§ 27-613.2. Thin-section precast concrete construction
The provisions of reference standard RS 10-4 shall apply.
§ 27-614. General requirements
Materials, design, and construction methods shall meet the requirements of the following reference standards:
(a) Structural steel. Reference standard RS 10-5.
(b) Light gauge cold formed steel. Reference standard RS 10-6.
(c) Open web steel joists. Reference standard RS 10-7. The commissioner shall amend RS 10-7 to establish minimum acceptable fireproofing methods for open web steel joists and to redefine the limitations or restrictions on the buildings or occupancies in which the use of open web steel joists shall be permitted.
§ 27-615. Identification
Structural steel that is required to have a minimum yield point greater than thirty-six thousand psi shall at all times in the fabricator's plant, be marked, segregated, or otherwise handled so that the separate alloys and tempers are positively identified, and after completion of fabrication, shall be marked to identify the alloy and temper. Such markings shall be affixed to completed members and assemblies or to boxed or bundled shipments of multiple units prior to shipment from the fabricator's plant. Open web steel joists shall have identification affixed to each bundle or lift showing size and type.
§ 27-616. Quality control
(a) Reference. The provisions of tables 10-1 and 10-2 shall apply.
(b) Welding operations.
(1) Welding work shall be performed only by persons who have obtained a license from the commissioner.
(2) Where manual welding work is not performed in the city of New York, welds shall be made by welders qualified under the provisions of appendix D, parts II and III, of the AWS code for welding in building construction. Qualification with any of the steels permitted by the AWS code shall be considered as qualification to weld any of the other steels permitted by the code.
(3) Tack welds, which are later incorporated into finished welds carrying calculated stress, shall not be considered as structural welds.
(4) The inspection of welding operations stipulated in table 10-2 shall include a check to ascertain that the welders employed on the work have the required license or who are qualified in accordance with paragraph two of this subdivision.
§ 27-617. General requirements
Materials (other than non-stress grade lumber), design, and construction methods shall meet the requirements of the following reference standards:
(a) Lumber and timber. Reference standard RS 10-8.
(b) Plywood. Reference standard RS 10-9.
(c) Structural glued-laminated lumber. Reference standard RS 10-18.
§ 27-618. Identification
Except as provided for in subdivisions (a) and (c) of this section, all wood used for structural elements shall be identified as to grade and shall bear an identifying mark of an approved bureau or agency performing the grading, or the official grade mark and trade mark of the bureau or association under whose rules the wood was graded, in accordance with the following:
(a) Lumber and timber. All lumber and timber, including non-stress grade lumber, shall be identified by the grade mark of a lumber grading or inspection bureau or agency approved by the commissioner, except that pre-cut material and rough-sawn lumber may be covered by a certificate of inspection issued by a lumber grading or inspection agency approved by the commissioner in lieu of grade marking.
(b) Plywood. Plywood used structurally shall bear identification as to grade, type, and species group, or identification index. Such identification shall be affixed by and identified by the trademarks of a testing and grading agency approved by the commissioner.
(c) Glued-laminated. Glued-laminated structural members shall bear identification and/or shall be accompanied by certification in accordance with the provisions of reference standard RS 10-18.
(d) Resawn lumber. Resawn (or reused) lumber shall be marked in accordance with its regraded status.
§ 27-619. Use of non-stress grade wood
The use of non-stress grade wood in structural elements shall be limited to the following conditions:
(a) Studs, joists, and rafters proportioned on the basis of the empirical provisions of section 27-622 of this article.
(b) The architect or engineer responsible for the design may assign an allowable stress value for the proposed material based on the provisions of reference standard RS 10-8 relating to "other species and grade". Under such condition, the required species and grade of wood, together with the assigned stress value, shall be conspicuously indicated on the plans.
§ 27-620. Quality control
Inspection of the fabrication of glued-laminated assemblies, as stipulated in table 10-2, shall include a check of sizes of members, of fit, and of gluing operations.
§ 27-621. General construction requirements
The provisions of this section shall be considered as supplemental to the provisions of the applicable reference standards.
(a) Firecutting. The ends of wood beams, joists, and rafters resting on masonry or concrete walls shall be firecut to a bevel of three inches in their depth.
(b) Protection of members.
(1) Positive drainage shall be provided for all areas under the building not occupied by basements or cellars.
(2) All loose wood and debris and all wood forms shall be removed from spaces under the building. All stumps and roots shall be grubbed to a minimum depth of twelve inches.
(3) Wood members embedded in the ground and used for the support of buildings shall be treated.
(4) Wood joists or wood structural floors closer than eighteen inches, wood girders closer than twelve inches, or sills closer than eight inches to an exposed ground surface within or without the building shall be treated or shall be of an equivalent resistant species.
(5) Sleepers, sills, columns, and posts supported on concrete or masonry piers shall be treated or shall be of an equivalent resistant species unless isolated from the ground as specified in paragraph four of this subdivision or by a concrete slab. Where the isolation consists of a concrete slab-on-grade, the sleepers, sills, columns, or posts shall be raised at least three inches above the top of such slab.
(6) Ends of wood girders entering masonry or concrete walls shall be provided with a minimum one-half inch air space on top, sides, and at the end, unless the girder is treated or is of an equivalent resistant species.
(7) Wood or plywood used as siding or a combination of siding and sheathing shall be isolated from exposed ground by at least six inches.
(8) Crawl spaces shall be ventilated as required in subchapter twelve of this chapter.
(9) Where treated timber is required, the preservative treatment shall comply with reference standards RS 10-20 and RS 10-22. Treatment of wood poles shall comply with reference standard RS 10-28. All treated wood shall be handled in accordance with the provisions of reference standard RS 10-29.
§ 27-622. Empirical provisions in lieu of design
The provisions of this section may be used in lieu of structural analysis only for those buildings in occupancy group J-3 where the specific occupancies correspond to a live load requirement of forty psf, or less, and to constructions wherein the supporting framing consists of multiple, closely spaced members, such as joists, studs, platform or balloon frames. All wood structural members in other classes of construction shall be proportioned on the basis of the analysis of stresses. All requirements established in this section may be reduced when an analysis of stresses, executed in accordance with reference standard RS 10-8, indicates such reduction is feasible. Sizes of wood members stated in this section are nominal sizes.
(a) Stud walls and partitions.
(1) Studs shall be of equivalent or better grade than the minimum grades for the various species as established in reference standard RS 10-13.
(2) Corner posts shall be 3-stud members or members of equivalent strength.
(3) Load bearing studs shall be set with the larger cross section dimension perpendicular to the wall or partition. Studs in exterior walls of one story buildings of construction class II-D and II-E shall be at least two inches by three inches spaced not more than sixteen inches on center, or where studs are two inches by four inches, spaced not more than twenty-four inches on center. Studs for other classes of construction shall be at least two inches by four inches spaced not more than sixteen inches on center.
(4) Stud walls resting on concrete or masonry shall have sills at least two inches in nominal thickness. Where such sills bear on concrete, they shall be fastened with minimum one-half inch bolts embedded at least six inches. Each sill piece shall have at least two anchor bolts, with one bolt located at least one inch from each end of the plate, and with intermediate spacing not more than eight feet. Where such sills bear on masonry, they shall be anchored in accordance with the applicable provisions of reference standard RS 10-1.
(5) Stud partitions that rest directly over each other and are not parallel to floor joists or beams may extend down between the joists and rest on the top plate of the partition, partition girder, or foundation below, or may be constructed on sill plates running on top of the beams or joists.
(6) All load bearing stud partitions shall be supported on walls, other partitions, double joists or beams, solid bridging, or on beams at least as wide as the studs. Joists supporting a partition parallel to the joists wherein the joists are spaced apart to permit the passage of piping or duct work shall be provided with solid blocking at intervals of not more than sixteen inches.
(7) Load bearing partitions perpendicular to joists shall not be offset from supporting girders, walls or partitions by more than the depth of the joists unless the joists are proportioned on the basis of analysis of stress.
(8) In interior walls and in bearing partitions, double studs shall be provided at the sides of openings that are greater than three feet six inches up to six feet in width, and triple-studs shall be provided at the sides of openings of greater width.
(9) Headers shall be provided over each opening in exterior walls and bearing partitions. Where the opening does not exceed three feet, each end of the header shall be supported on a stud or framing anchor. Where the opening exceeds three feet in width each end of the header shall be supported on one stud and where the opening exceeds six feet each end shall be supported on two studs.
(10) All studs in exterior walls and in bearing partitions shall be capped with double top plates installed to provide overlapping at corners and at intersections with other walls and bearing partitions. End joists in double top plates shall be offset at least twenty-four inches. In lieu of double top plates, a continuous header of similar dimensions may be used. For platform frame construction, studs shall rest on a single bottom plate.
(b) Bracing of exterior walls. Exterior stud walls shall be braced by one inch by four inch continuous diagonal strips let into the face of the studs and into the top and bottom plates at each corner of the building. Bracing may also be provided by one of the following means:
(1) Wood board sheathing of one inch nominal thickness, applied diagonally.
(2) For one and two-story dwellings, plywood sheathing at least four feet by eight feet (except where cut to fit around openings and for similar purposes) and at least five-sixteenths of an inch thick on studs spaced sixteen inches or less on centers and at least three-eighths of an inch thick on studs spaced more than sixteen inches but not exceeding twenty-four inches on centers.
(3) For one story dwellings and for the upper story of two story dwellings, fiberboard sheathing applied vertically in panels at least four feet by eight feet (except where cut to fit around openings and for similar purposes). Fiberboard sheathing shall be at least one-half inch thick and shall conform to the provisions of reference standard RS 10-27.
(4) For one story dwellings and for the upper story of two story dwellings, gypsum board sheathing applied horizontally in panels at least two feet by eight feet (except where cut to fit around openings and for similar purposes). Gypsum boards shall be at least one-half inch thick and shall conform to the provisions of reference standard RS 10-19.
(c) Floor and roof framing.
(1) SPAN TABLES. Joists and rafters may be used in accordance with reference standard RS 10-13.
(2) BRIDGING. In all floor and roof and roof framing, there shall be at least one line of bridging for each eight feet of span. The bridging shall consist of at least one inch by three inch lumber or equivalent metal bracing. A line of bridging or solid blocking shall also be required at supports unless lateral support is provided by nailing to a beam, header, or to the studs. Midspan bridging is not required for floor or roof framing in one- and two-family dwellings where joist depth does not exceed twelve inches. Bridging shall bear securely against and be anchored to the members to be braced.
(3) NOTCHES. Notches in the ends of joists and rafters shall not exceed one-fourth the depth unless adequate reinforcement is provided or analysis of stresses indicates that larger openings are feasible without the necessity for reinforcement. Notches in joists or rafters, located in the span shall not exceed one-sixth the depth and shall not be located in the middle third of the span. Bored holes shall not be within two inches of the top or bottom of the joists or rafter and the diameter of any such hole shall not exceed one-third the depth. For stair stringers, the minimum effective depth of the wood at any notch shall be three and one-half inches unless the stringer is continuously supported on a wall or partition.
(4) SUPPORT.
a. Floor or roof framing may be supported on stud partitions.
b. Tail beams over twelve feet long and all header and trimmer beams over six feet long shall be hung in metal stirrups having anchors, or by other methods providing adequate support. Trimmers and headers shall be doubled where the header is four feet or more in length.
c. Except where supported on a one inch by four inch ribbon strip and nailed to the adjoining stud, the ends of floor joists shall have at least one and one-half inches of bearing on wood or metal, nor less than four inches on masonry.
d. Joists framing from opposite sides of and supported on a beam, girder, or partition shall be lapped at least four inches and fastened, butted end-to-end and tied by metal straps or dogs, or otherwise tied together in a manner providing adequate support.
e. Joists framing into the side of a wood girder shall be supported by framing anchors, on ledger strips at least two inches by two inches, or by equivalent methods.
f. Wood joists and rafters bearing on masonry walls shall be anchored to such walls in accordance with the applicable provisions of reference standard RS 10-1.
(5) RAFTERS AND CEILING JOISTS.
a. Where rafters meet to form a ridge, they shall be placed directly opposite each other and nailed to a ridge board at least one inch thick, and not less than the cut end of the rafters in depth.
b. Provisions shall be made to resist the thrust from inclined rafters by connection of collar beams at least one inch by six inches, by connection to joists, or by equivalent means.
c. Where ceiling joists are not parallel to rafters, subflooring or metal straps attached to the ends of the rafters shall be installed in a manner to provide a continuous tie across the building.
d. Ceiling joists shall be continuous, or where they meet over interior partitions, shall be securely joined to provide a continuous tie across the building.
e. Valley rafters shall be double members. Hip rafters may be single members. Valley and hip rafters shall be two inches deeper than jack rafters.
f. Trussed rafters shall be designed in accordance with the provisions of reference standard RS 10-8.
(6) Built-up members shall be securely spiked or bolted together and provision shall be made to resist the horizontal shear between laminations.
(d) Nailing schedule. The size and number of nails for connections shall be in accordance with table 10-4.
§ 27-623. Heavy timber construction (construction class II-A)
(a) Minimum sizes of members. To conform to the fire resistance rating requirements for heavy timber construction (construction class II-A), members shall be solid sawn or solid glue-laminated and of the following minimum dimensions: (Sizes of wood members indicated in this section are nominal sizes).
