NYC Administrative Code Title 27, Chapter 1 Building Code, part 17 of 17

RS 18-7 to RS 19-4: 8 sections.

RS 18-7

Open this section

ANSI A 10.4–1981—Safety requirements for Personnel Hoists.

MODIFICATIONS.—The provisions of ANSI A 10.4—1981 shall be subject to the following modifications:

Add the following sub-section to 25.10.2:

25.10.2.1 Thereafter the rack and pinion type personnel hoist shall be reinspected every ninety (90) days. The inspection shall include a full load test of the safety device.

Add the following sections to govern the installation, jumping and dismantling or rack and pinion type personnel hoists to Rule 26, Inspections and Tests of Personnel Hoists:

26.1.1.1 Installations of rack and pinion type personnel hoists shall be approved by the Elevator Division. Both a construction application and an elevator application shall be filed by a licensed professional engineer or registered architect. The drawings shall be sealed.

26.1.1.2 The Elevator Division shall be notified at least three (3) days before the inspection date prior to each "cathead" raise, when the travel of the hoist is increased. This inspection shall include the examination of the normal, terminal and final limit stopping devices. All parts of the equipment shall be inspected; and tested to determine that they are in safe operating condition where found necessary by the Elevator Division. A full load test may not be required at this time by the Elevator Division. If an Elevator Division Inspector cannot be present at the time the required tests are made, the qualified private elevator inspectional agency conducting the tests shall:

(1) Submit a statement upon a department form to the Elevator Division certifying the tests which have been conducted and the results thereof within 24 hours of such tests.

(2) Attach a tag showing the date of the tests and the name of the person and/or agency conducting it.

26.1.3.1 Acceptance inspections of new installations shall be made prior to use by the contractor. The Elevator Division shall be notified at least three (3) days before the required acceptance inspection and test. A full rated load test shall be made. All shaftway protection doors, ramps, guards and required safety devices shall be installed and in place. The contractor may apply upon successful completion of the inspection and test for a ninety (90) day temporary elevator certificate (B Form 256).

26.2.1.1.1 All rack and pinion type safeties shall be stamped with their expiration date by the manufacturer and shall be replaced when such date is expired which shall not exceed a period of three (3) years.

26.7 Materials Handling Plan. A materials handling plan shall be provided if a potentially hazardous condition exists because of simultaneous operation of the rack and pinion personnel hoist and either a crane and/or derrick.

26.7.1 The materials handling plan shall be acceptable to Site Safety Coordinator and approved by the Department.

26.7.2 The hoist contractor and the safety coordinator shall be jointly responsible for the enforcement of the provisions of the materials handling plan.

26.8 Dismantling and Removal. The Elevator Division shall be notified on department forms when a rack and pinion type hoist is dismantled and removed.

26.8.1 The notification shall include the elevator application number, the street address locations listed on the construction application, the block and lots and the date of removal.

26.9 Field Inspection. A department field inspection will be scheduled by the Elevator Division upon receipt of proper notification to ascertain the actual job-site conditions and to sign-off the forms documenting the same.

Add the following to Rule 30:

Electrical work shall conform to the New York City Electrical Code.

Welding shall conform to the applicable portions of the Administrative (Building) Code.

RS 18-8. POWER OPERATED SCAFFOLDS

Open this section

1. CONSTRUCTION REQUIREMENTS FOR THE SCAFFOLD.—

(a) The scaffold shall be constructed of steel conforming to reference standard RS 18–1, rules 203.6(a), (b), (c), and 203.7, or of equivalent metals.

(b) A railing with an intermediate horizontal rail, shall be provided on all four sides of a scaffold. The railing shall be at least 36 in. high on the building side and at least 42 in. high on the other three sides. Design of the guard rail at or near both ends of the scaffold shall include provisions for mounting roller guides.

(c) The spaces between the top guard rails and the scaffold toe board on the outside railing and the end railing shall be filled with metallic mesh, expanded metal, or similar material that shall reject a ball 1 in. in diameter and that shall be capable of withstanding a horizontal force of 75 lbs. at any point with a maximum deflection of 1 in. The railing on the building side shall have mesh below the intermediate rail only.

(d) A solid metal toe board, at least 4 in. high, shall be provided at the floor on all four sides. The bottom of the toe board shall be flush with floor. The toe board shall be capable of withstanding a horizontal force of 75 lbs. at any point with a maximum deflection of 1 in.

