NYC Administrative Code Title 27, Chapter 1 Building Code, part 7 of 17
§ 27-700 to § 27-797: 100 sections.
§ 27-700. Allowable axial load
The allowable axial load on a pile shall be the least value permitted by consideration of the following factors (for battered piles, the axial load shall be computed from the resultant of all vertical loads and lateral forces occurring simultaneously):
1. The capacity of the pile as a structural member.
2. The allowable bearing pressure on soil strata underlying the pile tips.
3. The resistance to penetration of the piles, including resistance to driving, resistance to jacking, the rate of penetration, or other, equivalent criteria as established in this section.
4. The capacity as indicated by load test, where load tests are required.
5. The maximum loads prescribed in subdivision (e) of this section.
(a) The capacity of the pile as a structural member.
(1) EMBEDDED PORTION OF THE PILE. The compressive stress on any cross section of a pile produced by that portion of the design load that is considered to be transmitted to that section shall not exceed the allowable values for the construction materials as established in table 11-3. The tensile stress shall not exceed the values established in subchapter ten of this chapter for like material.
(2) PORTION OF THE PILE THAT IS NOT EMBEDDED. That portion of any pile that is free standing in air or water shall be designed as a column in accordance with the provisions of subchapter ten of this chapter, fixed at a point five feet below the soil contact level in class 8-65 material or better and ten feet below in any other material. The conditions of lateral and rotational restraint offered by the pile cap shall be considered in determining the equivalent unbraced length.
(3) LOAD DISTRIBUTION ALONG EMBEDDED PORTION OF THE PILE. The portion of the design load acting on any cross-section of a pile may be determined by analysis, considering time dependent changes in distribution of the load. As an alternative method for the purposes of this section, it may be assumed that:
a. For piles embedded forty feet or more in materials of class 10-65 or better, or in controlled fills, and bearing on or in materials of classes 1-65 to 5-65: seventy-five per cent of the load shall be assumed to be carried by the tip. For shorter piles, with similar conditions of embedment and bearing, one hundred per cent of the load shall be assumed carried by the tip.
b. For piles embedded in materials of class 10-65 or better, or in controlled fills, and bearing on or in materials of classes 6-65 to 10-65 (or controlled fills): the full load shall be assumed to act at a cross section located at two-thirds of the embedded length of the pile measured up from the tip. Where tapered piles are used, the stress at all sections of the pile shall be determined on the basis that the full load acts at a location as described above and that one-third of the full load acts at the tip. The stresses so computed shall not exceed the allowable values in table 11-3.
c. For conditions not covered in subparagraphs a and b of this paragraph three the provisions relating to analysis shall apply.
TABLE 11-3 Allowable Compressive Stress for Pile Materials
Pile Material Allowable Compressive Stress Concrete Concrete – The provisions of Reference Standard RS 10-3 relating to short compression members shall apply. For working stress design use 0.25 f'c. For ultimate strength design use minimum eccentricity of 5 per cent, phi = 0.70 (phi = 0.75 where a permanent metal shell having a minimum wall thickness of 1/8 inch is used), and load factors as specified in Reference Standard RS 10-3. The above provisions shall be deemed applicable to reinforced and unreinforced sections. For unreinforced sections use Ds = D and d = t (symbols refer to those used in Reference Standard RS 10-3). Reinforcing steel – 0.40fy but not greater than 30,000 psi. (The provisions of article five of subchapter ten of this chapter relating to ties, spirals, and percentages of reinforcing steel for reinforced concrete compression members shall apply.) Timber See timber piles (section 27-707 of article eight of this subchapter) Steel H piles – 0.35fy, with fy not to be taken as greater than 36,000 psi. Minimum thickness of metal shall be 0.40. Pipe piles, shells for cast-in place concrete piles and shells of pipe sections used in caisson piles: 0.35fy, (fy not to be taken as greater than 36,000 psi.) for thickness of 1/8 in. or more. Metal thinner than 1/8 in. shall not be considered as contributing to the structural strength of the pile section. Core sections for caisson piles: 0.50fy with fy not to be taken as greater than 36,000 psi.
Note for Table 11-3:
f'c = 28 day compressive strength of concrete.
fy = Minimum specified yield strength of steel.
(b) Allowable bearing pressure on soil strata underlying the pile tips.
(1) BEARING CAPACITY. The allowable pile load shall be limited by the provision that the pressures in materials at and below the pile tips, produced by the loads on individual piles and by the aggregate of all piles in a group or foundation, shall not exceed the allowable bearing values established in article four of this subchapter. The provisions of section 27-678 and 27-679 of article four of this subchapter shall apply. The transfer of load from piles to soil shall be determined by a recognized method of analysis. As an alternative, for purposes of this section, piles or pile groups may be assumed to transfer their loads to the underlying materials by spreading the load uniformly at an angle of sixty degrees with the horizontal, starting at a polygon circumscribing the piles, located as follows:
a. For piles embedded entirely in materials of classes 4-65 to 8-65, or in controlled fill materials, the polygon shall be circumscribed at a level located two-thirds of the embedded length of the pile, measured up from the tip.
b. For piles penetrating through soils of classes 9-65, 10-65, or 11-65 into bearing in soils of class 8-65 or better, the polygon shall be circumscribed at the bottom of the strata of class 9-65, 10-65 or 11-65 materials.
c. In the case of piles having enlarged bases, the lateral distribution of the load to the soil may be assumed to begin at the junction of the shaft and the enlarged base and to extend as follows:
1. In the case where the enlarged base is formed in loose or medium compact (N value less than thirty) soils of class 6-65 or 7-65 that extend twenty feet or more below the junction of the base and shaft, or that are of lesser extent but are directly underlain by soil of class 5-65 or better, the bearing area may be taken at a plane six feet below said junction but not lower than the bottom of the soil strata of class 6-65 or 7-65.
2. Where the enlarged base is formed in compact (N value thirty to sixty) soils of class 6-65 or 7-65, or in any soil of these classes that extends less than twenty feet below the junction of the base and the shaft and that is underlain by soil of class 8-65 or poorer, the bearing area shall be taken at planes less than six feet below said junction, with a lower limit of three feet where the material is very compact (N value sixty, or greater) and the extent of the class 6-65 or 7-65 material is ten feet below the junction of shaft and base. (The provisions of subdivision (e) of section 27-710 of article ten of this subchapter relating to minimum depth of bearing stratum below the junction of base and shaft shall apply.) For conditions intermediate between that described in clause one of this subparagraph and the lower limit conditions described here, the location of the bearing area may be determined by linear interpolation between the indicated limits of N value and extent of bearing material below the junction of shaft and base, giving equal weight to both variables.
3. Where the enlarged base is formed in or on soils of class 4-65 or 5-65, the bearing area shall be taken at a depth below the junction of the shaft and base consonant with the size and depth of the base formed, and as evaluated from the required test piles.
d. For all piles bearing on soils of classes 1-65 to 3-65, analysis of load distribution will not be required if the requirements relating to capacity of the pile as a structural member, to resistance to penetration, to load test where required, and to maximum tabulated loads are satisfied.
e. For piles bearing in soils of classes 9-65 and 10-65, for cases not described above, or for any case where the method of installing the pile utilizes a temporary casing, the provision relating to analysis shall apply.
f. In no case shall the area considered as supporting the load extend beyond the intersection of the sixty degree planes of adjacent piles or pile groups.
(2) BEARING STRATUM. The plans for the proposed work shall establish, in accordance with the requirements relating to allowable bearing pressure, the bearing strata to which the piles in the various sections of the building are to be penetrated and the approximate elevations of the top of such bearing strata. Where penetration of a given distance into the bearing strata is required for adequate distribution of the loads, such penetration shall be shown on the plans. The indicated elevations of the top of the bearing strata shall be modified by such additional data as may be obtained during construction. All piles shall penetrate to or into the designated bearing strata.
(c) Capacity as indicated by resistance to penetration. Where subsurface investigation, as described in article two of this subchapter, or general experience in the area, indicates that the soil that must be penetrated by the pile consists of glacial deposits containing boulders, or fills containing riprap, excavated detritus, masonry, concrete, or other obstructions in sufficient numbers to present a hazard to the installation of the piles, the selection of type of pile and penetration criteria shall be subject to the approval of the commissioner but in no case shall the minimum penetration resistance be less than that stipulated in Tables 11-4 and 11-5.
Table 11-4 Minimum Driving Resistance and Minimum Hammer Energy for Steel H-Piles, Pipe Piles, Precast and Cast-in-Place Concrete Piles and Composite Piles (other than timber)
Minimum Driving Resistance a, c, e Pile Capacity (tons) Hammer b Energy (ft. lbs.) Friction Piles (blows/ft.) Piles Bearing on Hardpan (Soil Class 5-65) (blows/ft.) Non- Displacement Piles Bearing on Decomposed Rock (Soil Class 4-65) (blows/ft.) Displacement Piles Bearing on Decomposed Rock (Soil Class 4-65) (blows/ft.) Piles Bearing on Rock (Soil Classes 1-65, 2-65, & 3-65) Up to 20 15,000 19,000 24,000 19 15 11 19 15 11 48 27 16 48 27 16 30 15,000 19,000 24,000 30 23 18 30 23 18 72 40 26 72 40 26 40 15,000 19,000 24,000 44 32 24 50 36 30 96 53 34 96 53 34 50 15,000 19,000 24,000 32,000 72 49 35 24 96 54 37 25 120 80 60 40 120 80 60 40 5 Blows per 1/4 inch (Minimum hammer energy of 15,000 ft. lbs.) 60 15,000 19,000 24,000 32,000 96 63 44 30 240 150 100 50 240 150 100 50 70 & 80 19,000 24,000 32,000 5 Blows per 1/4 inch (Minimum hammer energy of 15,000 ft. lbs.) 5 Blows per 1/4 inch (Minimum hammer energy of 19,000 ft. lbs.) 100 Over 100
Notes for Table 11-4:
a Final driving resistance shall be the sum of tabulated values plus resistance exerted by non-bearing materials. The driving resistance of non-bearing materials shall be taken as the resistance experienced by the pile during driving, but which will be dissipated with time and may be approximated as described in subparagraph a of paragraph one of subdivision (c) of this section.
b The hammer energy indicated is the rated energy.
c Sustained driving resistance – where piles are to bear in soil classes 4-65 and 5-65, the minimum driving resistance shall be maintained for the last six inches, unless a higher sustained driving resistance requirement is established by load test. Where piles are to bear in soil classes 6-65 through 10-65, the minimum driving resistance shall be maintained for the last twelve inches unless load testing demonstrates a requirement for higher sustained driving resistance. No pile need be driven to a resistance to penetration (in blows per inch) more than twice the resistance indicated in this table, nor beyond the point at which there is no measurable net penetration under the hammer blow.
d The tabulated values assume that the ratio of total weight of pile to weight of striking part of hammer does not exceed 3.5. If a larger ratio is to be used, or for other conditions for which no values are tabulated, the driving resistance shall be as approved by the commissioner.
e For intermediate values of pile capacity, minimum requirements for driving resistance may be determined by straight line interpolation.
TABLE 11-5 Minimum Driving Resistance and Hammer Energy for Timber Piles
Pile Capacity (tons) Minimum Driving Resistance (blows-in.) to be added to driving resistance exerted by non-bearing materials 1,3,4 Hammer Energy (ft. – lbs.)2 Up to 20 Formula in Note4 shall apply 7,500-12,000 Over 20 to 25 9,000-12,000 14,000-16,000 Over 25 to 30 12,000-16,000 (single-acting hammers) 15,000-20,000 (double-acting hammers) Greater than 30
Notes for Table 11-5:
1 The driving resistance exerted by non-bearing materials is the resistance experienced by the pile during driving, but which will be dissipated with time and may be approximated as described in subparagraph a of paragraph one of subdivision (c) of this section.
2 The hammer energy indicated is the rated energy.
3 Sustained driving resistance. Where piles are to bear in soil classes 4-65 and 5-65, the minimum driving resistance shall be maintained for the last six inches, unless a higher sustained driving resistance requirement is established by load test. Where piles are to bear in soil classes 6-65 thru 10-65, the minimum driving resistance measured in blows per inch shall be maintained for the last twelve inches unless load testing demonstrates a requirement for higher sustained driving resistance. No pile need be driven to a resistance to penetration (in blows per inch) more than twice the resistance indicated in this table nor beyond the point at which there is no measurable net penetration under the hammer blow.
4 The minimum driving resistance shall be determined by the following formula:
P = 2W h H or P = 2E s + 0.1 s + 0.1
where:
P = Allowable pile load in pounds.
Wp = Weight driven in pounds.
Wh = Weight of striking part of hammer in pounds.
H = Actual height of fall of striking part of hammer in feet.
E = Rated energy delivered by the hammer per blow in foot lbs.
s = Penetration of pile per blow, in inches, after the pile has been driven to a depth where successive blows produce approximately equal net penetration.
The value W p shall not exceed three. Wh
(1) PILES INSTALLED BY USE OF STEAM-POWERED, AIR-POWERED, DIESEL-POWERED OR HYDRAULIC IMPACT HAMMERS.
a. The minimum required driving resistance and the requirements for hammer energies for various types and capacities of piles are given in tables 11-4 and 11-5. To obtain the required total driving resistance, the indicated driving resistances shall be added to any driving resistance experienced by the pile during installation, but which will be dissipated with time (resistance exerted by non-bearing materials or by materials which are to be excavated). For purposes of this section, the resistance exerted by non-bearing materials may be approximated as the resistance to penetration of the pile recorded when the pile has penetrated to the bottom of the lowest stratum of nominally unsatisfactory bearing material (class 11-65, but not controlled fill) or to the bottom of the lowest stratum of soft or loose deposits of class 9-65 or 10-65 but only where such strata are completely penetrated by the pile. The provisions of articles nine and ten of this subchapter shall also apply.
b. Alternate for similitude method. The requirement for installation of piling to the penetration resistances given in tables 11-4 and 11-5 will be waived where the following five conditions prevail:
1. The piles bear on, or in, soil of class 5-65 through class 10-65.
2. The stratigraphy, as defined by not less than one boring for every sixteen hundred square feet of building area, shall be reasonably uniform or divisible into areas of uniform conditions.
3. Regardless of pile type or capacity, one load test, as described in subdivision (d) of this section, shall be conducted in each area of uniform conditions, but not less than two typical piles for the entire foundation installation of the building or group of buildings on the site, nor less than one pile for every fifteen thousand square feet of pile foundation area shall be load tested.
4. Except as permitted by the provisions of clause six of this subparagraph, all building piles within the area of influence of a given load-tested pile of satisfactory performance shall be installed to the same or greater driving resistance as the successful load-tested pile. The same or heavier equipment of the same type that was used to install the load-tested pile shall be used to install all other building piles, and the equipment shall be operated identically. Also, all other piles shall be of the same type, shape, external dimension, and equal or greater cross-section as the load-tested pile. All building piles within the area of influence represented by a given satisfactory load-tested pile shall bear in, or on the same bearing stratum as the load test pile.
