Section BC 3306. Demolition

Open this section

3306.1 Scope.

All full demolition and partial demolition operations shall be performed in accordance with the requirements of this section so that the safety of the public and property will not be endangered by demolition operations.

3306.2 Protection of pedestrians and adjoining property.

Demolition operations shall not commence until the applicable pedestrian and adjoining property protection is in place as required by Sections 3307, 3308, and 3309. In addition, safety zones and measures to prevent access shall be implemented as required by Sections 3306.2.1 and 3306.2.2.

3306.2.1 Preventing access.

The permit holder, or where there is no permit holder, the person causing the demolition work to be performed, shall institute and maintain measures to prevent persons other than workers from entering areas where demolition work is occurring, debris is stored, or equipment is located.

3306.2.2 Safety zone for exterior demolition.

Where demolition work occurs on the exterior of a building, the permit holder, or where there is no permit holder, the person causing the demolition work to be performed, shall institute and maintain a safety zone around the site to prevent persons other than workers from entering such safety zone. Where the safety zone precludes access to the entire demolition site, it shall be considered to satisfy the requirements of Section 3306.2.1.

Exception: A safety zone is not required for the following types of work. Relief from the safety zone requirements does not grant relief from applicable pedestrian and adjoining property protection required by Sections 3307, 3308, and 3309, nor from the requirements of Section 3306.2.1.

1. Demolition work whose scope is limited to a minor alteration or ordinary repair, and is accomplished without any mechanical demolition equipment, other than handheld devices.

2. Work whose scope is limited to the alteration, maintenance, or repair of a facade, and which does not constitute a facade recladding as defined in rules promulgated by the commissioner, and is accomplished without any mechanical demolition equipment, other than handheld devices.

3. Demolition work accomplished without any mechanical demolition equipment, other than handheld devices, provided the entire exposure where demolition work is to occur is covered by either:

3.1. A supported scaffold with netting and guardrails in accordance with Section 3314.8; or

3.2. A site specific engineered enclosure system in accordance with Section 3309.17.

3306.2.2.1 Approval of the commissioner.

Where a safety zone is required by Section 3306.2.2, it shall be approved by the commissioner.

3306.2.2.2 Size of safety zone for mechanical demolition.

Where mechanical demolition equipment, other than handheld devices, is to be used for the full or partial demolition of a building, the safety zone shall be equal to or greater than half the height of the building to be demolished; such safety zone may be reduced by the same ratio as the building is being demolished.

3306.3 Notification.

The permit holder shall notify the department and adjoining property owners prior to the commencement of full and partial demolition operations in accordance with Sections 3306.3.1 and 3306.3.2.

Exceptions:

1. Notification to the department or adjoining property owners is not required for partial demolition operations limited to the interior components of a building provided no mechanical demolition equipment, other than handheld devices, are used.

2. Notification to the department or adjoining property owners is not required for partial demolition that occurs on the exterior of a building, provided such work is a minor alteration or ordinary repair, and is accomplished without any mechanical demolition equipment, other than handheld devices.

3306.3.1 Notification of the department.

The permit holder shall notify the department via phone or electronically at least 24 hours, but no more than 48 hours prior to the commencement of such work. If the notification date falls on a weekend or official holiday, the permit holder shall notify the department on the last business day before the commencement date.

3306.3.2 Notification of adjoining property owners.

Adjoining property owners shall be notified of upcoming demolition operations in writing not less than 10 days prior to the scheduled starting date of the demolition. The written notice shall provide a description of the work to be performed, the timeframe and schedule, and contact information of the person causing the demolition work and of the department. Demolition or removal work that is to be done with the use of explosives shall also be subject to the notification requirements set forth in the New York City Fire Code.

Editor's note: For related unconsolidated provisions, see Appendix A at L.L. 2008/026.

3306.4 Mechanical demolition equipment.

Where mechanical demolition equipment, other than handheld devices, is to be used in the full or partial demolition of a building or structure, or is to be used within a structure to remove debris or move material, approval of the commissioner for the use of the mechanical demolition equipment must be obtained prior to the commencement of demolition operations.

Exception: Approval of the commissioner is not required where the structure has been demolished to grade and mechanical equipment, located on the ground or a slab on grade, is utilized to remove the slab or foundation of the structure or to remove debris or move material.

3306.5 Submittal documents for demolition.

Full and partial demolition operations shall be conducted in accordance with submittal documents. Such submittal documents shall comply with Sections 3306.5.1 through 3306.5.7.

Exceptions: Section 3306.5 shall not apply to:

1. Demolitions performed as emergency work pursuant to Section 28-215.1 of the Administrative Code when such work is monitored by a qualified person with experience in demolition operations who is employed by the city agency that has been directed to perform or arrange for the performance of such work. If the department or such city agency determines that there is a need for supervision of the work by a registered design professional, such city agency shall retain a registered design professional or cause a registered design professional to be retained to supervise the demolition operations.

2. The full demolition of a detached one- two- or three-family dwelling, or both halves of a semi-detached one- two- or three-family dwelling, or a detached accessory structure to a one- two- or three-family dwelling, provided such dwelling or accessory structure is three stories or fewer in height, and also provided that the demolition is to be accomplished without any mechanical demolition equipment, other than handheld devices.

3. The full demolition of a fully detached building that is three stories or fewer and with a gross floor area of 5,000 square feet (464.5 m 2 ) or less per story, provided such demolition is to be accomplished without any mechanical demolition equipment, other than handheld devices.

4. The removal, with mechanical demolition equipment, of the remaining slab or foundation of a structure described in Exemption 2 or 3 above once the structure has been demolished to grade, or the removal of landscaping elements, on grade parking or driveways, or pools that are accessory to a structure described in Exemption 2 or 3 above, provided during all such removal work the mechanical demolition equipment is located on the ground or a slab on grade.

5. Partial demolition operations accomplished without any mechanical demolition equipment, other than handheld devices, provided such work is a minor alteration or ordinary repair.

6. Demolition operations that do not require a permit.

(Am. L.L. 2023/077, 6/11/2023, eff. 6/11/2023)

Editor's note: For related unconsolidated provisions, see Appendix A at L.L. 2023/077.

3306.5.1 Required documents.

Submittal documents shall be approved by the department before demolition work begins. Such submittal documents shall be signed, sealed, and submitted by a registered design professional and shall contain, at a minimum, the following:

1. Basic structure of the building, or portion thereof, to be demolished, including general sizes and types of main structural members and an identification of the general structural lateral system;

2. A statement that the condition of the existing structure to be demolished has been assessed and a determination regarding whether it is a weakened structure in accordance with Section 3306.7;

3. Plans, sections, and details of the building, or portion thereof, to be demolished clearly showing the extent and sequence of the demolition, including, but not limited to:

3.1. Work involving a full demolition, a demolition performed in conjunction with work that meets the requirements of Article 101.4.5 of Title 28 of the Administrative Code,* a demolition that results in the demolition of more than 50 percent of the gross floor area of the building during the course of work over any 12-month period, or a demolition that results in the removal of one or more floors during the course of work over any 12-month period, a clear and detailed demolition sequence provided in narrative and illustrated in the plans shall also be provided. All phases shall be designated by a number or letter to clearly depict the required sequence of the work. Structural stability must be demonstrated through all phases of demolition. A "preparation phase" must be included indicating but not limited to the following: glass removal, sealing of windows, removal of equipment/fixtures, and cutting of services. A note must indicate that any required permits for termination of services will be obtained, including necessary Fire Department and Department of Buildings variances.

* Editor's note: Correct reference should be Section 28-101.4.5 of the Administrative Code.

3.2. Work involving a full demolition, or for a partial demolition that razes a portion of a building to grade, plan and section views detailing the end-of-demolition conditions, including any remaining foundation elements and means of stabilizing those elements and the adjoining property via complete backfill, berms, shoring/bracing, or a similar approved method, shall be provided.

3.3. Work involving a demolition that involves the removal of foundation elements, a detailed section showing the elevation of the footings of the building being demolished as it relates to the footings of all adjoining property shall be provided.

3.4. Work involving a demolition that involves an excavation component or the removal of foundation elements, a sequence showing coordination between the demolition work and the installation of sheeting, shoring, bracing, underpinning, berming, backfill, or other methods of supporting excavations and/or adjoining property shall be provided.

4. Bracing, shoring¸ and other stabilization measures necessary to support all demolition operations, and adjoining ground, or structures, as needed, through all sequences of the demolition. If shoring, bracing, or other stabilization measures must be taken prior to demolition, a clear and detailed sequence of this work, along with clear identification that this work is required to be performed prior to the start of any demolition activity shall be included;

5. Where interior walls are to be demolished, a statement shall be provided indicating that the removal of the interior walls has been coordinated with the load capacity of the exterior walls and floors;

6. Partitions required for the stability of the structure or required for egress shall be clearly indicated on the plans, and the sequence of operations shall indicate when the partitions can be safely removed;

7. Where mechanical demolition equipment, other than handheld devices, is to be used, a listing and description of all such proposed equipment to be used in the demolition, including the scope of equipment work and positioning of equipment on the existing structure. The description of the equipment shall include the gross weight of the equipment and calculations showing the adequacy of the existing structure to support loads imposed by such equipment. Any conditions imposed on the use or position of the equipment must be noted. If more than one piece of demolition equipment is proposed to be used at the same time, the effect of the simultaneous loads imposed on the existing structure shall be described and investigated. The plans may allow for alternate types of equipment within the same weight range and type. Such alternatives must be listed on the plans. A list of cranes to be utilized, if applicable, must also be provided, including their location along with a note that any department-required permit for the crane shall be obtained;

8. A description of compliance with the applicable provisions of Sections 3306.8 and 3306.9 of this code;

9. A statement regarding whether the building where demolition operations are to occur shares a party wall or party foundation with an adjoining structure;

10. For demolition work that occurs on the exterior of a building, or for demolition operations that will disturb elements shared between buildings, including but not limited to party walls or party foundations, the adjoining properties shall be indicated, with property lines, addresses, block and lot numbers, stories and heights of all buildings, and horizontal offset dimensions of all adjacent structures from the property lines of structure being demolished and from the structure clearly shown. Any encroachments on adjoining property, including but not limited to fencing, barriers, or safety zones, along with a note stating that permission shall be obtained from the adjoining property owner, shall also be clearly indicated;

11. Pedestrian protection, unenclosed perimeter protection, or adjoining property protection installed in accordance with Sections 3307, 3308, or 3309, including but not limited to, as applicable:

11.1. Fencing/gates, including type, location, and dimensions, as well as the location of the project information sign on the fence;

11.2. Sidewalk sheds, including locations and dimensions;

11.3. Supported scaffolding and netting, including heights above the building being demolished, details of anchorage to building, and netting type; and

11.4. Adjoining roof, mechanical equipment, and yard protection, including types, locations, and dimensions.

12. The boundaries of the demolition work zone and demolition safety zone, as required by Section 3306.2, and the method of defining those zones and preventing access (e.g. fencing, barriers, etc.);

13. All means and methods of debris removal from the point of demolition to the public roadway (carting), including openings in floors, chutes, etc., as well as the location of any debris sorting operation and barriers to separate the operation from other demolition activity;

14. Means of egress for all phases of the demolition;

15. The elevator or hoist in readiness, if required;

16. Measures to protect, stabilize, and brace, as necessary, fire escapes, cornices, flues, and chimneys;

17. Where fire separation elements are to be breached or diminished during demolition operations in an occupied building, or between adjoining occupied or unoccupied buildings, temporary measures to maintain fire separation;

18. The methods of remediating adjoining lot line walls, including weatherproofing, repair, floor-to-wall anchorage, etc.;

19. A listing of required special inspections;

20. Application numbers for associated filings (e.g. fencing, pedestrian protection, adjoining property protection, scaffolding, netting, underpinning, support of excavation, etc.); and

21. Reference to the monitoring plan, when a monitoring plan is required by Section 3306.12.

(Am. L.L. 2023/077, 6/11/2023, eff. 6/11/2023)

Editor's note: For related unconsolidated provisions, see Appendix A at L.L. 2023/077.

3306.5.1.1 Submittal documents for full or partial demolition using mechanical equipment other than handheld.

Submittal documents for full or partial demolition using mechanical equipment other than handheld shall be signed, sealed and submitted by a registered design professional.

3306.5.2 Maintenance of submittal documents.

The approved set of submittal documents shall be kept at the site at all times and be accessible for inspection in accordance with Section 3301.7. It shall be a violation of this code to use mechanical equipment, whether handheld or other than handheld, to perform full or partial demolitions unless the approved submittal documents required by Section 3306.5.1 are available for inspection. Failure to make submittal documents available on site may result in the issuance of a stop work order.

3306.5.3 Filing requirements.

Where submittal documents are required in connection with full or partial demolition in accordance with Section 3306.5, applications shall be filed by the registered design professional in accordance with Article 104 of Chapter 1 of Title 28 of the Administrative Code and shall be approved prior to issuance of the work permit.

3306.5.4 Assessment of structure to be demolished.

Submittal documents required by Section 3306.5 shall be based upon an assessment of the structure where demolition operations are to occur. The assessment shall be performed by a registered design professional. The assessment shall, at a minimum, consist of an interior and exterior physical inspection of the structure where demolition operations are to occur, in which all areas to be demolished are accessed during the inspection. The results of the assessment shall be documented in an assessment report prepared by the person who performed the assessment. If the assessment was performed by a registered design professional other than the registered design professional who prepares the submittal documents, the report shall be provided to the registered design professional who prepares the submittal documents.

