.

(vi) All students must be scheduled at the same time to receive the hands-on training.

(o) Denial of Registration Renewal. The department may, following notice and an opportunity to be heard, refuse to renew a registration on any grounds on the basis of which it could deny, suspend or revoke such registration pursuant to § 28-401.19 of the Administrative Code.

(p) Suspension and Revocation of Registration.

(1) The Department may, in accordance with the provisions of § 28-401.19.1 of the Administrative Code, take corrective action, including probation, suspension, or revocation of a course provider’s registration, for failure to comply with the requirements of this section or with the requirements of any applicable law, rule, or regulation. However, when the public safety may be imminently jeopardized, the Commissioner may, pending a hearing and determination of charges, suspend registration for a period not exceeding fifteen (15) days.

(2) The basis for the suspension or revocation of a course approval may form the basis for the suspension or revocation of any or all of that course provider’s approved courses.

(3) The Department will post on its website that the approval of a course or course provider registration has been suspended or revoked.

(q) Withdrawal. The course provider must notify the Department and its students at least 30 days prior to its withdrawal from the course provider program. The course provider must be in compliance with the record-keeping provisions of this rule, including uploading certificates of completion into the Department’s online platform, Training Connect, before its withdrawal.

(Amended City Record 12/20/2019, eff. 1/19/2020; amended City Record 11/10/2020, eff. 12/10/2020; amended City Record 5/20/2025, eff. 6/19/2025)