5. A report by an architect or engineer shall be submitted establishing to the satisfaction of the commissioner, that the soil bearing pressures do not exceed the values permitted by the provisions of article four of this subchapter and that the probable differential settlements will not cause stress conditions in the building in excess of those permitted by the provisions of subchapter ten of this chapter.
6. Where the structure of the building or the spacing and length of the piling is such as to cause the building and its foundation to act as an essentially rigid body, the building piles may be driven to length and/or penetration into the bearing stratum without regard to penetration resistance, subject to the requirement of clause five of this subparagraph, relating to submission of report.
(2) PILES INSTALLED BY JACKING OR OTHER STATIC FORCES. The carrying capacity of a pile installed by jacking or other static forces shall be not more than fifty per cent of the load or force used to install the pile to the required penetration, except for piles jacked into position for underpinning. The working load of a temporary underpinning pile shall not exceed the total jacking force at final penetration. The working load of each permanent underpinning pile shall not exceed the larger of the following values: two-thirds of the total jacking force used to obtain the required penetration if the load is held constant for seven hours without measurable settlement; or one-half of the total jacking force at final penetration if the load is held for a period of one hour without measurable settlement. The jacking resistance used to determine the working load shall not include the resistance offered by non-bearing materials which will be dissipated with time.
(3) PILES INSTALLED BY USE OF VIBRATORY HAMMER. The capacity of piles installed by vibratory hammer shall not exceed the value established on the principle of similitude, as follows:
a. Comparison piles, as required by the provisions of subdivision (d) of this section, shall be installed using an impact hammer and driving resistances corresponding to the proposed pile capacities as determined in paragraph one of subdivision (c) of this section or to tip elevations and driving resistances as determined by the architect or engineer.
b. For each comparison pile, install an identical index pile by use of the vibratory hammer at a location at least four feet, but not more than six feet, from each comparison pile. The index piles shall be installed to the same tip elevation as the comparison pile, except that where the comparison piles bear on soils of classes 1-65 to 5-65, the index piles shall bear in, or on, similar material. All driving data for the index pile shall be recorded.
c. The index piles shall be load tested in accordance with the provisions of subdivision (d) of this section. Should the specified load test criteria indicate inadequate capacity of the index piles, steps a, b, and c shall be repeated using longer, larger, or other types of piles.
d. All building piles within the area of influence of a given, satisfactorily tested index pile shall be installed to the same or lesser rate of penetration (in. per min.) as of the successful index pile. The same equipment that was used to install the index pile, identically operated as to rpm, manifold pressure, etc., shall be used to install the building piles. Also, all building piles shall be of the same type, size, and shape as the index pile. All building piles within the area of influence as represented by a given satisfactorily tested index pile shall bear in, or on, the same bearing stratum as the index pile.
TABLE 11-6 Basic Maximum Pile Loads
Type of pile Basic maximum pile load (tons) Caisson piles No upper limit Open-end pipe (or tube) piles bearing on rock of classes 1-65, 2-65, and 3-65 18 in. O.D. and greater – 250; less than 18 in. O.D. – 200 Closed-end pipe (or tube) piles, H piles, cast-in-place concrete and compacted concrete piles bearing on rock of classes 1-65, 2-65 and 3-65 150 Piles (other than timber piles) bearing on soft rock (class 4-65) (1) Displacement piles such as pipe, cast-in-place concrete, and compacted concrete piles 60 (2) Non-displacement piles such as open-end pipe and H piles 80 Piles (other than timber piles) bearing on hardpan (class 5-65) overlying rock 100 Piles (other than timber piles) that receive their principal support other than by direct bearing on soils of classes 1-65 to 5-65 60 Timber piles Bearing in soils of classes 1-65 to 5-65 25 Bearing in soils of classes 6-65 to 10-65 30
(d) Capacity as indicated by load test. Load test of piling shall be required as follows:
(1) PILES INSTALLED BY STATIC FORCES. The load bearing capacity of all types and capacities of piles installed by static forces, other than caisson piles and underpinning piles, shall be demonstrated by load test.
(2) PILES DRIVEN BY IMPACT HAMMERS. The load bearing capacity of piles installed by impact hammers shall be demonstrated by load test when the proposed pile capacity exceeds the following values:
a. Caisson piles. No load test required.
b. Piles installed open end to rock of class 1-65, 2-65 or 3-65 – one hundred tons, except as provided in subparagraph d of this paragraph, and except that no load tests will be required for piles up to two hundred tons capacity wherein the pile load does not exceed eighty per cent of the load determined on the basis of limiting stresses in the pile materials and provided that the pipe or shell be driven to the resistance indicated in table 11-4.
c. Piles bearing on rock or hardpan (soil classes 1-65 to 5-65) other than as described in subparagraph b of this paragraph, and except as provided in subparagraph d of this paragraph – forty tons.
d. Piles bearing on materials of class eight or better, wherein, on the assumption that one hundred per cent of the load reaches the pile tip, (or, in case of piles having an enlarged base or other enlargement of the bearing area, the top of the enlargement) the bearing pressure on the soil underlying the tips or bases can be demonstrated to be equal to or less than the values of basic allowable pressure indicated in table 11-2 – provided that the class and density of the bearing material supporting the piles be confirmed by not less than one boring at each column location, then the commissioner may reduce the required number of load tests.
e. All other types of piles – thirty tons.
(3) PILES INSTALLED BY USE OF VIBRATORY HAMMERS. The load bearing capacity of all types and capacities of piles (other than caisson piles) shall be demonstrated by load test.
(4) LOAD TEST PROCEDURES. Before any load test is made, the proposed apparatus and structure to be used in making the load test shall be satisfactory to the commissioner and when required by him or her, all load tests shall be made under the commissioner's surveillance or that of his or her representative. A complete record of such tests shall be filed with the commissioner.
a. Areas of the foundation site within which the subsurface soil conditions are substantially similar in character shall be established. In addition, for friction piles bearing on, or on, soil materials of class 6-65, or poorer, the uniformity of each such area shall be verified by installing at least three penetration-test piles, distributed over the area. Continuous records of penetration resistance shall be made for such piles. If the records of penetration resistance are not similar or are not in reasonable agreement with the information obtained from the borings, the assumed areas of similar subsurface conditions shall be modified in accordance with the information derived from the penetration-test piles and additional penetration-test piles shall be installed as required to verify the uniformity of such areas.
b. For piles installed by jacking or other static forces or by impact hammer, one load test shall be conducted in each area of uniform conditions, but not less than two typical piles for the entire foundation installation of the building or group of buildings on the site, and not less than one pile for each fifteen thousand square feet of the area of the building wherein said piles are to be used shall be load tested. For piles installed by use of vibratory hammers, one comparison pile shall be installed and one index pile shall be load tested in each area of uniform conditions, but not less than two index piles shall be tested for the entire foundation installation of the building or group of buildings on the site, nor less than one index pile be tested for every seventy-five hundred square feet of pile foundation area. For piles whose capacity is determined on the basis of similitude, the provisions of subparagraph b of paragraph one of subdivision (c) of this section shall apply.
c. The load test shall be conducted by a method that will maintain constant load under increasing settlement. Settlement observations shall be made by means of dial extensometers. The extensometers shall provide readings to the nearest one one-thousandth of an inch. In addition, settlement observations shall be taken using an engineer's level reading to one one-thousandth of a foot, properly referenced to a well-established benchmark.
1. Test loads shall be applied by direct weight or by means of a hydraulic jack. The loading platform or box shall be carefully constructed to provide a concentric load on the pile. If direct weight is employed, the loading increments shall be applied without impact or jar. The weight of the loading platform or box shall be obtained prior to the test and this weight shall be considered as the first increment of load. If a hydraulic jack is employed, facilities for maintaining each increment of desired load constant under increasing settlement shall be provided. The gauge and the jack shall be calibrated as a unit for each project.
2. The test load shall be twice the proposed working load of the pile. The test load shall be applied in seven increments at a load of fifty per cent, seventy-five per cent, one hundred per cent, one hundred twenty-five per cent, one hundred fifty per cent, one hundred seventy-five per cent, and two hundred per cent of the proposed working load. After the proposed working load has been applied and for each increment thereafter, the test load shall remain in place until there is no measurable settlement in a two hour period. The total test load shall remain in place until settlement does not exceed one one-thousandth of a foot in forty-eight hours. The total load shall be removed in decrements not exceeding twenty-five per cent of the total load at one hour intervals or longer. The rebound shall be recorded after each decrement is removed, and the final rebound shall be recorded twenty-four hours after the entire test load has been removed.
3. Under each load increment, settlement observations shall be made and recorded at one-half minute, one minute, two minutes, four minutes, and each four minutes thereafter after application of load increment, except in the instance of the total load where, after the four minute reading, the time interval shall be successively doubled until the final settlement limitation is reached and the load is removed.
4. The allowable pile load shall be the lesser of the two values computed as follows:
(a) Fifty (50) per cent of the applied load causing a net settlement of the pile of not more than one one-hundredth of an inch per ton of applied load. Net settlement in this paragraph means gross settlement due to the total test load minus the rebound after removing one hundred per cent of the test load.
(b) Fifty (50) per cent of the applied load causing a net settlement of the pile of three-quarters of an inch. Net settlement in this paragraph means the gross settlement as defined in subclause (a) of clause 4 of this subparagraph, less the amount of elastic shortening in the pile section due to total test load.
(5) FOUNDATION PILES. Except as provided in clause six of subparagraph b of paragraph one of subdivision (c) of this section, all building piles within the area of influence of a given load-tested pile of satisfactory performance, shall be installed to the same or greater penetration resistance (or static load) as the successful load-tested pile. The same equipment (or heavier equipment of the same type) that was used to install the load-tested pile shall be used to install all other building piles, and the equipment shall be operated identically. Also all other piles shall be of the same type, shape, external dimension, and equal or greater cross section as the load-tested pile. All building piles within the area of influence represented by a given satisfactory load-tested pile shall bear in, or on the same bearing stratum as the load-tested pile. For friction piles where the actual pile lengths vary more than fifty per cent from that of the test pile, the commissioner may require investigation to determine the adequacy of the piles.
(6) PILE GROUPS. When the commissioner has reasons to doubt the safe load sustaining capacity of pile groups, he or she may require at the expense of the owner, group load tests up to one hundred fifty per cent of the proposed group load.
(7) "CASING-OFF." Any temporary supporting capacity that the soil might provide to the pile during a load test, but which would be dissipated with time, shall be obviated by "casing-off" or by other suitable means. For purposes of this section, temporary supporting capacity shall include the resistances offered by any strata of nominally unsatisfactory bearing materials (class 11-65, other than controlled fill) or of soft or loose deposits of class 9-65 or 10-65 that are completely penetrated by the pile, or any resistance offered by granular soils that will be dissipated by reason of vibration.
(e) Maximum loads.
(1) BASIC MAXIMUM LOADS. Except as permitted by the provisions of paragraph two of this subdivision, the maximum allowable pile load, determined in accordance with the provisions of subdivisions (a) through (d) of this section, shall not exceed the values specified in table 116.
(2) SUBSTANTIATION OF HIGHER ALLOWABLE LOADS. The pile capacities tabulated in table 11-6 may be exceeded where a higher value can be substantiated on the basis of test and analysis, as follows:
a. Load tests. The provisions of subdivision (d) of this section shall be supplemented, as follows:
1. Not less than one single-pile load test shall be conducted for each ten thousand square feet of pile foundation area.
2. Final load increment shall remain in place for a total of not less than ninety-six hours.
3. Single test piles shall be subjected to cyclical loading or suitably instrumented so that the movements of the pile tip and butt may be independently determined. Other alternate methods or devices, acceptable to the commissioner which will permit evaluation of the transfer of load from piles to soil may be used.
4. Where the commissioner deems necessary, the provisions of paragraph six of subdivision (d) of this section relating to group load tests shall apply. If required, group load tests shall be performed in groups of numerically average size. Except where the proposed foundation is limited to single and/or two pile groups, each test group shall contain not less than three piles.
5. Individual pile loadings shall not exceed those determined from the single pile load tests.
6. The provisions of paragraph two of subdivision (d) of this section shall apply.
b. Analysis and report. A report shall be submitted by the architect or engineer establishing to the satisfaction of the commissioner (on the basis of soil and load tests and foundation analysis, including analysis of the group action of the piles) that the proposed construction under a one hundred per cent overload of the foundation is safe against failure of the pile and soil materials, and showing that the probable total magnitude and distribution of settlement to be expected under design conditions will not result in instability of the building or stresses in the structure in excess of the allowable values established in subchapter ten of this chapter.
c. Penetration resistance. The penetration resistance shall not be less than that required by the provisions of subdivision (c) of this section or, where applicable values are not indicated therein, shall be determined from the required load tests. The pile material shall be capable of withstanding the driving stresses without being damaged.
(f) Combination of loads. The provisions of section 27-594 of subchapter ten of this chapter shall apply.
§ 27-701. Allowable lateral load
For plumb piles fully embedded in the ground, the lateral load applied at the top of the pile shall not exceed one ton per pile unless it has been demonstrated by tests that the pile will resist a lateral load of two hundred per cent of the proposed working lateral load without lateral movement of more than one inch at the ground level and will resist the proposed working lateral load without a movement of more than three-eighths of an inch at the ground level. For piles projecting above the ground level the shear and bending stresses computed on the basis of cantilever action to a level of five feet below grade in soils of class 8-65 or better and to ten feet below grade in poorer soils shall not exceed the allowable values for like materials established in subchapter ten of this chapter. The provisions of subdivision (f) of section 27-700 of this article relating to combination of loads shall apply.
§ 27-702. Uplift capacity
A minimum factor of safety against withdrawal of two shall be provided, except that the factor of safety against withdrawal shall be greater than two when the piles are subjected to dynamic uplift loads. The uplift capacity shall be demonstrated by pull-out tests, except where a factor of safety of three or more based on analysis is used, pull-out tests need not be conducted.
§ 27-703. Exceptions
§ 27-704. Equipment
(a) General. The hammer shall travel freely in the leads. The cushion or cap block shall be replaced, if crushed. The hammer shall deliver its rated energy, and measurements shall be made of the fall of the ram or other suitable data shall be observed at intervals as required to verify the actual energy delivered at the termination of driving.
(b) Cushion or cap block. The cushion or cap block shall be a solid block of hardwood with its grains parallel to the axis of the pile and enclosed in a tight-fitting steel housing, or shall be an equivalent assemblage. If laminated materials are used, the type and construction of these materials shall be such that their strength is equal to, or greater than, hardwood. Wood chips, pieces of rope, hose, shavings, or automobile tires and similar materials shall not be used. Cap blocks shall be replaced if burned, crushed, or otherwise damaged.
