Section BC 1616. Structural Integrity – Prescriptive Requirements

Open this section

1616.1 Scope.

The intent of these provisions is to enhance structural performance under extreme event scenarios by providing additional overall system redundancy and local robustness. All structures shall be designed to satisfy the prescriptive requirements of this Section.

Exception: Structures in Risk Category I of Table 1604.5 and structures in Occupancy Group R-3 are exempt from the requirements of Sections 1615 through 1617.

1616.2 Continuity and ties.

All structural elements shall have a minimum degree of continuity and shall be tied together horizontally and vertically as specified in Chapters 19, 21 and 22 for concrete, masonry and steel, respectively.

1616.3 Lateral bracing.

Floor and roof diaphragms or other horizontal elements shall be tied to the lateral load-resisting system.

1616.4 Vehicular impact.

Structural columns that are directly exposed to vehicular traffic shall be designed for vehicular impact. Structural columns that are adequately protected by bollards, guard walls, vehicle arrest devices or other elements do not need to be designed for vehicular impact. The load combinations for vehicular impact shall be as specified in Section 1605.5.

Specific loads for vehicular impact shall be as follows:

1. Exterior corner columns shall be designed for a concentrated load of 40 kips applied horizontally in any direction from which a vehicle can approach at a height of either 18 inches (457.2 mm) or 36 inches (914.4 mm) above the finished driving surface, whichever creates the worst effect.

2. All other exterior columns exposed to vehicular traffic, and columns within loading docks, and columns in parking garages along the driving lane shall be designed for a concentrated load of 20 kips applied horizontally in any direction from which a vehicle can approach at a height of either 18 inches (457.2 mm) or 36 inches (914.4 mm) above the finished driving surface, whichever creates the worst effect.

1616.5 Gas explosions.

In buildings with gas piping operating at pressures in excess of 15 psig (193.4 kPa gauge), all key elements and their connections within 15 feet (4572 mm) of such piping shall be designed to resist a potential gas explosion. The structure shall be designed to account for the potential loss of the affected key elements one at a time by the alternate load path method. Load combinations for the alternate load path shall be as specified in Section 1605.4. In lieu of the alternate load path method, the affected key elements shall be designed to withstand a load of 430 psf (20.6 kPa) applied using the load combinations specified in Section 1605.5. The load shall be applied along the entire length of the element, and shall be applied in the manner and direction that produces the most damaging effect.

Exceptions:

1. If a structural enclosure designed to resist the specified pressure is provided around the high-pressure gas piping, only the key elements within the structural enclosure need to comply with this section.

2. A reduced pressure for gas explosions can be used based on an engineering analysis approved by the commissioner.

1616.5.1 Explosion prevention and deflagration venting.

The structural design and installation of explosion prevention systems and deflagration venting shall be in accordance with the requirements of Appendices E and G of the New York City Fuel Gas Code, as well as the New York City Fire Code, and the rules and regulations of the department.

Section BC 1617. Structural Integrity – Key Element Analysis

Open this section

1617.1 Scope.

A Key Element Analysis shall be performed for the following buildings:

1. Buildings included in Risk Category IV as defined in this chapter.

2. Buildings with the aspect ratios of seven or greater.

3. Buildings greater than 600 feet (182.9 m) in height or more than 1,000,000 square feet (92 903 m 2 ) in gross floor area.

4. Buildings taller than seven stories where any element, except for walls greater than 10 feet (3.1 m) in length, supports in aggregate more than 15 percent of the building area.

5. Buildings designed for areas with 3,000 or more occupants in one area in close proximity, including fixed seating and grandstand areas.

6. When specifically ordered by the commissioner.

1617.2 Load combinations.

Where specifically required by Section 1617.1, elements and components shall be designed to resist the forces calculated using the combination specified in Section 1605.4 or 1605.6 as applicable.

1617.3 Seismic and wind.

When the code-prescribed seismic or wind design produces greater effects, the seismic or wind design shall govern, but the detailing requirements and limitations prescribed in this and referenced sections shall also be followed.

1617.4 Joints.

Where a structure is divided by joints that allow for movement, each portion of the structure between joints shall be considered as a separate structure.

1617.5 Key element analysis.

Where key elements are present in a structure, the structure shall be designed to account for their potential loss one at a time by the alternate load path method or by the specific local resistance method as specified in Section 1617.6.