(1) COLUMNS, FRAMES AND ARCHES.
a. Columns shall be at least eight inches in all dimensions when supporting floor loads, and at least six inches wide and eight inches deep when supporting roof and ceiling loads only.
b. Beams and girders shall be at least six inches wide and ten inches deep.
c. Frames or arches that spring from grade or the floor line and support floor loads shall be at least eight inches in all dimensions.
d. Timber trusses supporting floor loads shall have members at least eight inches in all dimensions.
e. Frames or arches for roof construction that spring from grade or the floor line and do not support floor loads shall have members at least six inches wide and eight inches deep for the lower half of the height, and at least six inches deep for the upper half.
f. Frames or arches for roof construction that spring from the top of walls or wall abutments, framed timber trusses, and other roof framing, which do not support floor loads, shall have members at least four inches wide and six inches deep. Spaced members may be composed of two or more pieces at least three inches thick when blocked solidly through their intervening spaces or when such spaces are tightly closed by a continuous wood cover plate at least two inches thick secured to the underside of the members. Splice plates shall be at least three inches thick. When protected by approved automatic sprinklers under the roof deck, framing members shall be at least three inches wide.
(2) FLOORS.
a. Planks shall be splined or tongue-and-groove, not less than three inches thick, covered with one inch tongue-and-groove flooring, laid crosswise or diagonally to the plank, or other surface having equivalent fire resistance; or shall be,
b. At least four inches wide, set on edge close together and well spiked, and covered the same as for three inch thick plank. The planks shall be laid so that there is no continuous line of end joints except at points of support. Floors shall not extend closer than one-half inch to walls to provide an expansion joint, but the joint shall be covered at top or bottom to avoid flue action.
(3) ROOF DECKS. Roof decks shall be splined or tongue-and-groove planks at least two inches thick; or tongue-and-groove plywood panels (bonded with exterior glue) at least one and one-eighth inch thick, with face grain perpendicular to supports that shall be spaced not more than forty-eight inches on center; or of planks at least three inches wide set on edge close together and laid as required for floors.
(b) Construction details. Self releasing type wall plate boxes or approved hangers shall be provided where beams and girders enter masonry.
Table 10-4 Nailing Schedule
Building Element Nail Type Number and Distribution Stud to sole plate Common-toe-nail 4 – 8d Stud to cap plate Common-end-nail 2 – 16d Double studs Common-direct 10d 12 in. o. c. or 16d 30 in. o.c. Corner studs Common-direct 16d 30 in. o.c. Sole plate to joist or blocking Common 16d 16 in. o.c. Double cap plate Common-direct 16d 24 in. o. c. Cap plate laps Common-direct 3 – 16d Ribbon strip, 6 in. or less Common-direct 2 – 10d each bearing Ribbon strip, over 6 in. Common-direct 3 – 10d each bearing Roof rafter to plate Common-toe-nail 3 – 16d Roof rafter to ridge Common-toe-nail 2 – 16d Jack rafter to hip Common-toe-nail 3 – 10d Floor joists to studs (no ceiling joists) Common-direct 5 – 10d or 3 – 16d Floor joists to studs (with ceiling joists) Common-direct 2 – 10d Floor joists to sill or girder Common-toe-nail 2 – 16d Double-joist to joist Common-direct 10d – staggered at 16 in. Ledger strip Common-direct 3 – 16d at each joist Ceiling joists to plate Common-toe-nail 2 – 16d Ceiling joists to every rafter Common-direct (See table below) Ceiling joists (laps over partitions) Common-direct 3 – 16d Collar beam Common-direct 4 – 10d Bridging to joists and rafters Common-direct 2 – 8d each end Bridging to studs Common-direct or toe 2 – 10d each end Diagonal brace (to stud and plate) Common-direct 2 – 8d each bearing Tail beams to headers (when nailing permitted) Common-end 1 – 20d each 4 sq. ft. floor area Header beams to trimmers (when nailing permitted) Common-end 1 – 20d each 8 sq. ft. floor area 1 in. Subflooring (6 in. or less in width) Common-direct 2 – 8d each joist 1 in. Subflooring (over 6 in. in width) Common-direct 3 – 8d each joist 2 in. Subflooring Common-direct 2 – 20d each joist 1 in. Wall sheathing (8 in. or less in width) Common-direct 2 – 8d each stud 1 in. Wall sheathing (over 8 in. in width) Common-direct 3 – 8d each stud Plywood sheathing and subflooring a 1 in. Roof sheathing (6 in. or less in width) Common-direct 2 – 8d each rafter 1 in. Roof sheathing (over 6 in. in width) Common-direct 3 – 8d each rafter Shingles, wood Corrosion-resistive 2 – No. 15 B&S each bearing Weather boarding Corrosion-resistive 2 – 8d each bearing 1/2 in. Fiberboard sheathing 1 1/2 in. galvanized roofing nail 6d common nail 16 ga. galvanized staples, 1 1/8 in. long, 7/16 in. crown 3 in. c. c. on all edges and 6 in. c. c. at other bearings 25/32 in. Fiberboard sheathing 1 3/4 in. galvanized roofing nail 8d common nail 16 ga. galvanized staples, 1 1/2 in. long, 7/16 crown 3 in. c. c. on all edges and 6 in. c. c. at other bearings 1/2 in. Gypsumboard sheathing 1 1/2 in. galvanized roofing nail 11 ga., 3/8 in. to 7/16 in. head 16 ga. galvanized staples, 1 1/2 in. long, 7/16 crown 4 in. c. c. on all edges and 8 in. c. c. at other bearings
Note a. For nailing of plywood, see reference standard RS 10-9.
CEILING JOIST NAILING TO EVERY RAFTER (Number of 16d nails)
Slope of Roof 4/12 5/12 6/12 7/12 9/12 12/12 Rafter Spacing, o.c. (in.) 16 24 16 24 16 24 16 24 16 24 16 24 Width of building Up to 24 ft. 5 8 4 7 3 5 3 4 3 3 3 3 24 to 30 ft. 7 11 6 9 4 7 3 6 3 4 3 3
§ 27-624. Construction methods
(a) Fabrication. All timber shall be accurately cut and framed to a close fit in such a manner that the joints will have even bearing over the contact surfaces. Mortises shall be true to size for their full depth and tenons shall fit snugly. No shimming in joints, or open joints, shall be permitted.
(b) Erection.
(1) ASSEMBLY. Joints shall have a tight fit. Fasteners shall be installed in a manner that will not damage the wood. End compression joints shall be brought to full bearing. All framework shall be carried up true and plumb.
(2) TEMPORARY CONNECTIONS. As erection progresses, the work shall be bolted, or nailed as necessary, to resist all dead load, wind, and erection stresses.
(3) ALIGNMENT. The structure shall be properly aligned before final tightening of the connections.
§ 27-625. General requirements
Materials, design, and construction methods shall meet the requirements of reference standards RS 10-10 and RS 10-11.
§ 27-626. Identification
Aluminum for structural elements shall at all times in the fabricator's plant, be marked, segregated, or otherwise handled so that the separate alloys and tempers are positively identified, and after completion of fabrication shall be marked to identify the alloy and temper. Such markings shall be affixed to completed members and assemblies or to boxed or bundled shipments of multiple units prior to shipment from the fabricator's plant.
§ 27-627. Quality control
(a) Reference. The provisions of tables 10-1 and 10-2 shall apply.
(b) Welding operations.
(1) Welding work shall be performed only by persons who have obtained a license from the commissioner.
(2) Where manual welding work is not performed in the city of New York, welds shall be made by welders qualified under the applicable provisions of reference standard RS 10-25.
(3) Tack welds that are not later incorporated into finished welds carrying calculated stress shall not be considered as structural welds.
(4) The inspection of welding operations stipulated in table 10-2 shall include a check to ascertain that the welders employed on the work have the required license or are qualified in accordance with paragraph two of this subdivision.
§ 27-628. Erection
(a) Bracing. All framework shall be carried up true and plumb. Temporary bracing shall be provided to support all loads imposed upon the framework during construction that are in excess of those for which the framework was designed.
(b) Temporary connections. As erection progresses, the work shall be securely bolted, or welded, to resist all dead loads, wind, and erection stresses.
(c) Alignment. The structure shall be properly aligned before riveting, permanent bolting, or welding is performed.
§ 27-629. General requirements
Materials, design, and construction methods shall meet the requirements of reference standard RS 10-12.
§ 27-630. Identification of metal reinforcement
Bundles or rolls of welded wire fabric shall be securely tagged so as to identify the type and grade of steel, and the size.
§ 27-631. Limitations of use
Reinforced gypsum concrete shall not be used where exposed directly to the weather or where subject to frequent or continuous wetting. Precast units shall be protected by coverings or coatings from the weather and from contact with moisture during shipment and during storage at the work site.
§ 27-632. General requirements
Thin shell and folded-plate construction may be used for buildings or portions of buildings, as required in this section and subject to the provisions of this subchapter. The applicable provisions of the several reference standards relating to allowable stresses and the use of structural materials shall apply except as modified in this section.
§ 27-633. Analysis
(1) Unless otherwise permitted by the commissioner, stresses, displacements, and stability of thin shell and folded-plate structures shall be determined on the basis of the assumption of elastic behavior. The shell or plate may be assumed to be homogeneous and isotropic.
(2) The analysis for stability shall consider large deflections, creep effects and the deviation between the actual and theoretical shell surface.
§ 27-634. Thin concrete shells
The provisions of sections 403, 404 and 405 of reference standard RS 10-45 shall apply with the following modifications. The remaining sections of reference standard RS 10-45 shall not apply.
(1) The advisory provisions of this standard shall be considered as mandatory.
(2) The minimum ultimate strength of concrete for thin shells shall be three thousand psi.
(3) Change all references to "the building code (ACI 318-63)" to "reference standard RS 10-4".
§ 27-635. General requirements
The materials, design, and construction of suspended structures shall meet the applicable requirements of the code and the requirements of this article.
§ 27-636. Suspenders
(a) Bridge wire cable. Bridge wire cables used for suspenders shall be either bridge strand or bridge rope fabricated from galvanized bridge wire.
(1) WIRE. Wire shall be produced from rods rolled from high carbon steel, the composition of which shall be controlled to provide internal soundness, uniformity of chemical composition and physical properties, freedom from injurious surface imperfections, and shall meet the following requirements.
a. The minimum ultimate tensile strength of zinc-coated wire shall be as follows:
Class A coating two hundred twenty thousand psi
Class B coating two hundred ten thousand psi
Class C coating two hundred thousand psi
b. Yield strength shall be one hundred fifty thousand psi minimum for zinc-coated wire with class A or class B coating, one hundred forty thousand psi minimum for zinc-coated wire with class C coating, based on the cross-sectional area of the coated wire when loaded to 0.7% elongation in a ten inch gage length. In determining the yield strength, an initial stress equivalent to forty-two thousand psi, based on cross-sectional area of the coated wire, shall be applied to the wire sample. At this loading, the entensometer shall be attached and an initial dial reading set at the equivalent of 0.15% elongation.
c. Elongation shall be four percent minimum in a ten inch gage length, determined as the permanent increase in length after failure of a marked section of the wire originally ten inch in length except that a value of two percent will be permitted for wires 0.110 in. or less in diameter having a class A zinc coating.
d. The zinc-coated wire must withstand wrapping at a rate not exceeding fifteen turns per minute twice around a mandrel equal to three times the wire diameter without fracture of the steel.
e. The wire used in bridge strand or bridge rope shall be zinc-coated (galvanized) in accordance with the requirements of table 10-5. Weight of coating shall be determined in accordance with the provisions of reference standard RS 10-24.
TABLE 10-5 Minimum Weights of Coating – Bridge Wire, Zinc-Coated, For Bridge Strand and Bridge Rope Constructions
Diameter of Coated Wire (in.) Minimum Weight of Coating (Ounces per Sq. Ft. of Uncoated Wire Surface) Class A Class B Class C 0.041 to 0.061 incl. 0.40 0.80 1.20 Over 0.061 to 0.079 incl. 0.50 1.00 1.50 Over 0.079 to 0.092 incl. 0.60 1.20 1.80 Over 0.092 to 0.103 incl. 0.70 1.40 2.10 Over 0.103 to 0.119 incl. 0.80 1.60 2.40 Over 0.119 to 0.142 incl. 0.85 1.70 2.55 Over 0.142 to 0.187 incl. 0.90 1.80 2.70 Over 0.187 1.00 2.00 3.00
(2) BRIDGE STRAND. Bridge strands shall be made from wires complying with subparagraphs a through e of paragraph one of this subdivision, and shall meet the following requirements:
a. The wires shall be made in such lengths that the strands can be manufactured with no splices in the outside wires. Splicing of inner wires during the stranding operation is permissible. When joints are necessary in any wires, they shall be electrically butt welded and shall be recoated in a workmanlike manner. Joints in the wires of strand shall be made and dispersed in a manner that will maintain the minimum specified breaking strength of the strand.
b. The minimum breaking strength shall be based on tests to destruction and shall be certified by the manufacturer.
c. Bridge strand shall be prestretched to produce a stable modulus of elasticity of at least the following values for strand wires having class A coating:
one-half inch to two andnine-sixteenths inches dia. . . . twenty-four million psi
two and five-eighths inches and larger . . . twenty-three million psi
For bridge strands that have classes B and C zinc-coating on the outside wires, the modulus of elasticity shall not be more than one million psi less than the corresponding values for bridge strand with a class A coating. The pre-stretching load shall not exceed fifty-five percent of the breaking strength of the strand.
(3) BRIDGE ROPE. Bridge rope shall be made from wires complying with subparagraphs a through e of paragraph one of this subdivision, and shall meet the following requirements:
a. Joints are permissible in inner and outer wires and shall be electrically butt welded and shall be recoated in a workmanlike manner. Joints in the wires of strand shall be made and dispersed in a manner that will maintain the minimum specified breaking strength of the rope.
b. The minimum breaking strength shall be based on tests to destruction and shall be certified by the manufacturer.
c. Bridge rope shall be prestretched to produce a stable modulus of elasticity of at least twenty million psi for rope wires having a class A coating. For bridge rope that has class B and C zinc-coatings on the outside wires, the modulus of elasticity shall not be more than one million psi less than the corresponding value for bridge rope with a class A coating. The prestretching load shall not exceed fifty-five percent of the breaking strength of the rope.