(c) Followers. Followers shall not be used unless permitted in writing by the architect or engineer, and only when necessary to accomplish such installation. They shall be of steel or hardwood of such size, shape, length, and weight as to permit driving the pile in the desired location and to the required depth and resistance. The required driving resistance tabulated in Tables 11-4 and 11-5 shall be increased to compensate for the loss of energy in the hammer blow. The follower shall be a single length section, shall be provided with a socket or hood carefully fitted to the top of the pile to minimize loss of energy and to prevent damage to the pile, and shall have sufficient rigidity to prevent "whip" during driving.
§ 27-705. Procedures
(a) Continuous Driving. Driving of piles preliminary to final seating shall be continuous for an interval adequate to break or prevent the development of freeze. The hammer shall be operated at its rated speed during this interval.
(b) Jetting. Jetting, augering and other methods of pre-excavation shall not be used unless permitted in writing by the architect or engineer. When permitted, such procedures shall be carried out in a manner which will not impair the carrying capacity of the piles already in place or the safety of existing adjacent structures. Jetting or augering shall be stopped at least three feet above the final expected pile-tip elevation and at least three feet above the tip elevation of any pile previously driven within six feet of the jet or auger, except that where piles are to be end bearing on rock or hardpan, jetting or augering may be carried to the surface of the rock or hardpan. Piles shall be carried down beyond the depth of jetting, augering or other pre-excavation until the required resistance is obtained. If there is evidence that jetting or other procedures have disturbed the load-bearing capacities of previously installed piles, those piles that have been disturbed shall be restored to conditions meeting the requirements of this article by redriving or by other methods acceptable to the architect or engineer. Redriving or other remedial measures shall be instituted after the jetting or other operations in the area have been completed.
(c) Sequence of installation. Individual piles and pile groups shall be installed in such sequence that: (1) the carrying capacity of previously installed piles is not reduced; (2) the soil surrounding the piles is not compacted to the extent that other piles in the group cannot be installed properly; and (3) ground movement that would damage adjacent buildings or utilities is prevented. In general, in any group, driving shall start from one side and proceed progressively toward the other side of the group or shall start from the middle and proceed toward the edges of the group.
(d) Heaved piles. In soils in which the installation of piles causes previously installed piles to heave, accurate level marks shall be put on all piles immediately after installation, and all piles that have been heaved by an amount in excess of one-quarter of an inch shall be redriven to the required resistance.
(e) Penetration measurements. Penetration measurements made for the purpose of determining resistance to driving shall not be made when pile heads are damaged to an extent that may affect measured penetration, nor shall they be made immediately after fresh cushion blocks have been inserted under the striking part of the hammer.
§ 27-706. Scope
Types of pile construction and installation that are not described in this section will be permitted for use only where acceptable to the commissioner.
§ 27-707. Timber piles
(a) Materials. Timber piles shall conform in quality to class A or B of reference standard RS 11-7.
(1) SIZE OF PILES. Piles shall be of adequate size to resist the applied loads without creating stresses in the pile materials in excess of twelve hundred psi for piles of southern pine, Douglas fir, oak, or other wood of comparable strength; or eight hundred fifty psi for piles of cedar, Norway pine, spruce or other wood of comparable strength. Except as provided in paragraph two of this subdivision, for piles forty feet or more in length and of thirty tons capacity or less, the following sizes or classes of piles shall be deemed to be adequate for considerations of stress in the pile material:
a. Piles of twenty-five to thirty tons capacity – Class A or minimum eight inch tip with uniform taper.
b. Piles of less than twenty-five tons capacity – Class A or B or minimum six inch tip with uniform taper.
(2) PILES DRIVEN TO END BEARING. All timber piles, regardless of capacity, driven to end bearing on soils of classes 1-65 through 5-65 shall be class A or shall have a minimum eight inch tip and a uniform taper.
(3) SPECIES OF WOOD. Any species of wood may be used that conforms to the provisions of reference standard RS 11-7 and that will stand the driving stresses.
(4) PEELING. Unless treated, piles need not be peeled.
(b) Limitations on use. Where timber piles are to be driven to end bearing on soils of classes 1-65 through 5-65 by use of an impact hammer, the installation of each such pile shall be under the personal supervision of an architect or engineer, and the operations of driving such piles, the observations of penetration resistance, and the operation of the equipment shall be so conducted as to terminate driving directly when the pile reaches bearing on the hard material. A report, prepared by the architect or engineer, describing the procedures, equipment, and precautions followed to prevent injury to the piling shall be submitted to the commissioner.
(c) Lagged and inverted piles. The use of lagged or inverted piles will be permitted. Double lagging shall be adequately connected to the basic pile material to transfer the full pile load from the basic pile material to the lagging without exceeding values of allowable stress as established in subchapter ten of this chapter. The connection for single lagging shall be proportioned for half the pile load. The diameter of any inverted timber pile at any section shall be adequate to resist the applied load without exceeding the stresses indicated in paragraph one of subdivision (a) of this section, but in no case shall it be less than eight inches.
(d) Installation.
(1) All broomed, crushed, or otherwise damaged materials at the head of the piles shall be removed before capping.
(2) Any sudden decrease in driving resistance shall be investigated with regard to the possibility of breakage of the pile, and if such sudden decrease in driving resistance cannot be correlated to boring data or some incident in the driving, and if the pile cannot be removed for inspection, it shall be considered as adequate cause for rejection of the pile.
§ 27-708. Precast concrete piles (including prestressed sections)
(a) Materials. Materials for precast concrete piles shall conform to the requirements of article five of subchapter ten of this chapter.
(b) Construction.
(1) HANDLING. Precast concrete piles shall be proportioned, cast, cured, handled, and driven so as to resist the stresses induced by handling and driving as well as by loads. Handling stresses shall be computed on the basis of fifty per cent of the weight of the pile as an allowance for impact. Handling equipment shall be constructed so as to equalize the reactions on the several lines of the pile pickups. Loading conditions induced by handling and driving shall be considered as of infrequent occurrence.
(2) DIMENSIONS. The minimum lateral dimension of the pile shall be ten inches, except for the taper at the tip.
(3) STRUCTURAL DESIGN. Piles shall be proportioned in accordance with the provisions of article eight of this subchapter, subject to the following additional requirements:
a. For a length equal to at least three times the minimum lateral dimension at each end of the pile, lateral tie reinforcement consisting of 0.225 in. diameter rods or larger shall be spaced not more than three inches center-to-center, or an equivalent spiral shall be provided. Elsewhere, the spacing of the ties or the pitch of the spiral may be increased to twelve inches The minimum amount of longitudinal reinforcement shall be two per cent of the concrete section placed in a symmetrical pattern of at least four bars. If prestressed piles are used, the minimum residual compression in the pile section shall be seven hundred psi. For piles designed with voids, the three inch spacing of the ties or spiral at each end of the pile shall be extended for a distance of twelve feet or one-third the length of the pile, whichever is smaller.
b. For piles designed with voids, the minimum wall thickness of the concrete in any section of the piles shall be four inches. Voids may extend through either or both ends of the pile. If the void extends through the lower end of the pile, the pile head shall be vented to prevent buildup of internal hydraulic pressure during driving.
c. Reinforcing steel shall be covered with at least one and one-half inches of concrete on the surface against the ground.
(c) Tolerances. Voids, when used, shall be located within three-eighths of an inch of the position shown in the plans. The maximum departure of the pile axis from a straight line, measured while the pile is not subject to bending forces, shall not exceed one-eighth of an inch in ten feet or three eighths of an inch in forty feet, or 0.1 per cent of the pile length.
(d) Installation. Precast concrete piles shall not be handled or driven until they have cured sufficiently to develop the necessary strength.
§ 27-709. Cast-in-place concrete piles
(a) Description. Cast-in-place concrete piles shall be cast in shells previously installed in the ground or, with the limitations indicated in section 27-697 of article seven of this subchapter, may be cast in an uncased hole. Cast-in-place piles may be tapered or cylindrical, or a combination of tapered and cylindrical shapes.
(b) Materials. Concrete for cast-in-place concrete piles shall conform to the requirements of article five of subchapter ten of this chapter. Slump shall be five inches plus or minus one inch. Where the pile shell is assumed to contribute to the capacity of the pile as a structural member, the shell shall be of metal and shall conform to the provisions of article six of subchapter ten of this chapter or section 27-712 of this article. Where the pile shell is not assumed to contribute to the capacity of the pile as a structural member, the shell may be of any material that will adequately resist the driving stresses and maintain an open well to receive the concrete. End closures for shells shall not project more than one-half inch beyond the outer limits of the pile when bearing in soils of class 6-65 or lower.
(c) Installation.
(1) After installation to final depth and immediately before filling with concrete, the inside of the tube, shell, or bore shall be thoroughly cleaned to the bottom and inspected by lowering a drop light or by means of a light beam. To be accepted: (a) the pile shall be free of collapsed sections of shell and the pile shell shall not show any tears; (b) the pile shall be free of water except that a minor amount of water may be allowed to occur in the pile if it be absorbed by placing a suitable amount of dry cement-sand mixture in the tip end of the pile; and (c) the alignment of the pile shall conform to the provisions of section 27-691 of article seven of this subchapter. If the bottom of the casing is out of sight, the shape and alignment of the casing shall be surveyed with a suitable instrument, or the pile rejected.
(2) Concrete shall be placed by such methods that the entire volume of the tube, shell, or bore is filled and in a manner that will preclude separation of the ingredients.
(3) No concrete shall be placed in a cast-in-place pile until all piles within a radius of fifteen feet, or within the heave range, have been driven.
(4) Rejected pile shells shall be filled with concrete or sand.
(5) The concrete cap shall not be placed until at least one hour after all piles within the cap group are completely filled.
§ 27-710. Compacted concrete piles
(a) Description. A "compacted concrete pile" shall denote a concrete pile formed with an enlarged base in which the concrete in the base is placed in small batches that are compacted prior to attaining an initial set. The concrete in the shaft of the pile shall be placed as specified in section 27-709 of this article for cast-in-place concrete piles if a permanent casting is provided, or in small batches that are compacted.
(b) Materials. Concrete for compacted concrete piles shall conform to the requirements of article five of subchapter ten of this chapter. Concrete to be compacted shall have a minimum compressive strength at the age of twenty-eight days of four thousand psi and shall be mixed with sufficient water to permit hydration of the cement, but the slump shall be zero. The concrete shall be placed and compacted before initial set can occur. Non-compacted concrete, if used for the pile shafts, shall conform to the requirements for cast-in-place concrete piles.
(c) Spacing. Minimum spacing between compacted concrete piles shall be four feet six inches, center to center except that where the shafts of such piles are cased for their full length, this spacing may be reduced to three feet six inches. Where a question exists as to possible damage to adjacent previously driven piles, these minimums shall be increased.
(d) Installation.
(1) The base shall be formed by ramming concrete, in batches of approximately five cubic feet or less, from a drive casing and into the soil. Unless specifically otherwise permitted by the commissioner, a minimum of twenty blows of at least one hundred forty thousand foot-pounds per blow shall be required for extrusion of the last five cubic feet of concrete. The total quantity of concrete extruded from the drive casing to form the base shall be equal to or greater than the quantity so extruded in the case of the nearest successful applicable test pile, except that a compactive effort in excess of thirty blows, each of one hundred forty thousand foot-pounds, will not be required for extrusion of the last five cubic feet.
(2) After the expanded base has been formed, the shaft shall be constructed. Where a cased shaft is to be used, a steel shell shall be inserted into the drive casing and anchored to the expanded base by placing a fresh charge of concrete in the shell and driving it into the base. The shell may then be filled with concrete to cut-off elevation after the removal of the drive casing, in accordance with the provisions relating to cast-in-place concrete piles. Any annular space remaining between the shell and surrounding soil shall be suitably filled to assure proper lateral support of the shaft, unless there is sufficient recovery of the ground to provide the necessary support. Where an uncased shaft is to be used, the provisions of section 27-697 of article seven of this subchapter shall apply, and the concrete for the shaft shall be placed by ramming or by the use of approved pressure devices as the drive casing is withdrawn. Where ramming is used, the concrete batches being rammed shall not exceed five cubic feet in volume, not less than two blows of thirty thousand foot-pounds each shall be applied to compact each batch of concrete, and the bottom of the drive casing shall be kept below the level of the concrete at all times.
(3) The outside diameter of the permanent shaft shall not be more than four inches less than the inside diameter of the drive casing.
(4) Except where uncased shafts are used, as described in section 27-697 of article seven of this subchapter, no concrete shall be placed in the pile shafts until all piles within a radius of fifteen feet, or within the heave range, have been driven.
(e) Bearing material. The enlarged base of the pile shall be formed in, or on the same type of bearing material as is used to support the nearest applicable load test pile and at a similar depth therein. In addition, the enlarged base shall be underlain by a minimum depth of ten feet (measured from the junction of the shaft and base) of soil materials of classes 1-65 to 7-65, except that, where installation of the base is permitted to be performed with blows of less energy than the one hundred forty thousand foot-pounds indicated in paragraph one of subdivision (d) of this section, the requirement for a ten foot depth of class 1-65 to 7-65 material may be reduced, subject to the approval of the architect or engineer and the approval of the commissioner.
§ 27-711. Steel H sections
(a) Materials. Steel H sections may be of any type of steel permitted by the provisions of reference standard RS 10-5. The use of built-up sections or sections of other than "H" form will be permitted if the several components of the section are adequately connected to develop the strength of the adjacent components and if the ratio of width to thickness of the component parts does not exceed the values for conventional "H" sections.
(b) Limitations on use. The tips of all steel H piles having a thickness of metal less than one-half inch, which are driven to end bearing on rock of class 1-65 through 3-65 by an impact hammer, shall be reinforced. The installation of all steel H piles by impact hammer to end bearing on rock of classes 1-65 through 3-65 shall be under the personal inspection of an architect or engineer, and the operations of driving such piles, the observations of penetration resistance, and the operation of the equipment shall be conducted so as to terminate driving directly when the pile reaches refusal on the rock surface.
§ 27-712. Concrete-filled pipe piles
(a) Materials. The pipe shall conform to the provisions of reference standard RS 11-8. Concrete shall conform to the requirements of article five of subchapter ten of this chapter.
(b) Minimum dimensions.
(1) Pipe installed open-end and having a nominal outside diameter of less than fourteen inches shall be at least one-quarter inch thick. For diameters from fourteen inches to eighteen inches, the minimum thickness shall be 0.310 in. For diameters over eighteen inches, the minimum thickness shall be 0.375 in.
(2) Steel pipe piles installed with ends closed shall have a minimum nominal wall thickness of at least 0.125 in.
(3) For piles which receive their principal support by friction, closure or splice plates shall not project more than three-eighths of an inch beyond the outer limit of the pipe section.
(c) Installation.
(1) Pipe shells driven open-end shall be cleaned to the bottom of the shell after driving.
(2) After driving and cleaning the pipe, open-end piles driven to end bearing on rock or hardpan shall be reseated to full bearing by redriving, to the resistance indicated in table 11-4. If the pipe shell shows two inches or more of penetration on redriving, the pipe shall be recleaned and redriven in successive cycles until the penetration on redriving is less than two inches.