(e) A hinged access gate shall be provided in the scaffold railing on the building side. The gate shall be of construction similar to the railing, and the open spaces in the gate shall be filled with material as prescribed in (c) above. With the gate open, the clear width of access shall be at least 18 in.

(f) The gate shall be provided with an interlock that will prevent power operation of the scaffold when the gate is in the open position.

(g) The scaffold dimension parallel with building shall be designated the "length", and shall be measured between the inside surface of the end railings. The dimension perpendicular to the building wall shall be designated the "width", and shall be measured between the inside railing surfaces on the long sides of scaffold. The width of a scaffold shall be at least 28 in. When the building side of the scaffold is of irregular shape, following the contour of a building wall, scaffold "width" shall be measured at the tightest point of the irregularity.

(h) The rated load of a scaffold shall be 50 plf. The maximum number of occupants permitted simultaneously on a scaffold shall be equal to the inside clear length divided by 5.

(i) The maximum permissible vertical scaffold speed shall be 50 fpm.

(j) The scaffold floor shall have an anti-slip surface with air passage interstices, which must reject a 1/2 in. diameter ball, and shall be designed for a uniform live load of 75 psf. The floor and its supports and bracings shall be able to withstand a concentrated load of 300 lbs. on any random 4 sq. in. of floor area with a maximum deflection of 1/1666 of the span.

(k) A manufacturers rating plate shall be mounted conspicuously near the access gate on the scaffold. The plate shall be made of non-corrosive material with letters at least 1/4 in. high etched, stamped, or cast on the surface. It shall state the rated load, the maximum number of occupants, and the manufacturers name and model number.

2. CONSTRUCTION AND DESIGN REQUIREMENTS FOR ROOF CARRIAGE.—

(a) A movable roof carriage and track system shall be provided to move the scaffold in a horizontal direction. The maximum permissible horizontal speed of the roof carriage shall be 50 fpm.

(b) The roof carriage shall be constructed of steel conforming to reference standard RS 18–1, rules 203.6(a), (b), and (c), and 207.7, or of equivalent metals, welded, riveted, or bolted together. The roof carriage construction shall be capable of supporting the scaffold and its rated load plus impact loads imposed by motor stall torque and wind forces with a safety factor conforming to reference standard RS 18–1, rules 203.10 and 203.11.

(c) The design of the roof carriage, track, and track support system shall include means to accurately stop and position the roof carriage at predetermined locations that correspond to the locations of the vertical guides on the building wall.

(d) When the roof track system is not a continuous loop and terminal track ends exist, mechanical end barricades shall be provided together with terminal limit switches.

(e) In the design of roof components of buildings where suspended scaffolds and movable roof carriages are to be used, all forces transmitted to the building structure by such equipment shall be added to normal design loads.

3. STABILITY OF ROOF CARRIAGE.—The roof carriage and its support system shall be designed and constructed for structural adequacy and required stability to resist overturning moments occurring with a scaffold carrying its full rated load.

(a) Windforce: 30 psf.

(b) All imposing forces that are caused by moving loads shall be doubled for impact.

(c) If the roof carriage is of open structure type, the effect of windforce on interior components shall be considered as the sum of all framing components areas plus mounted equipment areas projected on a plane perpendicular to the wind direction. No component shall be considered as shielding another component along the wind direction if the separating distance is more than 4 times the smallest dimension of the windward component.

4. ACCESS FOR INSPECTION AND MAINTENANCE.—Safe and convenient means of access between roof and roof carriage and between roof carriage and scaffold shall be provided, conforming where applicable to reference standard RS 18–1 Rule 101.3.

(a) On installations where movable roof carriages are used, the means of access shall be a permanent part of the carriage design and shall be constructed so as to permit stepping on or off the carriage to or from the roof at any carriage position.

(b) Means of access between a movable roof carriage and its scaffold shall be possible only with the scaffold raised to its top position. Electrical interlocks in the carriage drive motor circuit, and actuated by the scaffold, shall prevent carriage movements until scaffold is in access position.

5. VERTICAL GUIDING OF POWER OPERATED SCAFFOLDS.—

(a) Power operated scaffolds shall be guided up and down the face (facade) of a building or structure.