(b) Other materials. Any structural material permitted for use under the provisions of other sections of this subchapter may be used for support of a suspended structure including, but not limited to, types of steel permitted for use under the provisions of reference standard RS 10-5; reinforcing steel and wire, prestressing wire and strand, and high strength alloy steel bars conforming to the requirements of reference standard RS 10-3; and steel conforming to the requirements of reference standards RS 10-66 and RS 10-69. Prestressing wire and strand may be used for suspenders without the application of prestressing force. All such suspenders shall be protected as described in section 27-642 of this article.
§ 27-637. Tests of materials for bridge wire suspenders
The following minimum quantities of bridge wire for suspenders shall be tested:
(1) Tensile strength tests of the wires shall be made of a specimen cut from each coil of zinc coated wire.
(2) Tests for elongation and for yield strength shall be made on samples from approximately ten percent of the coils of any one size finished wire. If any of these tests fail to meet the specified requirements, all the coils in that lot of finished wire shall be tested and only coils that satisfactorily pass the test shall be used.
(3) Tests of the zinc coating shall be made of approximately five percent of the coils of any one size of finished wire. If any of these tests fail to meet the specified requirements, all the coils in that lot of finished wire shall be tested and only coils that satisfactorily pass the test shall be used.
§ 27-638. Tests of materials for other types of suspenders
The applicable provisions of reference standards RS 10-3 and RS 10-5 shall apply.
§ 27-639. Design
The following design requirements shall supplement the applicable provisions of this subchapter.
(a) Flexibility. Suspenders, unless encased, may be considered as perfectly flexible.
(b) Elastic stretch. The elastic stretch of the suspenders shall be considered.
(c) Displacement. Displacement resulting from changes in magnitude and position of load and its affects on stress shall be considered.
(d) Other considerations. Consideration shall be given to the effects of temperature variations, partial and reversible wind loadings, and vibration.
(e) Allowable working load. The allowable working load in suspenders formed from bridge wire cable shall be computed on the basis of factors equal to one and one-half times dead load plus two and one-half times live load or one and two-tenths times dead load plus two times live load plus two times wind load, applied to the specified, minimum, ultimate strength of the suspender. The allowable working load in suspenders conforming to the materials specifications or several reference standards of this code shall be the allowable working stresses for tension members as prescribed in the applicable reference standard or, for those materials where allowable stresses for tension members are not prescribed, on factors of one and one-half times dead load plus two times live load or one and two-tenths times dead load plus one and one-half times live load, plus one and one-half times wind load, also applied to the specified minimum, ultimate strength of the suspender. In no case, however, shall the factor, applied to the yield strength of the material or to the prestretching or prestressing force, exceed one and one-tenth times dead load plus one and one-quarter times live load.
§ 27-640. Fittings for wire cable suspenders
Fittings for wire cable suspenders shall be capable of developing the specified minimum ultimate strength of the attached cable or strand without developing stresses in the fitting equal to, or in excess of, the yield strength of the material in the fitting. One end fitting, of each type and size to be used, shall be tested to insure the adequacy of the fitting to develop the ultimate strength of the cable or strand to which it is to be attached.
§ 27-641. Construction
(a) General. The general provisions of reference standard RS 10-5 relating to erection of steel shall apply.
(b) Fitting for wire cable suspenders.
(1) Only fittings designed for use with the specific wire cable shall be used.
(2) All fittings shall be galvanized in accordance with reference standard RS 10-23.
(3) Zinc used for attaching all speltered fittings shall be at least equal to the grade designated as "high grade" in reference standard RS 10-26.
§ 27-642. Protection of suspenders
(a) Protected locations. All wires in bridge strands, bridge ropes, or other wire rope or strand suspenders placed on the interior of structures or concealed from exposure by interior finish shall have at least a class A coating of zinc. Rods, bars, plates, or shapes used for suspenders shall be given a protective coating as specified for the protection of like material in the applicable reference standard.
(b) Exposed locations. The outside wires of bridge strand or bridge rope suspenders placed in locations exposed to the weather shall have at least a class B coating of zinc and the inside wires shall have at least a class A coating. Rods, bars, plates, or shapes used for suspenders shall be given a protective coating as specified for the protection of like material in the applicable reference standard.
§ 27-643. Scope
The provisions of sections 27-644 through 27-648 of this article shall apply to the use of glass in the exterior wall of a building and shall be limited to exterior application wherein the glass would not be subjected to any loads normal to the face of glass other than those due to wind. For applications involving human impact, the provisions of section 27-651 of this article shall apply. For other cases, the strength and mode of installation of glass shall conform to accepted industry standards.
§ 27-644. Support for glass panels
Glass shall be firmly held in place. The supports shall be of adequate strength to resist the applicable design wind loads as prescribed in subchapter nine of this chapter.
§ 27-645. Glass requirements
Glass shall meet the requirements of reference standard RS 10-68 for the applicable type, size, thickness and quality.
§ 27-646. Thickness of glass
Thicknesses of glass panels shall be chosen either on the basis of statistical probability of breakage (subdivision (a) of this section) or on the basis of table 10-7, at the designer's option.
(a) Statistical probability. Thickness of glass panels shall be chosen so that the statistical probability of breakage when the glass is initially subjected to the design wind load specified in table RS 9-5-1 does not exceed the values indicated in table 10-6. Probability or load factors used for design shall be derived by test. The sufficiency and validity of such test data shall be subject to approval by the commissioner.
(b) Alternate requirements. Alternative to the requirements of paragraph (a) above, the thickness of glass panels may be chosen from table 10-7. For glass with assured minimum thickness greater than required by reference standard RS 10-68, the maximum areas in table 10-7 may be increased in proportion to the assured minimum thickness.
TABLE 10-6 Probability of Breakage for Glass Panels (Based on Coefficient of Variation of 25%)
Elevation Above Grade of Mid-Point of Glass Area of Panel – Sq. Ft. 0-50-Ft 0-60 60-80 80-100 100-120 120+ 0-50 1.0% 1.0% 1.0% 1.0% 1.0% 50 or more 1.0% 0.8% 0.6% 0.4% 0.2%
TABLE 10-7 Maximum Area of Glass – Sq. Ft.
Nominal Thickness of Glass – Inches Elevation Above Grade of Mid-Point of Glass – Ft. 0-50 50-300 300-600 600+ Sheet Glass Single strength 9 9 8 7 Double strength 13 13 11 10 3/16" 25 25 21 19 7/32" 32 32 27 24 Plate and Float Glass 13/64" 25 25 21 19 1/4" 37 37 32 28 5/16" 54 54 46 40 3/8" 78 74 63 58 1/2" 114 100 86 75 5/8" 152 120 103 90 3/4" 210 137 118 103 7/8" 241 158 135 118 1" 312 204 175 153
§ 27-647. Special glasses
For types of glass other than single annealed sheet and plate glass, allowable maximum areas may be determined by multiplying values in table 10-7 by the appropriate multiplying factor listed in table 10-8.
TABLE 10-8 Multiplying Factors for Various Types of Glass
Glass Type Multiplying Factor Full tempered 4.0 Heat strengthened 2.0 Factory-fabricated double glazing *1.5* Laminated 0.6 Wired 0.5 Sandblasted or etched 0.4
* For asymmetrical units base strength on thinner lite.
§ 27-648. Installation of glass panels
Glass panels shall be handled and installed so that their strength is not impaired by chipping or scratching, shall be fully and firmly bedded in their supports, and shall be mounted in a manner that will accommodate differential movements due to thermal and loading conditions.
§ 27-649. Protection of glass panels
Glass panels installed in areas where they will be subject to unusual conditions of construction damage, such as spatter from welds or locations near materials hoists, shall be protected by a hardboard covering or its equivalent during the period that such work is in progress.
§ 27-650. Deflection of support
The deflection of members supporting glass panels under the design wind load (measured perpendicular to the plane of the panel) shall not exceed L/175, where L is the span of the supporting member. In no case shall such deflection exceed three-quarters of an inch.
§ 27-651. Panels subject to human impact loads
Glass in prime and storm doors, interior doors, fixed glass panels that may be mistaken for means of egress or ingress, shower doors and tub enclosures, or in similar installations wherein one or more of the following criteria apply, shall meet the requirements set forth in table 10-9, or by comparative tests shall be proven to produce equivalent performance:
(a) openings are located in regularly occupied spaces.
(b) lowest point of panel is less than eighteen inches above finished floor.
(c) minimum dimension of panel is larger than eighteen inches.
Table 10-9 Requirements for Glass Panels Subject to Impact Loads a, b
Glass Type Individual Opening Area Requirements Regular plate, sheet or rolled (annealed) Over 6 sq. ft. Not less than 3/16 in. thick. Must be protected by a push-bar or protective grille firmly attached on each exposed side c, if not divided by a muntin. Regular plate, sheet or rolled (annealed), surface sandblasted, etched, or otherwise depreciated Over 6 sq. ft. Not less than 7/32 in. thick. Must be protected by a push-bar or protective grille firmly attached on each exposed side c. Regular plate, sheet or rolled (annealed), obscure Over 6 sq. ft. Not less than 3/16 in. thick. Must be protected by a push-bar or grille firmly attached on each exposed side c. Laminated Over 6 sq. ft. Not less than 1/4 in. thick. Shall pass impact test requirements of reference standard RS 10-67. Fully-tempered Over 6 sq. ft. Shall pass impact test requirements of reference standard RS 10-67. Wired Over 6 sq. ft. Not less than 7/32 in. thick. Shall pass impact test requirements of reference standard RS 10-67. All unframed glass doors (swinging) Shall be fully-tempered glass and pass impact test requirements of reference standard RS 10-67.
NOTES:
a Glass less than single strength (SS) in thickness shall not be used.
b If short dimension is larger than 24 in., glass must be double strength (DS) or thicker.
c Building owners and tenants shall maintain push-bars or protective grilles in safe condition at all times.
§ 27-652. Scope
The provisions of this subchapter shall establish minimum requirements for the design and construction of the foundations of buildings. In addition, within special flood hazard areas, and below the regulatory flood datum, as described in article ten of subchapter four of this chapter, foundations shall conform with the applicable provisions of reference standard RS 4-5.
§ 27-652. Paving
(a) Definitions. For the purposes of this article the following terms shall have the following definitions:
ASPHALT. A dark brown to black bitumen pitch that melts readily and which appears in nature in asphalt beds or is produced as a by-product of the petroleum industry.
ASPHALTIC CONCRETE or ASPHALT PAVING. A mixture of liquid asphalt and graded aggregate used as a paving material.
I-4 MIX. A type of heavy duty asphaltic concrete mix containing 0.75 inch (19 mm) nominal maximum size aggregate with 25% to 50% of the aggregate capable of passing through a No. 8 sieve and in which all sand contained in the mix is crushed.
RECLAIMED ASPHALT PAVEMENT. Asphalt pavement that has been processed for reuse in asphaltic concrete.
(b) Reclaimed asphalt pavement content in asphaltic concrete. Asphaltic concrete, other than I-4 mix or other approved heavy duty asphaltic concrete mix, shall contain not less than thirty percent reclaimed asphalt pavement, as measured by weight. I-4 mix or other approved heavy duty asphaltic concrete mix shall contain not less than ten percent reclaimed asphalt pavement, as measured by weight. Reclaimed asphalt pavement used in asphaltic concrete shall comply with the version of ASTM D 692 or ASTM D 1073 specified in chapter 35 of the New York city building code or in the rules of the department. This subdivision shall not apply to asphaltic concrete used in a project where the content of asphaltic concrete is governed by a federal or state law, rule, regulation, guideline, or specification that requires a different composition or to runways, taxiways, or other surfaces utilized by aircraft. The commissioner may waive compliance with this subdivision if the commissioner, after consulting with the commissioner of transportation and the owners or persons in charge of all asphalt plants located within the city, finds that a sufficient supply of reclaimed asphalt pavement is not available.
Editor's note: For related unconsolidated provisions, see Appendix A at L.L. 2011/071.
§ 27-653. Standards
The provisions of reference standard RS-11 shall be part of this subchapter.
§ 27-654. Definitions
For definitions to be used in the interpretation of this subchapter, see subchapter two of this chapter.
§ 27-655. Plans
For the requirements governing the filing of plans and the work to be shown on the plans, see subchapter one of this chapter.
§ 27-656. Permits
For the requirements governing equipment work permits and for equipment use permits, see subchapter one of this chapter.
§ 27-657. General requirements
Except as otherwise specifically provided herein, the foundations of buildings including retaining walls and other structures shall bear on, or be carried down to, satisfactory bearing materials in such manner that the entire transmitted load will be distributed over the supporting soils at any depth beneath the foundation at unit intensities within the allowable bearing values established in this subchapter. In addition, foundations shall be proportioned to limit settlements to a magnitude that will not cause damage to the proposed construction or to existing adjacent or nearby buildings during or after construction.
§ 27-658. Depth of foundations
(a) Footings and Pile Caps. The bottom surface of any footing, pier, pile cap, or other foundation construction, other than grade beams, shall be carried down at least four feet below the lowest level of the adjoining ground or pavement surface that is exposed to frost, except as follows:
(1) In refrigerator, cold storage, or similar areas, the depth shall be increased as required to found the construction below the potential level of freezing in the soil, or loss of heat from the soil shall be prevented by insulation, warm air ducts, circulating systems, or equivalent means.