(3) Pipe shells shall be inspected before filling with concrete, shall be clean, and shall meet the requirements for alignment and condition of the shell as specified with regard to the shells of cast-in-place piles. If leakage of water into the pipe occurs, the provisions of paragraph five of subdivision (e) of section 27-713 of this article shall apply.
(4) Placing of concrete fill in pipe shells shall conform to the requirements for placing concrete fill in cast-in-place piles.
§ 27-713. Caisson piles
(a) Description. Caisson piles shall denote concrete filled pipe piles that are socketed into bedrocks of class 1-65, 2-65 or 3-65 and constructed with steel cores.
(b) Materials. Pipe or shell and concrete shall conform to the requirements for concrete filled pipe piles, except that the minimum compressive strength of the concrete at the age of twenty-eight days shall be thirty-five hundred psi. Steel cores shall conform to the requirements for steel H piles. Reinforcing steel cages shall be covered with at least one and one-half inches of concrete.
(c) Design of rock socket. The design of the rock socket shall be predicated on the sum of the allowable bearing pressure on the bottom of the socket plus bond along the sides of the socket. The allowable bearing pressure on the surface of the rock at the bottom of the socket shall be as established in section 27-678 of article four of this subchapter increased for embedment in accordance with note eight of table 11-2, provided that the strength of the concrete fill in the socket, computed as 0.45 f'c is of comparable magnitude. The allowable bond stress between the concrete and the sides of the socket shall be taken as two hundred psi. The provisions of subdivision (c) of section 27-700 of article eight of this subchapter relative to penetration resistance shall not apply.
(d) Spacing and minimum dimensions.
(1) Minimum diameter of a caisson shall be eighteen inches with a minimum shell thickness of three-eighths of an inch. Minimum depth of the rock socket shall be equal to the diameter of the pipe.
(2) The center-to-center spacing of caissons shall be at least two and one-half times the outside diameter of the shell.
(e) Installation.
(1) The steel shell shall be installed through overburden, the material within the shell shall be removed, and the shell seated in the rock sufficiently to stop the inflow of soil. Where required to extend the shells, splices are to be welded. A suitable steel driving shoe shall be welded to the bottom of each caisson.
(2) A socket shall then be drilled in the rock to the required depth and shall be approximately of the same diameter as the inside diameter of the shell. Before placement of concrete, the socket and shell shall be thoroughly cleaned and the rock inspected to verify that the rock is of the class on which the design has been predicated, or of a better class. In case visual inspection cannot be made because of inability to unwater the caissons by standard pumping methods, drilling logs and screenings from the rock drilling operation may be utilized to determine the class of rock in the socket.
(3) Where more than one section of steel core is required, the mating ends of the sections shall be spliced so as to safely withstand the handling stresses to which they may be subjected. The ends shall be milled or field ground to insure contact. The steel core shall be centrally installed in the caisson before grouting and concreting, shall not be more than one inch above the rock at the bottom of the socket, and shall be full length of the caisson or extend a sufficient distance up into the shaft to transmit the load in the steel core into the concrete of the caisson. A minimum-weight thirty-six pounds stub core beam shall be installed in the socket for caissons not requiring steel cores in order to lock the caissons into the rock. In these cases, the length of the steel cores shall be twice the socket depth.
(4) Concrete and grout shall be placed so that it completely fills the shell, the socket, and the space between the steel core and shell, and in a manner that will preclude separation of the ingredients.
(5) If the leakage of water into the caisson is minor, the caisson shall be pumped out and one cubic yard of grout shall be placed in the caissons and then the balance of the concrete installed. If the leakage of water makes it inadvisable to attempt to place concrete in the dry, the shell shall be filled to its top with clean water, and the concrete placed by the tremie method to the top of the caisson in one continuous operation or by using a seal of grout of the same strength as the specified concrete. The grout seal, if used, shall be deposited by means of a grout pipe to an elevation of at least three feet above the cutting edge, and after a sufficient time has elapsed to allow the grout to set, the caisson shall be pumped dry and the remaining space filled with concrete.
§ 27-714. Composite piles
Composite piles include those consisting of two types of pile joined together. The maximum allowable load shall be that allowed for the component of lesser strength used to make up the full pile length. The connection or joint between the two components shall be constructed so as to prevent the separation of the upper and lower components during construction and thereafter. The details and methods of making joints shall be designed.
§ 27-715. General requirements
Where support of adjacent structures or properties is required, such support may be provided by underpinning, sheeting, and bracing, or by other means acceptable to the commissioner. Except as specifically permitted otherwise, underpinning piers, walls, piles, and footings shall be designed and installed in accordance with the applicable provisions of this subchapter relating to piers, walls, piles, and footings used in new construction and shall be inspected as provided in section 27-724 of article thirteen of this subchapter.
§ 27-716. Use of rock support in lieu of underpinning
Existing structures founded at a level above the level of adjacent new construction may be supported on hard rock in lieu of underpinning, the use of sheeting and bracing, or the construction of retaining walls, provided that a report by the architect or engineer is submitted substantiating the safety of the proposed construction and verifying that an "in-place" inspection has been made of the rock exposed and of the jointing therein in the excavation.
§ 27-717. General
The possibility of overturning and sliding of the building shall be considered.
§ 27-718. Factor of safety
(a) Overturning. The minimum factor of safety against overturning of the structure as a whole shall be one and one-half. Stability against overturning shall be provided by the dead load of the building, by the allowable uplift capacity of piling, by anchors, by the weight of soil directly overlying footings provided that such soil cannot be excavated without recourse to major modification of the building, or by any combination of these factors.
(b) Sliding. The minimum factor of safety against sliding of the structure under lateral load shall be one and one-half. Resistance to lateral loads shall be provided by friction between the foundation and the underlying soil, by passive earth pressure, by batter piles, or by plumb piles, subject to the following:
(1) The resistance to lateral loads due to passive earth pressure shall be discounted where the abutting soil could be removed inadvertently, by excavation.
(2) In the case of pile supported structures, frictional resistance between the foundation and the underlying soil shall be discounted.
(3) The available resistance to friction between the foundation and the underlying soil shall be predicated on an assumed friction factor of one-half for soils of classes 1-65 through 8-65. A greater value of coefficient of friction may be used subject to verification by analysis and test. For soils of poorer classes, the stability shall be analyzed by accepted procedures of soil mechanics.
§ 27-719. General
The applicable provisions of article seven of subchapter one of this chapter shall apply.
§ 27-720. Boring and test pit operations
Boring and test pit operations shall be subject to controlled inspection, except that fifty per cent or less of the required number of borings and/or test pits may be inspected by an architect or engineer other than the architect or engineer designated for controlled inspection. The records of borings and/or test pits shall be attested to as follows:
(a) The architect or engineer shall file a report stating which borings and/or test pits were performed under his or her inspection and whether such inspection was performed personally or otherwise. If the inspection was not made personally by the architect or engineer, the name and address of the inspector shall be noted. It shall be stated: that the borings and/or test pits so inspected were made and were carried to the depths indicated; that, to the best of the architect's or engineer's knowledge and belief, the description and classification of the soils are a true description of the samples recovered from the respective borings and/or test pits; that such samples were recovered at the levels indicated; and that the boring and/or test pit work progressed in such manner that the samples recovered are reasonably representative of the subsurface conditions.
(b) The accuracy of the other data indicated on the boring records shall be attested to by the drilling contractor or by the driller making the borings.
§ 27-721. Piling
The installation of all piling shall be subject to controlled inspection. Such inspection shall be performed only by an architect or engineer resident at the site, except that where more than one pile rig is working at a site, inspection of the work may be performed by nonlicensed or nonregistered personnel working under the resident architect or engineer, who need act only in a supervisory capacity. This exception shall not apply, however, in the cases of timber or steel piles driven to end bearing as described in article ten of this subchapter. Materials for piling shall be subject to inspection requirements as prescribed in subchapter ten of this chapter for those or like materials. In all cases, an inspector shall be assigned to observe the operations of each rig.
§ 27-722. Footings, foundation piers, foundation walls and pile caps
The provisions of section 27-683 of article six of this subchapter shall apply.
§ 27-723. Subgrade for footings, foundation piers, and foundation walls
The soil material directly underlying footings, foundation piers, and foundation walls shall be inspected by an architect or engineer after excavation and immediately prior to construction of the footings. If such inspection indicates that the soil conditions do not conform to those assumed for purposes of design and described on the plans, or are unsatisfactory due to disturbance, then additional excavation, reduction in allowable bearing pressure, or other remedial measures shall be adopted, as required. A copy of a report or reports on such inspection or inspections describing the conditions found and any necessary modification of the design, and bearing the signature of the architect or engineer making the inspections, shall be filed with the commissioner. In addition, notification shall be received by the department at least two working days prior to construction of the footing, pier, or foundation walls, that the subgrade is ready for inspection unless the requirements of section 27-209 of article twenty-one of subchapter one of this chapter have been met.
§ 27-724. Construction required for or affecting the support of adjacent properties or buildings
Except in cases where a proposed excavation will extend less than ten feet below the legally established grade, all underpinning operations and the construction and excavation of temporary or permanent cofferdams, caissons, braced excavated surfaces, or other constructions or excavations required for or affecting the support of adjacent properties or buildings shall be subject to controlled inspection. The details of underpinning, cofferdams, caissons, bracing, or other constructions required for the support of adjacent properties or buildings shall be shown on the plans or prepared in the form of shop or detail drawings and shall be approved by the architect or engineer who prepared the plans.
§ 27-725. Scope
The provisions of this subchapter shall establish and control the minimum requirements for light, heat, ventilation, and noise control except as otherwise provided in subchapters six, seven, and eight.
§ 27-726. Standards
The provisions of reference standard RS-12 shall be part of this subchapter.
§ 27-727. Definitions
For definitions to be used in the interpretation of this subchapter, see subchapter two of this chapter.
§ 27-728. Plans
For the requirements governing the filing of plans and the work to be shown on plans, see subchapter one of this chapter.
§ 27-729. Permits
For the requirements governing equipment work permits and equipment use permits, see subchapter one of this chapter.
§ 27-730. Tests and inspections
Where required in this subchapter, all equipment and systems shall be subject to tests and/or inspections that would disclose defects or operating conditions dangerous to life or health. Such equipment or systems shall not be operated until these defects or conditions are corrected.
§ 27-731. Alterations
No building, or part thereof, shall hereafter be altered or rearranged so as to reduce any of the following to less than the required standards prescribed in this subchapter for buildings hereafter erected:
(a) The amount of available natural or artificial light.
(b) The output of devices providing heat to a room.
(c) The outdoor air supply. No additional room shall be created unless made to conform to the requirements of this subchapter except that in basements of one family dwellings existing on January first, nineteen hundred eighty-two and in basements of all other dwellings existing on January first, nineteen hundred forty-eight, the minimum clear ceiling height may be seven feet for the minimum area. In multi-family dwellings, the installation of all new mechanical equipment shall conform to the requirements of article nine of this subchapter except that existing mechanical equipment may be replaced with new equipment of the same kind as previously installed.
§ 27-732. Natural light requirements
Every habitable room shall be provided with natural light complying with the provisions of this subchapter.
§ 27-733. Natural light sources and location
(a) Natural light, when required, shall be provided by windows, skylights, monitors, glazed doors, transoms, fixed lights, jalousies or other natural-light transmitting media. Such sources shall not be located in recesses having a width of less than six feet, and such sources shall not be located so as to create a habitable room whose depth exceeds thirty feet, except in dwelling units of group one construction containing more than three habitable rooms. Such sources, except as provided in subdivision (b) of this section, shall face or open upon the sky or upon a public street, space, alley, park, highway, or right of way, or upon a yard, court, plaza, or space above a setback, when such yard, court, plaza, or space above a setback is located upon the same lot and is of the dimensions required by the applicable provisions of the zoning resolution. Where dwelling units in buildings or spaces classified in occupancy group J-1 or J-2 are located in a cellar or a basement such dwelling unit or units shall have at least one-half of their height and all of their window surfaces above every part of an "adequate adjacent space". Such "adequate adjacent space" shall be open to the sky and shall be a continuous surface area outside the dwelling unit or units not less than thirty feet in its least dimension and abutting at same level or directly below every part of the exterior walls of such dwelling unit or units. Such "adequate adjacent space" shall include only spaces which are located on the same lot or plot as the building or on a public street, space, alley, park, highway or right of way and the level of such areas which abut or adjoin the habitable room at least shall be six inches below the window sills of any windows.
(b) Natural light sources may face or open upon an enclosed or partially enclosed balcony or space above a setback when such balcony or space faces upon a public street, space, alley, park, highway or right of way or upon a yard, court, plaza, or space above a setback, when such yard, court, plaza, or space above a setback is located upon the same lot and is of the same dimensions required by the applicable provisions of the zoning resolution, the maximum depth of any habitable room is at most thirty feet measured from the outer face of the wall forming the partial or full enclosure of the balcony or space, the enclosure of the balcony or space is not more than one story in height, and the balcony or space complies with either of the following:
(1) The front of the balcony or space above a setback has an opening to the outer air whose area is equal to at least seventy-five percent of the floor surface area of such balcony or space.
(2) The front of the balcony or space above a setback may be completely enclosed when the building is of group one construction provided the outer enclosing walls are glazed with clear plate glass or with plastic equivalent complying with subdivision (e) of section 27-331 of article four of subchapter five of this chapter and such glazed wall area is equal to at least fifty percent of the interior walls enclosing such balcony or space and at least fifty percent of the required glazed area is openable and no window from any bathroom, watercloset compartment, or kitchen whose area is fifty-nine square feet or less opens on such balcony or space.
§ 27-734. Area of natural light sources
Required sources of natural light shall have an aggregate transmitting area of at least ten percent of the floor area of the room or space served and where an enclosed or partially enclosed balcony or space above a setback complying with section 27-733 of this article intervenes, the required sources of natural light shall have an aggregate transmitting area of at least ten percent of the combined floor area of such room and the portion of the balcony or space directly adjoining and in front of such room. Each required source shall have a minimum transmitting area of twelve square feet and only that area of the light source above thirty inches from the finished floor may be considered as providing the natural light required in any space.
§ 27-735. Artificial light requirements
Adequate means for producing artificial light by electricity shall be provided in every room or floor space in every building hereafter erected and in the portions of existing buildings where alterations are performed except as follows:
(a) Artificial light need not be provided in rooms or spaces occupied exclusively during the daylight hours between one hour after sunrise and one hour before sunset, and which are provided with natural light meeting the requirements of sections 27-733 and 27-734 of article three of this subchapter.
(b) Artificial light need not be provided in rooms or spaces with less than forty square feet of floor area if they are used exclusively for storage purposes or for mechanical facilities containing no rotating or moving parts, no combustion equipment, or no other hazardous equipment.
§ 27-736. Means of egress
All means of egress shall be provided with the levels of artificial illumination as required in article six of subchapter six of this chapter.
§ 27-737. Places of assembly
All places of assembly shall be provided with the levels of artificial illumination as required in subchapter eight of this chapter.