3306.5.5 Assessment of adjoining structures.

Where a bearing masonry or wood framed building shares a party wall or party foundation with a building that is to undergo a full demolition, a demolition performed in conjunction with work that meets the requirements of Section 101.4.5 of Title 28 of the Administrative Code,* a demolition that results in the demolition of more than 50 percent of the gross floor area of the building during the course of work over any 12-month period, or a demolition that results in the removal of one or more floors during the course of work over any 12-month period, the submittal documents required by Section 3306.5 shall be based upon an assessment of such bearing masonry or wood framed building. The assessment shall be performed by a registered design professional. The assessment shall, at a minimum, consist of an interior and exterior visual inspection of the structure where demolition operations are to occur. The results of the assessment shall be documented in an assessment report prepared by the person who performed the assessment. If the assessment was performed by a registered design professional other than the registered design professional who prepares the submittal documents, the report shall be provided to the registered design professional who prepares the submittal documents.

* Editor's note: Correct reference should be Section 28-101.4.5 of the Administrative Code.

3306.5.6 Review of pertinent plans and records.

Submittal documents required by Section 3306.5 shall be based upon a review of all pertinent plans and records of the structure where demolition operations are to occur. In addition, where a building is to undergo a full demolition, a demolition performed in conjunction with work that meets the requirements of Section 101.4.5 of Title 28 of the Administrative Code,* a demolition that results in the demolition of more than 50 percent of the gross floor area of the building during the course of work over any 12-month period, or a demolition that results in the removal of one or more floors during the course of work over any 12-month period, the submittal documents shall further be based upon a review of all pertinent plans and records of all adjoining structures. The review shall be performed by the registered design professional who prepares the submittal documents.

* Editor's note: Correct reference should be Section 28-101.4.5 of the Administrative Code.

3306.5.7 Incorporate all other relevant reports.

The demolition submittal documents must incorporate all the conditions and findings identified in the geotechnical report when such report is required by Section 1803.6, the evaluation analysis when such analysis is required by Section 1817, the assessment reports required by Section 3306.5.4 and 3306.5.5, and the preconstruction survey when such survey is required by Section 3309.4.3.

3306.6 Special inspection.

Demolition shall be subject to special inspection in accordance with Chapter 17.

3306.7 Demolition of weakened structures.

Where a structure to be demolished has been partially wrecked or weakened by fire, flood, explosion, age, or other causes, it shall be shored or braced to the extent necessary to permit orderly full demolition or partial demolition without collapse. The necessary measures to ensure a safe demolition shall be determined by the owner's registered design professional and shall be approved by the commissioner.

Exception: Shoring or bracing are not required for the full demolition of a building, subject to the approval of the commissioner, provided:

1. The demolition is conducted with mechanical demolition equipment, other than handheld devices; and

2. No demolition operation occurs, or equipment is located, within the structure of the building.

3306.8 Demolition sequence.

Any structural member that is being dismembered shall not support any load other than its own weight. No wall, chimney, or other structural part shall be left in such condition that it may collapse or be toppled by wind, vibration or any other cause. The method of removal of any structural member shall not destabilize remaining members. All handling and movement of material or debris shall be controlled such that it will not develop unaccounted impact loads on the structure.

3306.8.1 Structural steel, reinforced concrete, and heavy timber buildings.

Structural steel, reinforced concrete, and heavy timber buildings, or portions thereof, shall be demolished column length-by-column length and tier-by-tier. Structural members shall be chained or lashed in place to prevent any uncontrolled swing or drop.

Exception: Where the design applicant who prepared the submittal documents required by Section 3306.5 has demonstrated the adequacy of alternate means of demolition through plans, calculations, or the establishment of safety zones, as appropriate, the commissioner may accept such alternative means of demolition.

3306.8.2 Masonry buildings with wooden floors.

Demolition of masonry buildings with wooden floors shall comply with the following requirements:

1. Demolition of walls and partitions shall proceed in a systematic manner, and all work above each tier of floor beams shall be completed before any of the supporting structural members are disturbed.

2. Sections of masonry walls shall not be loosened or permitted to fall in such masses as to affect the carrying capacity of floors or the stability of structural supports.

3. No section of masonry wall with a height to thickness ratio greater than 22 shall be permitted to stand without the wall being braced. Such bracing shall be designed by a registered design professional.

3306.9 Safeguards.

Demolition shall be conducted in accordance with the requirements of Sections 3306.9.1 through 3306.9.16.

3306.9.1 Utilities and service lines.

The requirements of Section 3303.2 shall apply.

3306.9.2 Party wall exits, fire exits.

The requirements of Section 3303.9 shall apply.

3306.9.3 Dust.

Dust producing operations shall be wetted down to the extent necessary to control the dust.

3306.9.4 Water accumulation.

The requirements of Section 3303.14 shall apply.

3306.9.5 Temporary elevators and standpipe systems.

The requirements of Sections 3303.8 and 3303.12 shall apply.

3306.9.6 Sprinkler systems.

The requirements of Section 3303.7.4 shall apply.

3306.9.7 Use of explosives.

The use of explosives in demolition operations shall conform to the requirements and limitations imposed by the New York City Fire Code and Section 3312.

3306.9.8 Hazards to be removed.

Prior to the commencement of demolition operations, hazards shall be removed in accordance with Sections 3306.9.8.1 through 3306.9.8.4.

3306.9.8.1 Combustible content.

Prior to the commencement of demolition operations, the area authorized to be demolished by the work permit shall be thoroughly cleaned of combustible content and debris, including but not limited to building contents and exterior finishes, down to the structural elements.

3306.9.8.2 Asbestos.

Prior to the commencement of demolition operations, all asbestos shall be removed from the area authorized to be demolished by the department work permit, and certification to that effect shall be filed with the department and the Department of Environmental Protection. Such asbestos removal shall be in accordance with Section 28-106 of the Administrative Code and rules promulgated by the commissioner of the Department of Environmental Protection.

3306.9.8.3 Glass.

Prior to the commencement of demolition operations, all glass located in the area authorized to be demolished by the work permit, including but not limited to glass in windows, doors, skylights, and fixtures, shall be removed.

Exception: Demolition operations relating to the alteration, maintenance, or repair of a facade.

3306.9.8.4 Steam and fuel.

Prior to the commencement of demolition operations, all pipes, tanks, boilers, or similar devices containing steam or fuel and located in the area authorized to be demolished by the work permit shall be purged of such steam or fuel.

Exception: Pipes, tanks, boilers, or similar devices containing steam or fuel located in the area authorized to be demolished by the work permit and which will not be disturbed during the course of the demolition operation may, in lieu of being purged, be safeguarded so as to prevent their being damaged during the course of demolition operations.

3306.9.9 Stairs.

All enclosed vertical shafts and stairs shall be maintained enclosed at all floors except the topmost floor being demolished, and all work on the topmost floor shall be completed before stair and shaft enclosures on the floor below are disturbed. All hand rails and banisters shall be left in place until actual demolition of such floor is in progress.

3306.9.10 Floors.

The safeguards of Sections 3306.9.10.1 through 3306.9.10.3 shall apply to demolition operations involving floors.

3306.9.10.1 Bearing partitions and headers.

No bearing partition shall be removed from any floor until the floor framing system on the floor above has been removed and lowered. All header beams and headers at stair openings and chimneys shall be carefully examined and, where required, shall be shored from the cellar floor through successive floors. All operations shall be continually monitored by a qualified person designated by the permit holder as the work progresses to detect any hazards that may develop.

3306.9.10.2 Floor openings not to aggregate more than 25 percent of the gross floor area.

Openings in any floor shall not aggregate more than 25 percent of the area of that floor unless it can be shown by submission from a registered design professional to the satisfaction of the commissioner that larger openings will not impair the stability of the structure.

3306.9.10.3 Covering of floor openings.

Floor openings used for the removal of debris shall comply with Section 3306.9.12.1. Every opening not used for the removal of debris in any floor shall be clearly marked and solidly planked over by planking not less than 2 inches (51 mm) in thickness, or equivalent solid material, laid close.

3306.9.11 Storage of material.

Material shall not be stored on catch platforms, working platforms, floors, or stairways of any structure, except that any one floor of a building to be demolished may be used for the temporary storage of material when such floor can be evaluated by a registered design professional and proven to be of adequate strength to support one and one-half times the load to be superimposed. Such evaluation by the registered design professional shall be maintained by the permit holder and made available to the department upon request.

3306.9.11.1 Avoid interference.

Storage spaces shall not interfere with access to any stairway or passageway, and suitable barricades shall be provided so as to prevent material from sliding or rebounding into any space accessible to the public. All material shall be safely stored or piled in such storage locations in a manner that will not overload any part of the structure or create any hazard.

3306.9.11.2 Examination of connections.

Before any material is stored on any floor, the existing flooring adjacent to bearing walls, shear walls, beams and columns shall be removed and the connections of the floor framing system to the bearing walls, shear walls, beams and columns shall be carefully examined by a competent person designated by the permit holder to ascertain their condition and adequacy to support such material. If the connections are found to be in poor condition or inadequate to support the stored material, no material shall be deposited on the floor until these connections are shored from the cellar floor through each successive floor or otherwise strengthened to safely support such material.

3306.9.11.3 Removal of floor slabs for storage.

In buildings of noncombustible construction, floor slabs to an elevation of not more than 25 feet (7620 mm) above the legally established curb level may be removed to provide temporary storage for debris, provided that:

1. The stored debris is piled with sufficient uniformity to prevent lateral displacement of interior walls or columns as determined by a registered design professional.

2. The height of the piled material will not burst the exterior walls due to horizontal loading as determined by a registered design professional.

3. The operation does not otherwise endanger the stability of the structure.

3306.9.11.4 Cellar or basement storage.

Debris stored in the cellar or basement shall not be piled above the level of the adjacent exterior grade unless the demolition contractor provides sheet-piling, shoring, bracing, or such other means necessary to insure the stability of the walls and to prevent any wall from collapsing due to horizontal loading created by the debris as determined by a registered design professional. Where debris is stored against a party wall, the requirements of Section 3306.9.11.5 shall also apply.

3306.9.11.5 Examination of party walls.

Party walls shall be carefully examined by a competent person designated by the permit holder to ascertain the condition and adequacy of the party wall prior to the placement of any material that will impose a load upon such party wall. If the party wall is found to be in poor condition or inadequate to support the stored material, no material shall be deposited on the floor until the party wall is shored or otherwise strengthened as determined by a registered design professional to safely support such material.

3306.9.12 Removal of material.

Debris, bricks, and similar material shall be removed through openings in the floors of the structure, or by means of chutes, buckets, or hoists that comply with the provisions of this chapter.

3306.9.12.1 Floor openings used for the removal of debris.

Every opening in a floor used for the removal of debris shall be tightly enclosed with a shaftway, extending from floor to floor, with such shaftway enclosed with:

1. Planking not less than 2 inches (51 mm) in thickness, or equivalent solid material; or

2. Where the opening is used for the removal of noncombustible material, wire mesh may be utilized in lieu of planking, provided such mesh is not less than number 18 gauge wire mesh, with openings in the wire no larger than 1/2 inch (13 mm), and also provided that the wire mesh is securely attached, in accordance with drawings developed by a registered design professional, to the shaftway so that the wire mesh enclosure in any location does not deflect more than 2 inches (51 mm) when a force of at least 200 pounds (890 n) is applied along any horizontal portion of such wire mesh enclosure.

Exceptions:

1. In buildings not more than six stories or 75 feet (22 860 mm) in height, whichever is less, a shaftway is not required. Instead openings in the floor shall be clearly marked and solidly planked over while not in use by planking not less than 2 inches (51 mm) in thickness, or equivalent solid material, and laid close.

2. A shaftway is not required at the working deck. Instead, openings in the working deck shall be clearly marked and solidly planked over while not in use by planking not less than 2 inches (51 mm) in thickness, or equivalent solid material, laid close.

3306.9.12.1.1 Temporary removal of protection.

Wherever a shaftway or planking required by Section 3306.9.12.1 has been temporarily removed to permit debris removal, the floor opening shall be protected by a guardrail system that meets the requirements of Sections 3308.7.1 through 3308.7.5. Such protection required by Section 3306.9.12.1 shall be promptly replaced in position upon the ceasing of such work at the end of each workday.

3306.9.12.2 Protection of wall openings.

In any building more than 25 feet high (7620 mm), any window or other exterior wall opening that is within 20 feet (6096 mm) of a floor opening used for the passage of debris from levels above shall be solidly boarded up or otherwise substantially covered, unless such window or opening is so located as to preclude the possibility of any person being injured by material that may fall from such window or opening.

3306.9.12.3 Chutes.

Chutes used in association with the removal of materials shall comply with Section 3303.5.5.

3306.9.13 Rodent extermination.

A licensed exterminator shall effectively treat the premises for rodent extermination as per the requirements of the Department of Health and Mental Hygiene for the following work:

1. Where the proposed construction work involves 50% or more of the floor area of a building;

2. Where the proposed vertical or horizontal enlargement increases the amount of building floor area by more than 25% over the amount of existing floor area of the building;

3. Where the proposed demolition involves more than 50% of the floor area of a building;

4. Where full demolition work is proposed.

(Am. L.L. 2022/109, 11/18/2022, eff. 5/17/2023)

3306.9.14 Chimneys.

Where brick or masonry chimneys cannot be safely toppled or dropped, all materials shall be dropped down on the inside of such chimneys.