(2) For foundation elements resting on rock, the footings may rest on the rock surface at shallower depths than those indicated above, provided that visual inspection of the rock surface directly underlying the bearing area shows it to be free of seams, cracks, or disintegrated materials that could serve as reservoirs for water and thus be subject to freezing.
(3) For foundation elements in the interior of closed and heated buildings, or in cases where the soil underlying the foundation is not subject to frost action, there shall be no mandatory minimum requirement for embedment.
(4) Mobile or portable buildings not more than one story high may be supported on foundation elements bearing at grade, subject to the following conditions:
a. The building shall be supported on jacks, wedges, or other devices that will permit readjustment of level in the event of displacement.
b. The bearing capacity of the underlying soil shall be adequate to support the building loads without rupture. Where the building is to be supported on nominally unsatisfactory bearing materials, the provisions of sections 27-677 and 27-679 of article four of this subchapter shall apply except that, where the bearing material is confined under pavement and the bearing pressure on the surface of the soil material does not exceed five hundred psf, special investigation of the foundation will not be required.
c. The bearing area shall be well drained and not subject to inundation.
d. The levels of the foundations shall be checked and adjusted to compensate for displacements at least once every year, and the owner shall maintain a record of such work, available for inspection by the commissioner.
(5) Where piles project above grade and displacement of the pile cap is prevented by interposing a space between the underside of the cap and the ground, the requirement for embedment of the cap below the level of frost penetration shall not apply.
(b) Grade beams. The bottom surface of any grade beam shall be carried down at least eighteen inches below the lowest level of the adjoining ground or pavement surface that is exposed to frost.
§ 27-659. Foundations at different levels
Where footings are supported at different levels, or at different levels from the footings of adjacent structures, the influence of the pressures under the higher footings on the stability of the lower footings shall be considered. Consideration shall be given to the requirements for lateral support of the material supporting the higher footings, the additional load imposed on the lower footings, and assessment of the effects of dragdown on adjacent pile-supported buildings.
§ 27-660. Slabs on grade
Slabs on grade within or adjacent to a building shall be so designed to limit settlement of such slabs to a magnitude that will not impair their usability or cause damage to the building or its foundations.
§ 27-661. Construction
The provisions of subchapter nineteen of this chapter relating to safety and of subchapter ten of this chapter relating to concrete, timber, masonry, and steel construction shall apply. For inspection requirements, see article thirteen of this subchapter.
(a) Cold weather. No foundation shall be placed on frozen soil. No foundation shall be placed in freezing weather unless provision is made to maintain the underlying soil free of frost.
(b) Seepage. In an excavation where soil and ground water conditions are such that an inward or upward seepage might be produced in soil material intended to provide vertical or lateral support for foundation elements or for adjacent foundations, excavating methods that will control or prevent the inflow of ground water shall be employed to prevent disturbance of the soil material in the excavation or beneath existing buildings. No foundation shall be laid on soil that has been disturbed by seepage unless remedial measures, as directed by an architect or engineer, are taken.
§ 27-662. General
Borings in earth or rock, recovery of samples, tests of soil samples, load tests, or other investigations or exploratory procedures shall be performed as necessary for the design and construction of a safe foundation subject to inspection in accordance with the requirements of article thirteen of this subchapter.
§ 27-663. Borings
(a) Number. At least one boring shall be made for every twenty-five hundred square feet of building area or fraction thereof and, for buildings supported on piling of such type or capacity that load tests are required, one boring shall be made for every sixteen hundred square feet of building area or fraction thereof except as indicated in paragraphs one through three of this subdivision.
(1) For one- and two-family dwellings (appurtenant structures such as garages, sheds, and porches shall be considered as part of the dwelling):
a. Buildings supported on footings founded on soil of class 8-65 or better – For contiguous groups of four or more dwellings at least one boring shall be made for every four buildings. For isolated dwellings and for contiguous groups of two or three dwellings, the overall site shall be explored by at least one boring or auger probing or, alternately, the site of each building shall be explored by one test pit carried to a depth of at least eight feet below the level of the bottom of the proposed footings.
b. Buildings supported on piles or on footings founded in soil strata of class 9-65, or poorer – The site shall be explored by at least one boring for every four buildings in contiguous groups or one boring for each building in the case of isolated dwellings.
(2) For buildings having a plan area in excess of ten thousand square feet and where subsurface conditions as determined from preliminary borings or from borings on neighboring sites consist of uniform deposits of materials of class 1-65, 2-65, 3-65, 6-65, 7-65, or 8-65, subject to the approval of the commissioner, the required borings may be reduced to one for every five thousand square feet of building area or fraction thereof except where the foundation is to be supported on piles.
(3) Where foundations are to rest on rock of class 1-65, 2-65, or 3-65 and such rock is exposed prior to construction over a part or all of the area of the buildings, borings will not be required in those areas where rock is exposed, and the area (within the limits of the building) of the exposed rock surface shall not be included in the area used to compute the required number of borings, provided the following requirements are met:
a. The presence of defects or the inclination of bedding planes in the rock are of such size and location as to not affect the stability of the foundation.
b. The foundation is designed for bearing pressures not exceeding those permitted in table 11-2 without increase for embedment.
(b) Location. At least two-thirds of the required number of borings shall be located within the area under the building. Those outside the area shall not be more than twenty-five feet from the limits of the building. Borings shall be uniformly distributed or distributed in accordance with the loading pattern imposed by the building.
(c) Depth.
(1) Unless soil material of class 1-65 through 3-65 is encountered at shallower depth, borings shall extend below the deepest part of the excavation as necessary to satisfy the more restrictive of the following requirements:
a. Borings shall extend deep enough into nominally satisfactory bearing material to establish its character and thickness, but not less than the following:
1. Where the soil material is class 5-65 – ten feet.
2. For one and two family residences, two stories or less in height-fifteen feet.
3. For other cases – twenty-five feet.
b. Borings shall extend to the depth at which the vertical stress caused by the proposed construction is reduced to ten percent or less of the original vertical stress at this depth due to the weight of the overburden, except that where strata of soil materials of class 9-65 or poorer are encountered within this depth, the borings shall penetrate such strata and be carried to a depth that shows penetration continuous of material of class 8-65 or better as required in paragraph a of this subdivision.
c. In addition to the requirements of paragraphs a and b of this subdivision, at least one boring in every ten thousand square feet of building area, but not less than one boring per building, shall be carried to a depth of one hundred feet below the curb for buildings having an average area load exceeding one thousand psf. The average load shall be computed as the sum of all dead loads and live loads of the building, divided by the area of the building at ground level.
(2) Where rock is encountered in borings within the depths noted in paragraph one the borings shall be cored a minimum of five feet into rock, or farther where necessary or required, to obtain at least a recovery of thirty-five per cent core from five feet of penetration but not to exceed the depth in paragraph one of this subdivision. However, for foundations supported on piles or drilled-in caissons bearing on the rock and having a capacity in excess of eighty tons per unit, the capacity of the rock to support the applied load shall be demonstrated by increasing the length of coring to ten feet.
(d) Types.
(1) SOIL BORINGS. Soil samples shall be recovered at intervals not to exceed five feet and at every change of soil strata. Such samples shall be recovered using a two inch O.D. split spoon sampler having an inside diameter of one and three-eighths inches and a constant internal cross section. The sampler shall be at least twenty-four inches long and shall be tipped with a heat treated, sharp cutting shoe. It shall be straight and sound, with an undistorted cross section. The rods to which the sampler is attached shall be one inch extra heavy pipe or one and five-eighths O.D. drill rods. The sampling tools shall be driven with a one hundred forty pound hammer having a fall of thirty inches. The blows per foot so recorded shall be designated, hereinafter, by the symbol, N. The fall of the hammer shall be a free fall and the energy of impact shall not be mitigated by friction of the hoisting line on the drum, friction of the hammer against its guide, or other similar effects. All samples, except those of rock, shall be preserved in air tight bottles having a capacity of at least eight ounces.
(2) ROCK BORINGS. Where borings are required to penetrate rock they shall be advanced by core drilling, and core samples shall be recovered using a double tube core barrel and diamond bits that provide cores at least one and three-eighths inches in diameter.
(e) Data to be reported. Records of all borings required by the provisions of subdivision (a) of this section shall accompany the application for approval of the foundation plans. Such records shall show, as a minimum, the size of casing and the number of blows per foot required to advance the casing (to the depth that casing is used); the weight of hammer and the distance of fall; a description of the sampler; a description of the drill tools and equipment including, where used, the size of diamond bits and type of core barrels; the number of blows required to drive the sampling spoon for each six inches increment of penetration; the elevation of the ground surface referenced to an established datum; the location and depth of the boring and its relation to the proposed construction; the elevations at which samples were taken; the elevations at which core drilling was started and stopped for each "run"; the elevations of the boundaries of soil strata; percent recovery for each "run" of core drilling; description of the soil strata encountered and geological classification of rock drilled (based on visual examination of cores); any particular, unusual, or special conditions such as loss of water in the earth and rock strata, boulders, cavities, and obstructions, use of special type of samplers, traps, etc.; and the level of ground water together with a description of how and when the ground water level was observed. All abandoned or unsuccessful attempts at borings or rock drilling shall be reported.
(f) Disposition of samples and cores. Soil samples and rock cores shall be retained in an accessible location by the owner, or by the party making application for approval of the foundation plans for a period of one year after the date of issuance of a certificate of occupancy, and shall be available upon reasonable notice for inspection by the commissioner.
§ 27-664. Test pits
(a) Test pits may be substituted for boring on a one-for-one basis. All applicable requirements as to depth, numbers of samples, data to be reported, and disposition of samples shall be observed, except that the use of sample spoon, recording of driving resistance, and recovery of rock cores is not required in test pit investigations, and except as provided in subdivision (b) of this section.
(b) Test pits for buildings not more than one story in height or for one or two-family residences not more than two stories in height need only extend four feet below the deepest part of the excavation for the construction of footings, or a minimum of four feet when foundation elements rest on grade pursuant to paragraph four of subdivision (a) of section 27-658 of article one of this subchapter, provided that such structures are supported by footings bearing on nominally satisfactory bearing materials of class 9-65 (except soft clay) soil or better.
§ 27-665. Boring methods
Borings shall be made by continuous driving and cleaning out of a pipe casing (including telescoping of smaller sizes inside of larger casing) except as permitted in subdivisions (a), (b), and (c) of this section. Where casing is used, it shall be cleaned out to undisturbed soil prior to sampling and the sample spoon driven into soil that has not been affected by chopping, washing, or hydrostatic imbalance.
(a) Uncased borings. Uncased borings, including borings where the casing is omitted for part of the depth, may be used if the mud slurry method is followed. The requirements for soil sampling and rock coring shall be the same for uncased borings as for borings made using casing, except that prior to each soil sampling operation the boring shall be substantially cleaned of disturbed material and the sample spoon shall be advanced through any settled solids before counting the blows required to drive the spoon. Longer sample spoons, having a sludge chamber, shall be used where settled solids exceed six inches In determining ground water levels, methods shall be used to reduce and replace the mud slurry so that the hydrostatic head may be measured. The procedures shall be described in detail in the records.
(b) Auger borings. Borings may be made with augers except that short flight augers shall not be used in granular soils below the water level. Sampling procedures in auger borings for both soil and rock shall be the same as for cased borings. Full hydrostatic head shall be maintained in granular soils below the ground water level during the boring operation.
(c) Maximum diameter. Where the bore hole, as drilled by any method, is in excess of four inches in diameter, sampling operations shall be performed through a temporary casing having a four inch inside diameter or less.
§ 27-666. Probings and geophysical explorations
(a) Footings, pier or wall designs. Where the foundations for a proposed building consist of footings or foundation piers or walls bearing on rock of class 1-65, 2-65 or 3-65, the use of probings, auger borings or geophysical methods, made without the recovery of soil samples or rock cores, may (except as hereafter specified) be substituted for up to one-half of the number of borings required by the provisions of subdivision (a) of section 27-663 of this article, provided that such probings, borings, etc. are carried to adequate depth and are of a nature that will reasonably define the surface contours of the rock. The accuracy of such surface contour definition shall be confirmed by recovering rock cores at the locations of at least one-fifth of the probings or auger borings or, in the case where geophysical methods are used, those borings which are made shall be so distributed as to permit confirmation of the accuracy of the geophysical investigations. The provisions of paragraph two of subdivision (a) of section 27-663 of this article, shall not apply where the provisions of this section are invoked.
(b) Pile support. Where the foundation for the proposed building consists of piling bearing on rock of class 1-65, 2-65 or 3-65, the provisions of subdivision (a) of this section shall apply, provided that the borings consistently show that the soil overlying the rock consists solely of deposits of class 6-65 through 11-65 and is free of boulders or other obstructions.
(c) Geophysical methods. Geophysical investigations shall be conducted by experienced and qualified personnel acceptable to the commissioner who may reject the results and require additional exploration by borings if the results of the geophysical explorations cannot be satisfactorily correlated to the logs of the borings.
§ 27-667. Existing borings
Existing boring data may be utilized subject to the following:
(1) Borings, test pits, probings, etc., that have been made in accordance with all requirements of this section, but not necessarily for the investigation of the specific project for which application is being made, may be utilized in fulfillment of these provisions.
(2) The logs of borings, test pits, probings, etc., that have been made in accordance with all requirements of this section, but wherein the soil samples and/or rock cores are not available for examination, may be utilized in fulfillment of these provisions to an extent not to exceed one-half of the required number of borings.
(3) Borings, test pits, probings, etc., or the logs thereof, that do not meet the specific requirements of this subchapter, but which are of suitable type and adequate penetration to provide the data required for the safe design and construction of the proposed foundation, may be utilized in fulfillment of the provisions of this section, subject to the approval of the commissioner.