§ 27-738. Bathrooms and toilet rooms
In all bathrooms and toilet rooms, the required means for producing artificial illumination shall be capable of producing an average intensity of not less than ten foot candles, when measured at thirty inches above the floor.
§ 27-739. Yards and courts
Where a building is classified in occupancy group J-1 or J-2, or where a building contains a space or spaces classified in occupancy group J-1 or J-2, all yards and courts shall be provided with adequate means of providing artificial light by electricity having a minimum intensity of not less than one foot candle measured at the lower level or levels of all yards or courts.
§ 27-740. Heating requirements
All habitable or occupiable rooms or spaces, and all other rooms or spaces listed in table 12-1, shall be provided with means of heating in accordance with the requirements of this subchapter and reference standard RS 12-1. Heating systems shall be capable of producing the required temperatures listed in table 12-1 when the outdoor temperature is five degrees Fahrenheit and the wind velocity is fifteen mph. In highly exposed locations, provision shall be made for higher wind velocities. Heating equipment shall not be required when either of the following conditions exist:
(a) Where the occupancy is seasonal and the rooms or buildings will not be occupied between November first and May first of the following year.
(b) Where the processes or activities normally conducted within the space will generate sufficient heat to produce the prescribed indoor temperature during the time of occupancy.
TABLE 12-1 Minimum Space Temperature Requirements a
Rooms or Spaces Minimum Temperature (degree F) Habitable rooms in all buildings 70 Building equipment and machinery rooms 50 Patients' rooms, bathrooms and toilet rooms, stairs and corridors in hospitals and nursing homes 75 Bathrooms and toilet rooms, except patients' bathrooms and toilet rooms in hospitals and nursing homes 70 Offices, waiting rooms, art galleries, museums, libraries, meeting rooms, churches, classrooms, auditoriums, lecture halls, night clubs, restaurants, theatres, locker rooms, dressing rooms, and spaces where persons are engaged in sedentary activities 70 Laboratories, light machine work, product inspections, loft buildings, shops, stores, display rooms, show rooms, sales rooms, and spaces where persons are engaged in moderate physical activities 70 Laboratories, light machine work, product inspections, loft buildings, shops, stores, display rooms, show rooms, sales rooms, and spaces where persons are engaged in moderate physical activities 65 Gymnasia, dance halls, skating rinks, bowling alleys, heavy assembly workrooms or shops, and spaces where persons are engaged in vigorous physical activities 60 Automotive repair shops 50 Storage areas, garages, space where work or process requires a low temperature None Hospital operating rooms, and recovery, labor, delivery, and nursery rooms 80 Swimming pools, bathhouses, and shower rooms 75
Note for Table 12-1:
a Where the listed temperatures differ from those that are required to be maintained under the provisions of section 131.03 of the New York city health code, the higher temperature shall apply.
§ 27-741. Minimum temperature requirements
Heating systems shall be capable of producing the required minimum space temperatures as set forth in table 12-1. Where the occupancy of a space does not conform exactly with any of the spaces listed, the temperature shall be determined by the requirements of the listed space to which it most nearly conforms.
§ 27-742. Devices producing incidental heat
Where a room or space contains equipment that produces heat, such as motors, generators, resistors, lights, compressors, steam heated vessels, etc., and where such equipment is in constant use during the period of occupancy, the equipment may be considered as a supplementary heating device. Its heating capacity may be deducted from the required capacity of the heating devices in the room.
§ 27-743. Capacity of central heat sources
Where central heat sources are used, they shall have a gross output capacity sufficient to provide for the required heating load, including appropriate allowance for distribution losses, pick-up, and the heating of domestic hot water if the central heat source is used for that purpose.
§ 27-744. System design
Where central heat sources are used, the heating system including all wiring, piping and/or ductwork, the heat sources and the various space heating devices shall be designed and installed so as to be capable of producing the minimum temperatures set forth in table 12-1. Also, the installation of the entire system shall be in accordance with applicable requirements of this subchapter and subchapters thirteen through sixteen of this chapter, and the electrical code of the city of New York.
§ 27-745. Occupiable rooms
All occupiable rooms shall be ventilated by natural or mechanical means, or by a combination of both. Natural ventilation may be provided except where mechanical ventilation is required by article seven or eight of this subchapter.
§ 27-746. Habitable rooms
All habitable rooms shall be provided with natural ventilation complying with the provisions of this subchapter except as provided in section 27-750 of this article.
§ 27-747. Alcoves
An alcove or room opening off another room or space shall be considered as a separate room in determining its requirements for ventilation. However, for dwellings classified in occupancy group J-3, where the opening between the alcove and the room or space is at least eighty percent of the area of the common wall and the floor area of the alcove does not exceed twice the area of the opening, the alcove and the room opening into the alcove may be considered as a single space.
§ 27-748. Balconies
Where an interior balcony or mezzanine opens to form part of another room or space, its area shall be added to the area of the room or space in which it is located to compute the ventilation required for both spaces.
§ 27-749. Natural ventilation sources
Natural ventilation, when required, shall be provided by windows, skylights, monitors, doors, louvers, jalousies, or other similar ventilating openings. Such ventilating openings shall open to the sky or a public street, space, alley, park, highway, or right of way, or upon a yard, court, plaza, or space above a setback, where such yard, court, plaza, or space above a setback is located on the same lot and is of the dimensions required by the applicable provisions of the zoning resolution.
§ 27-750. Area of ventilating openings
Ventilating openings in all habitable rooms or spaces shall have a free openable area of at least five percent of the floor area of the room or space ventilated and where there is an enclosed or partially enclosed balcony or space above a setback complying with section 27-733 of article three of this subchapter the ventilating openings shall have a free openable area of at least five per cent of the combined floor area of such room and portion of the balcony or space directly adjoining and in front of such room. Each required ventilating opening shall have a minimum openable area of six square feet. Where fresh air is furnished in any habitable room or space by mechanical means supplying a minimum of forty cfm the free openable area of the openings may be reduced to one-half of the above requirements but not less than five and one-half square feet in aggregate. In all occupiable rooms or spaces, the free openable area shall be used to calculate the index for ventilation (section 27-753 of article seven of this subchapter), which shall determine the minimum requirements for supplementary mechanical ventilation.
§ 27-751. Minimum dimensions of habitable rooms
Habitable rooms shall have a minimum clear width of eight feet in any part; a minimum clear area of eighty square feet and a minimum clear ceiling height of eight feet for the minimum area, except:
(a) A room which complies with the requirements for natural light and ventilation and in addition has an opening of not less than sixty square feet into an immediately adjoining room may have a minimum floor area of seventy square feet and a least horizontal dimension of seven feet;
(b) A dining space which has legally required ventilation, and in which the window has an area of at least one-eighth the floor area of such dining space;
(c) One-half the number of bedrooms in a dwelling unit containing three or more bedrooms may have at least minimum dimension of seven feet;
(d) A room in a class B multiple dwelling as defined in section four of the multiple dwelling law which may have a minimum floor area of sixty square feet and a least horizontal dimension of six feet.
§ 27-752. Areas requiring mechanical ventilation
Mechanical ventilation shall be provided in all occupiable rooms or spaces where the requirements for natural ventilation are not met; in all rooms or spaces, which because of the nature of their use or occupancy, involve the presence of dust, fumes, gases, vapors, or other noxious or injurious impurities, or substances which create a fire hazard; or where required by the provisions of article eight of this subchapter or subchapters six through eight of this chapter.
§ 27-753. Index for ventilation
The index for ventilation for any room or space shall be computed by adding the following:
(a) The contents per occupant, in cubic feet.
(b) The floor area per occupant, times ten, in square feet.
(c) The clear, unobstructed openable area of windows, skylights, and other sources of natural ventilation per occupant times two hundred, in square feet. In all cases, the number of occupants used in computing the index for ventilation shall be the maximum number who will occupy the room or space simultaneously during any two-hour period.
§ 27-754. Minimum quantity of outside air for mechanical ventilation
The minimum quantity of outside air required for mechanical ventilation in any occupiable room, where not otherwise prescribed, shall be determined according to table 12-2.
TABLE 12-2 Required Minimum Outdoor Air Supply and Exhaust (cfm per sq. ft.)
Index for Ventilation Ventilated Rooms with Natural Ventilation Openings Ventilated Rooms without Natural Ventilation Openings Air Conditioned Rooms Supply Exhaust Supply Exhaust Supply Exhaust 0- 300 2.5 2.0 2.5 2.0 1.5 1.5 301- 520 2.0 1.5 2.0 1.5 1.2 1.2 521- 850 1.5 1.25 1.5 1.25 0.9 0.9 851-1250 - 1.0 1.0 1.0 0.6 0.6 1251-1650 - 0.67 0.67 0.67 0.5 0.5 over 1650 - - 0.33 0.33 0.4 0.4
(a) Window requirements. To be credited as ventilating openings under the provisions of this subchapter, windows or other openings shall meet the requirements of section 27-749 of article six of this subchapter, and where mechanical supply ventilation is not provided, shall have a free openable area of at least one square foot per one hundred square feet of floor area.
(b) Air conditioning.
(1) In air conditioned rooms, the windows and other openings shall not be credited as such in computing the index for ventilation. Air conditioned rooms shall be considered as interior rooms.
(2) Air that has been exhausted from an air conditioned space may be reconditioned by air conditioning apparatus and recirculated as equivalent outdoor air, provided that the total of supply air is not less than required for air conditioned rooms by table 12-2 and that the amount of actual outdoor air is at least thirty-three and one-third per cent of the required total. The actual outdoor air supply shall not, under any circumstances, be reduced to less than five cfm per occupant, except that these minimum requirements may be reduced by fifty per cent as provided in section 27-755 of this article.
(c) Required exhaust. Required exhaust may be accomplished by raising the pressure within the space with consequent leakage through doors and windows, or by drawing the vitiated air from air conditioned spaces into the return air duct of air conditioning apparatus or into an exhaust duct discharging directly to the outdoor air.
(d) Make-up air. A sufficient quantity of air to make the exhaust system effective shall be provided to the space being exhausted by one or by any combination of the following methods:
(1) By supplying air to the space by means of a blower system.
(2) By infiltration through louvres, registers, or other permanent openings in walls, doors, or partitions, adjoining spaces where air is supplied by one of these methods.
(3) By infiltration through cracks around window sash and doors.
(4) By other methods acceptable to the commissioner.
(e) Prohibited use of recirculated air. Air drawn from any of the following spaces may not be recirculated; mortuary rooms; bathrooms or toilet rooms; or any space where an objectionable quantity of flammable vapors, dust, odors, or noxious gases is present. Air drawn from rooms that must be isolated to prevent the spread of infection shall not be recirculated, except that air drawn from hospital operating rooms may be recirculated, if in compliance with the following requirements:
(1) There shall be a minimum of twenty-five total air changes per hour, of which five air changes per hour shall be outdoor air.
(2) All fans serving exhaust systems shall be located at the discharge end of the system.
(3) Outdoor air intakes shall be located at least twenty-five feet from exhaust outlets of ventilation systems and other exhaust discharges, combustion equipment stacks, medical surgical vacuum systems, and plumbing vent stacks, from areas which may collect vehicular exhaust such as off-street loading bays, and from areas which may collect other noxious fumes. The bottom of outdoor air intakes serving central systems if installed above a roof, shall be located at least three feet above roof level.
(4) Positive air pressure shall be maintained at all times in relation to adjacent areas.
(5) All ventilation or air conditioning systems serving such rooms shall be equipped with a filter bed of twenty-five per cent efficiency upstream of the air conditioning equipment and a filter bed of ninety per cent efficiency downstream of the supply fan, any recirculating spray water systems and water reservoir type humidifiers. All filter efficiencies shall be average atmospheric dust spot efficiencies tested in accordance with ASHRAE standard 52-68.
(6) A manometer shall be installed across each filter bed.
(7) Duct linings shall not be used in ventilation and air conditioning systems serving such rooms unless terminal filters of at least ninety per cent efficiency are installed downstream of linings.
(8) Air supplied shall be delivered at or near the ceilings and all exhaust air shall be removed near floor level, with at least two exhaust outlets not less than three inches above the floor.
(f) Outdoor air intakes. For high-rise office buildings erected pursuant to new building applications filed on or after the effective date of this section, outdoor air intakes serving spaces above the second story and serving spaces greater than ten thousand square feet of floor area shall be located at least twenty feet above ground level, at least twenty feet from exhaust outlets of ventilation systems and other exhaust discharges, and at least twenty feet from areas that may collect vehicular exhaust such as off-street loading bays.
§ 27-755. Use of adsorption devices
In all cases where the use of recirculated air is permitted, the required outdoor air supply may be reduced up to fifty per cent, provided that the recirculated air is passed through adsorption devices. The adsorption devices shall be approved and rated. Means shall be provided for maintaining the effectiveness of the adsorption devices.
(a) Improper maintenance. Should the adsorption devices be improperly maintained so that their effectiveness is impaired, the commissioner may order their removal. If the adsorption devices are removed, the air conditioning or ventilating system shall not be operated without supplying one hundred per cent of the outdoor air required by this article or article eight of this subchapter.
(b) Test records. The building owner shall, at all times, maintain a maintenance record showing the manufacturer's recommendation of the frequency of tests, the method of making tests, and the results of all tests of the adsorption devices. Such tests shall be made and certified by the manufacturer or by a laboratory acceptable to the commissioner at least twice every six months. The records of such tests shall be maintained for a period of at least two years, and shall be available for inspection by the commissioner.
(c) Ventilation of water closet compartments. The use of any device that returns exhaust air from water closet compartments or from toilet rooms after passing through adsorption devices is not permitted as a means of providing ventilation for a water closet compartment for which a mechanical system of ventilation is required.
§ 27-756. Installation and operation of ventilating and air conditioning systems
Where mechanical ventilation is accepted as an alternate for, or a supplement to, natural means of ventilation, or is required under the conditions herein prescribed, or where ventilation is provided by means of air conditioning system, the system, equipment, and distributing ducts shall be installed in accordance with the applicable provisions of subchapters thirteen through fifteen of this chapter. Such required ventilating and/or air conditioning systems shall be kept in operation at all times when the building or space is being used in a normal manner in accordance with the purpose for which it was intended.
§ 27-757. Rooms in institutional H-1 occupancy
In occupancy group H-1, rooms or spaces in which persons are detained under restraint may be naturally ventilated by means meeting the intent of this subchapter.
§ 27-758. Kitchens
Kitchens shall be ventilated as follows:
(a) Kitchens located within dwelling units and having a floor area of greater than fifty-nine square feet shall have natural ventilation as prescribed in article six of this subchapter. When the floor area is fifty-nine square feet or less, the kitchen shall be ventilated by either of the following:
(1) Natural means complying with article six of this subchapter and further that the windows shall have a minimum width of twelve inches, a minimum area of thee square feet or ten per cent of the floor area of the space whichever is greater and so constructed that at least one-half of their required area may be opened. When the space is located at the top story the window or windows may be replaced with a skylight whose minimum width shall be twelve inches, whose minimum area shall be four square feet or one-eighth the floor area of the space whichever is greater and shall have ventilating openings of at least one-half of the required area of the skylight.