3306.9.15 Partitions.

Partitions required for the stability of the structure or required for egress, as identified in the submittal documents required by Section 3306.5, shall be clearly marked prior to the commencement of demolition operations. Such partitions shall not be removed until a competent person designated by the permit holder has determined the demolition sequence, as identified in the submittal documents, has reached the point the partitions can be safely removed, and authorizes their removal.

3306.9.16 Temporary weather protection.

Temporary weather protection shall be installed and maintained by the demolition contractor, as necessary, to protect building systems or elements that may be susceptible to exposure to the weather during periods where the permanent weather protection has been breached, diminished, or is not yet in place. Such building systems or elements include, but are not limited to, walls, party walls, roofs, areas of missing brick, loose lain brick, and exposed electrical conduit.

3306.10 Removal of foundations and slabs.

Where a building, or any portion, has been demolished to grade, the floor slab or foundation of such building, or portion, shall be removed and the site backfilled to grade.

Exceptions:

1. Cellar floors may remain provided the cellar floor slab is broken up to the extent necessary to provide ground drainage and prevent accumulation of water, and also provided that all fixtures or equipment that would cause voids in the fill are removed.

2. Where portions of a foundation, underpinning, or similar elements, other than a cellar floor, are to remain and be covered with backfill, a waiver approved by the commissioner shall be obtained. Drawings prepared by a registered design professional depicting the remaining buried structure shall be submitted with the waiver request.

3. Where a floor slab or foundation is to remain and not be backfilled, a waiver approved by the commissioner shall be obtained. Such request for waiver shall be accompanied by a statement and drawings prepared by a registered design professional demonstrating the necessity for retaining the existing floor slab or foundation for future construction or site remediation, as well as demonstrating positive cellar drainage to an approved place of disposal.

3306.10.1 Evaluation of fill on adjoining foundations.

Where the installation of fill will impart a load on an adjoining foundation, a registered design professional shall evaluate the foundation prior to the placement of the fill. If necessary, sheeting, shoring, or bracing shall be provided as indicated by the registered design professional.

3306.11 Completion of demolition operations.

All work required for structural stability and permanent waterproofing of adjacent buildings must be completed prior to demolition sign-off.

3306.12 Monitoring of adjoining structures during demolition.

Where a bearing masonry or wood framed building shares a party wall or party foundation with a building that is to undergo a full demolition, a demolition performed in conjunction with work that meets the requirements of Section 101.4.5 of Title 28 of the Administrative Code,* a demolition that results in the demolition of more than 50 percent of the gross floor area of the building during the course of work over any 12-month period, or a demolition that results in the removal of one or more floors during the course of work over any 12-month period, such bearing masonry or wood framed building shall be monitored during the demolition operation. The monitoring shall be in accordance with a monitoring plan prepared or accepted by the registered design professional who prepared the submittal documents in accordance with Section 3306.5. The monitoring plan shall be acceptable to the commissioner and shall include but not be limited to, the monitoring frequency, reporting requirements for the monitoring program, anticipated movement and settlement thresholds, and procedures to be implemented when thresholds are exceeded.

* Editor's note: Correct reference should be Section 28-101.4.5 of the Administrative Code.

3306.13 Additional monitoring required by the commissioner.

When, in the opinion of the commissioner, a demolition operation poses a potential hazard to an adjacent building, elevations of the building under demolition or the adjacent building, or both, shall be recorded or other monitoring procedures shall be implemented by a registered design professional at intervals of 24 hours or less as determined by the commissioner to ascertain if movement has occurred.

Section BC 3307. Protection of Pedestrians

Open this section

3307.1 Scope.

Pedestrians shall be protected during construction or demolition activities as required by this section and by the Department of Transportation.

3307.2 Streets, including bicycle lanes and sidewalks, as well as walkways and pathways.

Streets, including bicycle lanes and sidewalks, as well as walkways and pathways, either within the public way or within a site, shall meet the requirements of Sections 3307.2.1 through 3307.2.6, and the requirements of the Department of Transportation.

3307.2.1 Obstruction of streets, including bicycle lanes and sidewalks.

The requirements of the Department of Transportation shall apply with regard to the closing of streets, including bicycle lanes and sidewalks, or to the obstruction of any part thereof.

3307.2.2 Temporary public walkway in the street.

Where authorized by the Department of Transportation, a temporary walkway open to the public may be provided in the street in front of the site. Such temporary walkway shall be protected in accordance with the requirements of the Department of Transportation. Department of Transportation authorization is required where a temporary walkway and a temporary or permanent bicycle lane will share the same space.

3307.2.3 Temporary public walkway within the site.

Where authorized by the commissioner, a temporary walkway open to the public may be provided through a site that is otherwise fenced and closed to the public. Such temporary walkway shall be:

1. Protected by a sidewalk shed, or where acceptable to the commissioner, provided with overhead protection and lighting equivalent to that afforded by a sidewalk shed;

2. Enclosed along the side facing the site with a solid fence that meets the requirements of Section 3307.7. Where the sidewalk shed or equivalent overhead protection extends beyond 8 feet (2438 mm) in height, the fence shall extend to the top of the overhead protection, or the gap between the top of the fence and the overhead protection shall be enclosed with a wire screen comprised of not less than number 18 gauge wire mesh, or equivalent synthetic netting that is flame retardant in accordance with NFPA 701, with openings in the wire or synthetic mesh no larger than 1/2 inch (13 mm) in the vertical or horizontal dimensions and 3/4 inch (19 mm) in any other dimension; and

3. Enclosed along the side facing the street in accordance with Section 3307.4.7.

3307.2.4 Pathways.

Where a means of ingress/egress to a building or structure remains open to the public during the course of construction or demolition, an adequate pathway shall be provided between such means of ingress/egress and the sidewalk, or in lieu of the sidewalk, the temporary public walkway provided in accordance with Section 3307.2.2.

3307.2.5 Foot bridges.

Where foot bridges are utilized as part of a sidewalk, walkway, or pathway, they shall be provided with guardrails for the entire length, and shall have cleats to prevent slipping. Where planks are used to pave the walkway of the foot bridge, the planks shall be laid close and securely fastened to prevent displacement. Planks shall be of uniform thickness, and all exposed ends on ramps shall be provided with beveled fillers to eliminate tripping hazards.

3307.2.6 Requirements for sidewalks, temporary walkways, foot bridges, and pathways.

Sidewalks, walkways, foot bridges, and pathways that remain open to the public shall be accessible and shall be provided with:

1. A continuous clear path, free of obstruction, at least 5 feet (1524 mm) in width;

2. A durable walking surface capable of supporting all imposed loads and in no case shall the design live load be less than 150 pounds per square foot (732.4 kg/m 2 );

3. Mirrors at locations where a pedestrian's or bicyclist's view is obstructed, including but not limited to blind corners, blind turns, and points where fencing or similar barriers project into a sidewalk, temporary walkway, foot bridge, or pathway;

4. For a temporary walkway or foot bridge where there is a change in elevation along the walkway or foot bridge, a ramp with a running slope not steeper than one unit vertical in 12 units horizontal (8-percent slope) with a level landing at least 5 feet long at the top and bottom of each run, and if there is a total rise greater than 6 inches (152 mm), handrails; and

5. For a temporary walkway or foot bridge where the running slope of such walkway or foot bridge is steeper than one unit vertical in 20 units horizontal (5-percent slope) and there is a total rise greater than 6 inches (152 mm), handrails.

Exception: Where it is not possible to provide the continuous clear path to the extent required by Item 1, the sidewalk, temporary walkway, or pathway shall be kept open to the extent required by the Department of Transportation, and shall also comply with applicable provisions of ICC A117.1, the ADA Accessibility Guidelines for Buildings and Facilities and/or the ADA Accessibility Guidelines for Pedestrian Facilities in the Public Right-of-Way, as applicable.

(Am. L.L. 2023/077, 6/11/2023, eff. 6/11/2023)

Editor's note: For related unconsolidated provisions, see Appendix A at L.L. 2023/077.

3307.3 Sidewalk sheds and fences.

Sidewalk sheds shall be provided as required by Section 3307.6. Fences shall be provided as required by Section 3307.7.

3307.4 Warning signs, personnel, and barriers.

Warning signs, personnel, or barriers shall be provided to protect the public from hazards generated by construction or demolition activity in or adjacent to a public way as set forth in Sections 3307.4.1 through 3307.4.7.

3307.4.1 Obstructions and openings.

Obstructions or openings located in a public way shall be marked and guarded by barriers, flags, or signs in accordance with the requirements of the Department of Transportation.

3307.4.2 Dangerous areas.

In areas where special danger to the public exists, including but not limited to vehicle entrances and exits, hoisting areas, points of storage of explosives or highly flammable material, blasting areas, or discharge ends of chutes, descriptive warning signs shall be provided in accordance with the requirements of the Department of Transportation.

3307.4.3 Vehicular traffic.

Whenever any work is being performed over, on, or in close proximity to a highway, street, or similar public way, control and protection of traffic shall be provided by barriers, signals, signs, flagpersons, or other devices, equipment, and personnel in accordance with the requirements of the Department of Transportation.

3307.4.4 Areas open to persons other than workers.

A flagperson shall be provided whenever intermittent operations are conducted on, or adjacent to, areas open to use by persons other than workers, or when dangerous operations, such as blasting, may affect such areas. Where required by the Department of Transportation, designated personnel shall also be provided in addition to flag persons.

3307.4.5 Additional signs.

In addition to the requirements of this section, information panels and signs shall also be provided as required by Section 3301.9.

3307.4.6 Prohibited signs.

See Section 3301.9.

3307.4.7 Work or storage zones.

Where work or storage related to the construction or demolition of a building or structure is occurring adjacent to a sidewalk shed or equivalent overhead protection, and such work or storage area is not contained within the enclosed and fenced area of the site as specified in Section 3307.7, fencing, barriers, or netting complying with Items 1, 2, or 3 of this section shall be provided to separate the sidewalk, walkway, foot bridge, or pathway from the work or storage area.

1. In an area where a material hoist, personnel hoist, hoistway, chute, or hoisting zone is located, a solid opaque fence or barrier shall be provided. Such fence or barrier shall be securely attached to the sidewalk shed or equivalent overhead structure, and shall extend from the level of the ground to the deck of the sidewalk shed or equivalent overhead protection.

2. In an area where a special hazard exists, including but not limited to areas of high pile storage or areas where operations that produce sparks or debris are occurring, such as cutting or grinding, a fence or barrier shall be provided. Such fence or barrier shall be securely attached to the sidewalk shed or equivalent overhead structure, and shall extend from the level of the ground to the deck of the sidewalk shed or equivalent overhead protection. Portions of the fence or barrier at a height of 4 feet (1219 mm) or less shall be comprised of solid opaque material. Portions of the fence or barrier above a height of 4 feet (1219 mm) shall be comprised of material sufficient to protect the public from the special hazard and shall be transparent so as to allow a clear view into and from the area protected by the sidewalk shed or equivalent overhead protection, for example, chain link fencing, neatly framed panels consisting of nonfrangible acrylic paneling, or wire screen comprised of not less than number 18 gauge wire mesh, or equivalent synthetic netting that is flame retardant in accordance with NFPA 701, with openings in the wire or synthetic mesh no larger than 1/2 inch (13 mm) in the vertical or horizontal dimensions and 3/4 inch (19 mm) in any other dimension.

3. In all other instances, one of the following shall be provided:

3.1. A chain link fence that is at least 8 feet (2438 mm) high;

3.2. A solid barrier that is at least 32 inches (813 mm) high, topped by a chain link fence extending to a height of at least 8 feet (2438 mm) above the level of the ground; or

3.3. A wire screen comprised of not less than number 18 gauge wire mesh, or equivalent synthetic netting that is flame retardant in accordance with NFPA 701, with openings in the wire or synthetic mesh no larger than 1/2 inch (13 mm) in the vertical or horizontal dimensions and 3/4 inch (19 mm) in any other dimension. Such wire screen or synthetic netting shall extend from the ground to a height of at least 8 feet (2438 mm) above the level of the ground and shall be securely attached to the sidewalk shed or equivalent overhead protection. A solid barrier that is at least 32 inches (813 mm) high may be installed in lieu of bringing the netting fully to the ground, provided the bottom of the netting is also securely attached to the solid barrier.

(Am. L.L. 2023/077, 6/11/2023, eff. 6/11/2023)

Editor's note: For related unconsolidated provisions, see Appendix A at L.L. 2023/077.

3307.5 Watchperson and flagperson.

Watchpersons shall be provided as required by Section 3303.3. Flagpersons shall be provided as required by Section 3307.4.

3307.6 Sidewalk sheds.

Sidewalk sheds shall be provided as required by this section to protect pedestrians from construction or demolition operations.

3307.6.1 Permit.

No sidewalk shed shall be installed without a permit in accordance with the requirements of Chapter 1 of Title 28 of the Administrative Code.