1617.6 The specific local resistance method.

Where the specific local resistance method is used key elements shall be designed using specific local loads as follows:

1. Each compression element shall be designed for a concentrated load equal to 2 percent of its axial load but not less than 15 kips, applied at midspan in any direction, perpendicular to its longitudinal axis. This load shall be applied in combination with the full dead load and 50 percent of the live load in the compression element.

2. Each bending element shall be designed for the combination of the principal acting moments plus an additional moment, equal to 10 percent of the principal acting moment applied in the perpendicular plane.

3. Connections of each tension element shall be designed to develop the smaller of the ultimate tension capacity of the member or three times the force in the member.

4. All structural elements shall be designed for a reversal of load. The reversed load shall be equal to 10 percent of the design load used in sizing the member.

1617.7 Design criteria.

Alternate load path method and/or specific local resistance method for key elements shall conform to the appropriate design criteria as determined from Sections 1617.8 through 1617.10.

1617.8 Analysis procedures.

All structural analysis for specific local loads or alternate load paths shall be made by one of the following methods:

1617.8.1 Static elastic analysis.

For analysis of this type, dynamic effects of member loss or dynamic effects of specific local loads need not be considered. The structural demand is obtained from linear static analysis. However, structural member capacity is based on ultimate capacity of the entire cross section. The demand/capacity ratio of structural elements shall not exceed one.

1617.8.2 Dynamic inelastic analysis.

For analysis of this type, dynamic effects of member loss or specific local loads shall be considered. The structure does not need to remain elastic; however, the response ratio and rotation limits obtained from Table 1617.8.3 shall not be exceeded.

1617.8.3 Energy methods.

Static inelastic analysis using energy equilibrium may also be used. The structure does not need to remain elastic; however, the response ratio and rotation limits obtained from Table 1617.8.3 shall not be exceeded.

Table 1617.8.3 Response Ratio and Rotation Limits

Element Response Ratio Rotation Concrete Slabs m < 10 Ø < 4° Post-Tensioned Beams m < 2 Ø < 1.5° Concrete Beams m < 20 Ø < 6° Concrete Columns m < 2 Ø < 6° Long Span Acoustical Deck m < 2 Ø < 3° Open Web Steel Joists m < 2 Ø < 6° Steel Beams m < 20 Ø < 10° Steel Columns m < 5 Ø < 6°

For SI: 1 degree = 0.0 1745 rad.

Note: Table 1617.8.3 is intended for SDOF and simplified MDOF response calculations and a low level of protection. Table 1617.8.3 does not apply for explicit finite element methods that calculate the performance of the structural elements in response to the specified loading intensity. Steel joists: downward loading 6 degrees, upward loading ductility of 2.

1617.9 Minimum response.

Structural response of elements determined using a dynamic inelastic analysis shall not be less than 80 percent of the structural response determined using a static elastic analysis.

1617.10 Strength reduction factors.

For structural design for specific local loads or alternate load paths, all strength reduction factors may be multiplied by 1.1.

Section BC 1618. Structural Peer Review

Open this section

1618.1 General.

The provisions of this section specify where structural peer review is required, how and by whom it is to be performed.

1618.2 Where required.

A structural peer review of the primary structure shall be performed and a report provided for the following buildings:

1. Buildings included in Risk Category IV as defined in this chapter and more than 50,000 square feet (4645.2 m 2 ) of framed area

2. Buildings with aspect ratios of seven or greater.

3. Buildings greater than 600 feet (183 m) in height or more than 1,000,000 square feet (92 903 m 2 ) in gross floor area. Rooftop structures may be excluded from building height in accordance with Section 504.3.

4. Buildings taller than seven stories where any element, except for walls greater than 10 feet (3.048 meters) in length, supports in aggregate more than 15 percent of the building area.

5. Buildings designed using nonlinear time history analysis or with special seismic energy dissipation systems.

6. Buildings designed for areas with 3,000 or more occupants in one area in close proximity, including fixed seating and grandstand areas.

7. Buildings where a structural peer review is requested by the commissioner.

8. Buildings designed by performance-based methods.

1618.3 Structural peer review.

It shall be verified that the structural design is in general conformance with the requirements of this code.

1618.4 Geotechnical peer review.

Geotechnical peer reviews are required to be performed in accordance with Section 1815.