§ 27-668. Soil bearing pressures
The loads to be used in computing the bearing pressures on materials directly underlying footings shall be the total column, pier, or wall reactions determined in accordance with the provisions of subchapter nine of this chapter, on the basis of reduced live load; plus the weight of the foundations; plus the weight of any soil, fill, and slabs on grade that is included within vertical planes projected upward from the extreme limits of the footing to the final ground surface. Live load on grade, or on slabs on grade, within these limits shall also be included. Impact loads shall be considered in accordance with the provisions of section 27-673 of this article.
§ 27-669. Pile reactions
The loads to be used in computing pile reactions shall be determined as provided in section 27-668 of this article except that where piles penetrate fill, clay, silt, peat, or similar compressible strata, the pile loads shall be increased by the amount of drag exerted by such material, and by any overlaying strata, during consolidation. Computation of the amount of drag shall consider the amount of added fill, the amount of shear strain between pile (or group) and the soil, the ratio of vertical to horizontal pressure in the soil, and the arrangement of the piles. The soil surrounding or underlying the pile cap shall not be considered as providing any vertical support for the cap.
§ 27-670. Lateral loads
(a) Earth and ground water pressure. Every foundation wall or other wall serving as a retaining structure shall be designed to resist, in addition to the vertical loads acting thereon, the incident lateral earth pressures and surcharges, plus hydrostatic pressures corresponding to the maximum probable ground water level. Retaining walls shall be designed to resist at least the superimposed effects of the total static lateral soil pressure, excluding the pressure caused by any temporary surcharge, plus an earthquake force of 0.045 wsh2 (horizontal backfill surface), where ws equals unit weight of soil and h equals wall height. Surcharges which are applied over extended periods of time shall be included in the total static lateral soil pressure and their earthquake lateral force shall be computed and added to the force of 0.045 wsh2. The earthquake force from backfill shall be distributed as an inverse triangle over the height of the wall. The point of application of the earthquake force from an extended duration surcharge shall be determined on an individual case basis. If the backfill consists of loose saturated granular soil, consideration shall be given to the potential liquefication of the backfill during the seismic loading using reference standard RS 9-6.
(b) Wind and other superstructure loads. Provision shall be made to resist lateral loads imposed on the superstructure due to wind or other causes.
(c) Soil movements. Buildings shall not be constructed in areas where the soil is subject to lateral movements unless positive provision is made to prevent such movements.
Editor's note: For related unconsolidated provisions, see Appendix A at L.L. 1995/017.
§ 27-671. Eccentricities
Eccentricity of loading in foundations, including eccentricity of loading on the bases of retaining walls, shall be investigated and the maximum soil pressure or pile load (considering eccentricity) shall be kept within the safe capacity thereof as established in articles four and eight of this subchapter. Soil pressure and pile load due to eccentricity shall be computed on the basis of straight line distribution of foundation reaction. However, other modes of distribution of the foundation reaction may be assumed, subject to the approval of the commissioner, if it can be demonstrated that the pile and/or soil is capable of sufficient plastic deformation to develop such mode of distribution without failure.
§ 27-672. Uplift forces
Uplift and overturning forces due to wind and hydrostatic pressure shall be considered.
§ 27-673. Impact
Impact forces may be neglected in the design of foundations, except for foundations bearing on loose granular soils, or, regardless of the type of soil material, for foundations supporting cranes, heavy machinery, and moving equipment, or where the ratio of the live load causing impact to the total of the reactions from live load applied without impact plus dead load exceeds one-third.
§ 27-674. Stability
The provisions of article twelve of this subchapter shall apply.
§ 27-675. Classification of soil materials
For purposes of this subchapter, soil materials shall be classified and identified in accordance with table 11-1. In addition, the following supplementary definitions shall apply.
(a) Rock.
(1) HARD SOUND ROCK. Includes crystalline rocks such as Fordham geniss, Ravenswood geniss, Palisades diabase, Manhattan schist. Characteristics are: The rock rings when struck with pick or bar; does not disintegrate after exposure to air or water; breaks with sharp fresh fracture; cracks are unweathered and less than one-eighth inch wide, generally no closer than three feet apart; core recovery with a double tube, diamond core barrel is generally eighty-five percent or greater for each five foot run.
(2) MEDIUM HARD ROCK. Includes crystalline rocks of paragraph one of this subdivision, plus Inwood marble and serpentine. Characteristics are: all those listed in paragraph one of this subdivision, except that cracks may be one-quarter inch wide and slightly weathered, generally spaced no closer than two feet apart; core recovery with a double tube, diamond core barrel is generally fifty percent or greater for each five foot run.
(3) INTERMEDIATE ROCK. Includes rocks of paragraphs one and two of this subdivision, plus cemented shales and sandstone of the Newark formation. Characteristics are: the rock gives dull sound when struck with pick or bar; does not disintegrate after exposure to air or water; broken pieces may show weathered surfaces; may contain fracture and weathered zones up to one inch wide spaced as close as one foot; core recovery with a double tube, diamond core barrel is generally thirty-five per cent or greater for each five foot run.
(4) SOFT ROCK. Includes rocks of paragraphs one, two and three of this subdivision in partially weathered condition, plus uncemented shales and sandstones. Characteristics are: rock may soften on exposure to air or water; may contain thoroughly weathered zones up to three inches wide but filled with stiff soil; core recovery with a double tube, diamond core barrel is less than thirty-five percent for each five foot run, but standard penetration resistance in soil sampling is more than fifty blows per foot. Where core recoveries are less than twenty percent and the material is to be used for bearing, a minimum three inches diameter core shall be recovered and the material recovered shall be classified in accordance with table 11-1.
(b) Special soil types.
(1) FINE SAND. Soils of group SM, containing more than fifty percent (by weight) of particles passing a number sixty mesh sieve.
(2) HARDPAN. Soils of groups GM, GC, and SW, generally directly overlying rock, and which are sufficiently cemented to be difficult to remove by picking.
(3) CLAY SOILS. Soils of each group SC, CL, and CH shall be classified according to consistency as hard, medium, or soft in accordance with the following:
a. Hard clay. A clay requiring picking for removal, a fresh sample of which cannot be molded by pressure of the fingers.
b. Medium clay. A clay that can be removed by spading, a fresh sample of which can be molded by a substantial pressure of the fingers.
c. Soft clay. A clay, a fresh sample of which can be molded with slight pressure of the fingers.
(4) SILT SOILS. Soils of each group ML and MH shall be classified as dense, medium, or loose depending on relative difficulties of removal as described for hard, medium, and soft clays in paragraph three of this subdivision.
(5) VARVED SILT. A natural soil deposit consisting of alternating thin layers of silt, clay, and sand in which the silt or silt plus sand layers predominate.
§ 27-676. Satisfactory bearing material
This section has 1 picture (figures, equations, or tables drawn as images) that BetaNYC's copy does not show. Read § 27-676 at American Legal Publishing.
The following materials, or any combination of them shall be considered as generally satisfactory bearing materials; hard sound, medium hard, intermediate, and soft rock; hardpan; granular soils of G and S groups; dense or medium silt soils of groups ML and MH; and hard or medium clay soils of groups CL and CH.
FIELD IDENTIFICATION PROCEDURES FOR FINE-GRAINED SOILS OR FRACTIONS
These procedures are to be performed on the minus No. 40 sieve size particles, approximately 1/1964 in. For field classification purposes, screening is not intended, simply remove by hand the coarse particles that interfere with the tests.
Dilatancy (reaction to shaking)
After removing particles larger than No. 40 sieve size, prepare a pat of moist soil with a volume of about one-half cubic inch. Add enough water if necessary to make the soil soft but not sticky.
Place the pat in the open palm of one hand and shake horizontally, striking vigorously against the other hand several times. A positive reaction consists of the appearance of water on the surface of the pat which changes to a livery consistency and becomes glossy. When the sample is squeezed between the fingers, the water and gloss disappear from the surface, the pat stiffens, and finally it cracks or crumbles. The rapidity of appearance of water during shaking and of its disappearance during squeezing assist in identifying the character of the fines in a soil.
Very fine clean sands give the quickest and most distinct reaction whereas a plastic clay has no reaction. Inorganic silts, such as a typical rock flour, show a moderately quick reaction.
Dry Strength (crushing characteristics)
After removing particles larger than No. 40 sieve size, mold a pat of soil to the consistency of putty, adding water if necessary. Allow the pat to dry completely by oven, sun, or air-drying, and then test its strength by breaking and crumbling between the fingers. This strength is a measure of the character and quantity of the colloidal fraction contained in the soil. The dry strength increases with increasing plasticity.
High dry strength is characteristic for clays of the CH group. A typical inorganic silt possesses only very slight dry strength. Silty fine sands and silts have about the same slight dry strength, but can be distinguished by the feel when powdering the dried specimen. Fine sand feels gritty whereas a typical silt has the smooth feel of flour.
Toughness (consistency near plastic limit)
After particles larger than the No. 40 sieve size are removed, a specimen of soil about one-half inch cube in size, is molded to the consistency of putty. If too dry, water must be added and if sticky, the specimen should be spread out in a thin layer and allowed to lose some moisture by evaporation. Then the specimen is rolled out by hand on a smooth surface or between the palms into a thread about one-eighth inch in diameter. The thread is then folded and rerolled repeatedly. During this manipulation the moisture content is gradually reduced and the specimen stiffens, finally loses its plastic ity, and crumbles when the plastic limit is reached.
After the thread crumbles, the pieces should be lumped together and a slight kneading action continued until the lump crumbles.
The tougher the thread near the plastic limit and the stiffer the lump when it finally crumbles, the more potent is the colloidal clay fraction in the soil. Weakness of the thread at the plastic limit and quick loss of coherence of the lump below the plastic limit indicate either inorganic clay of low plasticity, or materials such as kaolin-type clays and organic clays which occur below the A-line.
Highly organic clays have a very weak and spongy feel at the plastic limit.
§ 27-677. Nominally unsatisfactory bearing material
Fill material, peat, (group Pt), organic silts and clays (grouping OL and OH), soft or loose soils of groups ML, CL, HM and CH, varved silt, or satisfactory bearing materials that contain lenses of, or are underlain by, these materials shall be considered as nominally unsatisfactory bearing materials.
§ 27-678. Allowable soil bearing pressures
The allowable bearing pressures on satisfactory bearing materials shall be those established in table 11-2. The allowable bearing pressures on nominally unsatisfactory bearing materials shall be those established in accordance with section 27-679 of this article. Allowable bearing pressure shall be considered to be the allowable pressure at a point in the soil mass in excess of the stabilized overburden pressure existing at the same point prior to construction operations. The stabilized overburden pressure existing at a point shall be defined as that portion of the weight of the overlying soil material that is supported by granular interaction rather than pore pressure. In general, the magnitude of the stabilized overburden pressure may be approximated as follows:
(a) The overlying soil material shall have been in place for an adequate length of time to produce a stable condition of pore pressure in, or below the foundation level. Where the bearing stratum consists of soils of classes 5-65 through 8-65, the bearing stratum shall be considered to be fully consolidated except with regard to the weight of that portion of the overlying soil material that consists of added fill material.
(b) Where all or a portion of the overlying soil consists of fill material, the weight of the fill material shall not be included in the stabilized overburden pressure unless the magnitude of stabilized pressure is verified by an architect or engineer on the basis of laboratory or field tests on undisturbed material.
(c) Where the bearing stratum consists of soils of classes 9-65 through 11-65, the stabilized overburden pressure shall be considered as zero unless the magnitude of the stabilized pressure is established by an architect or engineer on the basis of laboratory or field tests on undisturbed material.
(d) The stabilized overburden pressure shall not include the weight of any soil removed by excavation and not replaced. For footings, the total stabilized overburden pressure shall not exceed the weight of a one square foot column of soil (considering submerged weight where the soil column is partly submerged) measured from the bottom of the footing to the lowest level of the final grade above the footing.For a box foundation, where the strength of the slab is adequate to stabilize the underlying soil, the stabilized overburden pressure shall not exceed the weight of a one square foot column of soil measured from the bottom of the box to the lowest level of the adjacent grade.
(e) Where the bearing stratum consists of soils of classes 9-65 through 11-65, the allowable bearing pressure shall be adjusted for the effects of rebound due to excavation as determined from consolidation test data.
(f) Where the bearing stratum consists of rock of classes 1-65 through 3-65, the stabilized overburden pressure shall be neglected.
TABLE 11-2 Allowable Soil Bearing Pressures
Class of Material Description See Notes (1) Basic Allowable Bearing Values (Tons per sq. ft.) See Notes (10), (11) and (12) 1-65 Hard Sound Rock 60 See Notes (2) and (8). 2-65 Medium Hard Rock 40 See Notes (2) and (8). 3-65 Intermediate Rock 20 See Notes (2) and (8). 4-65 Soft Rock 8 5-65 Hardpan — See Notes (3) and (8). 6-65 Gravel and Gravel Soils (Soil Groups, GW, GP, GM & GC and soils of Soil Groups SW, SP, and SM containing more than 10% of material retained on a No. 4 sieve) — See Notes (4) and (8) and (9). 7-65 Sands (other than Fine Sands) (Soil Groups SW, SP & SM but containing not more than 10% of material retained on a No. 4 sieve) — See Notes (5), (8) and (9). 8-65 Fine sand — See Notes (6), (8) and (9). 9-65 Clays and Clay Soils (Soil Groups SC, CL & CH) Hard 5 See Note (7). Medium 2 See Note (7). Soft See Sec. 27-679. 10-65 Silts and Silt Soils (Soil Groups ML & MH) Dense 3 Medium 1.5 Loose See Sec. 27-679. 11-65 Nominally Unsatisfactory Bearing Materials See Sec. 27-679.