3307.6.2 Where required.

A sidewalk shed shall be installed and maintained to protect all sidewalks, walkways, and pathways within the property line of a site, and all public sidewalks that abut the property, as follows:

1. When such sidewalk, walkway, or pathway is to be located immediately below a scaffold, mast climber, or chute. The sidewalk shed shall be installed prior to the installation of such equipment and shall not be removed until such equipment has been dismantled and/or removed from the area being protected;

2. When a structure higher than 40 feet (12 192 mm) or greater is to be constructed, and the sidewalk, walkway, or pathway is within a perpendicular distance from the new structure that is equal to or less than half the height of the new structure. The sidewalk shed shall be installed when the structure reaches the planned height of the shed. Such shed shall not be removed until the structure is enclosed, all exterior work has been completed and the sash is glazed above the second story, the facade has been cleaned down, and all exterior chutes, scaffolds, mast climbers, and hoisting equipment have been dismantled and removed from the site;

3. When a portion of a facade over 40 feet (12 192 mm) above curb level is to be constructed, altered, maintained, or repaired, or a vertical or horizontal enlargement is to occur at a height over 40 feet (12 192 mm) above curb level, and the sidewalk, walkway, or pathway is within a perpendicular distance from the structure that is equal to or less than half the height of such facade work or vertical or horizontal enlargement. The sidewalk shed shall be installed prior to the commencement of work at a height greater than 40 feet (12 192 mm) above curb level. Such shed shall not be removed until the building is enclosed, all exterior work has been completed and the sash is glazed above the second story, the facade has been cleaned down, and all exterior chutes, scaffolds, mast climbers, and hoisting equipment have been dismantled and removed from the site; or

4. When a structure higher than 25 feet (7620 mm) is to undergo a full demolition, or when exterior partial demolition, other than that performed in conjunction with the construction, alteration, maintenance, or repair of a facade, is to occur at a height greater than 25 feet (7620 mm) above curb level, and the sidewalk, walkway, or pathway is within a perpendicular distance from the structure that is equal to or less than half the height of the demolition work. The sidewalk shed shall be installed prior to the commencement of demolition work. Such shed shall remain in place until the building has been razed to the height of the shed, or where the building is not being fully demolished, until all demolition work has been completed and all exterior chutes, scaffolds, mast climbers, and hoisting equipment have been dismantled and removed from the site.

Exceptions: Except where specifically required by the commissioner to protect the public from unique hazards at the site, sidewalk sheds are not required for:

1. Sidewalks, walkways, and pathways, or portions thereof, that are closed to the public.

2. Temporary walkways in accordance with Section 3307.2.3 that are provided with lighting and overhead protection equivalent to that afforded by a sidewalk shed.

3. Inspections, including a facade inspection, provided no work occurs during the inspection.

4. Sign hanging occurring by or under the direct and continuing supervision of a licensed sign hanger.

5. Window washing.

6. Work confined to the roof of an existing building, provided that:

6.1. The edge of the roof is enclosed to a height of 42 inches (1067 mm) with a solid parapet;

6.2. Such parapet is of sufficient strength to resist accidental impact during construction;

6.3. The work does not exceed the height of the parapet or is set back from the edge of the roof at a distance that is equal to or greater than half the height of the work; and

6.4. No work occurs on the parapet itself, and no material is placed or stored on the parapet during the course of the work.

7. Subject to the approval of the commissioner, work of limited scope and duration provided that:

7.1. During the course of the work the area immediately under the work zone is temporarily closed to the public by means of barriers, cones, or caution tape, and flagpersons are provided to direct pedestrian traffic;

7.2. At the end of the day the facade of the building is left in a safe condition and fully enclosed; and

7.3. There is compliance with Section 3307.2.1.

8. Locations where a cantilevered platform has been installed, provided that:

8.1. The cantilevered platform is approved by the commissioner;

8.2. The cantilevered platform provides overhead protection equivalent to a sidewalk shed; and

8.3. The cantilevered platform is installed below the level of work to be performed, excluding work performed at the first story.

9. Areas along an exposure that are located more than 5 feet (1524 mm) beyond those required for compliance with Item 1 of Section 3307.6.2, provided that:

9.1. The work is limited to the alteration, maintenance, or repair of a facade, and does not constitute a facade recladding as defined in rules promulgated by the commissioner; and

9.2. The entire exposure where facade work is to occur is covered by either:

9.2.1. A supported scaffold with netting and guardrails in accordance with Section 3314.8; or

9.2.2. A site specific engineered enclosure system in accordance with Section 3309.17.

3307.6.2.1 Sidewalk shed alternatives.

The department shall promulgate rules for the use of containment netting as an alternative to a sidewalk shed for areas with no public access or for use on a building exposure adjoining the exposure where facade work is to occur.

(L.L. 2025/047, 4/17/2025, eff. 8/15/2025)

Editor's note: For related unconsolidated provisions, see Appendix A at L.L. 2025/047.

3307.6.3 Area to be protected.

The decking of the sidewalk shed shall extend:

1. The full length of the area that falls within the zone specified in Section 3307.6.2, plus an additional 5 feet (1524 mm) beyond such length, or to within 18 inches (457 mm) of the curb line, whichever is less; or where the sidewalk shed is installed to protect against an unenclosed facade, work, or equipment that is greater than 100 feet (30 480 mm) above the ground, the decking of the sidewalk shed shall extend the full length of the area that falls within in the zone specified in Section 3307.6.2, plus an additional 20 feet (6096 mm) on both ends beyond such length, or to within 18 inches (457 mm) of the curb line, whichever is less.

2. The full width of the sidewalk, walkway, or pathway that falls within the zone specified in Section 3307.6.2, except for a clearance to avoid existing obstructions, not to exceed 18 inches (457 mm) along the curb.

Exceptions:

1. Where it is not possible to bring the deck tightly against the face of an abutting building, structure, or fence, the deck shall be brought to within 1 inch (25 mm) of the face of such building, structure, or fence, with the resulting gap sealed or covered by material of sufficient manner and strength capable of trapping falling debris.

2. Openings in the deck to avoid tree trunks and branches, provided such opening is brought as close to the tree as practical without damaging the tree.

3. When installed exclusively for the maintenance or repair of an existing facade of a building, and the building does not have any setbacks above the second story, nor any permanent or temporary projections above the second story, other than air conditioning units or window lintels or sills, the sidewalk shed decking need not cover sidewalks, walkways, or pathways, or portions thereof that are more than 40 feet (12 192 mm) from such building unless the commissioner orders a larger area to be covered due to a unique hazard at the site.

(Am. L.L. 2025/047, 4/17/2025, eff. 8/15/2025)

Editor's note: For related unconsolidated provisions, see Appendix A at L.L. 2025/047.

3307.6.4 Design and construction of sidewalk sheds.

Sidewalk sheds shall be designed and constructed in accordance with the requirements of Section 3307.6.4.1 through Section 3307.6.4.11. The requirements set forth in sections 3307.6.4.1 through 3307.6.4.11 may be added to, deleted, or modified by rules of the department as necessary to support the implementation of new sidewalk shed designs. Upon promulgation of such rules, the design and construction of sidewalk sheds shall be in accordance with such rules.

(Am. L.L. 2025/047, 4/17/2025, eff. 8/15/2025)

Editor's note: For related unconsolidated provisions, see Appendix A at L.L. 2025/047.

3307.6.4.1 Design required.

All sidewalk sheds shall be designed by a registered design professional. The sidewalk shed design shall be detailed on plans developed by the registered design professional. The plans shall be specific to the site and shall, at a minimum, include a plan view and an elevation view, with full dimensions, detailing:

1. The site;

2. The sidewalk shed;

3. Design load of the sidewalk shed (e.g. light duty, heavy duty);

4. All obstructions at the site that may interfere with the sidewalk shed, including but not limited to those listed in Section 3307.6.4.9;

5. Dunnage, blocking, or other founding material for the sidewalk shed, including details necessary to satisfy the requirements of Item 2.3 of Section 3307.6.4.10;

6. Anchorage of the sidewalk shed to the sidewalk or building, if necessary;

7. Materials or items to be placed or stored on the sidewalk shed, if authorized, in accordance with the requirements of Section 3307.6.4.2.2;

8. Any items connected to or attached to the sidewalk shed;

9. Locations, dimensions, and connection details of all signage, including parapet information panels, to be installed on the sidewalk shed; and

10. Location of any scaffolds and reference to a related application, if applicable.

3307.6.4.2 Design loads.

All sidewalk sheds shall be designed as a heavy duty sidewalk shed to carry a live load of at least 300 pounds per square foot (1464.7 kg/m). However, where the shed is installed to protect from work performed at a height of less than 100 feet (30 480 mm) above the ground, the sidewalk shed may be designed as a light duty sidewalk shed to carry a live load of at least 150 pounds per square foot (732.4 kg/m 2 ), provided that no item is stored or placed upon the shed.

3307.6.4.2.1 Wind and other loads.

The effect of wind and other loads on the sidewalk shed, and any item placed or attached on or to the shed, shall be considered in the design in accordance with Chapter 16.

3307.6.4.2.2 Storage.

Storage on sidewalk sheds shall be as follows:

1. No item shall be stored or placed upon a sidewalk shed designed as a light duty sidewalk shed under Section 3307.6.4.2.

2. Material may be stored or placed upon a sidewalk shed designed as a heavy duty sidewalk shed under Section 3307.6.4.2, provided conditions 2.1 through 2.4 are met:

2.1. The shed is designed for such storage, with such areas of storage or placement clearly designated on the drawings.

2.2. Where an item is to be stored or placed upon a heavy duty sidewalk shed, and such storage or placement is not in excess of 150 pounds per square foot (732.4 kg/m 2 ) on any square foot area of the sidewalk shed, the design live load of 300 pounds per square foot (1464.7 kg/m 2 ) need not be increased.

2.3. Where an item is to be stored or placed upon a heavy duty sidewalk shed, and such storage or placement is in excess of 150 pounds per square foot (732.4 kg/m 2 ) on any square foot area of the sidewalk shed, such shed shall be designed to carry:

2.3.1. The live load of 300 pounds per square foot (1464.7 kg/m 2 ) required of a heavy duty sidewalk shed; and

2.3.2. The load of the item to be placed or stored upon the shed, minus 150 pounds per square foot (732.4 kg/m 2 ).

2.4. The decking of the sidewalk shed does not consist of light-transmitting plastic material.

3307.6.4.3 Materials.

Sidewalk sheds shall be constructed out of wood, steel, or other material possessing equivalent strength and suitability.

3307.6.4.4 Vertical members and beams.

Vertical members and beams of the sidewalk shed shall conform with the following:

1. Vertical members and beams shall be adequately braced and connected to prevent displacement or distortion of the framework.

2. The vertical members of the sidewalk shed shall be plumb, with a tolerance of L/100, with "L" measured as the distance from the ground to the first cross brace or bottom of the beam.

3. Vertical members shall not be placed into the street unless approved by the Department of Transportation and protected in accordance with Department of Transportation requirements.

4. Vertical members placed on the sidewalk shall not be placed closer than 18 inches from the face of the curb line.

5. Vertical members shall be placed at least 7 feet (2134 mm) from the edge of a curb cut or vehicular access point, or where placed closer, the vertical members nearest the curb cut or vehicular access point shall be protected against displacement by vehicles, or shall be identified with high visibility marking.

6. Vertical members, cross bracing, struts, and similar lateral support shall be placed in such a manner that the sidewalk, walkway, or pathway continues to comply with the requirements of Section 3307.2.6 and avoids interference in accordance with Section 3307.6.4.9.

7. Where the sidewalk shed is installed in conjunction with the construction of a new major building, a horizontal span of at least 10 feet (3048 mm), as measured down the length of the sidewalk, walkway, or pathway, shall be provided between all vertical members, except where a shorter span is needed to avoid the curb or obstructions in accordance with Section 3307.6.4.9; and all cross bracing, struts, and similar lateral support between vertical members shall be placed a minimum of 8 feet (2438 mm) above the level of the sidewalk, walkway, or pathway. However, cross bracing, struts, and similar lateral support between vertical members may be placed lower where it is installed to guard against a tripping hazard in accordance with Item 2.5 of Section 3307.6.4.10. Mast sections, box towers, or similar elements used as vertical members shall, for the purposes of this item, be considered to be one vertical member, provided its base does not exceed 24 inches by 24 inches (610 x 610 mm). In the alternative, a sidewalk shed that is of a model whose prototype won a design competition recognized by the city may be installed instead.

8. Where the decking of the sidewalk shed consists of light-transmitting plastic material, all cross bracing, struts, and similar lateral support between vertical members shall be placed a minimum of 8 feet (2438 mm) above the level of the sidewalk, walkway, or pathway. However, cross bracing, struts, and similar lateral support between vertical members may be placed lower where it is installed to guard against a tripping hazard in accordance with Item 2.5 of Section 3307.6.4.10.

3307.6.4.5 Deck.

The deck of the sidewalk shed shall conform with the following:

1. The deck shall consist of 2-inch (51 mm) thick wood plank or equivalent material, or shall consist of light-transmitting plastic material, which shall include an anti-slip walking surface integral to the material or as an applied coating.

2. The deck shall be capable of sustaining the loads required by Section 3307.6.4.2.

3. The deck shall be solid, or shall consist of planking or panels laid close and made tight.

4. Where wood plank is used, corrugated metal or equivalent material shall be installed under the deck to catch fine grain material.

5. The deck of the sidewalk shed shall be brought tight to the face of any abutting building, structure, or fence, except for permissible gaps in accordance with Section 3307.6.3.