(Am. L.L. 2023/077, 6/11/2023, eff. 6/11/2023)

Editor's note: For related unconsolidated provisions, see Appendix A at L.L. 2023/077.

1618.5 Structural peer reviewer.

The structural peer review shall be performed by a qualified independent structural engineer who has been retained by or on behalf of the owner. A structural peer reviewer shall meet the requirements of the rules of the department.

1618.5.1 Independence.

In order to satisfy the requirement that the peer reviewer be independent, the department requires that the peer reviewer must not engage in any activities that may conflict with their objective judgment and integrity, including but not limited to having a financial and/or other interest in the design, construction, installation, manufacture or maintenance of structures or components that they are reviewing.

1618.6 Extent of the structural peer review.

The structural peer review shall comply with Sections 1618.6.1 and 1618.6.2.

1618.6.1 Scope.

The structural peer reviewer shall review the plans and specifications submitted with the permit application for general compliance with the structural and foundation design provisions of this code. The reviewing engineer shall perform the following tasks at a minimum:

1. Confirm that the design loads conform to this code.

2. Confirm that other structural design criteria and design assumptions conform to this code and are in accordance with generally accepted engineering practice.

3. Review geotechnical and other engineering investigations that are related to the foundation and structural design and confirm that the design properly incorporates the results and recommendations of the investigations.

4. Review the structural frame and the load supporting parts of floors, roofs, walls, shallow foundation elements, deep foundation caps, connection of deep foundation elements to deep foundation caps, and permanent rock or soil anchor connection to the structural elements. Cladding, cladding framing, stairs, equipment supports, ceiling supports, non-loadbearing partitions, railings and guards, and other secondary structural items shall be excluded.

5. Confirm that the structure has a complete load path.

6. Perform independent calculations for a representative fraction of systems, members, and details to check their adequacy. The number of representative systems, members, and details verified shall be sufficient to form a basis for the reviewer's conclusions.

7. Verify that performance-specified structural components (such as certain precast concrete elements) have been appropriately specified and coordinated with the primary building structure.

8. Verify that the design engineer of record complied with the structural integrity provisions of the code.

9. Review the structural and architectural plans for the building. Confirm that the structural plans are in general conformance with the architectural plans regarding loads and other conditions that may affect the structural design.

10. Confirm that major mechanical items are accommodated in the structural plans.

11. Attest to the general completeness of the structural plans and specifications.

12. Review performance based design.

1618.6.2 Structural design criteria.

If the design criteria and design assumptions are not shown on the drawings or in the computations, the structural engineer of record shall provide a statement of these criteria and assumptions for the reviewer. In addition, the design engineer shall provide information and/or calculations, if requested by the peer reviewer.

1618.7 Structural peer review report.

The structural peer review report shall comply with Sections 1618.7.1 through 1618.7.3.

1618.7.1 General.

The reviewing engineer shall submit a report to the department stating whether or not the structural design shown on the plans and specifications generally conforms to the structural and foundation requirements of this code.

1618.7.2 Contents.

The report shall demonstrate, at a minimum, compliance with Items 1 through 12 of Section 1618.6.1. In addition, the report shall also include the following:

1. A list of construction documents, including the latest revision dates submitted to the department for approval, as well as geotechnical reports, wind tunnel studies and other reports utilized in the design.

2. The codes and standards used in the structural design of the project.

3. The structural design criteria, including loads and performance requirements.

4. The basis for design criteria that are not specified directly in applicable codes and standards. This should include reports by specialty consultants such as wind tunnel study reports and geotechnical reports. Generally, the report should confirm that existing conditions at the site have been investigated as appropriate and that the design of the proposed structure is in general conformance with these conditions.

5. The basis of performance-based design and its appropriateness of use.

6. A statement that the qualification and independence of the peer reviewer is in accordance with Section 1618.5.

7. Peer review reports shall provide an unconditional statement that must be either an acceptance or rejection of code compliance of the structural design required to be reviewed by this section.

8. The structural peer review reports shall contain a statement that geotechnical peer review reports and/or wind tunnel peer review reports, when required, have been received with an unconditional statement of acceptance by the authors of those reports.

