NYC Administrative Code RS 10-5A
AISC—1989 Specification for Structural Steel Buildings—Allowable Stress Design and Plastic Design, effective June 1, 1989, as modified.
MODIFICATIONS—The provisions of AISC-ASD 1989, Specification for Structural Steel Buildings—Allowable Stress Design and Plastic Design, shall be subject to the following modifications. The section and paragraph numbers are from that standard.
CHAPTER A GENERAL PROVISIONS
A3 MATERIAL—Add the following after the next to last paragraph of section A3.1a.
"Special Steels other than those listed above may be used in accordance with the provisions of this reference standard when approved by the NYCDOB for such use."
A4 LOADS AND FORCES—Delete this text and substitute the following:
"The provisions of the building code for loads shall apply."
A5 DESIGN BASIS—Delete the text of Subsection 2. Wind and Seismic Stresses and substitute the following:
"The applicable provisions of the Building Code for combinations of loads shall apply."
A6 REFERENCED CODES AND STANDARDS—Revise the list of publications of the following listed standards to read as follows:
American National Standards Institute
ANSI/ASCE 7–93 (Formerly ANSI A58.1–82)
American Society for Testing and Materials
ASTM A 6–94a ASTM A 53–93a ASTM A 194–94a ASTM A 325–94 ASTM A 490–93 ASTM A 502–93 ASTM A 563–94 ASTM A 588–94 ASTM A 618–93 ASTM A 709–94 ASTM C 330–89 ASTM A 27–93 ASTM A 148–93b ASTM A 242–93a ASTM A 354–94 ASTM A 500–93 ASTM A 514–94a ASTM A 570–92 ASTM A 606–91a ASTM A 668–93 ASTM A 852–93a ASTM F 436–93 ASTM A 36–94 ASTM A 193–94b ASTM A 307–94 ASTM A 449–93 ASTM A 501–93 ASTM A 529–94 ASTM A 572–94b ASTM A 607–92a ASTM A 687–93 ASTM C 33–93
American Welding Society
AWS D1.1–94 AWS A5.17–89 AWS A5.23–90 AWS A5.1–91 AWS A5.18–93 AWS A5.28–90 AWS A5.5–89 AWS A5.20–89 AWS A5.29–89
Research Council on Structural Connections
Specification for Structural Joints Using ASTM A 325 or A 490 Bolts, 1988
CHAPTER B DESIGN REQUIREMENTS B 11 PROPORTIONING OF CRANE GIRDERS
Add the following at the end of the section.
"The applicable provisions of the Building Code for moving loads shall apply."
CHAPTER H COMBINED STRESSES
H1 AXIAL COMPRESSION AND BENDING—In the last sentence of the definition of F'c, delete the reference to Section A5.2 and substitute the following:
"The provisions of the Building Code for wind load shall apply."
CHAPTER I COMPOSITE CONSTRUCTION
I1 DEFINITION—Add the following paragraph as the first paragraph:
"Composite construction used for members subjected to heavy vehicle loads, as defined in the Building Code for moving loads (except where applied vehicle is limited to passenger cars), shall be proportioned in accordance with the requirement of reference standard RS 9–3.
Add the following as item 4 of the new third paragraph:
"4. The minimum specified compressive strength of concrete (f'c) for all encased composite beams shall be 3,000 lbs. per sq. in. and shall meet the applicable requirements of the Building Code."
I2. DESIGN ASSUMPTIONS—Add the following after the term, "0.76Fy" in the last sentence of section I2, paragraph 1:
"provided the encased beam is A36 steel, not more than 40 inches in depth and the concrete is made with ASTM C 33 aggregate."
I4. SHEAR CONNECTORS—Add the following at the end of the third paragraph:
"For aggregate not complying with the above, the Department of Buildings Rules for Design of Composite Construction with Metal Decks or Lightweight Concrete dated Sept. 8, 1975 shall be used. Working values for use with construction for which design values have not been established in accordance with the foregoing and for connector types other than those shown in Table I4.1 shall be established by a prequalified load test as set forth in Section 27-599. The minimum specified compressive strength of concrete (f'c) shall be 3,000 psi.
CHAPTER J CONNECTIONS, JOINTS AND FASTENERS
J1. GENERAL PROVISIONS
9. PLACEMENT OF WELDS, BOLTS AND RIVETS—At the end of the last sentence add the following:
"The foregoing provisions notwithstanding, the eccentricity perpendicular to the plane of the connection shall be considered in proportioning both the member and the connection."
J2. WELDS—Add the following paragraph before the first paragraph in Sec. J2.
"The provisions of the Building Code for welding operations, the Board of Standards and Appeals Rules for ARC and GAS Welding and Oxygen cutting of steel covering the Specifications for Design, Fabrication and Inspection of ARC and GAS Welding Steel Structures and the Qualification of Welders and Supervisors, and Board of Standards and Appeals Rules for Electroslag Welding Approvals shall apply."
Add the following paragraph after the first paragraph in Sec. J2:
"Welding equipment used to perform submerged-arc, gas metal-arc and flux cored arc welding of high strength steel; and electro-slag or electro-gas welding of all steel shall be approved."
J3. BOLTS, THREADED PARTS AND RIVETS
2. Size and Use of Holes—Add the following after the title of paragraphs c, d, and e;
"subject to the approval of the engineer of record,"
6. Combined Tension and Shear in Slip-critical Joints—Delete the last sentence in Section 6 and substitute the following:
"Allowable stresses for A combination of loads for A325 and A490 bolts shall be used in slip-critical connections. The applicable provisions of the Building Code for wind load shall apply."