(b) The guiding means shall consist of roller guide shoes engaging vertical guide rails securely attached to the structural members.

(c) Each vertical guide shall be engaged by an upper and a lower roller guide shoe securely attached to the scaffold and its suspension frame. Roller guide shoes shall be spaced at least 48 in. apart vertically. Where the platform is suspended at two points at each end, the vertical guides may be engaged by one guide shoe only.

(d) The two ends of the scaffold shall be supported and hoisted or lowered simultaneously, and means shall be provided to maintain the scaffold approximately at level position at all times to prevent the roller guide shoes from binding on the vertical guides. Out-of-level slope shall not exceed 1/4 in. in 12 in.

(e) Materials for vertical guides, suspension frame, and fastenings shall conform to applicable portions of reference standard RS 18–1, section 200.

6. CONSTRUCTION AND DESIGN REQUIREMENTS FOR HOIST MACHINES.—

(a) A hoist machine, whether mounted on the scaffold or the roof carriage, shall be designed and constructed to maintain its component parts in correct alignment to effectively transmit the imposed drum load into the supporting structure.

(b) Wire ropes shall lead from the drums through suitable fairleads to suspension points when the hoist machine is mounted on the scaffold. Wire ropes shall lead from the drums over suitable deflecting sheaves mounted on outriggers from the roof carriage when the hoist machine is located in the roof car.

(c) Chains, clutches, or friction gearing belts shall not be used to connect the drive motor to the winding drum. It shall be necessary to power drive the drive machine to either raise or lower the scaffold.

(d) Drive motors shall meet the requirements of the electrical code of the city of New York and shall:

(1) Lift the scaffold with 125 per cent of the rated load at the rated speed with maximum temperature rise of 50 degrees C. per hr.

(2) Provide dynamic braking.

(3) Be of weatherproof construction with the motor shaft connected to the input shaft of the speed reducer through a coupling capable of transmitting the motor stall torque.

(e) Guards.—All moving, power transmitting, and interacting components of the drive machines shall be effectively guarded to conform to applicable portions of the requirements of rule 19 of the industrial code of the state of New York.

(f) Brakes.—Each hoist machine shall be provided with at least two friction brakes applied by a spring or springs and released electrically.

(1) Each brake shall be able to stop and hold the dead weight of the scaffold and 125 per cent of the rated load.

(2) The drum brake shall be adjusted to apply not later than 2 seconds after the drive motor brake at every stopping operation.

(3) At least one brake shall be located at, and applied directly to, the winding drum or an equal strength extension of it. This brake shall have the additional function of reacting to a 40 per cent over-speed actuated by an inertia device or a speed governor, either of which must be reset manually.

(4) The second brake shall be located at, and applied on either side of the motor.

(5) All parts of the brakes shall be readily accessible for inspection and cleaning.

(g) Gearing.—Hoist machines shall be provided with speed reducers between the drive motor and the rope drum. Such speed reducers shall be of the meshing gear type, worm and worm gear type, spur gears type, bevel gears type, or a combination of these types. The speed reducer shall be fully enclosed, adequately lubricated, and sealed to prevent leakage.

(1) Such speed reducers shall conform to the requirements of the American Gear Manufacturers Association as listed in Reference Standard RS 18–1, Part XVI.

(2) Material used for gears and shafts in speed reducers shall conform to Reference Standard RS 18–1, Section 208.

(3) The gearbox shall be provided with oil level indicators and removable cover plates or plugs to permit visual inspection of the full width of the faces of the gear teeth.

(4) A data plate of a material resistant to weather and other corrosive agents shall be mounted on the gearbox, and shall bear the following information etched or stamped in 1/8 in. high letters:

• Mechanical horsepower

• Input speed R.P.M.

• Output speed R.P.M.

• Service factor

• Type of lubricant

• Quantity of lubricant Gallons

(h) Drums.—Drums for winding up suspension ropes shall have grooves or contact surfaces capable of withstanding the imposed rope pressure without deformation.

(1) The pitch diameter of the drum shall be at least 40 times the diameter of the rope wound on it.

(2) When grooved drums are used and single or multiple layers of rope are wound on the drum, the groove spacing or distance from centerline-to-centerline of adjacent grooves shall be at least 1/16 in. plus the rope diameter.

(3) When a drum without grooves is used and single or multiple rope laying is employed, a level winding device shall be provided to maintain the rope in close wound, parallel lays.