1618.7.3 Phased submission.

If an application is submitted for a permit for the construction of foundations or any other part of a building before the construction documents for the whole building have been submitted, then the structural peer review and report shall be phased. The structural peer reviewer shall be provided with sufficient information on which to make a structural peer review of the phased submission. In addition to the requirements of this section, phased submission of the report shall include any changes made to the initial structural peer review evaluation. The geotechnical peer review report need not be submitted concurrently with the structural peer review report.

1618.8 Responsibility.

The responsibilities of the engineer of record and peer reviewer shall be as laid out in Sections 1618.8.1 through 1618.8.4.

1618.8.1 Structural engineer of record.

The structural engineer of record shall retain sole responsibility for the structural design. The activities and reports of the structural peer reviewer shall not relieve the structural engineer of record of this responsibility.

1618.8.2 Structural peer reviewer.

The structural peer reviewer's report states his or her opinion regarding the design by the engineer of record. The standard of care to which the structural peer reviewer shall be held in the performance of the structural peer review and report is that the level of skill and care consistent with structural peer review services performed by professional engineers licensed in the State of New York for similar types of projects. The structural peer reviewer shall not be responsible for the conclusions of the wind and geotechnical peer review reports.

1618.8.3 Revisions of design.

The structural engineer of record shall identify that a new review is required based upon changes to the design documents relevant to the scope of the peer review. The structural peer reviewer shall review the items that have been affected and shall revise the structural peer review report.

1618.8.4 Disputes.

When a dispute arises between the applicant of record and the peer reviewer regarding compliance with Section 1618 that cannot be resolved by these parties, such dispute shall be reported to the department in the form of a letter from the applicant of record. The department may make a final decision or may accept a change of the peer reviewer.

1618.9 Change to peer reviewer.

The peer reviewer cannot be changed without the express consent of the department. The current peer reviewer must submit both a written letter to the borough commissioner detailing the reason for the withdrawal request and a report of the structural peer review findings to date. If a change of peer reviewer is approved, a revised submission indicating the replacement peer reviewer shall be filed with the department.

Section BC 1619. Temporary Structures and Temporary Construction Installations

Open this section

1619.1 General.

Temporary construction installations that are required by this code to be designed by a registered design professional, and all temporary structures, shall comply with all the provisions of this code, except as described in Sections 1619.3 and 1619.4.

1619.2 Definitions.

The following terms are defined in Chapter 2:

TEMPORARY CONSTRUCTION INSTALLATIONS.

TEMPORARY STRUCTURES.

1619.3 Temporary construction installations.

Temporary construction installations shall be subject to the requirements of this section and Chapter 33.

1619.3.1 Design drawings for temporary construction installations.

Design loads, including location and intensity of live loads, shall be indicated on the design drawings for temporary construction installations. Drawings for multilevel temporary construction installations shall indicate the maximum number of levels to be loaded simultaneously and the maximum design loads. Any temporary construction installation utilizing authorized exemptions and load reductions in the structural design shall be indicated on drawings as temporary, and all reduced loads shall be indicated on the drawings. The environmental load mitigations shall be indicated on the design drawings. The design drawings shall be maintained at the site of the temporary construction installation and be made available to the department upon request.

1619.3.2 Loads for temporary construction installations.

Temporary construction installations shall be designed and constructed to resist the loads and load combinations required by this chapter for permanent construction and Chapter 33 of the building code. Live loads shall not be less than the code prescribed value or the maximum loads for the use of a temporary construction installation as noted on the design drawings.

Exceptions:

1. Load reductions may be utilized where permitted by Section 1619.3.3.

2. Derricks not permanently mounted to a building shall not be subject to the loads and load combinations of this chapter. Such derricks shall instead be subject to the requirements of Section 3319 and rules promulgated by the commissioner. However, temporary construction installations used to support such derricks shall be subject to the loads and load combinations of this chapter.

3. Mobile cranes shall not be subject to the loads and load combinations of this chapter. Mobile cranes shall instead be subject to the requirements of Section 3319 and rules promulgated by the commissioner. However, temporary construction installations used to support mobile cranes shall be subject to the loads and load combinations of this chapter.

1619.3.3 Load reductions for temporary construction installations.

Temporary construction installations shall be permitted to reduce the design environmental loads required by this chapter in accordance with the specifications below. An action plan for load reductions shall be required in accordance with Section 1619.5.