(2) Mechanical means exhausting at least two cfm of air per square foot of floor area. Where doors are used to separate the space the lower portion of each door shall have a metal grille containing at least forty-eight square inches of clean openings or in lieu of such grille two clear open spaces may be provided, each of at least twenty-four square inches, one between the bottom of each door and the floor and the other between the top of each door and the head jamb.
(b) Kitchens, except those located within dwelling units, and side spaces, where cooking of any kind is done, shall be ventilated by either of the following; provided that in no instance may there be any violation of the nuisance provisions of the health code.
(1) Natural means complying with article six of this subchapter and supplemented with auxiliary mechanical supply and exhaust ventilation adequate to remove the fumes and smoke from the cooking equipment when operating.
(2) Mechanical means exhausting at least three cfm of air per square foot of floor area, but in no case less than one hundred fifty cfm. Such air shall be exhausted through duct or chimney constructed in accordance with the provisions of subchapters thirteen through fifteen of this chapter.
(c) Kitchens, snack bars, or pantries, where the operation consists of heating or warming previously prepared food that was cooked elsewhere, or preparation of food in vending machines may be ventilated by either of the following:
(1) Natural ventilation complying with article six of this subchapter.
(2) Mechanical ventilation complying with article seven of this subchapter.
§ 27-759. Bathrooms and toilet rooms
Bathrooms and toilet rooms shall be ventilated as follows:
(a) When ventilated by natural means, the natural ventilation sources shall comply with section 27-749 of article six of this subchapter and shall have an unobstructed free area of at least five per cent of the floor area. In no case shall the net free area of the ventilation sources be less than one and one-half square feet except that in occupancy groups H-1 and H-2, provided the ventilation opening conforming with section 27-749 of article six of this subchapter may be in a vent shaft provided that the net free area of the opening is not less than three square feet. The vent shaft cross-sectional area shall be increased by one-fifth of a square foot for every foot of height, but shall not be less than nine square feet in area and open to the outer air at the top; or, the vent shaft may be open at the sides above the roof, with louvres providing an equivalent net free area at the top, equal to the area of the shaft.
(b) By individual vent shafts or ducts constructed of noncombustible materials with a minimum cross-sectional area of one square foot and one-third additional square foot for each additional water closet or urinal above two in number. The upper termination of such ducts shall be equipped with a wind-blown ventilator cap.
(c) When a bathroom or toilet room is not ventilated by natural ventilation as required by this section, it shall be mechanically ventilated as follows:
(1) Rooms containing only one water closet or urinal shall be mechanically ventilated by an exhaust system capable of exhausting at least fifty cubic feet of air per minute. Means shall be provided for air ingress by louvres in the door, by undercutting the door, or by transfer ducts, grilles, or other openings.
(2) Rooms containing more than one water closet or urinal, and any auxiliary spaces such as those used in hand basins, slop sinks, and locker rooms, shall be mechanically ventilated by an independent exhaust system capable of exhausting at least forty cubic feet of air per minute per water closet or urinal. The outdoor air supply shall conform to the requirements of article seven of this subchapter.
(3) Toilet exhaust systems shall be arranged to expel air directly to the outdoors.
§ 27-760. Inside locker rooms
Inside locker rooms and dressing rooms for more than one person shall be provided with exhaust ventilation giving at least four changes of air per hour.
§ 27-761. Corridors
Unless natural sources complying with section 27-749 of article six of this subchapter provides ventilating openings equivalent to at least two and one-half percent of the floor area, corridors in buildings of occupancy groups H-1, J-1 and J-2 more than three stories in height, shall be mechanically ventilated by a system supplying at least one-half cubic foot of outdoor air per minute per square foot of floor area. When air conditioned, a part of the required supply may be recirculated as equivalent outdoor air, but at least thirty-three and one-third percent of the required air supply shall be actual outdoor air.
§ 27-762. Crawl spaces
(a) Buildings and structures without basements. In buildings and structures constructed without basements, and in which the first floor construction does not bear directly on the ground, a space at least eighteen inches high shall be provided directly under the floor beams, girders or sill of the first floor construction. Where the floor above such a space is constructed of wood or metal, the space shall be ventilated by one of the following means:
(1) At least four widely-distributed ventilating openings, providing a total net free area of at least one eight-hundredth of the area of the crawl space, shall be provided in the foundation walls, and the ground within the crawl space shall be covered with a vapor barrier in durability equivalent to at least fifty-five pounds, roofing felt with unsealed laps and with a transmission rate of one perm or less. At least two ventilating openings, providing a total net free area of at least one fifteen-hundredth the area of the crawl space shall be provided in foundation walls, provided that a vapor barrier with a transmission rate of one perm or less is installed over the entire underside of the first floor construction and overlaps the walls.
(2) Other means acceptable to the commissioner.
(b) Buildings and structures with basements. No foundation wall vents shall be required where one side of a crawl space is completely open except for structural members, to a basement that has an area at least equivalent to that of the crawl space, provided that the basement is naturally ventilated by openings complying with section 27-749 of article six of this subchapter and having a free openable area of at least five per cent of the floor area of the basement.
§ 27-763. Ventilation of refrigeration plants
Rooms containing refrigeration plants shall be ventilated in accordance with the provisions of subchapter thirteen of this chapter.
§ 27-764. Ventilation of boiler rooms
Boiler rooms shall be ventilated in a manner that will provide air for combustion in accordance with the provisions of subchapter fourteen of this chapter and also prevent the accumulation of hot air over or near the equipment within the room.
§ 27-765. Ventilation for schools
School buildings shall be ventilated in accordance with the following requirements:
(a) Rooms of instruction and administration. Classrooms, other rooms of instruction, and administrative rooms, where the index for ventilation is less than one thousand six hundred fifty, shall have a supply of outdoor air of at least fifteen cfm per occupant and mechanical exhaust. Where windows are used as the source of supply air, mechanical air exhaust shall be fifteen cfm per occupant. When outdoor air is supplied by mechanical means, the exhaust shall be at least eighty per cent of the supply. In air-conditioned rooms, the conditioned air supply may be reduced to a minimum of ten cfm per occupant, of which at least five cfm shall be outdoor air.
(b) Lockers and wardrobes. Lockers, wardrobes, or wardrobe rooms shall be ventilated in accordance with the provisions of section 27-760 of this article, and where these spaces are located within or adjacent to classroom, the exhaust air from the classroom may be used for such ventilation.
(c) Auditoria and assembly rooms. Rooms where there are more than seventy-five occupants shall have a supply of outdoor air of at least fifteen cfm per occupant and mechanical exhaust. Where windows are used as the source of supply air, mechanical air exhaust shall be at least fifteen cfm per occupant. When outdoor air is supplied by mechanical means, the mechanical exhaust shall be at least eighty per cent of the supply. In air-conditioning spaces, the conditioned air supply may be reduced to a minimum of ten cfm per occupant, of which at least five cfm shall be outdoor air.
§ 27-766. Ventilation of rooms or spaces with excessive temperatures, strong odors, toxic substances, or airborne irritants
In these rooms or spaces, prevention of all of the following conditions shall be considered in the design and installation of a ventilating system:
(a) Excessive temperatures that may be detrimental to the occupants.
(b) The danger of large concentrations of toxic substances in the air.
(c) The danger of large concentrations of airborne irritants an impurities, such as steam, gases, vapor, and dust, that may be injurious to health. Where the exhausted air may contain toxic substances or strong objectional odors, the exhaust system shall be independent of exhaust systems serving other parts of the building.
§ 27-767. Ventilation for special uses and occupancies
Special uses and occupancies, not provided for in this subchapter, shall be ventilated in accordance with the requirements of subchapter seven of this chapter. Ventilation of stage areas shall be in accordance with the requirements of subchapter eight of this chapter.
§ 27-768. Requirements
Interior walls, partitions, floor-ceiling constructions, and mechanical equipment in spaces or buildings of occupancy group J-2 shall be designed and constructed in accordance with the requirements of this subchapter, to provide minimum protection for each dwelling unit from extraneous noises emanating from other dwelling units and from mechanical equipment. In addition, airborne sound from exterior mechanical equipment of buildings in any occupancy group shall conform to the requirements of this subchapter.
(a) Field testing. Where conditions indicate that the installed construction or equipment does not meet the noise control prescribed in this subchapter, measurements shall be taken to determine conformance or non-conformance. For conformance with this subchapter, the results of such measurements shall not fail by more than two db to meet the requirements in any octave band, or by more than two points to meet any STC or INR requirements.
(b) Materials or assemblies of materials utilized to meet noise control requirements shall comply with load bearing, fire protection or other applicable requirements of this code for walls, partitions and floor-ceiling constructions.
§ 27-769. Acoustical isolation of dwelling units
(a) Airborne noise.
(1) Walls, partitions, and floor-ceiling constructions separating dwelling units from each other or from public halls, corridors, or stairs shall have a minimum sound transmission class (STC) rating of forty-five for airborne noise. This requirement shall not apply to dwelling unit entrance doors. However, such doors shall fit closely and not be undercut. For permits issued after January first, nineteen hundred seventy-two, the STC required shall be fifty for airborne noise. For permits issued after April thirtieth, nineteen hundred seventy-three, dwelling unit entrance doors shall have a minimum STC of thirty-five.
(2) STC ratings shall be obtained by tests conducted in accordance with the procedures of reference standard RS 12-2 except as provided in paragraph three of this subdivision.
(3) The STC ratings of construction assemblies as listed in reference standard RS 12-2 may be used to determine conformance with the requirements of paragraph one of this subdivision and with any other section that requires a specific STC rating.
(4) Penetrations or openings in walls, partitions, or floors for pipe sleeves, medicine cabinets, hampers, electric devices, or similar items shall be packed, sealed, lined, back-plastered, or otherwise isolated by sufficient mass to maintain the required STC ratings.
(5) Where grilles, registers, or diffusers in one dwelling unit are connected by duct-work with grilles, registers, or diffusers in another dwelling unit, and where such connecting duct is less than seven feet long, it shall be lined with duct lining; otherwise, an approved sound attenuating device shall be installed therein. Duct lining shall conform to the requirements of subchapter thirteen of this chapter.
(b) Structure-borne noise.
(1) Floor-ceiling constructions separating dwelling units from each other or from public halls or corridors shall have a minimum impact noise rating (INR) of zero.
(2) Such INR shall be obtained by tests conducted in accordance with the procedure of reference standard RS 12-3 except as provided in paragraph three of this subdivision.
(3) The INR of floor-ceiling constructions listed in reference standard RS 12-3 shall be used to determine conformance with the requirements of paragraph one of this subdivision and with any other paragraph that requires a specific INR. Constructions shall be designed and installed to avoid short circuiting the isolation devices that are incorporated into the constructions.
(4) This subdivision shall apply only to construction pursuant to permits issued after the thirty-first day of December, nineteen hundred seventy-six.
§ 27-770. Noise control of mechanical equipment
(a) Minimum airborne noise insulation requirements.
(1) BOILER ROOMS. Boiler rooms adjoining dwelling spaces, either vertically or horizontally, shall be separated therefrom by floor-ceiling or partition constructions having a minimum STC rating of fifty.
(2) MECHANICAL EQUIPMENT SPACES. Spaces or shafts containing air conditioning, refrigeration, or ventilating equipment, elevator machinery, or other mechanical equipment shall be separated both vertically and horizontally from dwelling units by constructions that will provide a minimum STC rating of fifty. Spaces or shafts containing equipment totaling more than seventy-five rated h.p. shall not be located vertically or horizontally adjacent to dwelling units unless the total sound power level output of all the equipment in the space or shaft is certified not to exceed the maximum sound power levels of table 12-3 in any octave band. Such sound power level ratings shall be obtained by tests conducted in accordance with the procedures of reference standard RS 12-5.
a. Ventilating openings into mechanical equipment spaces. Ventilating openings into boiler rooms and other mechanical equipment spaces shall not be located in yards or courts where there are windows opening from living quarters, unless such ventilating openings are provided with sound attenuating devices if needed to limit noise transmission to NC-40 (noise criterion) levels in the exposed dwelling units. For permits issued after January first, nineteen hundred seventy-two, the permissible noise levels shall not exceed NC-35.
b. Noise criteria requirements. Noise criteria requirements prescribed in this subchapter shall be in accordance with reference standard RS 12-4.
TABLE 12-3 Maximum Sound Power Levels Permitted in Mechanical Spaces or Shafts Adjoining Dwelling Spaces
Octave Bands, c.p.s. Mid- Frequency Max. Sound Power Level db a db re 10 -13 Watts db re 10 -12 Watts 63 101 91 125 101 91 250 103 93 500 105 95 1,000 102 92 2,000 101 91 4,000 98 88 8,000 96 86
Notes for Table 12-3:
a The maximum sound power levels shall be reduced five db in any octave band where the equipment data indicate pure tone generation. The presence of pure tones may be determined by means of one-third octave band analysis. The criterion for a significant pure-tone component shall be an audible pure-tone sound together with an increase of the sound pressure level in the corresponding one-third octave band above the mean of the two adjacent one-third of at least:
Center frequency of one-third octave band 40/125 160/250 215/19500 630/1,000 1,000/ 10,000 Increase in sound pressure level (db) 6 4 3 2 1 1/2
b For permits issued after January first, nineteen hundred seventy-two, the maximum sound power levels shall be changed as follows:
Octave Bands, c.p.s. Mid-Frequency db re 10-13 Watts db re 10-12 Watts 63 98 88 125 97 87 250 100 90 1,000 97 87 2,000 96 86 4,000 93 83 8,000 91 81
(3) DUCTWORK. Ducts serving dwelling units shall be lined with duct lining for at least twenty feet from the fan discharge or intake; otherwise, an approved sound attenuating device shall be installed therein. All toilet exhaust ducts shall be lined with duct lining for at least twenty feet upstream of the exhaust fan intake, otherwise, an approved sound attenuating device shall be installed therein. Duct lining shall conform to the requirements of subchapter thirteen of this chapter. (4) EXTERIOR MECHANICAL EQUIPMENT. Mechanical equipment in a building in any occupancy group, when located outside of the building in a yard or court or on a roof, or where the equipment opens to the exterior of the building, shall be subject to the noise output limitations given in table 12-4 where one or more windows of a dwelling unit in any building in occupancy groups J-1, J-2, or J-3 is located within a sphere of one hundred foot radius whose center is any part of the equipment or its housing, unless it can be shown that the sound pressure levels, in octave bands, of the exterior mechanical equipment as measured within the dwelling unit do not exceed the levels given in table 12-5.
(b) Minimum structure-borne noise and vibration isolation requirements. All isolators used in accordance with the following requirements shall be approved.