3307.6.4.6 Parapet.

A vertical parapet at least 3 feet 6 inches (1067 mm) high, but no more than 4 feet (1219 mm) high, as measured from the deck of the sidewalk shed, shall be constructed along all edges of the sidewalk shed. Such parapet shall consist of galvanized wire screen not less than No. 16 steel wire gauge with a 1/2 inch (13 mm) mesh. Parapets shall be securely attached to the shed with braced uprights. Parapet braces shall be made of metal. Temporary removal of a portion of the parapet is permitted for the handling of material, provided the parapet is immediately restored at the end of the handling operation.

Exceptions:

1. A parapet is not required along the edge of the sidewalk shed that abuts a building or structure.

2. A parapet is not required along the edge of a sidewalk shed that abuts an area that is closed to the public.

3. Where the sidewalk shed is installed in conjunction with the full or partial demolition of a building or structure, other than work limited to a facade project, the parapet shall consist of plywood or other equivalent solid material.

4. Where a sign, including a parapet information panel, is installed on a sidewalk shed, the parapet backing for the sign may consist of plywood or other equivalent solid material.

3307.6.4.7 Height.

The passageway under the shed shall have a minimum clear ceiling height of 12 feet (3658 mm). A lower height may be allowed if necessary to avoid interference with required light, air, or egress.

Exception: Lights that extend no more than 8 inches (203 mm) below the level of the deck shall be excluded from the clear ceiling height measurement.

(Am. L.L. 2025/047, 4/17/2025, eff. 8/15/2025)

Editor's note: For related unconsolidated provisions, see Appendix A at L.L. 2025/047.

3307.6.4.8 Lighting.

Sidewalk shed lighting shall be in conformance with the following:

1. The underside of sidewalk sheds shall be illuminated at all times either by daylight or electric light. The level of illumination shall be uniformly distributed along the entire length of the shed with a minimum of 1.5 footcandle (17 lux) measured at the level of the walking surface, or 5 footcandle (55 lux) measured at the level of the walking surface when the walking surface is within 10 feet (3048 mm) of a subway entrance, bus shelter, or similar transit facility, with a minimum luminous efficacy of 90 lumens per watt or greater and be rated to operate at temperatures of 5°F (-15°C) and higher.

2. All lamps shall be enclosed in water-resistant and vandal-resistant fixtures, and all lamps, wiring, and accessory components shall conform to the requirements of the New York City Electrical Code.

3. Photosensors may be used to control electric lighting according to the amount of daylight available. All photosensors shall be equipped for fail-safe operation ensuring that if the sensor or control fails, the lamps will provide the lighting levels required by this section.

4. LED lighting shall be used to satisfy the requirements of this section.

5. Where a lighting fixture serving a sidewalk shed is within a 20-foot (6096 mm) radius of the fenestration of a dwelling unit, such lighting fixture shall be equipped with directional adjustment or shielding to eliminate light trespass toward such dwelling unit.

(Am. L.L. 2025/047, 4/17/2025, eff. 8/15/2025; Am. L.L. 2025/050, 4/17/2025, eff. 8/15/2025)

Editor's note: For related unconsolidated provisions, see Appendix A at L.L. 2025/047.

3307.6.4.9 Avoid interference.

Sidewalk sheds shall be installed and located so to not unreasonably obstruct, either visually or physically, traffic, curb cuts, curb ramps, vehicular access points, street lighting poles, traffic lights or signs, fire hydrants, fire department connections, water sampling stations, bus shelters, or other street furniture, trees, adjacent show windows, means of ingress/egress, subway entrances, or access points to vaults, manholes, or other underground structures.

3307.6.4.10 Founding.

Sidewalk shed founding shall be in accordance with the following:

1. The surface upon which the shed ultimately bears, such as the street, sidewalk, or ground, shall be capable of supporting the design loads of the sidewalk shed, including any item placed or stored upon the shed, without damage, settlement, or deformation to such surface.

2. Vertical members of the sidewalk shed shall bear upon base plates, mud sills, dunnage, or other adequate firm foundation. Such items shall be:

2.1. Made of suitable firm material. Supports such as barrels, boxes, loose brick, loose stone, hollow block, or other unstable materials shall not be used.

2.2. Capable of transmitting and distributing the load imposed by the sidewalk shed vertical member to the underlying surface.

2.3. Secured against movement in any direction. When consisting of several pieces of material, such as multiple wood blocks, the material shall be nailed or otherwise positively connected together to prevent dislodgement. When more than 1 inch (25 mm) thick, the material shall be nailed or otherwise positively connected to the sidewalk shed vertical member.

2.4. Installed in such a manner that the sidewalk shed vertical member is fully supported across all horizontal dimensions.

2.5. Installed in such a manner that no portion extends more than 1.5 inches (38 mm) beyond any horizontal edge of the sidewalk shed vertical member, or where it extends beyond such distance, is adequately guarded or barricaded to prevent tripping hazards; the installation of cross bracing, struts, and similar lateral support between the corresponding vertical members of the sidewalk shed will satisfy this requirement.

3307.6.4.11 Color.

Sidewalk sheds shall meet the following color requirements:

1. Parapet frames and braces, legs and vertical members, beams, cross bracing, and metallic elements shall be a solid acceptable color.

2. Parapet panels shall be a solid acceptable color, or display artwork pursuant to Section 3307.11.

3. Acceptable colors are hunter green, metallic gray, or white. In addition, when the shed is installed for an existing building, other than one undergoing a full demolition or subject to the provisions of Section 28-101.4.5 of the Administrative Code, a color matching the facade, trim, cornice, or roof of the building, if the roof is sloped and visible from the street, is acceptable.

4. Where a fence is installed at the site in accordance with Section 3307.7, the fence and shed shall be the same color.

Exceptions: Regardless of the color of the shed:

1. Metallic elements and components of the shed may be painted metallic gray.

2. Mesh elements of parapet panels may be black.

(Am. L.L. 2025/047, 4/17/2025, eff. 8/15/2025; Am. L.L. 2025/103, 7/30/2025, eff. 8/15/2025)

Editor's note: For related unconsolidated provisions, see Appendix A at L.L. 2025/047.

3307.6.5 Installation, adjustment, maintenance, repair, use, inspection, and removal of sidewalk sheds.

Sidewalk sheds shall be installed, adjusted, maintained, repaired, used, inspected, and removed in accordance with the following requirements.

3307.6.5.1 Safe condition.

Sidewalk sheds shall be maintained in a safe condition and used in a manner that eliminates hazards to the public. Any hazardous conditions or defects discovered with the sidewalk shed shall immediately be brought to the attention of the permit holder for the shed.

3307.6.5.2 Supervision of installation, adjustment, repair, and removal.

The installation, adjustment, repair, or removal of a sidewalk shed shall be performed under the supervision of a competent person designated by the permit holder for the sidewalk shed.

3307.6.5.3 Responsibility for maintenance and use.

Sidewalk sheds shall be maintained and used by the general contractor, or where there is no general contractor, the contractor causing the work to be performed, or where there is no active work, the building owner.

3307.6.5.4 Storage or placement of items.

No item shall be stored or placed upon a sidewalk shed unless such shed has been designed for such storage or placement in accordance with Section 3307.6.4.2.2. Where such shed has been so designed items shall be stored or placed only in the area designated on the drawings for storage. Any item placed or stored upon a sidewalk shed shall be secured in a manner to prevent dislodgement, displacement by wind, and shall be distributed so as not to exceed the design limits of the sidewalk shed.

3307.6.5.5 Cleaning.

The decks of sidewalk sheds shall be broom swept and cleaned of material daily while active work is occurring at the site.

3307.6.5.6 Sharp edges.

Where located in an area that could pose a danger to the public, bolts and screws without a cap, and sharp edges, shall be protected to prevent injury to the public.

3307.6.5.7 Installation inspection.

Upon completion of the installation of a sidewalk shed, the shed shall be inspected by a qualified person designated by the designer, the permit holder for the shed, or a third party acceptable to both the designer and the permit holder to verify that the sidewalk shed is in a safe condition and has been installed in accordance with drawings and the requirements of this chapter.

3307.6.5.8 Periodic inspection.

A periodic inspection of the sidewalk shed shall be performed six months following the last installation, adjustment, or repair inspection required by Section 3307.6.5.7 or 3307.6.5.9, or where no such inspection has occurred within six months, six months following the last periodic inspection. The periodic inspection shall be performed by a qualified person designated by the designer, the permit holder for the shed, or a third party acceptable to both the designer and the permit holder to verify that the sidewalk shed is in a safe condition and is in compliance with drawings and the requirements of this chapter.

3307.6.5.9 Inspection following an adjustment or repair.

Following a repair or adjustment at a site, the sidewalk shed shall be inspected by a qualified person designated by the designer, the permit holder for the shed, or a third party acceptable to both the designer and the permit holder to verify the adequacy of the repair or adjustment and to verify the sidewalk shed is in a safe condition and is in compliance with drawings and the requirements of this chapter.

3307.6.5.10 Daily inspection.

Sidewalk sheds shall be visually inspected daily by a person designated by the general contractor, or where there is no general contractor, the contractor causing the work to be performed, or where there is no active work, by the building owner to verify compliance with Items 1 through 5 of this section.

1. The lights are functioning;

2. No brace or rail is hanging unattached at one or more ends;

3. No portions of the support structure are disconnected;

4. No section of parapet is missing; and

5. All legs remain on their support and are supported to the ground, and any wood blocking is free of visible rot.

Exception: The inspections for a scaffold suspended or supported above a sidewalk shed shall be in accordance with Section 3314.

3307.6.5.11 Inspection reports.

The results of an inspection required by Sections 3307.6.5.7 through 3307.6.5.10 shall be recorded in an inspection report that is prepared, signed, and dated by the person who performed the inspection. In lieu of compliance with the requirements of Section 3301.7, copies of the inspection reports required by Sections 3307.6.5.7 through 3307.6.5.10 shall be maintained at the site by the general contractor, or where there is no general contractor, the contractor causing the work to be performed, or where there is no active work, by the building owner.

3307.6.5.12 Discovery of defects.

Defects discovered during the course of performing an inspection required by Sections 3307.6.5.7 through 3307.6.5.10 shall immediately be brought to the attention of the permit holder for the shed.

3307.6.5.13 Notification of removal.

The permit holder for the shed shall notify the department no more than two business days following the complete removal of a sidewalk shed.

3307.6.5.14 Signage.

Only signage, including parapet information panels, allowed by Section 3301.9, and indicated on the sidewalk shed design drawings in accordance with Section 3307.6.4.1, shall be installed on the sidewalk shed. Sidewalk shed signage shall only be installed, adjusted, maintained, repaired, and removed by the permit holder for the shed or an entity authorized by the permit holder.

3307.6.5.15 Permit issuance notification.

No later than the fifth day of each month, the commissioner shall send an e-mail notification to all council members and community boards containing a report of all new sidewalk shed permits issued during the immediately preceding month. Such report shall be disaggregated by council district and community district and shall include the reason for each sidewalk shed installation.

(L.L. 2026/001, 1/3/2026, eff. 1/3/2026)

3307.7 Fences.

All sites where a new building is being constructed, or a building is being demolished to grade, shall be enclosed with a fence. Fences shall also be installed to fully or partially enclose sites, as necessary, where there exists an open excavation, an unenclosed portion of a building accessible at grade, or other hazard to the public. Such fences shall be at least 8 feet (2438 mm) high, built solid for their entire length out of wood or other suitable material, and shall be returned at the ends to the extent necessary to effectively close off the site.

Exceptions:

1. The commissioner may approve the use of a chain link fence to:

1.1. Secure a site where work has been interrupted or abandoned and discontinued, and a registered design professional has certified that all construction or demolition equipment and material that pose a hazard to the safety of the public or property have been removed from the site or safely secured. Prior to the resumption of work, the chain link fence shall be replaced by a solid fence meeting the requirements of this section.

1.2 Secure portions of a site where a one- two- or three-family building that is 40 feet (12 192 mm) or less in height, or a commercial building 40 feet (12 192 mm) or less in height, is being constructed or demolished and such building is setback at least 15 feet (4572 mm) from sidewalks or spaces accessible to the public and 5 feet (1524 mm) from adjoining buildings or structures.

2. Chain link fence shall be installed and maintained to secure a site where work has been discontinued for not less than two continuous years after a registered design professional has certified that all construction or demolition equipment and material that pose a hazard to the safety of the public or property have been removed from the site or safely secured. Prior to the resumption of work, the chain link fence shall be replaced by a solid fence meeting the requirements of this section.

(Am. L.L. 2021/074, 6/27/2021, eff. 12/24/2021; Am. L.L. 2023/077, 6/11/2023, eff. 6/11/2023)

Editor's note: For related unconsolidated provisions, see Appendix A at L.L. 2021/074 and L.L. 2023/077.

3307.7.1 Location of fence.

Where the fence is installed to fully enclose a site, the fence shall be constructed along the inside edge of the sidewalk or walkway and along the edges of the property line. Where a fence is installed to partially enclose a site, the fence shall be installed as necessary to prevent public access to any excavation or unenclosed portion of the building accessible at grade. Fences shall be installed and located so to not unreasonably obstruct, either visually or physically, traffic, curb cuts, curb ramps, vehicular access points, street lighting poles, traffic lights or signs, fire hydrants, fire department connections, water sampling stations, bus shelters, or other street furniture, trees, means of ingress/egress, or access points to vaults, manholes, or other underground structures.