Notes for Table 11-2:
(1) Classification. The soil classifications indicated in this table are those described in section 27-675 of this article. Where there is doubt as to the applicable classification of a soil stratum, the allowable bearing pressure applicable to the lower class of material to which the given stratum might conform shall apply unless the conformance to the higher class of material can be proven by laboratory or field test procedures.
(2) Allowable bearing pressure on rock. The tabulated values of basic allowable bearing pressures apply only for massive rocks or, for sedimentary or foliated rocks, where the strata are level or nearly so, and, then only if the area has ample lateral support. Tilted strata and their relation to nearby slopes or excavations shall receive special consideration.
(3) Allowable bearing pressure on hardpan. For hardpan consisting of well cemented material composed of a predominantly granular matrix and free of lenses of fine grained material and inclusions of soft rock, the basic allowable bearing pressure shall be twelve tons per square foot. For hardpan consisting of poorly cemented material or containing lenses of fine grained material, inclusions of soft rock, or a fine grained matrix, the basic allowable bearing pressure shall be eight tons per square foot.
(4) Allowable bearing pressure on gravel and gravel soils. Values of basic allowable bearing pressure shall be as follows:
(a) For soils of Soil Groups GW, GP, GM, and GC: Compact, well graded material – ten tons per square foot. Loose, poorly graded material – six tons per square foot. Intermediate conditions – Estimate by interpolation between indicated extremes.
(b) For soils of Soil Groups SW, SP, and SM, containing more than ten percent of material retained on a No. 4 sieve: Compact, well graded material – eight tons per square foot. Loose, poorly graded material – four tons per square foot. Intermediate conditions – Estimate by interpolation between indicated extremes.
(5) Allowable bearing pressure on sands. The basic allowable bearing pressure shall be determined from the resistance to penetration of the standard sampling spoon. The basic allowable bearing pressure in tons per square foot shall equal 0.10 times N but not greater than six tons per square foot, nor less than three tons per square foot. The appropriate value for the penetration resistance at various areas of the site shall be made by averaging the measured resistance within a depth of soil below the proposed footing level equal to the width of the footing. Where the average values so obtained do not vary by more than twenty-five percent of the minimum of the average values over the site of the proposed building, the lowest average value shall be used for the design of the entire building. Where the variation exceeds twenty-five percent, the allowable bearing pressure shall be predicated on the lowest average value unless appropriate measures are taken to avoid detrimental amounts of differential settlements of the footings. Where the design bearing pressure on soils of class 7-65 exceeds three tons per square foot, the embedment of the loaded area below the adjacent grade shall not be less than four feet and the width of the loaded area not less than three feet, unless analysis shall demonstrate the proposed construction to have a minimum factor of safety of 2.0 against shear failure of the soil.
(6) Allowable bearing pressure on fine sand. The basic allowable bearing pressure shall be determined from the resistance to penetration of the standard sampling spoon. The basic allowable bearing pressure in tons per square foot shall equal 0.10 times N but not greater than four tons per square foot nor less than two tons per square foot, except that, for loose materials (resistance to penetration of the standard sampling spoon ten blows per foot or less), where the foundation is subjected to vibratory loads from machinery or similar cause, the indicated basic values shall not apply. The allowable bearing pressure shall be established by analysis applying accepted principles of soil mechanics and a report of such analysis satisfactory to the commissioner shall be submitted as a part of the application for the acceptance of the plans.
(7) Allowable bearing pressure on clays and clay soils. The bearing capacity of medium and hard clays and clay soils shall be established on the basis of the strength of such soils as determined by field or laboratory tests and shall provide a factor of safety against failure of the soil of not less than 2.0 computed on the basis of a recognized procedure of soils analysis, shall consider probable settlements of the building, and shall not exceed the tabulated maximum values.
(8) Increases in allowable bearing pressure due to embedment of the foundation.
(a) The basic allowable bearing values for rock of classes 1-65, 2-65 and 3-65 shall apply where the loaded area is on the surface of sound rock. Where the loaded area is below the adjacent rock surface and is fully confined by the adjacent rock mass and provided that the rock mass has not been shattered by blasting or otherwise is or has been rendered unsound, these values may be increased ten percent of the base value for each foot of embedment below the surface of the adjacent rock surface in excess of one foot, but shall not exceed twice the basic values.
(b) The basic allowable bearing values for soils of classes 5-65 through 8-65 determined in accordance with notes three, four and five above, shall apply where the loaded area is embedded four feet or less in the bearing stratum. Where the loaded area is embedded more than four feet below the adjacent surface of the bearing stratum, and is fully confined by the weight of the adjacent soil, these values may be increased five percent of the base value for each foot of additional embedment, but shall not exceed twice the basic values. Increases in allowable bearing pressure due to embedment shall not apply to soils of classes 4-65, 9-65, 10-65, or 11-65.
(9) Increase in allowable bearing pressure for limited depth of bearing stratum: The allowable bearing values for soils of classes 6-65, 7-65 and 8-65 determined in accordance with this table and the notes thereto (including note eight), may be increased up to one-third where the density of the bearing stratum below the bottom of the footings or the tips of the piles increases with depth provided that:
(a) The bearing stratum is not underlain by materials of a lower class.
(b) The allowable bearing value of the soil material underlying the bottom of the footings or the tips of the piles increases at least fifty percent within a depth below the footing or the tips of the piles which is not greater than the width of the footing or the width of the polygon circumscribing the pile group. (c) It shall be demonstrated by a recognized means of analysis that the probable settlement of the foundation due to compression, and/or consolidation do not exceed acceptable limits for the proposed building.
(10) Combination of loads. The provisions of section 27-594 of article two of subchapter ten of this chapter shall apply.
(11) Correction for foundations bearing on materials of varying bearing capacities. Where it is shown by borings or otherwise that materials of varying bearing value will be used for support of a building: (1) Where the weakest material does not rank below class 5-65, no modifications shall be required. (2) Where the weakest materials rank as classes 6-65 through 8-65, if the difference in basic allowable bearing values for the several materials does not exceed thirty percent of the allowable value for the poorest material which is to support the foundation, the foundations may be proportioned in direct conformance with the allowable bearing pressures. Where the difference in basic allowable bearing values exceeds thirty percent, appropriate measures shall be taken to limit the differential settlements of the different portions of the structure to tolerable values. (3) For materials of classes 9-65 and 10-65, in all cases, appropriate measures shall be taken to equalize the settlements of the different portions of the structure.
(12) Inundated footings. The provisions of this section relating to materials of classes 1-65 through 7-65, shall be deemed equally applicable both to the dry and to the inundated condition of the soil provided: (a) That the subgrade is undisturbed by the construction operations, (b) The bearing area is in a confined condition. For such cases, no reduction in allowable bearing value will be required where the soil supporting the foundation is subject to a rising level of inundation. However, the effects on settlement of a falling level of inundation occurring after construction of the foundation shall be considered in the design.
§ 27-679. Bearing capacity of nominally unsatisfactory bearing materials
Whenever soils exploration shows that the proposed foundation would rest on, or be underlain by, nominally unsatisfactory bearing materials, a report based on soil tests and foundation analysis (including analysis of undisturbed samples) shall be submitted by an architect or engineer, demonstrating, subject to the approval of the commissioner, that the proposed construction, under a condition of one hundred percent over load, is safe against failure of the soil materials. The report shall also show that the probable total magnitude and distribution of settlement to be expected under design conditions will not result in instability of the building or stresses in the structure in excess of the allowable values established in subchapter ten of this chapter. In addition, the following provisions shall apply:
(a) Fill materials.
(1) CONTROLLED FILLS. Fills shall be considered as satisfactory bearing materials of class 6-65 or 7-65 when placed in accordance with the following procedures, under the provisions for controlled inspection.
a. Before placement of fill, the existing ground surface shall be stripped of all organic growth, timber, rubbish, and debris. After stripping, the ground surface shall be compacted to the density in subparagraph d of this paragraph.
b. Materials for fill shall consist of sand, gravel, crushed stone, crushed gravel, or a mixture of these, and shall contain no organic matter. The fill materials shall contain no particles exceeding four inches in the largest dimension. No more than thirty per cent of the material shall be retained on a three-quarter inch sieve. The material passing the three quarter inch sieve shall contain, by weight, no more than forty percent passing the one hundred sieve, or twelve percent passing the two hundred sieve.
c. The grading of the fill shall be determined in accordance with the applicable procedures of reference standards RS 11-1 and RS 11-2.
d. Fill shall be placed and compacted at its optimum moisture content, in uniform layers not more than twelve inches thick (after compaction) and each layer shall be thoroughly compacted to a density not less than ninety-five percent of the density prescribed in reference standard RS 11-3. The field density shall be verified by in-place density tests made on each lift of the embankment. Fill shall not be placed when frozen or placed on a frozen or wet sub-grade.
(2) UNCONTROLLED FILLS. Fill material, other than controlled fill, may be used for the support of buildings, other than one- and two-family dwellings, and may be considered as satisfactory bearing material of applicable class, subject to the following:
a. The soil within the building area shall be explored using test pits. At least one test pit, penetrating at least eight feet below the level of the bottom of the proposed footings, shall be provided for every twenty-five hundred square feet of building area. Where such test pits consistently indicate that the fill is composed of material that is free of voids and free of extensive inclusions of mud, organic materials such as paper, garbage, cans, or metallic objects, and debris, the provisions of subparagraphs b and c of this paragraph shall apply. Where the test pits show such voids or inclusions, the additional provisions of subparagraph d of this paragraph shall apply. Borings may be used in lieu of test pits, provided that continuous samples at least four inches in diameter are recovered.
b. The building area shall be additionally explored using one standard boring under each column. These borings shall be carried to a depth sufficient to penetrate into natural ground, but not less than twenty feet below grade, and a sufficient number shall penetrate deeper than twenty feet as required to meet the provisions of section 27-663 of article two of this subchapter. Where such borings show voids or inclusions, the provisions of subparagraph d of this paragraph shall apply.
c. The allowable soil bearing pressure on the fill material shall not exceed two tons per square foot.
d. Wherever the fill shows voids or inclusions as described in subparagraphs a and b of this paragraph either the fill shall be treated as having no presumptive bearing capacity, or the building shall incorporate adequate strength and stiffness to bridge such voids or inclusions or shall be articulated to prevent damage due to differential or localized settlement of the fill.
(b) Organic silts, organic clays, soft inorganic clay, loose inorganic silt, and varved silt.
(1) The allowable bearing pressure shall be determined independently of table 11-2 subject to the following:
a. For varved silts, the soil bearing pressure produced by the proposed building shall not exceed two tons per square foot, except that for desiccated or preconsolidated soils, higher bearing pressures will be allowed.
b. For organic silts or clays (groups OL and OH) or for soft or loose soils of groups ML, CL, MH, and CH, the soil bearing pressure produced by the proposed building shall not exceed one ton per square foot except that a value of two tons per square foot will be permitted on soils that are adequately preconsolidated or artificially treated.
(2) The report required in this section shall contain, as a minimum, the following information:
a. Geological profiles through the area defining the stratigraphy.
b. Sufficient laboratory test data on the compressible material to indicate the coefficient of consolidation, coefficient of compressibility, permeability, secondary compression characteristics, and Atterberg limits.
c. Where the design contemplates improvement of the natural bearing capacity and/or reduction in settlements by virtue of preloading, cross sections showing the amount of fill and surcharge to be placed on design details showing the required time for surcharging shall be indicated, and computations showing the amount of settlement to be expected during surcharging. Records of settlement plate elevations and pore pressure readings, before, during, and after surcharging, shall be filed with the commissioner.
d. The estimated amount and rate of settlement expected to occur after the structure has been completed, including the influence of dead and live loads of the structure.
e. A detailed analysis showing that the anticipated future settlement will not adversely affect the performance of the structure.
f. Where sand drains are to be used, computations showing the diameter, spacing, and method of installation of such drains, shall be provided.
(c) Artificially treated soils. Nominally unsatisfactory soil materials that are artificially compacted, cemented, or preconsolidated (including soils compacted by vibration, cemented by chemical injection, or preconsolidated by use of electric current, but not including cases where preconsolidation consists solely of the use of surcharge with or without sand drains) may be used for the support of buildings, and nominally satisfactory soil materials that are similarly treated may be used to resist soil bearing pressures in excess of those indicated in table 11-2 for the soil in its natural state, subject to the following:
(1) The vertical and lateral extent of the soil that is compacted, cemented, or preconsolidated shall conform to the full extent of the distribution of loading that is assumed for purposes of computing the intensities of the soil bearing pressure. The actual soil bearing pressure shall not exceed the limitations of subdivisions (a) and (b) of this section for nominally unsatisfactory bearing materials or, for satisfactory bearing materials, shall not exceed the limitations of table 11-2.
(2) After the treatment procedure, a minimum of one boring shall be made for every sixteen hundred square feet of that portion of the building area that is supported on treated soil, and a sufficient number of samples shall be recovered from the treated soil to demonstrate the efficacy of the treatment.
§ 27-680. Utility services
Where utility service lines are to be laid in soil materials of class 11-65, provision shall be made to prevent damage to such service lines as follows: (a) Where the lines enter a structure, including a building, a manhole, or a junction chamber, that is rigidly supported on piles or in firm bearing material, the services shall be supported on piles or bearing materials of adequate firmness to prevent differential settlement of the service lines with respect to the structure; otherwise, provisions, such as oversized sleeves, flexible connections, utility tunnels, or other approved device, shall be made to permit the anticipated differential movement to occur without damage to the service lines.
(b) Where the lines enter a structure that is supported on soil materials of class 11-65 or on soft clay or loose silt deposits, and engineering analysis shall be made of the probable differential settlement of the utility service line with respect to the structure, and provision shall be made to accommodate such displacement, as described in subdivision (a) of this section.
