NYC Administrative Code RS 18-5

ANSI/ASME B20.1—1987 Safety Standards for Conveyors and Related Equipment.

Modifications.—The provisions of ANSI/ASME B20.1—1987 shall be subject to the following modifications. The Section numbers are from that standard:

6.21 Vertical Reciprocating Conveyers

6.21.2 Guarding

(e) Controls shall be installed or located so they cannot be actuated by a person on the carrier. Controls shall be of constant pressure type.

(f) Non-operating sides of the conveyer to be guarded to a minimum height of 7 ft. If guarding is fence or expanded metal the mesh must be capable of rejecting a 2" diameter ball. The guarding is required at both levels where the unit penetrates a non-fire rated floor.

6.21.3 Shaft enclosure

Where a vertical conveyer (material lift) penetrates a fire-rated floor a two (2) hour rated enclosure with one and a half (1 1/2) hour rated self-closing fire doors shall be required.

6.21.4 Gates

(a) All lower and intermediate level manual loading and unloading points shall have gates with a minimum of six (6) ft in height. Each gate is equipped with a lock and electric contact to prevent the gates from being opened until the conveyer is at that level.

(b) Upper level gates must be with a minimum of six (6) ft in height and shall be equipped with a lock and electric contact.

6.21.5 Platform Side Guards

Platform side guards and gate with electric contact shall be provided with a minimum of six (6) ft in height.

6.21.6 Limitation of Load

The capacity shall be not less than 50 lbs. per sq. ft with a maximum capacity of 2,500 lbs.

6.21.7 Speed

The rated speed shall not exceed 25 ft/min (0.15 m/s).

6.21.8 Travel

The maximum travel shall not exceed 25 ft.

6.21.9 Floor Penetration

Not more than one floor penetration shall be permitted.

SECTION 7 OPENING PROTECTION

[7.01] 7.1 Passage Through Openings

[7.01.1] 7.1.1 Whenever a conveyer or other material-handling device is designed to pass through floors, ceilings, partitions or walls, the plans and specifications shall give the necessary details of the opening protection with respect to location, structural strength, and fire resistance in accordance with the requirements of the Building Code.