7. SUSPENSION MEANS AND THEIR ATTACHMENT.—Scaffolds shall be suspended by steel wire ropes, with at least one rope supporting the scaffold at, or near, each end. When winding drums are located at the top of travel, the suspension rope fastenings shall be attached to the scaffold; when winding drums are located on the scaffold, the suspension rope fastenings shall be attached to supports at the top of travel; and when a hoist machine with a continuously rotating traction sheave is used at each end of the scaffold, the single suspension rope shall have at least 4 turns on the sheave for minimum lifting effect, and the rope length shall be equal to the total scaffold travel plus 8 ft. For each suspension rope, an adjacent safety suspension rope shall be provided. The safety suspension rope shall normally run free through a clamping device, that is part of the machine, and the clamping device shall be arranged to automatically grasp and hold the safety rope upon failure of the hoist rope.

(a) Only steel wire ropes with fibre cores, having the commercial classification "elevator wire rope" and of minimum grade, "improved plow steel" shall be used for the suspension of scaffolds.

(b) Rope data tag information shall conform to the requirement of reference standard RS 18–1, rule 212.2b.

(c) The number of suspension ropes used, the diameter of the ropes, and the factor of safety shall conform to requirements of reference standard RS 18–1, rule 212.3.

(d) The minimum rope diameter shall be 5/16 in.

(e) Securing of wire rope to winding drums shall conform to requirements of reference standard RS 18–1, rule 212.6.

(f) At least 3 turns of rope shall remain on the winding drum when the scaffold is at the bottom of travel.

(g) Suspension wire ropes shall not be lengthened or repaired by splicing.

(h) Suspension wire rope fastenings at free ends shall conform to the requirements of reference standard RS 18–1, rules 212.9(a), (b), (c), (d), (e), and (f).

(i) Suspension ropes shall be provided with a rust-resistive coating.

(j) Reverse bends in the roping arrangement should be avoided. More than two reverse bends in each rope shall be prohibited.

(k) Means shall be provided to stabilize the suspension ropes to prevent sway and abrasion and, in all cases, such means shall be provided for every 300 ft. of scaffold travel.

8. OPERATING DEVICES AND CONTROL EQUIPMENT.—

(a) All electrical operating devices shall be of the constant pressure or dead man type with weatherproof enclosure. To prevent unauthorized use, the constant pressure device shall be key operated or protected by a padlock cover.

(b) All electrical equipment and wiring shall conform to the requirements of the electrical code of the city of New York.

(c) The normal operating devices for the vertical movement of the scaffold shall be located on the scaffold and shall be operable only when all electrical protective devices and interlocks on the scaffold are in position for normal service.

(d) The operating device of a power operated roof carriage for horizontal traversing shall be located on the roof carriage. This operating device shall be connected so that it will not be operable until the scaffold is raised to its uppermost position of travel and is disengaged from the building face or guiding rails on the building face and all protective devices and interlocks, on both the roof carriage or scaffold mounted hoist machine, are in position for traversing.

9. TRAVELING CABLE.—

(a) Conductors for control, power, communication, signal, and ground may be run in a single traveling cable, provided that the cable conforms to the requirements of rule B30–166.0(i) of the electrical code of the city of New York.

(b) Traveling cables exceeding 100 ft. in length shall comply with rule B30–69.0 of the electrical code of the city of New York.

(c) The traveling cable shall be provided with a tensioning device to prevent uncontrolled cable sway, to protect the cable against abrasion, and to automatically prevent overtensioning of the cable. The tensioning device and cable drum shall be mounted in a weatherproof housing.

10. ELECTRICAL PROTECTIVE DEVICES AND INTERLOCKS.—

(a) An overtensioning or tightrope device shall be connected into the drive motor circuit in a manner that will cause it to react to an overload and disconnect electric power to prevent upward pull on ropes if the scaffold becomes wedged in its tracks or is otherwise impeded while being raised.

(b) A slack rope device shall be provided that will react to a slackening of rope tension and disconnect electric power from drive motor to prevent the drum from overhauling the suspension rope if scaffold's downward motion is interrupted.

(c) Limit switches shall be provided at the top and bottom terminals of scaffold travel and shall be connected into the control circuits of the drive motors and actuated by cams at both ends of the scaffold and the roof carriage. Cam engagement of a limit switch at any travel terminal shall remove electric power from the motor circuit, and shall apply the brake to stop the scaffold or roof carriage.