1. Seismic resistance. Temporary construction installations do not need to consider seismic design. These installations, other than supports of excavation, shall be designed for a minimum of 2 percent of the dead and live load as a service level lateral force. This load shall be used in lieu of seismic forces required by Section 1613 in load combinations including seismic forces. This load shall be distributed in proportion to the design loads, applied in any horizontal direction, and need not be combined with other environmental loads.

2. Wind. The wind design for temporary construction installations shall be computed as required by Section 1609. The basic wind speed used to design the temporary construction installation shall be permitted to be reduced by applying a factor of 0.8.

Exceptions: The following are exceptions to item 2 concerning load reductions for wind design:

1. Mast climbers shall not be permitted to reduce wind loads.

2. Suspended scaffolds shall be designed for an out of service wind speed of at least 45 mph (72.4 kph), or a lower speed when so specified by the scaffold manufacturer.

3. Other environmental forces. Other environmental forces, including but not limited to snow, flood, ice, and temperature differential effects, shall be permitted to be reduced as appropriate for the limited seasonal exposure of the temporary construction installation.

1619.3.4 Permit renewal for temporary construction installations that utilize an action plan.

Where a temporary construction installation requires an action plan in accordance with Section 1619.5, the application to renew the permit for such temporary construction installation shall be accompanied by the submission of a report from a registered design professional certifying, based on an inspection of the temporary construction installation performed by the registered design professional within 30 days prior to the submittal of the permit renewal application, that the action plan:

1. Is still in effect;

2. Has been revised to reflect the current conditions of the temporary structure; or

3. Is no longer required, as the temporary structure has been retrofitted to comply with the loads for new construction without any reduction, pursuant to Section 1619.3.2.

1619.4 Temporary structures.

Temporary structures shall be subject to the requirements of Section 3103.1 and this section.

1619.4.1 Design drawings for temporary structures.

Design loads, including location and intensity of live loads, shall be indicated on the design drawings for temporary structures. Drawings for multilevel temporary structures shall indicate the maximum number of levels to be loaded simultaneously and the maximum design loads. Any temporary structure utilizing authorized exemptions and load reductions in the structural design shall be indicated on drawings as temporary, and all reduced loads shall be indicated on the drawings. The environmental load mitigations shall be indicated on the design drawings. The design drawings shall be maintained at the site of the temporary structure and be made available to the department upon request.

1619.4.2 Loads for temporary structures.

Temporary structures shall be designed and constructed to resist the loads and load combinations required by this chapter. Live loads shall not be less than the code prescribed value or the maximum loads for the use of a temporary structure as noted on the design drawings.

Exception: Load reductions may be utilized where permitted by Section 1619.4.3.

1619.4.3 Load reductions for temporary structures.

Temporary structures shall be permitted to reduce the design environmental loads required by this chapter in accordance with the specifications below. An action plan for load reductions shall be required in accordance with Section 1619.5.

1. Seismic resistance. Temporary structures do not need to consider seismic design. Temporary structures shall be designed for a minimum of 2 percent of the dead and live load as a service level lateral force. This load shall be used in lieu of seismic forces required by Section 1613 in load combinations including seismic forces. This load shall be distributed in proportion to the design loads, applied in any horizontal direction, and need not be combined with other environmental loads.

2. Wind. The wind design for temporary structures shall be computed as required by Section 1609. The basic wind speed used to design the structure shall be permitted to be reduced by applying a factor of 0.8.

Exception: In lieu of applying a factor of 0.8, temporary structures may be removed from service at the environmental conditions determined by the manufacturer of the temporary structure. The threshold for removal of service shall be indicated on the design drawings required by Section 1619.4.1 as well as the action plan required by Section 1619.5.

3. Other environmental forces. Other environmental forces, including but not limited to snow, flood, ice, and temperature differential effects, shall be permitted to be reduced as appropriate for the limited seasonal exposure of the temporary structure.

1619.4.4 Duration of time for temporary structures.

Temporary structures shall be erected for a limited period not exceeding ninety days in accordance with Article 111 of Title 28 of the Administrative Code. Such limited period shall be counted from the date the temporary structure is substantially completed.

Exception: Where the commissioner has approved a request to extend the duration of time for a temporary structure in accordance with Section 1619.4.5.