Exceptions:

1. Fences may encroach onto the sidewalk in accordance with Department of Transportation requirements.

2. A fence is not required to be installed along the party wall of an adjoining property, provided no material is stored along such wall during the course of work.

3307.7.2 Gates.

Gates shall be sliding or shall swing into areas not accessible to the public, and shall be provided only where required for access to the site or to facilitate the work. Gates shall consist of the same material and construction as the rest of the fence. Gates shall be kept closed at all times except during actual loading and unloading operations, when individuals or vehicles are actively entering or leaving the site, or as needed to facilitate active work around the gate.

Exception: Where approved by the commissioner, chain link gates may be utilized in a solid fence.

3307.7.3 Viewing panels.

Viewing panels shall be provided in solid fences erected on or after July 1, 2013, at a rate one for every 25 linear feet (7.6 m) per frontage, with a minimum of one per frontage. Viewing panels shall be 12" x 12" (305 x 305 mm) in size and shall be blocked with nonfrangible acrylic paneling or equivalent material. The top of the viewing panel shall be located no more than 6 feet (1829 mm) above the level of the ground, and the bottom of the viewing panel shall be located no less than 3 feet (914 mm) above the level of the ground.

3307.7.4 Chain link fences or gates.

Where a chain link fence or gate is utilized, the following requirements shall apply:

1. The fence or gate shall be made of new materials or, where salvaged, the fence shall be in good condition;

2. The fence posts shall be of galvanized steel pipe of a diameter that provides rigidity. Posts shall be suitable for setting in concrete footings, for driving into the ground, or for inserting in precast concrete blocks. Such posts shall be spaced in a manner that maintains the required rigidity to form a safe exterior fence;

3. The fence or gate shall be constructed of woven, galvanized steel wire mesh and shall be of sufficient strength and rigidity to prevent access to the site; and

4. The fence or gate shall be covered with an opaque sturdy cloth "windscreen" fabric or equivalent netting at all locations. Fabric or equivalent netting shall be securely attached to the fence or gate in accordance with manufacturer specifications. The fabric, or equivalent netting, and the fence shall be maintained in a neat, rigid and taut appearance.

3307.7.5 Design of fences.

Fence installations shall be designed by a registered design professional. The effect of wind on the fence shall be considered in the design in accordance with Chapter 16.

Exception: Fences installed in connection with the construction or demolition of a one-, two-, or three-family building that is 40 feet (12 192 mm) or less in height.

3307.7.6 Installation and removal of fences.

Fences required by this section shall be installed prior to the commencement of work. Such required fences shall not be removed until:

1. The site has been filled and graded and all hazards to the public removed; or

2. The facade has been enclosed, with all doors and windows installed, and all exterior work, except for incidental work including but not limited to landscaping, painting, weatherproofing, or installation of signs or fixtures, has been completed.

3307.7.7 Condition of fences.

All fences and related windscreens or netting shall be installed, adjusted, repaired, and maintained in a sound condition, free of protruding or loose nails, wood, or metal, and with posts in an upright position restrained to prevent the fence from leaning or overturning.

3307.7.8 Inspection of fences.

Fences and related windscreens or netting shall be visually inspected at least once a week, or where a sidewalk shed is installed at the site, daily, by a person designated by the general contractor, or where there is no general contractor, the contractor causing the work to be performed, or where there is no active work, by the building owner to verify the fence and related windscreens or netting remains in a safe condition in accordance with Section 3307.7.7.

3307.7.8.1 Inspection reports.

The results of the inspection shall be recorded in an inspection report that is prepared, signed, and dated by the person who performed the inspection. In lieu of compliance with the requirements of Section 3301.7, copies of the inspection report shall be maintained at the site by the general contractor, or where there is no general contractor, the contractor causing the work to be performed, or where there is no active work, by the building owner.

3307.7.8.2 Discovery of defects.

Defects discovered during the course of performing the inspection shall immediately be brought to the attention of the permit holder for the fence.

3307.7.9 Color.

Solid fences shall meet the following color requirements:

1. Acceptable colors are hunter green, metallic gray, or white. In addition, when the fence is installed for an existing building, other than one undergoing a full demolition or subject to the provisions of Section 28-101.4.5 of the Administrative Code, a color matching the facade, trim, cornice, or roof of the building, if such roof is sloped and visible from the street, is acceptable.

2. Where a sidewalk shed is installed at the site in accordance with Section 3307.6, the fence and shed shall be the same color.

(Am. L.L. 2025/047, 4/17/2025, eff. 8/15/2025)

Editor's note: For related unconsolidated provisions, see Appendix A at L.L. 2025/047.

3307.8 Maintaining Department of Transportation pedestrian and bicyclist protection in place.

Notwithstanding other provisions of law, pedestrian and bicyclist protection required by the Department of Transportation shall be maintained in place and kept in good order for the entire length of time pedestrians and/or bicyclists may be endangered.

3307.9 Removing protection at conclusion of work.

Public property shall be left in as good a condition following the completion of the construction or demolition work as it was before such work was commenced. Except where otherwise required by this code, the owner or the owner's agent shall, upon the completion of the construction or demolition work, immediately remove all sidewalk sheds, fences, guard rails, temporary walkways, material, and other obstructions in or adjacent to the public way.

3307.10 Facilitating city work.

In the event a duly authorized city agency must repair, maintain, or install city property, including but not limited to intersection control signs, electrical equipment, traffic signals, lane markings, sewer and water manholes, bus shelters, street lighting, other street furniture, or fire hydrants, at a location where pedestrian protection required by this chapter is located, such pedestrian protection shall be removed as directed by the department of buildings as long as the removal is deemed to be safe and, if necessary, suitable appropriate pedestrian protection that does not interfere with the work of such city agency is installed.

3307.11 Artwork on temporary protective structures.

To the extent permissible under the zoning resolution, approved artwork or alternative artwork, as selected by the owner of a property at which a temporary protective structure has been installed, shall be displayed on such temporary protective structure as provided in this section.

(L.L. 2021/163, 12/24/2021, eff. 9/1/2023)

3307.11.1 Temporary protective structure types.

Temporary protective structures covered by this section include (i) sidewalk sheds, (ii) construction fences, and (iii) supported scaffolds when such temporary protective structures have been installed for at least 90 days.

(L.L. 2021/163, 12/24/2021, eff. 9/1/2023)

3307.11.2 Approved artwork.

For purposes of this section, the term "approved artwork" means a work of art approved by the department of cultural affairs or other agencies as designated by the department of cultural affairs for display on temporary protective structures pursuant to Section 2508 of the New York City Charter.

(L.L. 2021/163, 12/24/2021, eff. 9/1/2023; Am. L.L. 2024/111, 11/9/2024, eff. 11/9/2024)

3307.11.2.1 Alternative artwork.

The owner of a property where a temporary protective structure has been installed may solicit a work or works of art for display on such temporary protective structure in lieu of approved artwork. Such owner shall notify, at a minimum, the council member in whose district such property is located and the community board of the community district in which such property is located, of a request for a work of art to be displayed on temporary protective structures at such property. Such owner may additionally notify community-based organizations based in the community district in which such property is located and any school, as such term is defined in subdivision g of Section 522 of the New York City Charter, located in the community district in which such property is located, of a request for works of art to be displayed on temporary protective structures at such property. Notifications made pursuant to this section must be made timely in accordance with a schedule established by rules of the department. Prior to installation of such work of art, such owner must obtain the approval for such work of art from the department of cultural affairs.

(L.L. 2021/163, 12/24/2021, eff. 9/1/2023; Am. L.L. 2024/111, 11/9/2024, eff. 11/9/2024)

3307.11.3 Illumination prohibited.

Approved artwork or alternative artwork affixed to or painted on a temporary protective structure pursuant to this section shall not be illuminated.

(L.L. 2021/163, 12/24/2021, eff. 9/1/2023; Am. L.L. 2024/111, 11/9/2024, eff. 11/9/2024)

3307.11.4 Required signs to be unobstructed.

Approved artwork or alternative artwork affixed to or painted on a temporary protective structure pursuant to this section shall not obscure any sign required to be posted pursuant to Section 3301.9.

(L.L. 2021/163, 12/24/2021, eff. 9/1/2023; Am. L.L. 2024/111, 11/9/2024, eff. 11/9/2024)

3307.11.5 Materials.

Notwithstanding any other provision of the building code, approved artwork or alternative artwork may be affixed to a sidewalk shed or construction fence or painted directly on a sidewalk shed or construction fence. Approved artwork or alternative artwork affixed to or painted directly on a sidewalk shed or construction fence pursuant to this section shall not include any illumination, electronic signage, protrusions, or projections. Approved artwork or alternative artwork affixed to a sidewalk shed or construction fence shall be printed on completely flat surfaces on materials that are durable, flame retardant, able to withstand all weather conditions, and designed to meet loads on temporary installations, including but not limited to wind, as prescribed in Chapter 16. All hardware and connection materials used to affix approved or alternative artwork shall also be durable, flame retardant, able to withstand all weather conditions, and designed to meet loads on temporary installations, including but not limited to wind, as prescribed in Chapter 16. The department may promulgate rules concerning materials used for the installation of approved artwork or alternative artwork.

(L.L. 2021/163, 12/24/2021, eff. 9/1/2023; Am. L.L. 2024/111, 11/9/2024, eff. 11/9/2024)

3307.11.5.1 Sidewalk sheds.

Approved artwork or alternative artwork may be affixed to or painted directly on a sidewalk shed. Approved artwork or alternative artwork affixed to a sidewalk shed shall be printed on lightweight, solid material that can be installed on the outer sides and ends of sheds either by stretching such material over the shed and fastening to the back or by affixing such material to self-adhesive panels that adhere directly to the shed. Approved artwork or alternative artwork shall not extend above or below the shed parapet.

(L.L. 2021/163, 12/24/2021, eff. 9/1/2023; Am. L.L. 2024/111, 11/9/2024, eff. 11/9/2024)

3307.11.5.2 Construction fences.

Approved artwork or alternative artwork may be affixed to or painted directly on a construction fence. Approved artwork or alternative artwork affixed to construction fences shall be printed on lightweight, solid material that can be installed on the outside of the construction fence either by stretching such material over the fence and fastening to the back or by affixing such material to self-adhesive panels that adhere directly to the fence. Approved artwork or alternative artwork shall not extend beyond the top of the fence.

(L.L. 2021/163, 12/24/2021, eff. 9/1/2023; Am. L.L. 2024/111, 11/9/2024, eff. 11/9/2024)

3307.11.5.3. Supported scaffolds.

Approved artwork or alternative artwork displayed on supportive scaffolds shall be printed directly onto debris netting meeting the requirements of Section 3314.8.2.

(L.L. 2021/163, 12/24/2021, eff. 9/1/2023; Am. L.L. 2024/111, 11/9/2024, eff. 11/9/2024)

3307.11.6 Artist credit and sponsorship message.

A temporary protective structure displaying approved artwork or alternative artwork pursuant to this section may display a barcode that can be read by a smartphone, or successor technology, and directs the user to the website of the department of cultural affairs containing information posted on such website pursuant to subdivision c of Section 2508 of the New York City Charter.

(L.L. 2021/163, 12/24/2021, eff. 9/1/2023; Am. L.L. 2024/111, 11/9/2024, eff. 11/9/2024)

3307.11.7 Opt out.

The department shall include in its process for an initial application for a permit for a new sidewalk shed, construction fence or supported scaffold or for an amendment to an existing sidewalk shed, construction fence or supported scaffold permit an option for the owner of the property for which such permit is filed to opt out of participation in the program established by this section and Section 2508 of the New York City Charter. If a property owner fails to affirmatively opt out, the requirements of this section and Section 2508 of the New York City Charter shall apply. Opting out pursuant to this section shall not be grounds for denial or delay of issuance of a permit for a sidewalk shed, construction fence or supported scaffold or for any other permit issued by the department. The department shall by rule allow the owner of such property to opt out of such program at a later time.

(L.L. 2021/163, 12/24/2021, eff. 9/1/2023; Am. L.L. 2024/111, 11/9/2024, eff. 11/9/2024)

3307.11.7.1 Exception.

An owner of a property for which a sidewalk shed, construction fence or supported scaffold permit has been filed may not opt out if the project site is owned by the city of New York or receives capital funding from the city of New York or an agency, provided that this exception shall not apply if (i) approved artwork has been approved for display at 100 or more such sites within a two-year period, or (ii) no appropriation has been made for participation in the program established by this section and Section 2508 of the New York City Charter. For the purposes of this section, the term "agency" has the same meaning as such term is defined in Section 1-112 of the Administrative Code.

(L.L. 2021/163, 12/24/2021, eff. 9/1/2023; Am. L.L. 2024/111, 11/9/2024, eff. 11/9/2024)

3307.11.8 Display of artwork.

Approved artwork or alternative artwork displayed on a temporary protective structure pursuant to this section shall be affixed to or painted directly on the temporary protective structure in conformity with rules promulgated by the department in consultation with the department of cultural affairs, and may remain on display for as long as the temporary protective structure remains in place pursuant to a valid permit. An owner who has participated in this program shall be deemed to have satisfied the requirements of Section 3307.11.