§ 27-681. Applicability
Soil load bearing tests made at the option and expense of the owner of the proposed structure and inspected in accordance with the provisions of section 27-132 of article seven of subchapter one of this chapter, controlled inspection, may be accepted by the commissioner as evidence of allowable bearing capacity of a given soil stratum, subject to the following limitations:
(a) The applicability of soil load bearing tests shall be limited to soil materials of classes 5-65 through 10-65.
(b) Soil load bearing tests shall not be used to justify allowable bearing pressures in excess of the maximum allowable bearing values established in table 11-2 for the applicable class of material.
(c) Soil load bearing tests shall not be applicable where the proposed bearing stratum is underlain by a stratum of lower class, unless analysis indicates that the presence of such lower stratum will not create excessive settlements of the building.
§ 27-682. Procedure
(a) Preparations.
(1) A sketch showing the layout, levels, number of tests, details of test apparatus, and test procedures shall be filed with the commissioner before conducting such tests. The sketch shall also include the locations and levels of the proposed tests in relation to the contemplated foundation levels as well as the logs of borings that have been made for the building or buildings involved.
(2) The tests shall be made at the levels contemplated for the proposed building footings, and in at least two locations within the limits of the building area. The surfaces at the locations of the proposed tests shall be leveled at the elevations of the proposed test for a clear distance of at least five feet all around the test plate.
(3) The loaded area shall be square and at least twenty-four inches by twenty-four inches.
(4) When load tests are performed on materials affected by drying, suitable methods shall be used to prevent evaporation from the material.
(5) In the event ground water is present immediately below, at, or above the level required to be tested, dewatering facilities shall be installed to maintain ground water a minimum of four feet below the level of the test plate during the preparation and duration of the test or tests.
(6) Trenches and other provisions at the ground surface shall be made to prevent inflow of surface water and to remove water that may drain into the test area. The entire test area shall be protected against weather and rainfall for the entire duration of the test.
(7) The load platform providing the support for the test load shall be supported on adequate timber cribbing, which shall not be closer than five feet from the edge of the test plate.
(8) The plate on which the loads are applied shall be of steel having a minimum thickness of two inches and shall be set and centered in a depression in the bottom of the pit or loading area about thirty inches square for a twenty-four inch by twenty-four inch plate and eight inches deep. The area on which the plate is placed shall be scraped to remove any disturbed soil. The area to be tested shall be covered with a thin layer of fine clean sand that shall be smoothed and leveled until a completely level surface for placing the test plate is obtained.
(9) Settlement observations shall be made at four corners of test plate by means of dial extensometers. The extensometers shall provide readings to the nearest 0.001 in. In addition, settlement observations shall be taken using an engineer's level reading to 0.001 ft., properly referenced to a well-established benchmark.
(10) All tests shall be made under the surveillance of the commissioner, who shall be duly notified in order that he or she may be represented.
(b) Loading of the soil.
(1) Loads shall be applied to the test plate by direct weight or by means of a hydraulic jack. The loading platform or box shall be constructed to provide a concentric load on the plate. If direct weight is employed, the loading increments shall be applied without impact or jar. The weight of the blocking placed on the plate and the loading platform or box shall be obtained prior to the test and this weight shall be considered as the first increment of load. If a hydraulic jack is employed, facilities for maintaining each increment of desired load constant under increasing settlement shall be provided. The gauge for the jack and the jack shall be calibrated as a unit not more than two weeks prior to the test.
(2) The unit intensity of the test load shall be one and one-half times the unit intensity of the loading proposed to be imposed on the soil by the design loads. The test load shall be applied in a minimum of six increments at twenty-five percent, fifty percent, seventy-five percent, one hundred percent, one hundred twenty-five percent, and one hundred fifty percent of the proposed working load. Each load increment shall be maintained for a length of time as follows:
a. At the proposed loading and at one hundred fifty percent of load until the settlement is less than 0.005 in. over a period of twenty-four hours.
b. At other loadings until the settlement is 0.001 in. or less, over a period of five minutes.
(3) Under each load increment, settlement observations shall be made and recorded at intervals of one-half minute, one minute, four minutes, and each four minutes thereafter after application of load increment except in the instance of the working load and one hundred fifty percent of working load where, after the four minute reading, the time interval shall be doubled successively until the final settlement limitation is reached and the load is increased or removed.
(4) After the test load and limiting rate of settlement under the test load is reached, loads shall be removed in not less than three equal increments and rebound observations made in the same manner as for the loading increments. The final rebound shall be recorded twenty-four hours after the entire test load has been removed.
(c) Determination of results.
(1) Subject to the limitations designated in section 27-681 of this article, the soil load test for soils of classes 5-65 through 8-65 shall be considered as tentatively substantiating the ability of the soil to support the proposed unit intensity of loading if the gross settlement of the test plate under the proposed unit intensity of loading does not exceed one-half inch and the total gross settlement after the fifty percent overload is applied does not exceed one inch. This tentative substantiation shall be supported by a report by the architect or engineer on the correlation of the behavior of the load test to the probable behavior of the full size building. The proposed design load shall be considered as acceptable only upon written acceptance by the commissioner.
(2) For soils of classes 9-65 and 10-65, the soil load test alone shall not be considered as evidence of allowable bearing capacity of the soil, but the data so obtained may be utilized to establish an allowable bearing capacity subject to the provisions of section 27-677 and 27-678 of article four of this subchapter.
(3) In the event that it is desired to conduct load tests on square areas larger than the minimum stipulated above, permission may be granted provided notice of such increase in area is properly filed with the test information required to be submitted to the commissioner. The limiting gross settlements stipulated in paragraph one of this subdivision shall be increased in relation to the increase in width of test plate in accordance with the following formula:
S = (9S 1 /16)(2B/B + 1) 2
where: S = settlement of the larger loaded area (in.)
S1 = permissible settlement of twenty-four inch by twenty-four inch loaded area, as specified in paragraph one of this subdivision (in.)
B = side dimension of square plate used for test (ft.).
§ 27-683. Materials
All structural elements of foundations as defined in section 27-585 of article one of subchapter ten shall meet the requirements as to type and minimum quality of materials prescribed in such subchapter. Inspection of materials and construction shall comply with the provisions of section 27-586 of such subchapter.
§ 27-684. Footings
Inspections of subgrade of footings, piers and walls shall comply with the requirements of section 27-723 of article thirteen of this subchapter.
(a) Wood footings. Wood footings may be used only for wood frame structures. Wood footings shall be given a preservative treatment in accordance with reference standard RS 11-4.
(b) Pole buildings. Buildings not more than one story high may be supported on poles embedded in the ground. Wood poles shall conform to the requirements of reference standard RS 11-5 and shall be given a preservative treatment in accordance with reference standard RS 11-4. Steel poles embedded in the soil shall be protected as required by the provisions of paragraph one of subdivision (c) of section 27-685 of this article.
(c) Grillages. Grillage beams shall be provided with proper spacers, stiffners, and diaphragms, or the space between the beams shall be filled with concrete or grout. In addition, all steel grillages shall be fully protected against corrosion by encasement, coating with metal protection of a type satisfactory to the commissioner or by other approved device.
(d) Design.
(1) CONCRETE FOOTINGS. Concrete footings shall be proportioned in accordance with the provisions of reference standard RS 10-3. Reinforcement shall extend to within four inches of the edges of the footing.
(2) MASONRY FOOTINGS. Masonry used for the construction of footings shall be of solid units.
a. Reinforced masonry footings shall meet the requirements of reference standard RS 10-2 and shall be proportioned similarly to the proportioning of reinforced concrete footings.
b. Unreinforced masonry footings shall be of such dimension that a sloping plane extending downward from the top of the footing where it intersects the pier of wall, to the bottom of the footing, and measured at the angle with the horizontal that is indicated below, will be contained entirely within the footing: Soil bearing capacity of three tons per square foot or less – sixty degrees Soil bearing capacity between three tons per square foot and six tons per square foot – seventy degrees Soil bearing capacity greater than six tons per square foot shall be investigated. The compressive stress in the footing, based on the assumption that the vertical load is uniformly distributed over horizontal sections bounded by said planes, shall not exceed the values given in reference standard RS 10-1.
§ 27-685. Foundation piers
Foundation piers shall be designed as columns. Reinforced concrete piers shall be designed in accordance with the provisions of reference standard RS 10-3. Reinforced and unreinforced masonry piers shall be designed in accordance with the provisions of reference standards RS 10-2 and RS 10-1. Unreinforced concrete piers shall be designed in accordance with subdivision (b) of this section.
(a) Lateral support. The equivalent unbraced length of a pier supported by lateral soil pressure may be determined by a recognized method of elastic analysis. Alternatively, such a pier may be assumed to be hinged, but laterally braced at intervals equal to the full height of the pier or eight times the least lateral dimension of the pier, whichever is the lesser value. The provisions of subdivision (e) of this section shall apply.
(b) Unreinforced concrete piers. Where unreinforced concrete piers are used, the allowable compressive stress shall not exceed 0.25 f'c and the center of cross section of the pier at any level shall not deviate from the line of action of the resultant of all forces (which line of action shall consider the eccentricities due to all loads and moments acting on the pier) by an amount more than one-sixtieth of its height or one-tenth of its least lateral dimension and the ratio of the height to the least lateral dimension shall not exceed eight. For larger values of the ratio of the height to the least lateral dimensions, or for greater eccentricities, piers shall be reinforced.
(c) Metal shells. Where piers are encased by a metal shell, the shell may be considered as contributing to the structural strength of the pier provided that the thickness is one-eighth inch or greater, and subject to the following requirements:
(1) Where boring records or site conditions indicate possible deleterious action on the shell, where any portion of the shell is embedded in ash, cinder fill or garbage fill, where the encased piers are used for support of chemical plants, piles of coal, or under other conditions conducive to chemical seepage or corrosive action, or where the encased piers are used for support of electrical generating plants, the metal shells shall be protected against deterioration by encasement, coating, or other device acceptable to the commissioner.
(2) The area of the metal section of the shell multiplied by the efficiency of the horizontal joints shall be considered as equivalent vertical reinforcement of the pier. The area of the metal section of the shell, multiplied by the efficiency of the vertical joints, shall be considered as equivalent spiral reinforcement of the pier.
(d) Minimum dimensions. The provisions of subdivision (e) of this section shall apply. In addition, the plan dimensions of the pier shall not be less than those of the column above. If the column above is a steel section resting on a base plate, the base plate and pier shall be proportioned for allowable bearing pressures as prescribed in reference standards RS 10-1, RS 10-2, and RS 10-3.
(e) Filling. The provisions of subdivisions (a) and (d) of this section shall apply only where the fill (or backfill) is placed around the pier as controlled fill, and wherein the level of the fill is raised uniformly around the entire perimeter of the pier. Where the fill operation is not controlled the least lateral dimension of a foundation pier shall be twenty-four inches and the pier shall be proportioned for lateral pressure equal to the pressure of a differential height of fill equal to five feet, applied simultaneously with the other loads on the pier specified in article three of this subchapter.
§ 27-686. Foundation walls
(a) Concrete. Concrete foundation walls shall be designed in accordance with the provisions of reference standard RS 10-3 relating to bearing or retaining walls. The equivalent unbraced height of a wall supported by lateral soil pressure may be determined by a recognized method of elastic analysis. Alternatively, such a wall may be assumed to be laterally braced at intervals as follows:
(1) Where fill is placed against both faces of the walls: the full height of the wall or eight times the thickness, whichever is the lesser value.
(2) Where both faces of the wall are not in contact with soil: the height of the unbraced section of the wall or eight times the thickness of the wall, whichever is greater, but not more than the full height of the wall.
(b) Masonry. Masonry foundation walls shall conform to the provisions of reference standards RS 10-1 and RS 10-2, and the following:
(1) TYPES. Masonry foundation walls may be of plain or reinforced masonry and shall be of solid units, except that load bearing hollow units will be permitted for support of one- and two-story buildings.
(2) WALL THICKNESS. Foundation walls of masonry shall be designed and constructed in accordance with the provisions of reference standards RS 10-1 and RS 10-2, supplemented by the provisions of subdivision (a) of this section, relating to unbraced height. The thickness shall be at least six inches.
§ 27-687. Construction of footings, foundation piers, and foundation walls
The provisions of sections 27-661 and 27-723 of this subchapter shall apply. In addition, methods of installation and construction shall satisfy the following conditions:
(a) Footings, piers, or walls shall be founded on undisturbed soil or on satisfactorily compacted or prepared materials.
(b) Accurate preparation and inspection of the bearing materials directly underlying the foundation shall be possible; and the bearing area shall be substantially level or suitably benched.
(c) Excavation shall be kept substantially free of water during construction of the foundation except that the use of tremie or similar underwater construction will be permitted in the case of foundations bearing directly on rock, provided that the construction procedure will permit thorough cleaning and preparation of the rock surface, and that the surface of the rock is maintained in a clean condition, unfouled by the inflow of soil or settlement of the fluid suspension, until the concrete is in place.
§ 27-688. Administrative requirements
(a) Identification of piles. A plan showing clearly the designation of all piles by an identifying system shall be filed with the commissioner prior to installation of such piles. All detailed records for individual piles shall bear an identification corresponding to that shown on the plan. A copy of such plan shall be available at the site for inspection at all times.
(b) Record of pile driving. A record of the penetration and behavior of each pile during installation shall be kept by the architect or engineer designated in section 27-721 of article thirteen of this subchapter. Such records shall be prepared on forms furnished by, or satisfactory to, the commissioner and, upon the completion of pile installation, shall be filed with the commissioner together with the records of any additional borings or subsurface information obtained during installation of the piles, and plans showing any deviations of the pile or related constructions (including any corrective measures) from the details and locations shown on the approved plans. Inspection of piling and pile load tests shall conform to the requirements of section 27-721 of article thirteen of this subchapter.
