NYC Administrative Code RS 18-7
ANSI A 10.4–1981—Safety requirements for Personnel Hoists.
MODIFICATIONS.—The provisions of ANSI A 10.4—1981 shall be subject to the following modifications:
Add the following sub-section to 25.10.2:
25.10.2.1 Thereafter the rack and pinion type personnel hoist shall be reinspected every ninety (90) days. The inspection shall include a full load test of the safety device.
Add the following sections to govern the installation, jumping and dismantling or rack and pinion type personnel hoists to Rule 26, Inspections and Tests of Personnel Hoists:
26.1.1.1 Installations of rack and pinion type personnel hoists shall be approved by the Elevator Division. Both a construction application and an elevator application shall be filed by a licensed professional engineer or registered architect. The drawings shall be sealed.
26.1.1.2 The Elevator Division shall be notified at least three (3) days before the inspection date prior to each "cathead" raise, when the travel of the hoist is increased. This inspection shall include the examination of the normal, terminal and final limit stopping devices. All parts of the equipment shall be inspected; and tested to determine that they are in safe operating condition where found necessary by the Elevator Division. A full load test may not be required at this time by the Elevator Division. If an Elevator Division Inspector cannot be present at the time the required tests are made, the qualified private elevator inspectional agency conducting the tests shall:
(1) Submit a statement upon a department form to the Elevator Division certifying the tests which have been conducted and the results thereof within 24 hours of such tests.
(2) Attach a tag showing the date of the tests and the name of the person and/or agency conducting it.
26.1.3.1 Acceptance inspections of new installations shall be made prior to use by the contractor. The Elevator Division shall be notified at least three (3) days before the required acceptance inspection and test. A full rated load test shall be made. All shaftway protection doors, ramps, guards and required safety devices shall be installed and in place. The contractor may apply upon successful completion of the inspection and test for a ninety (90) day temporary elevator certificate (B Form 256).
26.2.1.1.1 All rack and pinion type safeties shall be stamped with their expiration date by the manufacturer and shall be replaced when such date is expired which shall not exceed a period of three (3) years.
26.7 Materials Handling Plan. A materials handling plan shall be provided if a potentially hazardous condition exists because of simultaneous operation of the rack and pinion personnel hoist and either a crane and/or derrick.
26.7.1 The materials handling plan shall be acceptable to Site Safety Coordinator and approved by the Department.
26.7.2 The hoist contractor and the safety coordinator shall be jointly responsible for the enforcement of the provisions of the materials handling plan.
26.8 Dismantling and Removal. The Elevator Division shall be notified on department forms when a rack and pinion type hoist is dismantled and removed.
26.8.1 The notification shall include the elevator application number, the street address locations listed on the construction application, the block and lots and the date of removal.
26.9 Field Inspection. A department field inspection will be scheduled by the Elevator Division upon receipt of proper notification to ascertain the actual job-site conditions and to sign-off the forms documenting the same.
Add the following to Rule 30:
Electrical work shall conform to the New York City Electrical Code.
Welding shall conform to the applicable portions of the Administrative (Building) Code.