(L.L. 2021/163, 12/24/2021, eff. 9/1/2023; Am. L.L. 2024/111, 11/9/2024, eff. 11/9/2024)

Section BC 3308. Unenclosed Perimeter Protection

Open this section

3308.1 Scope.

Protection shall be provided along unenclosed perimeters as required by this section and rules promulgated by the commissioner, including but not limited to safety netting systems, guardrail systems, cocoon systems, climbing formwork, and enclosure panels. Except where this section authorizes the temporary removal of unenclosed perimeter protection, no work shall occur, nor shall materials be stored on any level where required unenclosed perimeter protection is not installed.

3308.2 Permit.

A permit is required for the installation of unenclosed perimeter protection.

Exceptions: A permit is not required for:

1. Vertical safety netting systems that are in accordance with Sections 3308.5;

2. Horizontal safety netting systems that are in accordance with Section 3308.6; or

3. Guardrail systems that are in accordance with Section 3308.7.

3308.3 Design and documentation of unenclosed perimeter protection.

Unenclosed perimeter protection shall be designed and provided with documentation in accordance with Sections 3308.3.1 through 3308.3.5.

Exception: The requirements of Sections 3308.3.1, and 3308.3.3 through 3308.3.5, shall not apply to guardrail systems. The requirements of Section 3308.7 shall apply to guardrail systems.

3308.3.1 Design.

Unenclosed perimeter protection shall be designed by a registered design professional to meet temporary loads, including but not limited to wind, as prescribed in Chapter 16. The registered design professional shall take the supporting structure into account when designing the installation and shall include details of connections, anchorages, and supports. The minimum loads for vertical net cables required by Section 3308.5.3 need not be added to wind loads in determining the maximum lateral force, but in no event shall the maximum design load for the cables be less than that required by Section 3308.5.3. A reduction in the surface area due to the openings in vertical or horizontal net fabric or partially enclosed perimeter panel is permitted provided that the force at design wind speed is derived from manufacturers' test data or other testing or methods acceptable to the commissioner.

3308.3.2 Site safety plans.

Details of the unenclosed perimeter protection shall also be shown on the site safety plan, where such plan is required by this chapter.

3308.3.3 Make and model.

The make and model of unenclosed perimeter protection, along with the connections and supports, shall be acceptable to the registered design professional responsible for the design of the unenclosed perimeter protection in accordance with Section 3308.3.1. The make and model, along with acceptance of the make and model by such registered design professional, shall be indicated as a note on the drawings, or in the form of a signed, sealed, and dated letter from such registered design professional that is kept with the drawings.

3308.3.4 Flame retardant.

Vertical and horizontal safety netting used for unenclosed perimeter protection shall be flame retardant in accordance with NFPA 701. Documentation of such shall be provided by the manufacturer and shall be noted on the drawings by the registered design professional responsible for the design of the safety netting systems in accordance with Section 3308.3.1, or shall be recorded by such registered design professional in the form of a signed, sealed, and dated letter from such registered design professional, with such letter kept with the drawings.

3308.3.5 Tensile strength.

The tensile strength for the structural net utilized in connection with a horizontal safety netting system shall be noted on the drawings by the registered design professional responsible for the design of the safety netting systems in accordance with Section 3308.3.1, or shall be recorded by such registered design professional in the form of a signed, sealed, and dated letter from such registered design professional, with such letter kept with the drawings. Where required by Section 3308.6.3, the strength shall be confirmed by testing; the results of the test shall be documented in the form of a signed, sealed, and dated letter from the registered design professional responsible for the design of the safety netting systems in accordance with Section 3308.3.1. Such letter shall be kept with the drawings.

3308.4 Responsibility and supervision.

The permit holder for the project, or where a permit is required by Section 3308.2, the holder of such permit, shall be responsible for complying with the requirements of Section 3308. A competent person designated by such responsible permit holder shall supervise the installation, reinstallation, adjustment, maintenance, repair, and temporary or permanent removal of all unenclosed perimeter protection, along with any support, connection, or component. The inspection of unenclosed perimeter protection shall be conducted in accordance with the requirements of Section 3308.9.3.

3308.5 Vertical safety netting systems.

Vertical safety netting shall be installed, maintained, and provided along all unenclosed perimeters.

Exceptions:

1. Vertical safety netting is not required for:

1.1. The story at grade, provided it is less than 6 feet (1829 mm) above the level of the adjoining ground or structure; or

1.2. The working deck; or

1.3. Any story in concrete construction where the formwork has not been stripped, provided such floor is no more than four stories or 40 feet (12 192 mm) below the working deck, whichever is less; or

1.4. Any story in steel construction where the concrete slab has not been placed, provided that no work, other than steel erection or metal deck placement, is occurring on that story.

2. Vertical safety netting is not required at a location where a supported scaffold has been installed provided the scaffold is decked even with the building at such level where the unenclosed perimeter exists, with no gap between the scaffold deck and the building deck greater than 3 inches (76 mm), and also provided that the scaffold is provided with netting and guardrails in accordance with Section 3314.8.

3. Vertical safety netting is not required to protect an unenclosed window opening, provided such window opening is enclosed with a sill not less than 3 feet 6 inches (1067 mm) in height.

4. Vertical safety netting is not required for a building whose final height will be no more than 4 stories or 40 feet (12 192 mm) in height, whichever is less.

5. Vertical safety netting is not required for a minor alteration or ordinary repair.

6. Vertical safety netting is not required at a location where an equivalent alternative system acceptable to the commissioner, including but not limited to cocoon systems, climbing formwork, or enclosure panels, has been installed.

(Am. L.L. 2023/077, 6/11/2023, eff. 6/11/2023)

Editor's note: For related unconsolidated provisions, see Appendix A at L.L. 2023/077.

3308.5.1 Openings.

The largest opening area for debris netting when used vertically shall not be larger than 1 square inch (645 mm 2 ), with no opening larger than 1 inch (25 mm) in the vertical or horizontal dimensions and 1 1/2 inch (38 mm) in any other dimension.

3308.5.2 Height.

Where required, vertical safety netting shall extend to cover all openings in the unenclosed perimeter to a height of at least 60 inches (1524 mm) above the floor or, where installed at the roof level, the roof.

3308.5.3 Cables.

Vertical safety netting shall be secured to non-corrosive wire cable capable of withstanding a load of at least 200 pounds (90.7kg) applied in any direction except upward. The cables shall be located at a height of 60 inches (1524 mm), 42 inches (1067 mm), 21 inches (533 mm), and 0 inches (0 mm) above the level of the floor or, where installed at the roof level, the roof. Where the vertical safety netting extends above 60 inches (1524 mm) in height, a cable shall also be placed at the top of the netting, with intermediate cables between the 60 inch (1524 mm) cable and the top cable as needed to satisfy the design requirements of Section 3308.3.

Exceptions: In lieu of a cable:

1. At 60 inches (1524 mm) or above, a toprail made of wood, pipe, or structural angle meeting the requirements of Section 3308.7.3.

2. At 42 inches (1067 mm) and 21 inches (533 mm), midrails made of wood, pipe, or structural angle meeting the requirements of Section 3308.7.3.

3. At 0 inches (0 mm), a toeboard meeting the requirements of Sections 3308.7.2 and 3308.7.3, provided the net is secured to the toeboard.

3308.5.3.1 Zero cable.

Zero cables shall be secured to the deck and be maintained in contact with the deck such that debris cannot accumulate nor pass beneath the cable.

3308.5.4 Taut systems.

Where the vertical safety netting relies upon a taut system, the net and cables shall be maintained taut. A positive tensioning system such as a turnbuckle shall be provided to keep the cable taut.

3308.5.5 Friction connections.

Wood installations that utilize a friction connection are not permitted.

3308.5.6 Temporary removal.

The requirements of Section 3308.10 shall apply.

3308.5.6.1 Supplemental requirement for removal of toeboard or zero cable.

The toeboard or zero cable may be temporarily removed to facilitate the placement and curing of a concrete floor slab, provided no other work occurs on such floor, and provided an alternative measure is utilized to secure the bottom of the netting as close to the deck as practical.

3308.5.7 Permanent removal.

Vertical safety netting systems may be removed from floors where the facade has been installed and all such openings in the facade, including for windows, have been permanently enclosed to a height of at least 60 inches (1524 mm) above the floor. Vertical safety netting systems may be removed from the roof where the final parapet or guardrail has been installed.

3308.6 Horizontal safety netting systems.

Horizontal safety netting shall meet the requirements of Sections 3308.6.1 through 3308.6.4.

3308.6.1 Where required.

Horizontal safety netting shall be installed and maintained as follows.

3308.6.1.1 During construction.

When, during the course of new building construction, or during the vertical or horizontal enlargement of an existing building, the topmost walkable floor reaches a height of six stories or 75 feet (22 860 mm), whichever is less, above the level of the ground or an adjoining roof, horizontal safety netting shall be provided at a level not more than two stories or 30 feet (9144 mm), whichever is less, below:

1. In concrete structures: the stripping floor; or

2. In steel structures: at the topmost story where the concrete floor slab has been placed.

Exception: When tarpaulins encase one or more floors immediately below the finished concrete floor in order to maintain temporary heat, the horizontal netting may be located no more than three floors below the finished concrete floor.

3308.6.1.2 During demolition.

When the demolition of the exterior walls or the roof of a building occurs at a height greater than six stories or 75 feet (22 860 mm), whichever is less, horizontal safety netting shall be provided at a level not more than two stories or 30 feet (9144 mm), whichever is less, below the story from which the exterior walls and roof are being removed.

Exception: Demolition of exterior walls only for the purposes of the alteration, maintenance, or repair of a facade shall be in accordance with Section 3308.6.1.3.

3308.6.1.3 During facade alteration, maintenance, or repair.

Where unique hazards associated with the alteration, maintenance, or repair of a facade exist to the public and property, horizontal safety netting shall be provided as required by the commissioner.

3308.6.1.4 Alternative systems.

Alternative systems may be used in lieu of horizontal safety netting in accordance with the requirements of Sections 3308.6.1.4.1 or 3308.6.1.4.2.

3308.6.1.4.1 Supported scaffold alternative.

Horizontal safety netting is not required at a location where a supported scaffold has been installed provided the scaffold is decked even with the building at the level where the horizontal safety net would otherwise be required to be installed and all levels above where the horizontal nets would otherwise be required, with no gap between the scaffold deck and the building deck greater than 3 inches (76 mm), and also provided that the scaffold is provided with netting and guardrails in accordance with Section 3314.8.

3308.6.1.4.2 Other alternative systems.

Horizontal safety netting is not required at a location where an equivalent alternative system acceptable to the commissioner, including but not limited to cocoon systems or climbing formwork, covers the full height of the unenclosed perimeter at and above all levels where horizontal nets are required.

3308.6.1.5 Hoisting area.

Where approved by the commissioner, horizontal safety netting may be omitted in designated crane, derrick, or hoisting areas.

3308.6.1.6 Temporary removal.

The requirements of Section 3308.10 shall apply.

3308.6.1.7 Permanent removal.

Horizontal safety netting systems may be permanently removed as follows:

1. Horizontal safety netting systems installed for the construction of a building in accordance with Section 3308.6.1.1 may be removed after all concrete has been placed at the highest level and all concrete stripping work at the highest level has been completed.

2. Horizontal safety netting systems installed for the demolition of a building in accordance with Section 3308.6.1.2 may be removed after the demolition has progressed to within six stories or 75 feet (22 860 mm), whichever is less, above the ground or adjoining roof level.

3. Horizontal safety netting systems installed for facade work in accordance with Section 3308.6.1.3 may be removed after all facade work above the level of the nets has been completed.

3308.6.2 Horizontal safety netting systems requirements.

Horizontal safety netting systems shall meet the requirements of Sections 5, 6.3, 6.4, 6.5, 6.6, 7, 8, 10.1, 10.4, 10.5, 10.6, 10.7, 11, and 13 of ANSI/ASSP A10.11, as modified as follows.

3308.6.2.1 Personnel net.

Throughout the standard, the term "personnel net" shall be amended to read "structural net."

3308.6.2.2 Should and shall.

Throughout the standard, the term "should" shall be amended to read "shall."

3308.6.2.3 Entanglement.

The phrase, "and to minimize entanglement of the persons head, arms, and legs when arresting the fall," shall be deleted from Section 6.3 of ANSI/ASSP A10.11.

3308.6.2.4 Arresting a fall.

The phrase "when arresting a fall," shall be deleted from Section 6.4 of ANSI/ASSP A10.11.

3308.6.2.5 Size of debris net openings.

Section 6.6 of ANSI/ASSP A10.11 shall be amended by adding a new sentence at the end of the section, as follows, "However, in no case shall the largest opening area for debris netting when used horizontally be larger than one-half square inch (323 mm 2 ), with no opening larger than 1/2 inch (13 mm 2 )* in the vertical or horizontal dimensions and 3/4 inch (19 mm) in any other dimension."

Editor's note: As set forth in L.L. 2021/126; correct measurement is 1/2 inch (13 mm).

3308.6.2.6 Projection of nets.

The phrase, "as to capture falling personnel" in Section 10.6 of ANSI/ASSP A10.11 shall be amended to read "as to capture falling material".

3308.6.2.7 Supports.

The phrase, "or personnel" in Section 10.7 of ANSI/ASSP A10.11 shall be amended to read, "or material."

3308.6.2.8 Inspection.

Section 11.1 of ANSI/ASSP A10.11 shall be deleted in its entirety and replaced with the following, "Horizontal safety netting systems shall be inspected in accordance with Section 3308.9.3."