1619.4.5 Extension of time for temporary structures.

Subject to the approval of the commissioner, the duration of time for a temporary structure may be extended by increments not to exceed ninety days. Each request to extend the time for a temporary structure shall be accompanied by the submission of a report from a registered design professional certifying the following:

1. Such registered design professional performed an inspection within the last 30 days to confirm that the temporary structure complies with the requirements of the approved construction documents for the temporary structure; and

2. Where an action plan is utilized in accordance with Section 1619.5:

2.1. It is still in effect;

2.2. It has been revised to reflect the current conditions of the temporary structure; or

2.3. It is no longer required, as the temporary structure has been retrofitted to comply with the loads for new construction without any reduction, pursuant to Section 1619.4.2.

1619.5 Action plan.

All temporary structures or temporary construction installations with reduced design environmental loads in accordance with Section 1619.3.3 or 1619.4.3 shall include environmental load mitigation measures as part of an action plan to protect the public. The action plan measures shall be indicated on the design drawings required by Section 1619.3.1 or 1619.4.1.

Exception: An action plan is not required for:

1. Derricks not permanently mounted to a building. Derricks not permanently mounted to a building shall be secured in accordance with a wind action plan as specified in rules promulgated by the commissioner.

2. Mobile cranes. Mobile cranes shall be secured in accordance with a wind action plan as specified in rules promulgated by the commissioner.

3. A suspended scaffold. Suspended scaffolds shall be secured in accordance with the requirements of Section 3314; requirements for securing suspended scaffolds shall be indicated on design drawings when required by Section 3314.

(Am. L.L. 2023/077, 6/11/2023, eff. 6/11/2023)

Editor's note: For related unconsolidated provisions, see Appendix A at L.L. 2023/077.

1619.5.1 Implementation.

The action plan shall be such that it can be reliably implemented within one day of notice or less as appropriate for the actions.

1619.5.2 Components.

The action plan shall, at a minimum, include the following:

1. Threshold of predicted environmental loads;

2. Method of monitoring environmental loads;

3. Name of party responsible for monitoring loads and determining implementation of action plan;

4. Name of party responsible for implementing the action plan;

5. Evacuation procedures;

6. Safety zone, standoff distance or standoff perimeter as appropriate. Safety zone, standoff distance or standoff perimeter shall not extend beyond the property line;

7. Any other activities, such as the addition or removal of structural and/or nonstructural elements, removal of loads or creating sacrificial elements so that the structure may resist unreduced forces as required for permanent structures;

8. Plan to prevent wind-born debris; and

9. Verification that the design and procedures shall not adversely impact other structures.

Section BC 1701. General

Open this section

1701.1 Scope.

The provisions of this chapter shall govern the inspection of quality, workmanship and requirements for construction. Materials, inspection and testing shall conform to the applicable standards listed in this code or in the rules of the department. See Chapter 1 of Title 28 of the Administrative Code for additional provisions relating to materials, testing and inspections.

1701.2 New materials.

See Chapter 1 of Title 28 of the Administrative Code for additional provisions.

1701.3 Used materials.

See Chapter 1 of Title 28 of the Administrative Code.

Section BC 1702. Definitions

Open this section

1702.1 Definitions.

The following terms are defined in Chapter 2:

APPROVED AGENCY.

APPROVED FABRICATOR.

CERTIFICATE OF COMPLIANCE.

FABRICATED ITEM.

INSPECTION CERTIFICATE.

INTUMESCENT FIRE-RESISTANT COATINGS.

LABEL.

MANUFACTURER'S DESIGNATION.

MARK.

MASTIC FIRE-RESISTANT COATINGS.

SPECIAL INSPECTION.

SPECIAL INSPECTION, CONTINUOUS.

SPECIAL INSPECTION, PERIODIC.

SPECIAL INSPECTOR.

SPRAYED FIRE-RESISTANT MATERIALS.

SUPERINTENDENT OF CONSTRUCTION.

Section BC 1703. Approvals

Open this section

See Chapter 1 of Title 28 of the Administrative Code.

Section BC 1704. Responsibilities for Special Inspections and Tests

Open this section

1704.1 General.

Where application is made for construction as described in this section, one or more special inspection agencies meeting the requirements of Sections 28-114.1, and 28-115.1 of the Administrative Code shall be retained by the owner to provide inspections during construction on the types of work listed under Section 1705 and elsewhere in this code. These inspections are in addition to the other inspections required by Section 110, elsewhere in this code, and Section 28-116 of the Administrative Code. The special inspector shall be acceptable to the registered design professional of record.