CHAPTER K SPECIAL DESIGN CONSIDERATION
K2. PONDING—Add the following paragraph:
In roof systems where secondary members are made up of materials other than steel, the depth of beams and girders supporting flat roofs shall not be less than fb 600 times their span length whether designed as simple or continuous spans."
K4. FATIGUE—The provisions of this section shall not apply to the design of overhead beams for elevators and hoisting apparatus nor to their immediate supporting framing.
CHAPTER L SERVICEABILITY DESIGN CONSIDERATIONS
L2. EXPANSION AND CONTRACTION—Delete this text and substitute the following:
"The provisions of the building code for loads due to thermal forces shall apply."
L6. MINIMUM THICKNESS OF METAL—Add this additional section following Section L5 CORROSION:
"L6. MINIMUM THICKNESS OF METAL
All exterior members of structural steel, except roofing and siding, that are exposed to the weather shall have a protective coating as required by the provisions of Section M3,1. and shall have a minimum thickness of metal of 0.23 in.
Exception: The minimum thickness of metal may conform to the requirements for stress under the following conditions:
1. Exterior members exposed to the weather—An approved type of atmospheric corrosion resistant steel is used or exposed surfaces are zinc coated with a minimum weight of coating of approximately 0.6 ounces per square foot of exposed surface and covered with a protective coating as required by section M3 or exposed surfaces are protected by other means.
2. Members not exposed to the weather—All members, except that members located where they would be subject to accidental impact, shall be stiffened to resist such impact.
3. Roofing and siding—All members, provided that surfaces which are exposed to the weather shall have a protective coating.
4. Temporary construction that will be in place for a period of one year or less, provided that all surfaces which are exposed to the weather shall have a protective coating.
5. Joists or purlins that are exposed to the weather but which do not support more than 200 sq. ft. of floor or roof area, and which have a protective coating as required by section M3,1.
CHAPTER M FABRICATION, ERECTION AND QUALITY CONTROL
M1. SHOP DRAWINGS—Add the following paragraph to Section M1.
"The shop drawings shall include the location of oversized, short-slotted or long-slotted holes."
M3. SHOP PAINTING
1. GENERAL REQUIREMENTS—Delete this section and substitute the following:
"1. PAINTING OF STRUCTURAL STEEL
(a) All structural steel, except as provided in subsection (b) of this section, shall receive one coat of paint, zinc, or bituminous coating, or equivalent metal protection before erection. The protection shall be applied thoroughly and evenly to dry surfaces which have been cleaned of loose mill scale, loose rust, weld slag flux deposit, dirt, and other foreign matter. Oil and grease deposits shall be removed. Surfaces inaccessible after assembly shall be treated as required above prior to assembly.
(b) Surfaces of structural steel shall not be required to receive metal protection when the structural steel is used under the conditions listed in paragraph (1) through (7) below. However, these surfaces shall be cleaned of oil and grease by solvent cleaners and be cleaned of dirt and other foreign material by thorough brushing with a fiber brush.
(1) Structural steel that is encased in concrete (other than cinder concrete) or surfaces that abut concrete (other than cinder concrete) at interior locations.
(2) Structural steel encased in non-corrosive fire resistive materials that are bonded or secured to the steel surfaces by approved means.
(3) Surfaces of structural steel that are to be riveted, bolted or welded together.
(4) Surfaces of structural steel within 2 in. of field welds shall be free of protective coatings that would prevent proper welding or produce objectionable fumes while welding is being done.
(5) Surfaces of structural steel that have been machine finished.
(6) Surfaces of types of structural steel that have been specifically approved for use without metal protection.
(7) Structural steel members that are completely concealed by interior finish such as lath and plaster, masonry, etc., need not be painted except that where such members are subject to condensation from piping, are in shower or steam rooms, are exposed to chemical fumes or are exposed to other conditions of potentially aggressive corrosion.
(c) Parts of structural members left unpainted because of welding, bolting or riveting operations are not exempted from painting by the provisions of subsection (b) above shall receive a field application of metal protection as prescribed in subsection (a) above.
(d) Structural steel that will remain exposed to the weather or to a corrosive atmosphere shall receive an additional coat of metal protection of another color after erection, except for types of structural steels that have been specifically intended for use under exposure to the weather without protection.
(e) All abrasions to, or deteriorations of, the protective coating shall be "spot painted."
M4. ERECTION
6. Delete in its entirety.
7. FIELD CONNECTIONS—Add the following paragraph to Section 7:
"Field connections shall meet the requirements for corresponding types of shop connections described in section M2. No holes, copes or cuts of any type shall be made to facilitate erection unless specifically shown on the shop drawings or authorized in writing by the engineers or architect of record."
Add the following new Section 8:
"8. HANDLING AND STORING MATERIALS
"All steel members shall be shipped and handled in a manner that will not cause injury to protective coatings or permanent deformations of the members. Steel members shall not be dropped, thrown, or dragged. Any bends, crimps or other evidence of permanent deformations shall be straightened by methods approved by the engineer or architect of record or the piece shall be rejected. Materials shall be stored out of contact with the ground, kept clean, and in general protected against damage and corrosion.
M5. QUALITY CONTROL—Add the following paragraph before paragraph one:
"The requirements of the building code for quality control shall apply."
Add this section following Section M5.5 IDENTIFICATION OF STEEL
"6. INSPECTION OF CONNECTIONS
All connections, both field and shop, shall be subject to Controlled Inspection pursuant to the requirements of Section 27-132, Section 27-585 and Table 10-2 of Section 27-586 of the Administrative Building Code."