Table 12-4 Maximum Sound Power Levels Permitted for Exterior Mechanical Equipment Adjoining Buildings b
Minimum Distance from Equipment to Exterior Window (ft.) a Maximum Sound Power Levels in Octave Bands-db re 10-13 Watts a Octave Bands c.p.s. Mid Frequency 63 125 250 500 1,000 2,000 4,000 8,000 12 99 92 88 84 82 82 82 82 25 103 96 92 88 86 86 86 86 50 107 100 96 92 90 90 90 90 100 110 103 99 95 93 93 93 93 in Octave Bands-db re 10- 12 Watts 12 89 82 78 74 72 72 72 72 25 93 86 82 78 76 76 76 76 50 97 90 86 82 80 80 80 80 100 100 93 89 85 83 83 83 83
Notes for Table 12-4:
a The minimum distance shall be measured in a straight line regardless of obstructions. Interpolated levels may be used for distances between those given in this table. See note a. at end of table 12-3.
1. In the event sound power level data for the exterior mechanical equipment is not available, the sound pressure levels in octave bands, of the exterior mechanical equipment shall be measured.
2. The measurements shall be obtained with the microphone of the measuring equipment located at the interior of the dwelling unit affected in a line with the window nearest the exterior mechanical equipment. The window shall be fully open and the microphone shall be located three ft. away from the open portion of the window.
3. Measurements shall be obtained during times when the ambient sound pressure levels, in octave bands, are at least six db lower at all octave bands than the sound pressure levels measured with the exterior equipment operating. By ambient sound pressure levels is meant the measured sound pressure levels, at the above described measuring location, with the exterior equipment not in operation.
b For permits issued after January first, nineteen hundred seventy-two, the permitted maximum sound power levels for exterior mechanical equipment adjoining buildings shall be changed as follows:
Maximum Sound Power Levels in
Feet Octave Bands-db re 10-13 Watts 63 125 250 500 1,000 2,000 4,000 8,000 12 97 90 83 78 75 73 72 71 25 104 96 89 84 81 79 78 77 50 110 102 95 90 87 85 84 83 100 116 108 101 96 93 91 90 89 in Octave Bands-db re 10-12 Watts 12 87 80 73 68 65 63 62 61 25 94 86 79 74 71 69 68 67 50 100 92 85 80 77 75 74 73 100 106 98 91 86 83 81 80 79
Table 12-5 Noise Output Limitations for Exterior Mechanical Equipment Maximum Sound Pressure Level a, b (Not to be exceeded in any octave bands)
Octave Bands Center Frequencies (cps) Decibels re .0002 Microbar 63 64 125 57 250 51 500 45 1,000 41 2,000 39 4,000 38 8,000 37
Notes for Table 12-5:
a Measurements shall be obtained with a sound level meter and octave band analyzer, calibrated both electronically and acoustically before and after the measurements are made. The equipment used shall meet the requirements of reference standards RS 12-6.
b For permits issued after January first, nineteen hundred seventy-two, the maximum sound pressure levels shall be changed as follows:
Octave Bands Center Frequencies (cps) Decibels re .0002 Microbar 63 61 125 53 250 46 500 40 1,000 36 2,000 34 4,000 33 8,000 32
(b) Minimum structure-borne noise and vibration isolation requirements. All isolators used in accordance with the following requirements shall be approved.
(1) BOILER ROOMS.
a. Boilers. All boilers supported on floors above a story having dwelling units shall be supported on resilient isolators having a minimum static deflection of one inch. The isolators shall be installed directly under the structural frame of the boiler.
b. Boiler breeching and piping. When boilers are equipped with mechanical draft fans, the boiler breeching and piping that is supported from or on slabs, floors, or walls that are contiguous to the dwelling unit shall be supported for a distance of fifty pipe diameters on or from resilient isolators. Each isolator shall have a minimum static deflection of one inch.
(2) INCINERATOR CHARGING CHUTES.
a. Metal chutes. Metal chutes, metal chute supports, and/or metal chute bracing, shall be free of direct contact with the shaft enclosure and the openings provided in the floor construction. Metal chutes shall be resiliently supported at each structural support location. Isolators shall provide a minimum static deflection of 0.30 in. All chutes shall be plumb.
b. Masonry chutes. The interior chute wall shall be plumb and without obstructions for the full height of the shaft and shall have a smooth interior finish.
(3) PIPING.
a. Metal piping connected to power driven equipment shall be resiliently supported from or on the building structure for a distance of fifty pipe diameters from the power driven equipment. The resilient isolators shall have a minimum static deflection of one inch for all piping with a four inch or larger actual outside diameter and one-half inch for piping with less than four inches in actual outside diameter. Piping connected to fluid pressure-reducing valves, shall be resiliently isolated for a distance of fifty pipe diameters from pressure reducing valves and isolators shall provide a minimum static deflection of one-half inch.
b. Equipment such as heat exchangers, absorption refrigeration machines, etc., that is located on any floor or roof other than a floor on grade, and that is not power driven but is connected by metal piping to power driven equipment, shall be resiliently supported from or on the building structure, for a distance of fifty pipe diameters from the power driven equipment. The resilient supports shall be vibration isolators having a minimum static deflection of one inch and shall incorporate approved resilient pads having a minimum thickness of one-quarter inch.
(4) Fans. Except for fans installed in compliance with section 27-353 of article five of subchapter five of this chapter all fan equipment located on any roof or floor other than a floor on grade shall be mounted on or from vibration isolators. Fan equipment with motor drives separated from the fan equipment shall be supported on an isolated integral rigid structural base supporting both the fan and motor. Fan equipment with motor drives supported from the fan equipment shall be mounted directly on vibration isolators. Each isolator shall have provision for leveling. Isolators shall incorporate resilient pads having a minimum thickness of one-quarter inch. The vibration isolators shall provide a minimum isolator efficiency of ninety percent at fan rotor rpm with a maximum deflection of two inches. Fans and compressors of three h.p. or less assembled in unitary containers may meet this requirement with isolators internal to the container providing the isolators meet the above minimum isolator efficiencies.
(5) PUMPS. All pumps of three h. p. or more located on any floor other than a floor on grade shall be supported on vibration isolators having a minimum isolation efficiency of eighty-five per cent at the lowest disturbing frequency. Each isolator shall incorporate a leveling device and a resilient pad having a minimum thickness of one-quarter inch.
(6) COMPRESSORS. Compressors and drives located on a floor other than a floor on grade shall be mounted on vibration isolators having a minimum isolation efficiency of eighty-five per cent at the lowest disturbing frequency. Each isolator shall incorporate a leveling device and a resilient pad having a minimum thickness of one-quarter inch.
(7) COOLING TOWERS. All moving parts of cooling towers located on a roof or floor other than a floor on grade shall be installed on vibration isolators providing a minimum isolation efficiency of eighty-five per cent at fan rotor rpm with a maximum static deflection of four inches. Each isolator shall incorporate a leveling device and a resilient pad having a minimum thickness of one-quarter inch.
(8) EVAPORATIVE CONDENSERS. Evaporative and air cooled condensers located on a roof or floor other than a floor on grade shall be mounted on vibration isolators providing a minimum isolation efficiency of eighty-five per cent at fan rotor rpm with a maximum static deflection of four inches. Each isolator shall incorporate a leveling device and a resilient pad having a minimum thickness of one-quarter inch.
(9) DUCT CONNECTIONS TO FAN EQUIPMENT. Flexible connections shall be installed between fan equipment and connecting ductwork.
(10) ELEVATOR MACHINERY. Gear-driven machinery, gearless machinery, motor generators, and controllers located in an elevator machinery room or shaft on a roof, or on a floor other than a floor on grade, shall be supported on vibration isolator pads having a minimum thickness of one-half inch.
(c) Maximum permissible air velocities in ducts.
(1) DUCTS LOCATED OVER CEILINGS OF DWELLING SPACES. The maximum permissible air velocity in ductwork located over the ceilings of dwelling spaces or in masonry shafts adjoining dwelling spaces shall not exceed the velocities prescribed in table 12-6.
TABLE 12-6 Maximum Permissible Air Velocities in Ducts
Type of System Branch Ducts Sub-Main Ducts Main Ducts Low Velocity 750 fpm 1,000 fpm 1,500 fpm High Velocity 1,000 fpm 2,000 fpm 3,000 fpm
In the application of table 12-6 the following shall apply:
a. Any duct that connects directly to any terminal device (grille, diffuser, etc.) shall be classified as a branch duct for a distance of at least four feet from the terminal device.
b. Any duct that connects a branch duct to a main duct or to the fan shall be classified as a sub-main duct. No duct may be classified as a sub-main duct if it connects to a terminal device by means of a connection less than four feet in length.
c. When a duct is connected to the fan and to two or more sub-main ducts it shall be classified as a main duct.
d. The maximum velocities shown in table 12-6 for low velocity ductwork shall apply in all cases except where a system of round ductwork is used and an acoustic air control device with self-contained attenuation components is located in the duct work prior to each air terminal device. Branch ducts, if any, connecting the acoustic air control devices to the terminals shall not have air velocities exceeding seven hundred fifty fpm. Maximum power level ratings for the acoustic air control devices shall be three db less than the values shown in table 12-7.
(d) Maximum permissible sound power levels of fan coil units, grilles, registers, diffusers and induction units. Sound power level data, in octave bands, shall be certified in accordance with the provisions of section 27-131 of article seven of subchapter one of this chapter, for grilles, registers, diffusers and induction units at design operating conditions and for coil units when operating at specified cfm. The sound power levels shall not exceed the levels listed in table 12-7 when measured in accordance with the provisions of reference standard RS 12-5.
TABLE 12-7 Maximum Permissible Sound Power Levels for Terminal Units1
Octave Bands, c.p.s. Mid-Frequency Sound Power Levels, db db re 10-13 db re 10-12 Watts 63 79 69 125 73 63 250 67 57 500 62 52 1,000 59 49 2,000 57 47 4,000 54 44 8,000 53 43
Notes for Table 12-7:
1 For permits issued after January first, nineteen hundred seventy-two, the Maximum Permissible Sound Power Level for terminal units shall be changed as follows:
Octave Bands, c.p.s. Mid Frequencies Sound Power Levels dB re 10-13 db re 10-12 Watts 63 76 66 125 69 59 250 62 52 500 57 47 1,000 54 44 2,000 52 42 4,000 49 39 8,000 48 38
§ 27-771. Scope
This subchapter shall establish the minimum safety requirements for, and control the design, construction, installation, alteration and use of, systems for providing mechanical ventilation, air conditioning, air cooling, air heating and refrigeration. In addition, within special flood hazard areas, and below the regulatory flood datum, as described in article ten of subchapter four of this chapter, mechanical ventilation, air conditioning and refrigeration systems and related equipment shall meet the requirements of the applicable provisions of reference standard RS 4-5.
§ 27-772. Standards
The provisions of reference standard RS-13 shall be a part of this subchapter.
§ 27-773. Definitions
For definitions to be used in the interpretation of this subchapter, see subchapter two of this chapter.
§ 27-774. Plans
For the requirements governing the filing of plans and the work to be shown on plans, see subchapter one of this chapter.
§ 27-775. Permits
For the requirements governing equipment work permits and equipment use permits, see subchapter one of this chapter.
§ 27-776. General requirements
(a) Ventilation. The minimum quantities of air and other requirements for the ventilation of habitable and occupiable rooms shall be as required by subchapter twelve of this chapter, and for the ventilation of special uses and occupancies by subchapters seven and eight of this chapter.
(b) Noise control. Noise control requirements for mechanical equipment shall be as required by subchapter twelve of this chapter.
(c) Safety. All systems, equipment, and materials including any devices, apparatus, piping work, sheet metal work, insulation work, and supports therefor, used as part of or in connection with installations governed by this subchapter, shall be designed, installed, located, and operated so that they will not create an immediate or potential danger to life or impair public health or welfare. No piping of any kind, with the exception of piping required or, permitted under subchapter seventeen of this chapter, shall be permitted within a stair enclosure. Ducts protected in accordance with the requirements of this subchapter, which do not reduce the required clearances of a stair enclosure, are permissible.
(d) Openings. No openings for outdoor exhaust air discharges, air intakes, or reliefs from equipment shall be located and constructed so as to:
(1) Interfere with the proper functioning of other openings in the same building or in adjoining buildings.
(2) Interfere unreasonably with the occupants of the same building or adjoining buildings or with the general public.
(3) Create a fire or health hazard.
§ 27-777. Construction
The construction, installation, and alteration of systems for providing mechanical ventilation, air conditioning, air cooling, air heating, and refrigeration, shall be in accordance with the following:
(a) Air conditioning and ventilating systems for all occupancies shall be constructed in accordance with the provisions of reference standard RS 13-1. In addition, equipment used for air conditioning systems shall be constructed, installed and altered in accordance with the provisions of reference standards RS 13-7 through 13-15. Where any conflicts arise between the electrical provisions of the foregoing reference standards and the New York city electrical code, the provisions of the latter shall govern.
(b) Air conditioning systems for one and two family dwellings, for one story buildings four thousand square feet or less in gross floor area provided ducts do not penetrate fire divisions, and for buildings classified in mercantile occupancy group C, twenty-five hundred square feet or less in gross floor area shall be constructed and installed in accordance with the provisions of reference standard RS 13-4. Also see article eleven of subchapter fourteen of this chapter.
(c) Exhaust systems for cooking spaces requiring mechanical ventilation in accordance with the provisions of subchapter twelve of this chapter, except kitchens located within dwelling units, shall be installed as provided in reference standard RS 13-2.
(d) Restaurant cooking equipment shall be provided with a means of ventilating such equipment constructed in accordance with the provisions of reference standard RS 13-3, provided however that restaurant cooking equipment installed for periodic cooking use other than commercial only, in community rooms of multiple dwellings, firehouses and other low hazard occupancies as determined by the commissioner may be provided with a means of ventilation constructed in accordance with the provisions of reference standard RS 13-1.
(e) Air blower and exhaust systems, where required for the removal or conveying of dust, vapor, or other impurities, shall be installed in accordance with the provisions of reference standard RS 13-5.
(f) Refrigeration systems shall be constructed, installed, and altered in accordance with the provisions of reference standard RS 13-6.
(g) The utilization of city water in air conditioning and refrigeration systems shall be subject to the requirements of reference standard RS-16.
§ 27-777.1. Smoke control requirements
(a) In all buildings classified in occupancy group C, D, E, F, G, H, J-1 or J-2:
(1) Ventilation systems supplying different occupancy groups shall not be interconnected, provided however that a ventilation system may serve two occupancy groups located on the same floor when the accessory use occupies less than twenty per cent of the floor area occupied by the principal use.
(2) Ventilation systems supplying corridors shall not be interconnected with systems serving other spaces, except that this requirement shall not apply to floors used exclusively as office space in buildings classified in occupancy group E which are fully sprinklered.
(3) A ventilation system supplying any part of a means of egress shall not be interconnected with any other ventilation system.
(4) A ventilation system supplying public areas and assembly spaces shall have smoke detecting devices that will shut down the system upon detecting smoke.
(5) In buildings classified in occupancy group J-2, ventilation systems supplying individual apartments shall not be directly connected with any other ventilation system.