Exception: Special inspections are not required for building components unless the design involves the practice of professional engineering or architecture as defined by the Education Law of the State of New York and applicable regulations governing the professional registration and certification of engineers or architects.

1704.1.1 Responsibilities.

Special inspection responsibilities of registered design professionals of record, special inspection agencies, and permit holders shall meet the applicable requirements of this section.

1704.1.1.1 Responsibilities of the registered design professional of record.

The registered design professional of record shall have the following duties and responsibilities:

1. Identification of required special inspections. The registered design professional of record shall identify the materials, equipment, installation, fabrication, erection or placement of components and connections, or construction operations for the work indicated on the construction documents that are subject to special inspections on the construction documents and in any other form supplied or manner required by the department prior to the approval of the construction documents.

2. Respond to field discrepancies. The registered design professional of record shall respond to special inspector reports of uncorrected discrepancies and shall approve remedial measures.

3. Review of shop drawings and other submittals. Where shop or working drawings, and other submittals have been provided, the registered design professional of record shall review such shop drawings for conformance with the approved design. The registered design professional shall acknowledge conformance with the approved design on such documents.

4. Deviations from approved construction documents. The registered design professional of record shall submit to the department and the special inspection agency written documentation of the professional's approval of deviations from the approved construction documents. All such deviations approved by the registered design professional of record shall be filed with the department on amended construction documents in accordance with section 28-104.3 of the Administrative Code.

1704.1.1.2 Responsibilities of the special inspection agency.

The special inspection agency shall have the following duties and responsibilities:

1. Independence. The special inspection agency shall be independent of the contractors responsible for the work being inspected. The registered design professional of record is permitted to act as the approved special inspection agency and such agency's personnel are permitted to act as special inspectors for the work designed by the registered design professional of record, provided those personnel meet the qualification requirements of this section to the satisfaction of the department.

2. Qualifications. The special inspection agency shall ensure that qualified special inspectors are provided to perform special inspections in accordance with the rules of the department. Upon request of the registered design professional of record, the special inspection agency shall provide proof of inspector's and agency's qualifications, certifications, and other documents demonstrating compliance with department rules and regulations.

3. Construction documents. The special inspection agency shall examine all approved construction documents that relate to the work that is the subject of the special inspections to confirm that the documents are sufficient to enable the proper performance of the special inspection. The special inspection agency shall confirm that any shop drawings or sketches have been accepted by the registered design professional of record. Acceptance shall be demonstrated in writing by the registered design professional of record on the documents. All approved shop drawings, submittals and/or sketches are to be located on site and accessible to the special inspector at time of inspection.

4. Inspection. The special inspection agency shall observe work subject to special inspection to confirm that the work that is the subject of the special inspection is in compliance with the approved construction documents; with the approved shop drawings, where provided; and with the special inspection requirements of this code and department rules and regulations.

5. Tests. Where specifically required by this code, the performance of testing shall be by qualified special inspectors working for the special inspection agency. In all other instances, the special inspection agency shall observe testing to confirm that testing activities that are subject to special inspection are in compliance with the prescribed testing procedures.

6. Reports. The special inspection agency shall prepare reports of its inspections and tests, and such reports shall indicate that work inspected was or was not performed in conformance with approved construction documents.

6.1. Format. Special inspection reports and records of special inspections shall be in the form and format supplied by the commissioner.

6.2. Discrepancies. Discrepancies shall be brought to the immediate attention of the contractor and, when applicable, to the attention of the superintendent of construction, for correction. The discrepancies shall also be brought to the attention of the owner, and the registered design professional of record in a timely manner to allow for correction of the discrepancies.

6.3. Hazardous conditions. The special inspector shall report conditions noted as hazardous to life, safety or health that are not immediately corrected to the immediate attention of the commissioner.

6.4. Final report. Prior to issuance of a certificate of occupancy or letter of completion, a final report documenting the required special inspections, including any required performance or witnessing of tests, and correction of all discrepancies noted in the inspections shall be submitted to the department. Such report shall certify compliance with approved construction documents, deviations approved by the registered design professional of record in accordance with Section 1704.1.1.1 Item 4 of this code, and the administrative and procedural requirements of this code.