3308.6.2.9 Dates tested.

The phrase "Dates inspected" in item number 5 of Section 11.4 of ANSI/ASSP A10.11 shall be amended to read "Dates tested".

3308.6.2.10 Moving.

Section 11.4 of ANSI/ASSP A10.11 shall be amended to add a new item number 9, which shall read, "Dates nets were moved to a higher or lower level."

3308.6.2.11 Cleaning.

Section 13.2 of ANSI/ASSP A10.11 shall be deleted and replaced with the following: "Horizontal safety netting shall not be used for storing material. Horizontal netting shall be cleaned, at least daily, to remove any items that fall into the nets."

3308.6.3 Tensile strength test.

The tensile strength of netting mesh and/or twine of a structural net utilized in conjunction with a horizontal safety netting system shall be confirmed by testing in accordance with ASTM D 5034 or ASTM D 5035. The testing criteria shall be developed by the registered design professional who designed the safety netting system in accordance with Section 3308.3. Such testing shall occur prior to the installation of the net at the site for any net that has previously been used, and for any net that has been installed at the site for two years and every two years thereafter. Nets that do not meet the specified tensile strength as required by Section 3308.3.5 shall not be utilized or shall be replaced.

3308.6.4 Identification of nets.

Structural netting shall be identified in accordance with Section 7 of ANSI/ASSP A10.11. Debris netting shall be identified by a letter or other documentation from the manufacturer stating the description and model. The identification for structural netting and debris netting shall be kept at the site until the netting is removed.

3308.7 Guardrail system.

A guardrail system shall be installed, maintained, and provided along all unenclosed perimeters.

Exceptions: A guardrail system is not required at:

1. The story at grade, provided that it is less than 6 feet (1829 mm) above the level of the adjoining ground or structure.

2. Locations where vertical safety netting is installed in accordance with Section 3308.5.

3. Locations where a supported scaffold has been installed provided the scaffold is decked even with the building at such level where the unenclosed perimeter exists, with no gap between the scaffold deck and the building deck greater than 3 inches (76 mm), and also provided that the scaffold is provided with netting and guardrails in accordance with Section 3314.8.

4. Locations where an equivalent alternative system acceptable to the commissioner, including but not limited to cocoon systems, climbing formwork, or enclosure panels, has been installed.

3308.7.1 Components.

Guardrail systems shall include a toprail, midrail, toeboard, and posts.

3308.7.2 Height of railings and toeboard.

Toprails, midrails, and toeboards shall be located as follows:

1. The top of the toprail shall be located at a height of 39 to 45 inches (991 and 1143 mm) above the floor.

2. The midrail shall be located at a height approximately midway between the toprail and the floor, or where more than one midrail is utilized, each shall be located equidistant from each other, the floor, and the toprail.

3. The toeboard shall be at least 3 1/2 inches (89 mm) high and shall be installed so that there is not more than a 1/4 inch (6 mm) gap between the floor and the bottom of the toeboard.

Exception: When conditions warrant, the height of the toprail may exceed the 45-inch (1143 mm) height provided additional midrails are installed so that there is no vertical gap larger than 24 inches (610 mm) between any toeboard, midrail, or toprail.

3308.7.3 Dimensions and materials.

Toprails, midrails, toeboards, and posts shall have the following dimensions and be constructed out of the following materials:

1. Toprails shall, at a minimum, consist of:

1.1. 2 inch by 4 inch (51 mm by 102 mm) 1,500 foot pounds per square inch (1.05 kgf/mm 2 ) fiber (stress grade) construction grade lumber;

1.2. 1 1/2 inch (38 mm) nominal diameter (Schedule 40) pipe;

1.3. 2 inch by 2 inch by 3/8 inch (51 mm by 51 mm by 10 mm) structural angle; or

1.4. 1/4 inch (6 mm) diameter noncorrosive wire cable made of mild plow steel.

2. Midrails shall, at a minimum, consist of:

2.1. 1 inch by 6 inch (25 mm by 152 mm) 1,500 foot pounds per square inch (1.05 kgf/mm 2 ) fiber (stress grade) construction grade lumber;

2.2. 1 1/2 inch (38 mm) nominal diameter (Schedule 40) pipe;

2.3. 2 inch by 2 inch by 3/8 inch (51 mm by 51 mm by 10 mm) structural angle; or

2.4. 1/4 inch (6 mm) diameter non-corrosive wire cable made of mild plow steel.

3. Toeboards shall, at a minimum, consist of:

3.1. 1 inch by 4 inch (25 mm by 102 mm) lumber; or

3.2. Metal plank at least 3 1/2 inches (89 mm) high.

4. Toprails, midrails, and toeboards shall be securely fastened to upright posts spaced not more than 8 feet (2438 mm) apart. Such posts shall, at a minimum, consist of:

4.1. 2 inch by 4 inch (51 mm by 102 mm) 1,500 foot pounds per square inch (1.05 kgf/mm 2 ) fiber (stress grade) construction grade lumber;

4.2. 1 1/2 inch (38 mm) nominal diameter (Schedule 40) pipe;

4.3. 2 inch by 2 inch by 3/8 inch (51 mm by 51 mm by 10 mm) structural angle; or

4.4. A building column.

Exceptions:

1. Guardrail systems designed by a registered design professional capable of withstanding, without failure:

1.1. A force of at least 200 pounds (890 N) applied within 2 inches (51 mm) of the top edge, in any outward or downward direction, at any point along the top edge. Where the force is applied in a downward direction, the top edge shall not deflect more than 6 inches (152 mm) and in no case to a height less than 39 inches (991 mm) above the floor; and

1.2. A load of at least 50 pounds (222 N) applied in any downward or horizontal direction at any point along the toeboard.

2. Posts supporting wire cable toprails and midrails, as well as the toeboards utilized in connection with such wire cable toprails and midrails, may be spaced more than 8 feet (2438 mm) apart provided that the posts are spaced such that where a force of 200 pounds (890 N) is applied in a downward direction along the top edge, the top edge shall not deflect more than 6 inches (152 mm) and in no case to a height less than 39 inches (991 mm) above the floor.

(Am. L.L. 2023/077, 6/11/2023, eff. 6/11/2023)

Editor's note: For related unconsolidated provisions, see Appendix A at L.L. 2023/077.

3308.7.4 Horizontal gap.

The guardrail system shall be installed so that there exists no horizontal gap larger than 1 inch (25 mm) as measured along the perimeter of the building from the edge of the guardrail system to any building column or facade.

3308.7.5 Tensioning system.

When made of wire cable, toprails and midrails shall be provided with a positive tensioning system, such as a turnbuckle, to keep the cable taught.

3308.7.6 Dislodgement.

Guardrail systems shall be secured to prevent dislodgement by impact or wind.

3308.7.7 Temporary removal.

The requirements of Section 3308.10 shall apply.

3308.7.8 Permanent removal.

Guardrail systems installed to protect unenclosed perimeters may be removed where vertical safety netting systems meeting the requirements of Section 3308.5 have been installed.

3308.8 Modifications.

The commissioner may, based upon a written request from a registered design professional, modify the requirements for unenclosed perimeter protection in accordance with Section 28-103.3 of the Administrative Code.

3308.9 Unenclosed perimeter protection inspection, use, adjustment, maintenance, and repair.

Unenclosed perimeter protection shall be inspected, used, adjusted, maintained, repaired, and replaced in accordance with the design drawings, manufacturer specifications, and the requirements of this code. Where there is a discrepancy, the stricter standard shall apply.

3308.9.1 Safe condition.

Unenclosed perimeter protection shall be maintained in a safe condition and used in a manner that eliminates hazards to the public and property. Any hazardous conditions or defects discovered with such shall immediately be brought to the attention of the responsible permit holder under Section 3308.4.

3308.9.2 Precautions.

Precautions shall be taken to prevent unenclosed perimeter protection from being damaged by sunlight, abrasion, sand, rust, welding, cutting operations, chemicals, and airborne contaminants, where such systems are susceptible to damage by such.

3308.9.3 Inspections.

Unenclosed perimeter protection shall be inspected for compliance with this code, manufacturer specifications, and required drawings at least daily, as well as before and after each removal and restoration in accordance with Section 3308.10.3, and after each impact loading event, installation, reinstallation, adjustment, maintenance, or repair of the unenclosed perimeter protection or any part or component of such. Where the job requires a site safety manager or coordinator in accordance with Section 3310, the inspection shall be performed by the site safety manager or coordinator, and a written record of such inspection maintained as part of the site safety log. Where the job does not require a site safety manager or coordinator, the inspection shall be performed by a competent person designated by the permit holder in accordance with Section 3308.4, with a record of such inspection prepared, initialed, and dated by such competent person.

3308.9.4 Removing from service.

Unenclosed perimeter protection showing signs of mildew, corrosion, wear, tears, breaks, frays, damage, or deterioration that may substantially affect the strength of such shall be immediately removed from service.

3308.9.5 Repair.

Repairs to unenclosed perimeter protection shall be in accordance with the specifications of the manufacturer of such and shall provide the original manufacturer factor of safety, or where manufacturer specifications do not exist, shall be repaired in accordance with specifications developed by the registered design professional responsible for the design of the unenclosed perimeter protection in accordance with Section 3308.3.1.

Exception: Structural nets and debris nets shall not be repaired.

3308.9.6 Vacuum cleaning.

Areas in the vicinity of operations related to the installation, reinstallation, adjustment, maintenance, repair, temporary removal, or permanent removal of unenclosed perimeter protection systems that produce or typically produce small debris shall be vacuumed as the operation progresses. Examples of operations that produce small debris include, but are not limited to, the installation or removal of fasteners for a vertical netting system, chipping to expose curtain wall clips, preparation of the slab to install or receive exterior walls, and chopping or core drilling at perimeter for mechanical risers. Vacuum equipment shall be tethered or otherwise secured to prevent the equipment from falling.

3308.10 Temporary removal of unenclosed perimeter protection.

Unenclosed perimeter protection, or portions thereof, may be temporarily removed in the immediate area where active loading or unloading operations are occurring, or to the extent necessary to facilitate active work at the perimeter, including but not limited to inspections or the relocation of unenclosed perimeter protection to a higher level, provided there is compliance with the following items:

1. All material, equipment, and debris on the floor is secured against dislodgement by wind or accidental impact;

2. A controlled access zone is established to prevent unauthorized personnel from entering the area where the unenclosed perimeter protection has been removed;

3. Prior to removal the floor is cleared of all material, equipment, and debris to a distance of at least 10 feet (3048 mm) in all directions from the area where the unenclosed perimeter protection is to be removed, except for material or equipment that is related to the active loading or unloading operation or active work at the perimeter, or that is stored in accordance with Section 3303.4.5.2;

4. Immediately prior to removal the floor is broom-swept to a distance of at least 10 feet (3048 mm) in all directions from the area where the unenclosed perimeter protection is to be removed and, in addition, areas in the immediate vicinity of the unenclosed perimeter protection are vacuumed, including areas around zero cables, toeboards, and spaces where trapped debris may have accumulated;

5. During removal operations areas are vacuumed as required by Section 3308.9.6;

6. A competent person supervises the operation as required by Section 3308.10.2;

7. Where vertical safety netting, guardrails, or equivalent alternative systems are removed, the removal does not extend past the column bays where the active loading or unloading operations are occurring or where active work at the perimeter is occurring; and

8. Where horizontal safety netting or equivalent alternative systems are removed, none of the following types of work occurs at or above the level where the horizontal safety netting or equivalent alternative system has been removed:

8.1. Concrete work, including formwork placement or stripping;

8.2. Structural steel placement or assembly; or

8.3. Any other work within 10 feet (3048 mm) from an unenclosed perimeter of the building.

3308.10.1 Restoring unenclosed perimeter protection.

Unenclosed perimeter protection shall be reinstalled immediately following the end of the active loading or unloading operation or active work at the perimeter, or at the end of the shift, whichever occurs sooner. Immediately prior to restoring a guardrail system, vertical netting system, or equivalent alternative system, areas in the vicinity of the edge shall be vacuumed, and other areas to a distance of at least 10 feet (3048 mm), in all directions from the area where the unenclosed perimeter protection is removed, shall be broom-swept. Vacuum equipment shall be tethered or otherwise secured to prevent the equipment from falling.

Exceptions:

1. Where material overhangs overnight in accordance with Section 3303.4.5.2, guardrails shall be reinstalled the next work day immediately following the relocation of the material.

2. Where a toeboard or zero cable has been temporarily removed to facilitate the placement and curing of a concrete floor slab, the toeboard or zero cable shall be reinstalled as soon as practical.

3308.10.2 Competent person.

The competent person designated in accordance with Section 3308.4 shall supervise the temporary removal and reinstallation of unenclosed perimeter protection, including all ancillary activities, such as preparing the area for the removal of the unenclosed perimeter protection, and shall ensure compliance with the requirements of Section 3308.10.

3308.10.3 Inspection.

An inspection shall be performed immediately prior to the removal of unenclosed perimeter protection to verify compliance with the provisions of Section 3308.10. An inspection shall be performed immediately prior to restoring a guardrail system, vertical netting system, or equivalent alternative system to verify compliance with the cleaning provisions of Section 3308.10.1. An inspection shall be performed immediately after unenclosed perimeter protection is restored to verify compliance with this code, manufacturer specifications, and required drawings. These inspections shall be performed by the site safety manager, site safety coordinator, or competent person in accordance with Section 3308.9.3, and recorded in accordance with Section 3308.9.3.