§ 27-689. Minimum pile penetrations
(a) Required by soil bearing capacity. The provisions of paragraph one of subdivision (b) of section 27-700 of article eight of this subchapter shall apply.
(b) Required for lateral restraint. The provisions of section 27-694 of this article shall apply.
(c) Piles located near a lot line. Piles located near a lot line shall be designed on the assumption that the adjacent lot will be excavated to a depth of ten feet below the nearest legally established curb level. Where such excavation would reduce the embedded length of the pile, the portion of the pile exposed shall be considered as providing no lateral or vertical support, and the load-carrying determination in accordance with the provisions of article eight of this subchapter shall be made after the resistance offered by the soil that is subject to potential excavation has been discounted.
§ 27-690. Use of existing piles at demolished structures
Piles left in place where a structure has been demolished shall not be used for the support of new construction unless satisfactory evidence, including load or hammer testing of representative piles, can be produced indicating the capacity, length, and driving conditions of the piles. The load bearing value for such existing piles shall be the least of the values indicated by: (1) the load or hammer test, (2) the capacity of the pile as a structural member, and (3) the allowable bearing pressure on the soil underlying the pile tips, all in accordance with the provisions of article eight of this subchapter.
§ 27-691. Tolerance and modification of design due to field conditions
(a) Tolerance in alignment of the pile axis. If the axis of any pile is installed out of plumb or deviates from the specified batter by more than four per cent of the pile length, the design of the foundation shall be modified as may be necessary to resist the resulting vertical and lateral forces. In types of piles for which subsurface inspection is not possible, this determination shall be made on the exposed section of the pile, which section, at the time of checking axial alignment, shall not be less than two feet. In piles which can be checked for axial alignment below the ground surface, the sweep of the pile axis shall not exceed four per cent of the embedded length.
(b) Tolerance in location of the head of the pile. A tolerance of three inches from the designed location shall be permitted in the installation of each pile, without reduction in load capacity of the pile group. Where piles are installed out of position in excess of this amount, the true loading on such piles shall be analytically determined from a survey which defines the actual location of the piles as driven, and using the actual eccentricity in the pile group with respect to the line of action of the applied load. If the total load on any pile, so determined, is in excess of one hundred ten per cent of the allowable load bearing capacity, correction shall be made by installing additional piles or by other methods of load distribution, as required to reduce the maximum pile load to one hundred ten per cent of the capacity.
(c) Bent piles. Where piles have been bent during installation, and the amount of the bend exceeds the allowable tolerance for alignment of the pile axis in subdivision (a) of this section, the condition shall be investigated and, where required, correction made by the installation of additional piles, by strengthening the bent piles, by reduction in capacity or other means acceptable to the commissioner.
§ 27-692. Minimum spacing of piles
Piles shall be spaced to meet the following requirements:
(1) Spacing of piles shall provide for adequate distribution of the load on the pile group to the supporting soil, in accordance with the provisions of subdivision (b) of section 27-700 of article eight of this subchapter.
(2) In no case shall the minimum center-to-center spacing of piles be less than twenty-four inches, nor less than the values for specific types of piling as indicated in article ten of this subchapter. Unless special measures are taken to assure that piles will penetrate sufficiently to meet the requirements of section 27-689 of this article without interfering with or intersecting each other, the minimum center-to-center spacing of piles shall be twice the average diameter of the butt for round piles; one and three-quarters times the diagonal for rectangular piles; or, for taper piles, twice the diameter at a level two-thirds of the pile length measured up from the tip. In cases of practical difficulty, the spacing of new piles from existing piles under an adjacent building may be less than the above values provided that the requirements relating to minimum embedment and pile interference are satisfied and that the soil under the proposed and existing buildings is not overloaded by the closer pile grouping.
§ 27-693. Minimum section
Except as provided in article ten of this subchapter for timber piles, no tapered pile shall be less than six inches in diameter at any section, nor have less than an eight inch diameter at cutoff. The taper of any tapered section may be uniform or may occur in steps. No pile of uniform section shall have a diameter of less than eight inches, or, if not circular, a dimension of less than seven and one-half inches. Tapered shoes or points of lesser dimensions may be attached to the tips of piles.
§ 27-694. Capping and bracing of piles
(a) Capping of piles.
(1) EMBEDMENT. Tops of all piles shall be embedded at least three inches in concrete caps. Such concrete shall conform to the provisions of article five of subchapter ten of this chapter and shall extend at least four inches beyond the edge of all piles. Alternatively, and only where the piles project above the future grade and will be readily accessible for visual inspection at all times, the tops of the piles may be capped with timber or steel caps, which shall be connected to the piles. Cap plates will not be required for steel H piles embedded in a reinforced concrete cap. Inspection of pile caps shall be as required in section 27-722 of article thirteen of this subchapter.
(2) UPLIFT. Where piles are subject to uplift, they shall be anchored into the cap to resist at least one and one-half times the amount of such uplift without exceeding the basic allowable stresses as established in subchapter ten.
(3) REINFORCEMENT. Reinforcement shall be placed to provide at least three inches of clear cover, measured to the surface of the pile cap that is in contact with the ground. All reinforcement adjacent to timber or concrete piling shall have a minimum of one inch of concrete protection. Reinforcement shall extend to within four inches of the edges of the pile cap.
(4) DESIGN. Except as modified above, concrete pile caps shall be designed in accordance with the provisions of reference standard RS 10-3.
(b) Bracing of piles. Except for short piles as described in subdivision (c) of this section, every pile shall be laterally braced to conform with one or more of the following provisions:
(1) RIGID CAP. Three or more piles connected by a rigid cap shall be considered as being braced provided that the piles are located in radial directions from the centroid of the group not less than sixty degrees apart (within a tolerance of three inches in location of the pile.) A two-pile group, in a rigid cap, shall be considered to be braced along the axis connecting the two piles.
(2) BRACE BEAMS. Piles may be braced by the use of brace beams or ties rigidly connecting to at least two other piles in radial directions not less than sixty degrees nor more than one hundred twenty degrees apart. Concrete brace beams shall have minimum dimensions of one-twentieth of the clear distance between pile caps, but not less than eight inches. All brace beams shall be proportioned to resist a minimum axial load equal to three per cent of the total axial load capacity of the piles that are to be braced by that beam, plus the moment due to any eccentricity between the centroid of the pile group and the line of action of the applied load. Where underlain by soil of class 9-65, 10-65 or 11-65, brace beams shall be proportioned to support the weight of soil, slab-on-ground, and live load on the slab-on-ground that is contained within vertical planes projected upward from the lateral limits of the brace beam. The design of brace beams to resist these loads shall conform to the provision of subchapter ten of this chapter.
(3) CONCRETE SLAB-ON-GRADE. A continuous concrete slab or mat on grade, that is five inches or more in thickness and reinforced, and that extends at least forty feet in each direction and is anchored to the pile caps (or in which the piles are embedded at least three inches), may be used in lieu of brace beams for bracing of pile caps, providing that the slab is supported on material having an allowable bearing pressure of one and one-half tons per square foot or better and such material is not underlain by nominally unsatisfactory bearing materials.
(4) OTHER MEANS. Piles may be braced by anchors, anchor wall, or other means acceptable to the commissioner.
(5) FLOOR SYSTEM. Single-pile or two-pile groups or a single line of piles may be considered to be adequately braced if connected to, and braced by, a self supporting floor system provided: (1) that the details and dimensions of the floor and the wall or pier are of adequate strength to resist lateral displacement of the pile cap under conditions of maximum eccentricity of the applied load; and (2) that the wall or pier is braced until connection of the floor framing is made and the flooring (or slab) is in place.
(6) SPECIAL REQUIREMENTS FOR BRACING BATTER PILES. The provisions of paragraphs one through five of this subdivision above shall apply. In addition, provisions shall be made to oppose the lateral thrust resulting from the pile inclination.
(c) Bracing of short piles.
(1) All pile caps supported by piles that penetrate less than ten feet below cutoff level or less than ten feet below ground level shall be braced against lateral movement. Such bracing may consist of connection to other pile caps that encompass piles embedded more than ten feet below those levels; the use of suitable anchors, connection to a slab-on-grade or the floor system as described in paragraphs three and five of subdivision (b) of this section, or by other equivalent means. The heads of the piles shall be fixed in the cap. In no event shall more than fifty percent of the piles in the foundation of any building penetrate less than ten feet below cut-off-level or less than ten feet below ground level.
(2) Where the embedded length of piles located near a lot line would be reduced to less than ten feet by excavation of the adjacent site to a depth of ten feet below the nearest established curb level, the provisions of paragraph one of this subdivision shall apply.
§ 27-695. Splicing of piles
Splices shall be constructed so as to provide and maintain true alignment and position of the component parts of the pile during installation and subsequent thereto, and shall be of adequate strength to transmit the vertical and lateral loads (including tensions) and the moments occurring in the pile section at the location of the splice without exceeding the allowable stresses for such materials as established in subdivision (a) of section 27-700 of article eight of this subchapter. Except for piles which can be visually inspected after driving, splices shall develop at least fifty per cent of the capacity of the pile in bending. In addition, all pile splices in the upper ten feet of the pile section shall be capable of resisting (at allowable working stresses) the moment and shear that would result from an assumed eccentricity of the pile load of three inches, or the pile shall be braced in accordance with the provisions of section 27-694 of article seven of this subchapter to other piles that do not have splices in the upper ten feet of embedment. For piles located near a lot line, the embedded length of such piles shall be determined on the basis that the adjacent site will be excavated to a depth of ten feet below the nearest established curb level.
§ 27-696. General requirements for installation of piles
(a) Protection of adjacent property. Piles shall be installed with adequate provision for the protection of adjacent buildings and property.
(b) Protection of the pile during installation. Piling shall be handled and installed to the required penetration and resistance by methods that leave their strength unimpaired and that develop and retain the required load-bearing resistance. Any damaged pile shall be satisfactorily repaired or the pile shall be rejected. Subject to the approval of the commissioner, damaged piles may be used at a fraction of the design load as determined by the architect or engineer in lieu of repair or rejection.
(c) Protection of pile materials after installation. Where boring records or site conditions indicate possible deleterious action on pile materials due to soil constituents, changing water levels, or other causes, such materials shall be adequately protected by preservatives or encasements that will not be rendered ineffective by driving and that will prevent such deleterious action. The following specific provisions shall apply:
(1) Untreated timber piles shall not be used unless the top level of the pile is below the permanent water table. The permanent water table level shall not be assumed higher than the invert level of any sewer, drain, or subsurface structure in the adjacent streets, nor higher than the water level at the site resulting from the lowest drawdown of wells or sumps, but in no case shall untreated timber piles be used where the cut-off level is less than ten feet below the adjacent legal grade. Where treated piles are required, preservative treatment shall consist of impregnation with creosote or a creosote solution or, for piles entirely embedded below grade, a pentachlorophenal solution may be used. Treatment shall be in accordance with all requirements of reference standard RS 11-6.
(2) Piles installed in ash or garbage fills, cinder fills, or which are free-standing in or near a seawater environment, or which are used for the support of chemical plants, coal piles or under similar conditions of chemical seepage or aggressive action, or which are used for support of electrical generating plants, shall be investigated regarding the need for special protective treatment and, where protective treatment is indicated, shall be protected against deterioration by encasement, coating, or other device acceptable to the commissioner.
(d) Equipment. Equipment and methods for installing piles shall be such that piles are installed in their proper position and alignment, without damage. Equipment shall be maintained in good repair.
§ 27-697. Use of uncased concrete pile shafts
The use of uncased shafts (i.e., where the concrete of the pile shaft is in direct contact with the surrounding soil) will be permitted under the following conditions:
(a) For bored piles. Where the bored hole is maintained free of water before and during placement of the concrete and the sides and bottom can be inspected prior to such placement, and provided that no displacement pile shall be installed within fifteen feet of any bored pile.
(b) For driven piles (including all piles wherein installation utilizes a temporary casing). The maximum length of the uncased shaft shall be limited to ten feet unless otherwise permitted by the commissioner. Uncased shafts will be permitted to be formed in soil below the water table but shall not be formed in any soil of class 9-65 that is of medium or soft consistency; in any soil of class 10-65 that is of medium or loose density; or in any soil of class 11-65.
§ 27-698. Where more than one pile type, pile capacity, or method of pile installation is used
Wherever it is proposed to:
(1) construct a foundation for a building utilizing piles of more than one type or capacity;
(2) modify an existing foundation by the addition of piles of a type or capacity other than those of the existing piling;
(3) construct or modify a foundation utilizing different methods or more than one method of installation, or using different types or capacities of equipment (such as different types of hammers having markedly different striking energies or speeds); or
(4) support part of a building on piles and part on footings, the several parts of the building supported on the different types, capacities, or modes of piling shall be separated by suitable joints providing for differential movement, or a report shall be submitted by the architect or engineer establishing to the satisfaction of the commissioner that the proposed construction is adequate and safe, and showing that the probable settlements and differential settlements to be expected will not result in instability of the building or stresses in the structure in excess of the allowable values established in subchapter ten of this chapter. The provisions of subdivision (d) of section 27-700 of article eight of this subchapter relating to required load tests shall apply separately and distinctly to each different type or capacity of piling, method of installation, or type or capacity of equipment used, except where analysis of the probable, comparative behavior of the different types or capacities of the piles or the methods of installation indicates that data on one type or capacity of pile permits a reliable extrapolation of the probable behavior of the piles of other types and capacities.