(6) Except in buildings classified in occupancy group J-2, and as otherwise provided in section 27-343 of article five of subchapter five of this chapter, either a combined heat and smoke damper or independent heat and smoke dampers shall be installed at any penetration of construction required to have a fire-resistance rating.
(b) In all buildings classified in occupancy group C, D, E, F, G, H or J-1, there shall be provided a system of mechanical means of sufficient capacity to exhaust six air changes per hour or 1 cfm/sq. ft., whichever is greater, from the largest floor in the building, using either dedicated fan equipment or the building ventilation system arranged to shut down automatically with manual override capability to exhaust one floor at a time through a roof or an approved location on an exterior wall other than a lot line wall.
§ 27-777.2. Ventilation in existing J-1 buildings
In any existing building classified in occupancy group J-1, either seventy-five feet or more in height or containing thirty or more sleeping rooms:
(a) Where a corridor or space above a ceiling in a corridor is being used on or after February first, nineteen hundred eighty-four to furnish direct ventilation to a sleeping room or suite, such use shall, unless continued use is permitted by the commissioner, be discontinued by closing all openings between the corridor and sleeping room with construction having a fire-resistance rating equal to the construction in which the opening occurs. When continued use of corridor spaces as a plenum is permitted, smoke detecting devices shall be installed in accordance with the requirements of section 27-981 of article six of subchapter seventeen of this chapter and activation of any two detectors on a floor shall cause closure of all openings to that floor and shut-off of ventilation service to the floor.
(b) All corridors and other public areas not provided with natural ventilation meeting the requirements of section 27-761 of article eight of subchapter twelve of this chapter shall be provided with manual smoke purging by means of existing ventilation systems.
(c) The requirements of this section shall be complied with on or before April first, nineteen hundred eighty-seven.
§ 27-778. General requirements
No required ventilating system, no voluntary air duct system containing smoke detection or fire protection devices that are required by this subchapter, and no refrigeration system shall be placed in operation, until it has been tested and inspected in accordance with the requirements of this subchapter and until an equipment use permit has been issued by the commissioner, except as hereinafter provided.
§ 27-779. Required ventilating systems
The following tests and inspection requirements shall be complied with in order to obtain an equipment use permit for a required ventilating system.
(a) Procedure. A required ventilating system shall be subject to the requirements for controlled inspection as provided in article eight of subchapter one of this chapter except that it shall not be required that the architect or engineer be in the employ of the owner. Such requirements shall include (1) a controlled inspection to verify that the installation and operation of the completed system comply with the requirements of this subchapter, comprising tests to ascertain that the amount of air being supplied to and exhausted from each space conforms with the requirements of this code, and tests that all required smoke detection and fire protection devices are functioning properly; and (2) a controlled inspection comprising tests to verify that required fire dampers are installed and functioning properly as provided for in subdivision (d) of section 27-343 of this code. When a required ventilating system handles five thousand cfm or less, it shall be subject to controlled inspection except that the person making the inspection may be an architect, engineer or a person with at least five years of experience installing ventilating systems. However, if such a system exhausts any of the following:
(1) fumes, dusts, vapors or other noxious or injurious substances,
(2) substances that create a fire hazard, then the person making the inspection shall be an architect or engineer. It shall not be required that the architect or engineer be in the employ of the owner. The test reports required under the provisions of article eight of subchapter one of this chapter shall be filed in the form prescribed by the commissioner. The form shall include the quantity of air supplied or exhausted by each outlet.
(b) Fire extinguishing systems. No equipment use permit for a required ventilating system containing a required fire extinguishing system shall be issued until a signed statement has been obtained from a representative of the fire commissioner who has witnessed the test of the extinguishing system and its control devices, certifying the fire commissioner's acceptance of such a system.
(c) Owner's statement. A statement shall be filed with the commissioner by the owner or lessee of the building that the required ventilating system will be kept in continuous operation at all times during the occupancy of the building and, if any smoke or fire detection devices or fire extinguishing systems have been installed, that he or she will have such devices and the fan shut-offs actuated by them tested and inspected by a competent person or agency at one year intervals or less. The owner or lessee shall also state that he or she will promptly make any necessary adjustments and repairs to keep the ventilating system and its safety devices in proper operating condition. A record of each inspection and test shall be maintained on the premises by the owner or lessee, and records for at least the last two years shall be made available for inspection by the commissioner and the fire commissioner.
§ 27-780. Voluntary ventilating systems or other voluntary air duct systems
The following test and inspection requirements shall be complied with in order to obtain an equipment use permit for a voluntary ventilating system or other air duct system when smoke detectors or fire protection devices are required.
(a) Procedure. A voluntary ventilating system or other voluntary air duct system shall be subject to test and inspection to ascertain that all smoke detection and fire protection devices are functioning properly, and that the installation conforms with the requirements of this subchapter.
(b) Fire extinguishing systems. No equipment use permit for a voluntary ventilating system containing a required fire extinguishing system shall be issued until a signed statement has been obtained from a representative of the fire commissioner who has witnessed the test of the extinguishing system and its control devices, certifying the fire commissioner's acceptance of such system.
(c) Owner's statement. A statement shall be filed with the commissioner by the owner or lessee of the building that he or she will have such devices and the fan shut-offs actuated by them tested and inspected by a competent person or agency at one year intervals or less. The owner or lessee shall also state that he or she will promptly make any necessary adjustments and repairs to keep these devices in operation. A record of each inspection and test shall be maintained on the premises by the owner or lessee, and the records for at least the last two years of operation shall be made available for inspection by the commissioner and the fire commissioner.
§ 27-781. Refrigerating systems
The following test and inspection requirements shall be complied with in order to obtain an equipment use permit for a refrigerating system, except as hereinafter provided.
(a) Procedure. A refrigeration system shall be designated for test and inspection under the requirements for controlled inspection as provided in article eight of subchapter one of this chapter, except that it shall not be required that the architect or engineer be in the employ of the owner. Test information and all other information required by reference standard RS 13-6 shall be posted, and the inspection shall be made of the completed system to verify that the installation complies with the requirements of this subchapter.
(b) Temporary permits. A temporary equipment use permit shall be required for a nonoperating system in which a charge is maintained. See subchapter one of this chapter for provisions governing temporary permits.
(c) Exception. No equipment use permit or temporary equipment use permit shall be required for any refrigerating system exempted under the provisions of section 27-189 of article eighteen of subchapter one of this chapter; for any system using a group A2, B1 or B2 refrigerant and having a prime mover of one horsepower or less; or for any system using water or air as a refrigerant.
§ 27-782. General requirements
All systems shall be maintained in a clean and orderly condition, free from accumulations of dust, oily waste, or debris. All machinery and all operating devices on piping and ductwork shall be kept readily accessible for inspections and repair. Plenum chambers, air ducts, and cooling and heating coils shall be kept clean. Filters shall be cleaned or renewed at proper intervals to insure safe operation and adequate air flow and shall comply with the applicable requirements of the fire prevention code.
§ 27-783. General requirements
Information to be posted shall be as required in reference standard RS-13. Method of posting shall be as required in subchapter one of this chapter.
§ 27-784. Electrical
All electrical work shall be installed in accordance with the requirements of the electrical code of the city of New York.
§ 27-785. Air pollution
The discharge of odors, smoke, or other emissions into the open air shall be subject to the requirements of the New York city air pollution control code.
§ 27-786. Refrigeration
For operating permits and qualification of operators for refrigeration systems, see the requirements of the fire department.
§ 27-787. Scope
This subchapter shall establish the minimum safety requirements for, and control the design, construction, installation, alteration and use of, heating, combustion, fuel storage and related equipment. In addition, within special flood hazard areas, and below the regulatory flood datum, as described in article ten of subchapter four of this chapter, heating, combustion, fuel storage and related equipment shall meet the requirements of the applicable provisions of reference standard RS 4-5.
§ 27-788. Standards
The provisions of reference standard RS-14 shall be a part of this subchapter.
§ 27-789. Definitions
For definitions to be used in the interpretation of this subchapter, see subchapter two of this chapter.
§ 27-790. Plans
For the requirements governing the filing of plans and the work to be shown on plans, see subchapter one of this chapter.
§ 27-791. Permits
For the requirements governing equipment work permits and equipment use permits, see subchapter one of this chapter.
§ 27-792. General requirements
All heating, combustion, and cooking equipment shall be installed with adequate clearances from combustible construction in accordance with the provisions of this subchapter. Either the equipment shall be provided with insulation or the building construction shall be fire protected, so that during continued or intermittent operation the surface of combustible construction materials will not be raised to a temperature higher than one hundred seventy degrees Fahrenheit. Such equipment shall be located, arranged, and protected so that the means of access to them for ordinary operation and maintenance will not be hazardous. They shall not be located in exits, hoistways, nor in the same space with other equipment or materials when the proximity to the other equipment or materials would create a hazardous condition. All piping shall be installed so as to provide for adequate expansion and contraction.
§ 27-793. Boilers
(a) Acceptance tests. Boilers shall not be placed in operation upon completion of construction until they have been inspected and tested and an equipment use permit has been issued by the commissioner. All final inspections and tests for boilers shall be subject to the provisions for controlled inspection as provided in subchapter one of this chapter, except that such inspections and tests shall be made by a qualified boiler inspector in the employ of the department or a duly authorized insurance company as provided in section two hundred four of the labor law. Equipment having a Btu input of not more than three hundred fifty thousand Btu per hour shall be exempt from this requirement.
(b) Periodic boiler inspections.
(1) Except as provided in paragraph two of this subdivision, all boilers, as defined in section two hundred four of the labor law, excepting those boilers listed in subdivision five of such section of the labor law, shall be inspected at least once a year by duly authorized insurance companies or other qualified inspectors in the manner set forth in rules and regulations promulgated by the commissioner. Such inspections shall also include the chimney connectors described in article three of subchapter fifteen of this chapter. All boiler inspectors who perform periodic inspections pursuant to this subdivision shall be qualified under section two hundred four of the labor law and rules and regulations promulgated by the commissioner of labor.
(2) Each owner of a high-pressure boiler, as defined in sections 26-160 and 27-795 of this code, may choose to have the annual boiler inspection conducted by the department or by a duly authorized insurance company.
(c) Owners annual statement.
(1) The owner of each boiler that is subject to periodic inspection shall file an annual written statement with the commissioner, specifying:
a. The location of each boiler.
b. Whether or not the owner, agent, or lessee has had the boiler inspected by a duly authorized insurance company or other qualified inspector in accordance with the requirements of subdivision (b) of this section, setting forth the name and address of the insurance company or other qualified inspector, the date of inspection, and the policy number covering the boiler.
(2) If the periodic boiler inspection has been performed by a duly authorized insurance company or other qualified inspector pursuant to subdivision (b) of this section, the annual statement shall be accompanied by a signed copy of the report of each boiler inspection, on such forms and in such manner as required by the commissioner.
(3) The statement shall be filed within thirty days after installation of a boiler. Thereafter, it shall be filed on or before the last day of December of the year of each annual inspection.
(d) Removal or discontinuance notice. The owner of a boiler that is removed or discontinued from use shall file a written notice of such removal or discontinuance with the commissioner within thirty days of the date of removal or discontinuance.
(e) Failure to file statements and notices. If an owner of a boiler shall fail to file any statement or notice required under this section, such owner shall be liable for a civil penalty pursuant to section 26-125 of this code.
(f) Additional inspections. In addition to the inspections required by subdivisions (a) and (b) of this section, the commissioner may make such additional inspections as required to enforce the provisions of this code. No fee shall be charged for such additional inspections.
(g) Fees. Every owner of a boiler in use and inspected by a duly authorized insurance company shall pay to the department an annual fee for each boiler in the amount prescribed by section 26-213 of Title 20-6 of the administrative code to cover the city's administrative and supervisory costs involved. The fee shall be payable at the time of the filing of the statement required by this subdivision.
§ 27-794. Fuel burning and fuel storage installations
(a) Field tests.
(1) All liquid fuel piping and fuel oil storage tanks shall be hydrostatically tested for tightness by the contractor who made the installation before the work is closed in and before the system is operated. The piping shall be tested at one and one-half times the maximum working pressure applicable to that part of the piping system but at a pressure less than the test pressure required for the storage tank. The minimum pressure for testing tanks shall be one and one-half times the maximum working pressure applicable to the tank but in no case less than twenty-five psi. The hydrostatic pressure shall be maintained until all joints and connections have been visually inspected for leaks, but in no case for less than one-half hour. The tank shall not show any permanent deformation as a result of the test. A record shall be kept of the pressure tests showing the name of the contractor and the pressures at which the piping and the tank were tested.
(2) Gas distribution piping shall be tested for tightness by the contractor who made the installation before the work is closed in and before the system is operated, in accordance with the requirements of section 27-922 of article seven of subchapter sixteen of this chapter. For gas storage tanks see chapter four of this title.
(b) Inspections. Fuel burning equipment shall be inspected in accordance with the requirements for controlled inspections in subchapter one, except that the inspections may be made by an architect or engineer who need not be in the employ of the owner or by a representative of the commissioner.
(c) Temporary use permit. A temporary equipment use permit, as provided in subchapter one, may be issued by the commissioner upon receipt of a statement signed by the contractor who made the installation, certifying that:
(1) The portions of the work completed conform with all provisions of the code listing at the same time any items still to be completed.
(2) All required pressure tests have been successfully completed on the portion of the work installed and giving the pressures at which the tests were made.
(d) Instruction cards. For oil burning systems, cards giving complete instructions for the care and operation of the system shall be furnished and shall be permanently located in an easily visible and accessible location near the equipment.
(e) Exceptions. An equipment use permit shall not be required for any installation for which a work permit is not required as provided in section 27-189 of article eighteen of subchapter one of this chapter.
§ 27-795. High pressure boiler operating engineer license
If a boiler produces steam or vapor or has a safety valve setting of more than fifteen psi and rated in excess of ten hp. or if such boiler produces hot water at a pressure of more than one hundred sixty psi or at a temperature over two hundred fifty degrees Fahrenheit, such boiler shall be operated by a high-pressure boiler operator licensed in accordance with the requirements of subchapter two of title twenty-six of the administrative code.
§ 27-796. Oil burning equipment installer license
All oil burning installations, including storage equipment, shall be made by, or under, the direct supervision of a licensed oil burning equipment installer, in accordance with requirements of subchapter two of title twenty-six of the administrative code.
§ 27-797. Certificates
No oil burning equipment hereafter installed shall be operated until an equipment use permit has been issued by the commissioner, the requirements of the air pollution control code have been met as provided in section 27-799 of article four of this subchapter, and until approval for the storage of fuel oil has been given by the fire commissioner, except that temporary operation may be permitted as provided in section 27-188 of article eighteen of subchapter one of this chapter.
(a) Every oil burning installation that is not fully automatic or requires preheating shall be operated by, or under, the direct supervision of a person holding a certificate of fitness issued by the fire commissioner. Such person shall be in the building at all times while the burners are in operation, and shall be present in the boiler room during the starting of the operation of a boiler.