(d) Hoist machine winding drums shall be provided with stop motion limit switches of the traveling nut type or equivalent. Such stop motion limit switches shall be connected to the drum shaft and set to open the operating circuit of the motors simultaneously with the cam operated final terminal travel limit switches.

(e) All electrical mounting boxes, conduits, piping, and junction boxes, and the controller frame, hoist machinery frame, roof carriage track system, and scaffold shall have a ground connection through a ground wire in the scaffold traveling cable and by a third rail contact or cable with a tensioning device for the roof carriage.

11. POWER SUPPLY SYSTEM.—Electrical equipment and wiring for the power supply system shall conform to the applicable requirements of the electrical code of the city of New York.

12. EMERGENCY COMMUNICATION WITH MEN ON SCAFFOLD.—Communication equipment shall be provided for each power operated scaffold to facilitate rescue operations in an emergency and shall consist of either:

(a) A telephone instrument mounted on the scaffold and connected through wires in the traveling cable to a manned instrument in the building and, in addition, a battery or hand operated air horn or other signalling device not requiring electricity to operate.

(b) A two-way radio telephone system with the receiving instrument in the building constantly manned during the operation of the scaffold and in addition, a battery or hand operated air horn or other signaling device not requiring electricity to operate.

13. SPECIAL MAINTENANCE.—

(a) Suspension ropes shall be examined, lubricated, and shackled or reshackled to conform to ANSI A17.2—1979.

(b) Control mechanisms, switch panels, relay panels, and similar electrical operating equipment shall be examined and maintained to conform to ANSI A17.2—1979.

(c) A continuous record of modifications and changes of equipment shall be kept on the premises for inspection and review by the commissioner.

(d) A complete and continuous record of operations shall be maintained, in which shall be recorded, regular maintenance procedures, and malfunctions, repairs, and emergencies.

RS 18-9

Open this section

ANSI/ASME A90.1–1985—Safety Standards for Belt Manlifts.

RS 19. SAFETY OF PUBLIC AND PROPERTY DURING CONSTRUCTION OPERATIONS

Open this section

List of Referenced National Standards RS 19–3 Cableways.

LIST OF REFERENCED NATIONAL STANDARDS

ANSI A10.3—Power Actuated Fastening Systems—Safety Requirements, as Modified—1985

ANSI A10.11—American national standard for personnel and debris nets used during construction, repair and demolition operations, as modified—1989

ANSI B30.5—Mobile and Locomotive Cranes—Chapter 5-1 except §5–1.9.9—2000

ANSI B30.5—Mobile and Locomotive Cranes—Chapter 5–1 except §5-1.9.9—1994

ANSI B30.5—Mobile and Locomotive Cranes—Chapter 5–1 except §5–1.9.9—1989

ANSI B30.5—Mobile and Locomotive Cranes—Chapter 5–1 except §5–1.9.9—1982

ANSI B30.5—Mobile and Locomotive Cranes—Chapter 5-1 except §5–1.9.9—2004

ANSI B30.5—Mobile and Locomotive Cranes—1968

CEN EN 13000—Cranes—Mobile Cranes, except §4.2.6—2004

RS 19-1. POWDER ACTUATED FASTENING SYSTEMS [Repealed]

Open this section

(Repealed City Record 12/3/2015, eff. 1/2/2016)

RS 19-2. POWER OPERATED CRANES AND DERRICKS [Repealed]

Open this section

(Repealed City Record 11/30/2015, eff. 1/1/2016)

RS 19-3. CABLEWAYS

Open this section

1.0 SCOPE.—This standard applies to the use of cableways for the construction, alteration and repair of buildings.

2.0 DEFINITION.—

2.1 A power operated system for moving loads in a generally horizontal direction in which the loads are conveyed on an overhead cable, track or carriage.

3.0 An on-site inspection shall be required for cableways used for the erection, alteration and repair of buildings. The provisions of article 9.0 of RS 19–2 shall apply and for this purpose the word "cableway" shall be substituted for "crane" or "derrick" where those words appear in article 9.0.

RS 19-4. SAFETY NETS [Repealed]

Open this section

(Repealed City Record 12/3/2015, eff. 1/2/2016)