6.5. Approval of partially completed work. Reports of partially completed work shall be accepted when such reports indicate that the inspected work has been completed in accordance with the construction documents, and indicate the extent and the condition of the remaining work.

6.6. Maintain records. The special inspection agency shall maintain records of inspections for a period of 6 years from the date of the special inspection agency's final submittal or report of completed inspection. Such records shall be supplied to the commissioner upon request. The commissioner may require that special inspection reports be filed with the department and/or that such reports be otherwise made accessible for review.

1704.1.1.3 Responsibilities of the permit holder.

The permit holder shall have the following duties and responsibilities:

1. Statement of special inspections. The application for permit shall include a statement of relevant special inspections as a condition for permit issuance on forms supplied by the department. This statement shall include:

1.1. A complete list of materials and work included in the permit application requiring special inspections by this section and elsewhere in this code and the inspections to be performed on such work and materials; and

1.2. A list of the special inspection agencies retained by the owner for conducting the special inspections listed on the approved plans. Within each category of work, multiple special inspectors or special inspection agencies may be employed.

2. Identification of registered design professionals providing design documents for certain construction operations. The registered design professionals responsible for the production of design, sequence of construction operations or shop drawings for projects that require design pursuant to Chapter 33, shall file documentation of their intent to perform those duties on forms supplied by the department. The registered design professionals preparing such documents shall also be subject to the responsibilities of a registered design professional of record required by Section 1704.1.1.1 for the scope of work covered in the design, sequence of construction operations or shop drawings for which they are responsible.

3. Required notification to special inspection agencies. The holder of a permit covering work requiring a special inspection shall notify the relevant special inspectors or special inspection agencies in writing at least 72 hours before the commencement of any work requiring special inspection. The permit holder shall make available the most current approved construction documents to the special inspection agency.

4. Access for special inspection. The construction or work for which special inspection is required shall remain accessible and exposed for special inspection purposes until completion of the required special inspections.

5. Resolution of discrepancies. The permit holder shall be responsible for the resolution of identified discrepancies. A satisfactory inspection by a special inspection agency or the acceptance by the department of a satisfactory report of an inspection by a special inspection agency shall not be construed to be an approval by the department of a violation of the provisions of this code or of any other provision of law.

1704.2 Inspection of fabricators.

Where fabrication of structural members, and other regulated products is performed on the premises of a fabricator's shop, special inspection and progress inspection of the fabricated items shall be required by this section, the New York City Construction Codes, and Chapter 1 of Title 28 of the Administrative Code.

1704.2.1 Fabrication and implementation procedures.

The special inspector shall verify that the fabricator maintains detailed fabrication and quality control procedures that provide a basis for inspection control of the workmanship and the fabricator's ability to conform to approved construction documents and referenced standards. The special inspector shall review the procedures for completeness and adequacy relative to the code requirements for the fabricator's scope of work.

Exception: Special inspections and progress inspections as required by Section 1704.2 shall not be required where the fabricator is approved in accordance with Chapter 1 of Title 28 of the Administrative Code, except as required by Section 1704.2.2 of this code.

1704.2.2 Fabricator approval.

Work that is subject to special inspection and performed on the approved fabricator's premises shall be inspected by the special inspection agency in accordance with Section 1704.2.2.3. Approval of fabricators shall be based upon review of the fabricator's written procedural and quality control manuals and periodic auditing of fabrication practices by an approved agency.

1704.2.2.1 Certificate of intent to fabricate.

For all work where approval is sought based upon Section 1704.2.2, the approved fabricator shall submit a certificate of intent to fabricate such work to the department identifying the work to be performed as an approved fabricator, and that such work shall be performed in accordance with the approved construction documents, referenced standards and applicable provisions of law and for which site the work is being fabricated prior to fabricating any items for such project.

1704.2.2.2 Fabricator's certificate of compliance.

For all fabricated items, the approved fabricator shall submit a certificate of compliance to the department stating that the work was performed in accordance with the approved construction documents, referenced standards and applicable provisions of law.

1704.2.2.3 In-plant special inspections.

The owner shall engage an approved special inspection agency to perform special inspections for the portion of the work performed in the approved fabricators premises. These inspections shall at a minimum include: (i) one visit to the fabricator's premises during the course of the subject work to verify the fabricator's compliance with the written and procedural quality control manuals; and (ii) inspection of 5 percent of the subject work to verify compliance with the approved construction documents.